Loading...
19-100188 (2)a PBS October 17, 2018 Ray Vefik Federal Way Public Schools Capital Projects 1211 S 232"d St Federal Way, WA 98004 Email: rvefik@fwps.org fwpscpl8@fwps.org RE: Mirror Lake Elementary School — Arsenic and Lead Soil Sampling 625 S 314th Street, Federal Way, Washington PBS Project #41519.002 Federal Way Public Schools (FWPS) has contracted PBS Engineering and Environmental Inc. (PBS) to evaluate the potential for arsenic and lead contaminants in near surface soils at the site of Mirror Lake Elementary School (MLES) prior to site redevelopment as part of the Mirror Lake Elementary School Replacement Project. On October 1, 2018 PBS performed soil sampling activities to determine the levels of arsenic and lead in shallow soil at MILES in Federal Way, Washington (Figure 1). This report presents the findings of the sampling activities and provides recommendations for regulatory compliance as well as for the handling and management of impacted soils during future redevelopment. The scope of services was presented in the Proposal for Arsenic and Lead Soil Testing (WA28797) by PBS, dated August 2, 2018. BACKGROUND MLES is located within the widespread soil contamination plume of the former Asarco smelter operation. The Asarco Company operated a copper smelter in Tacoma from 1890 to 1985. Smelter operations emitted an airborne plume of particulates with arsenic, lead, and other heavy metals that were distributed over a wide region of the Puget Sound. As a result, these metals have been found in near surface soils at concentrations which may pose a threat to human health and/or the environment. The Washington State Department of Ecology (Ecology) recommends soil sampling at properties in areas with estimated arsenic levels above the state cleanup level of 20 ppm1. Ecology's "Everett and Tacoma Smelter Search" web page https://fortress.wa.gov/ecy/smeltersearch/ maps the MLES site within a zone of potential arsenic concentrations ranging from 20 milligram per kilogram (mg/kg) to 40 mg/kg. Thus, the 20mg/kg to 40 mg/kg range can be considered the "baseline" for arsenic concentrations in near surface soils expected on site. REGULATORY CRITERIA Ecology's Model Toxics Control Act (MTCA) has established cleanup levels for arsenic and lead for unrestricted land use that are protective of human health and the environmentz. Results of soil sampling will be compared to the applicable MTCA standards. 1 'Tacoma Smelter Plume Model Remedies Guidance: Sampling and cleanup of arsenic and lead contaminated soils", Washington State Department of Ecology, June 2012, Publication No. 12-09-086-A z "Model Toxics Control Act Regulation and Statute", Washington State Department of Ecology, 2013 Revision, Publication No. 94-06 2517 EASTLAKE AVENUE EAST, SUITE 100, SEATTLE, WA 98102 • 206.233.9639 MAIN • 866,727.0140 FAX • PBSUSA.COM Federal Way Public Schools Mirror Lake Elementary School Arsenic and Lead Sampling Report October 17, 2018 Page 2 Ecology's MTCA Method A cleanup levels (CULs) for unrestricted land use for arsenic and lead are the applicable regulatory criteria for this project. The CUL for arsenic is 20 milligrams per kilogram (mg/kg) The CUL for lead is 250 mg/kg. For reference, Ecology conducted a study to determine natural background concentrations of metals in soil for the Puget Sound area3. The study found that the natural background concentration for arsenic in soil is 7.0 parts per million (ppm) and 24 ppm for lead. Parts per million is roughly equivalent to mg/kg. CHARACTERIZATION SOIL SAMPLING On October 1, 2018, sixty (60) discrete soil samples were collected from forty-eight (48) locations around the building landscaping and playfields of MLES. Following Ecology guidance, the property was divided into three decision units (DUs) based on current use as playfield or landscape area. Decision units and sample locations are shown on Figure 2. A summary of the decision units is provided below. The number of samples screened and collected for analysis per DU for this project is based on the Ecology guidance. Decision Units Decision Unit ID Soil disturbance planned? Number of samples collected (0-6") Number of samples collected (6-12") Acres (approximate) Total Number of Samples 1 unknown 24 6 3 4.3 30 16 2 unknown 13 2.5 3 unknown 11 3 2.0 14 0-6" = Soil samples were collected from the 0-6 inch depth interval 6-12" = Soil samples were collected from the 6-12 inch depth interval One (1) discrete sample was collected at each sample location from a depth interval of zero to six inches below ground surface (bgs). A second discrete sample was collected at every fourth location from a depth interval of six to twelve inches bgs. Sample locations were chosen in a manner that maximized coverage of the decision units and did not contain areas with surface cover or buildings during the sampling activities. Soil sample collection started just below any surface cover layer (e.g., sod or grass). A hand spade and a hand auger were used to complete 6-inch deep test holes. A soil sample was collected at a depth of less than 6 inches below ground surface at each location. At every fourth location, upon collection of the zero to six-inch sample, the hole was advanced to a depth of twelve inches, and a second sample was collected from the six to twelve -inch depth interval using the same methods described above. 3 "Natural Background Soil Metals Concentrations in Washington State", Washington State Department of Ecology, October 1994, Publication No. 94-115 41519.002 Federal Way Public Schools Mirror Lake Elementary School Arsenic and Lead Sampling Report October 17, 2018 Page 3 PBS personnel wore disposable nitrile gloves to protect against cross -contamination between samples. Soil retained for analysis was packed into laboratory -provided containers, labeled and transported on ice under chain of custody documentation to Friedman and Bruya, Inc. in Seattle, an Ecology accredited analytical laboratory. Samples were analyzed for total arsenic and lead using EPA Method 6020. Total arsenic and lead results were reported on a dry weight basis. ANALYTIC RESULTS Analytical results from soil samples collected on site are below MTCA Method A CULs for arsenic, except for two (2) samples from two different locations. Arsenic was detected in exceedance of the CUL in samples ML-2-09 and ML-3-04 within DU2 and DU3 at concentrations of 33.1 mg/kg and 21.6 mg/kg, respectively. All other sample results for arsenic were below the MTCA Method A cleanup level of 20 mg/kg. All analytical results for lead from soil samples collected on -site are below the MTCA Method A cleanup level of 250 mg/kg. Based on the analytical results of soil samples collected on -site, average arsenic and lead concentrations were calculated for each decision unit and are presented below. Average Concentrations per Decision Unit Decision Unit ID Mean Concentration (0-6") Mean Concentration (6-12") As Pb As Pb 1 4.3 10.6 6.9 13.4 2 8.4 13.7 4.3 10.5 3 7.5 19.7 5.7 13.2 MTCA A Cleanup Level 20 250 20 250 (0-6") (Pb / As) = Average Concentration at the zero to six-inch interval for arsenic (As) and lead (Pb) in mg/kg (6-12") (Pb / As) = Average Concentration at the six to twelve -inch interval for arsenic (As) and lead (Pb) in mg/kg Analytical results from soil samples collected on -site are summarized in Table 1. Figure 2 depicts the decision unit boundaries and the locations where analytical results indicated lead or arsenic concentrations above MTCA Method A CULs. Laboratory reports are provided in Attachment A. 41519.002 Federal Way Public Schools Mirror Lake Elementary School Arsenic and Lead Sampling Report October 17, 2018 Page 4 CONCLUSIONS Based on the analytical results of the soil sampling, and using Ecology's Tacoma Smelter Plume Model Remedy Guidance, June 20721, the following conclusion and recommendations were made regarding the handling and management of project site soils. Decision Unit 1 Analytical results from discrete soil samples collected within decision unit 1 of the MLES site indicate arsenic and lead concentrations in soils are within the known local baseline for arsenic and lead contamination, and below MTCA Method A CULs for unrestricted land use. No further regulatory action or evaluation is required for the soil within decision unit 1. Should soil from these areas be scheduled for removal and exported from the site, additional testing may be required for the purposes of off -site use or disposal by the accepting user or facility. Decision Units 2 and 3 Analytical results from discrete soil samples collected within decision units 2 and 3 of the MLES site identified two (2) locations (ML-2-09 and ML-3-04) where arsenic concentrations are above MTCA Method A CULs. Further action will be required to address the arsenic concentrations in soil and achieve compliance with MTCA regulations. According to Ecology's Model Remedies Guidance, the impacted soil can be managed in -place or removed by excavation. Strategies for management of impacted soil in -place include dilution of arsenic concentrations via mixing of impacted soil with clean imported soil or capping of soil in place with clean soil and a geotextile or a hard cap. Mixing of soils is accepted for arsenic -impacted soil with an average concentration less than 40 ppm. The mixing option requires testing to confirm levels meet the MTCA criteria. Ecology does not consider capping in -place a permanent remediation strategy given the potential for exposure if the cap is removed. Capping in -place may require annual inspection of the cap's integrity, as well as the filing of an environmental land covenant for the property. Given the intended land use, PBS recommends removal of the impacted soil from the site. Remediation of impacted soils can be conducted by the contractor as part of the Mirror Lake Elementary School Replacement Project under PBS's supervision, but must be completed prior to any grading, excavation or earthwork activities that disturb on -site soil. The construction design and specifications for remediation of the arsenic -impacted soil as part of the Mirror Lake Elementary School Replacement Project shall incorporate health and safety requirements, methods for soil removal, disposal and confirmation sampling and soil management strategies. 41519.002 Federal Way Public Schools Mirror Lake Elementary School Arsenic and Lead Sampling Report October 17, 2018 Page 5 LIMITATIONS This investigation was conducted to characterize lead and arsenic distributions in shallow soils on -site, with a focus on protection of human health and the environment. The data collected in this investigation are not intended for the purposes waste profiling for offsite disposal, or for estimation of volume or tonnage of soil requiring disposal. PBS has prepared this report for use by FWPS. This report is not intended for use by others without the written consent of the FWPS. Our interpretation of soil conditions in this study was based on field observations and analytical data from the indicated explorations. Regulated substances may exist in portions of the site that were not explored or analyzed. The conclusions in this report are not to be considered a legal opinion as the client's duty concerning due diligence relating to potential liabilities in leasing, owning, or purchasing real estate. PBS ENGINEERING AND ENVIRONMENTAL INC. Digitally signed by James Welles Date: 2018.10.17 16,09:08 -07'00' James Welles, LG Project Geologist Reviewed By: Digitally signed by Thomas Mergy Date:2018.10.17 16:14:13-07'00' Thomas Mergy, LHG Environmental Services Manager Attachments: Figure 1: Vicinity Map Figure 2: Sample Location Map Table 1: Laboratory Data Summary Table Attachment A: Laboratory Data 41519.002 SEATTLE FEDERAL WAY OLYMPIA -SITE VANCOUVER WASHINGTON SOURCE: USGS POVERTY BAY, WA QUADRANGLE 1990, PHOTO REVISED 1994 SCALE 1" = 2000' 0' 1,000' 2,000' 4,000' PREPARED FOR: FEDERAL WAY PUBLIC SCHOOLS PBS VICINITY MAP MIRROR LAKE ELEMENTARY SCHOOL 625 SOUTH 31TH STREET FEDERAL WAY4WASH NGTON °519002 FIGURE 1 Id S314THST SUBJECT PROPERTY ML-2-01 0 ML-1-01 0 ML-1-02 0 ML-1-03 /0 ML 0 ML-1-04 MIL-3-011SP 0 M trl -05.. 0 ML-1-06 ML-3-03 0 ML-1 -07 0 ML- 1 -08 k DECISION UNIT 3 0 ML-1-10 DECISION UNIT 1 MIRROR LAKE, ML-346 0 -ELEMENTARY SCHOOL- 0 ML-1-13 % ML-1-14' 0 ML-3-07 DECISION UNIT 2 ry N 0 0 ML -09 0 ML-1-16 0 ML-1-17 0 -197 L-2-104 ML-3-08 eL2 Z�05 0 L_ 4 L-.2-06 ML- 8 0 ML-1720 2 0 ML-1-19 I OML-3-lu ML-2-11 M 0 ML-1-,22 0 ML -2-100 ML-2-12 0 MLt, SOURCE: @ 2018 GOOGLE EARTH PRO LEGEND * ML-1-01 SOIL SAMPLE LOCATION, DECISION UNIT AND IDENTIFICATION (0-6") * ML-1-04 SOIL SAMPLE LOCATION, DECISION UNIT AND IDENTIFICATION (0-6", 6-12") SCALE 1 125' 0. 62'-6" 125' 250' PREPARED FOR: FEDERAL WAY PUBLIC SCHOOLS OCT 2018 As / Pb SOIL SAMPLE LOCATION MAP 41519.002 P MIRROR LAKE ELEMENTARY SCHOOL FIGURE B S 625 SOUTH 314TH STREET FEDERAL WAY, WASHINGTON 2 Tables Site: Address: PBS Project No. Table 1 - Soil Sample Analytical Results Mirror Lake Elementary School 625 S 314th Street, Federal Way, WA 41519.002 Location / Sample Identification Sample Depth (inches bgs) Metals Arsenic m /k Lead (m /k Regulatory Criteria MTCA Method A Cleanup Level 20 250 Decision Unit 1 (-4.3 acres) M L-1-01 0-6 4.92 13.5 ML-1-02 0-6 4.41 11.6 M L-1-03 0-6 3.53 11.1 M L-1-04a 0-6 5.61 13.5 ML-1-05 0-6 4.49 11.5 M L-1-06 0-6 4.4 11.3 M L-1-07a 0-6 5.02 12.4 M L-1-08 0-6 5.4 30.9 M L-1-09 0-6 4 13.6 M L-1-10 0-6 5.4 10.8 M L-1-11 0-6 4.08 13.7 ML-1-12a 0-6 5.18 9.76 M L-1-13 0-6 6.3 14.9 M L-1-14 0-6 2 2.27 M L-1-15 0-6 2.27 2.67 ML-1-16a 0-6 7.87 15.2 M L-1-17 0-6 2.21 2.89 ML-1-18 0-6 2.04 2.11 M L-1-19 0-6 9.37 28.6 ML-1-20 0-6 2.62 4.4 M L-1-21 a 0-6 4.16 6.93 M L-1-22a 0-6 1.8 2.02 M L-1-23 0-6 3.23 5.48 M L-1-24 0-6 2.15 2.78 Average 4.3 10.6 ML-1-04b 6-12 7.17 15.9 M L-1-07b 6-12 9.28 21.6 ML-1-12b 6-12 6.34 10.5 ML-1-16b 6-12 8.74 17.3 M L-1-21 b 6-12 4.64 7.46 ML-1-22b 6-12 5.37 7.48 Average 6.9 13.4 Site: Address: PBS Project No. Table 1 - Soil Sample Analytical Results Mirror Lake Elementary School 625 S 314th Street, Federal Way, WA 41519.002 Location / Sample Identification Sample Depth (inches bgs) Metals Arsenic Lead m /k m /k Regulatory Criteria MTCA Method A Cleanup Level 20 250 Decision Unit 2 (-2.5 acres) M L-2-01 0-6 8.8 12.9 ML-2-02 0-6 5.03 8.04 M L-2-03a 0-6 4.59 10.3 ML-2-04 0-6 4.32 6.7 M L-2-05 0-6 4.57 5.8 M L-2-06a 0-6 4.76 9.3 M L-2-07 0-6 5.51 11.5 M L-2-08 0-6 6.79 16 ML-2-09 0-6 33.1 9.09 ML-2-10 0-6 9.74 30.3 M L-2-11 a 0-6 6.52 16.1 ML-2-12 0-6 7.71 17.5 M L-2-13 0-6 7.93 24.2 Average 8A 13.7 ML-2-03b 6-12 3.8 9.25 M L-2-06 b 6-12 4.78 13.1 M L-2-11 b 6-12 4.45 9.19 Average 4.3 10.5 Decision Unit 3 (-2.0 acres) M L-3-01 a 0-6 5.84 17.7 ML-3-02 0-6 11.2 31.5 M L-3-03 0-6 2.5 6.19 M L-3-04 0-6 21.6 49.4 M L-3-05a 0-6 4.37 12.4 M L-3-06 0-6 4.63 13.9 ML-3-07 0-6 6.66 16.7 M L-3-08 0-6 3.21 15.1 M L-3-09a 0-6 3.71 8.62 ML-3-10 0-6 7.35 21.1 ML-3-11 0-6 11.1 24.0 Average 7.5 19.7 ML-3-01 b 6-12 6.34 13.5 ML-3-05b 6-12 4.74 12.7 ML-3-09b 6-12 5.93 13.3 Average 5.7 13.2 Arsenic and lead analyzed by U5 EPA Method 6026 mg/kg - milligrams per kilogram bold = concentration exceeds adopted criteria bgs = below ground surface Attachment A Laboratory Report and Chain of Custody Documentation FRIEDMAN & BRUYA, INC. ENVIRONMENTAL CHEMISTS James E. Bruya, Ph.D. Yelena Aravkina, M.S. Michael Erdahl, B.S. Arina Podnozova, B.S. Eric Young, B.S. October 8, 2018 James Welles, Project Manager PBS Engineering and Environmental, Inc. 2517 Eastlake Ave E, Suite 100 Seattle, WA 98102 Dear Mr Welles: 3012 16th Avenue West Seattle, WA 98119-2029 (206) 285-8282 fbi@isomedia.com www.friedmanandbruya.com Included are the results from the testing of material submitted on October 1, 2018 from the Mirror Lake As/Pb Inv. 41519.002.0004, F&BI 810016 project. There are 36 pages included in this report. Any samples that may remain are currently scheduled for disposal in 30 days. If you would like us to return your samples or arrange for long term storage at our offices, please contact us as soon as possible. We appreciate this opportunity to be of service to you and hope you will call if you should have any questions. Sincerely, FRIEDMAN & BRUYA, INC. Michael Erdahl Project Manager Enclosures PBS 1008R.DOC FRIEDMAN & BRUYA, INC. ENVIRONMENTAL CHEMISTS CASE NARRATIVE This case narrative encompasses samples received on October 1, 2018 by Friedman & Bruya, Inc. from the PBS Engineering and Environmental Mirror Lake As/Pb Inv. 41519.002.0004, F&BI 810016 project. Samples were logged in under the laboratory ID's listed below. Laboratory ID PBS Engineering and Environmental 810016 -01 ML-1-01 810016 -02 ML-1-02 810016 -03 ML-1-03 810016 -04 ML-1-04a 810016 -05 ML-1-04b 810016 -06 ML-1-05 810016 -07 ML-1-06 810016 -08 ML-1-07a 810016 -09 ML-1-07b 810016 -10 ML-1-08 810016 -11 ML-1-09 810016 -12 ML-1-10 810016 -13 ML-1-11 810016 -14 ML-1-12a 810016 -15 ML-1-12b 810016 -16 ML-1-13 810016 -17 ML-1-14 810016 -18 ML-1-15 810016 -19 ML-1-16a 810016 -20 ML-1-16b 810016 -21 ML-1-17 810016 -22 ML-1-18 810016 -23 ML-1-19 810016 -24 ML-1-20 810016 -25 ML-1-21a 810016 -26 ML-1-2lb 810016 -27 ML-1-22a 810016 -28 ML-1-22b 810016 -29 ML-1-23 810016 -30 ML-1-24 All quality control requirements were acceptable. 1 FRIEDMAN & BRUYA, INC. ENVIRONMENTAL CHEMISTS Analysis For Total Metals By EPA Method 6020B Client ID: ML-1-01 Client: PBS Engineering and Environmental Date Received: 10/01/18 Project: Mirror Lake As/Pb Inv. 41519.002.0004 Date Extracted: 10/02/18 Lab ID: 810016-01 Date Analyzed: 10/02/18 Data File: 810016-01.127 Matrix: Soil Instrument: ICPMS2 Units: mg/kg (ppm) Dry Weight Operator: SP Concentration Analyte: mg/kg (ppm) Arsenic 4.92 Lead 13.5 FRIEDMAN & BRUYA, INC. ENVIRONMENTAL CHEMISTS Analysis For Total Metals By EPA Method 6020B Client ID; ML-1-02 Client: PBS Engineering and Environmental Date Received: 10/01/18 Project: Mirror Lake As/Pb Inv. 41519.002.0004 Date Extracted: 10/02/18 Lab ID: 810016-02 Date Analyzed: 10/02/18 Data File: 810016-02.179 Matrix: Soil Instrument: ICPMS2 Units: mg/kg (ppm) Dry Weight Operator: SP Concentration Analyte: mg/kg (ppm) Arsenic 4.41 Lead 11.6 3 FRIEDMAN & BRUYA, INC. ENVIRONMENTAL CHEMISTS Analysis For Total Metals By EPA Method 6020B Client ID: ML-1-03 Client: PBS Engineering and Environmental Date Received: 10/01/18 Project: Mirror Lake As/Pb Inv. 41519.002.0004 Date Extracted: 10/02/18 Lab ID: 810016-03 Date Analyzed: 10102/18 Data File: 810016-03.180 Matrix: Soil Instrument: ICPMS2 Units: mg/kg (ppm) Dry Weight Operator: SP Concentration Analyte: mg/kg (ppm) Arsenic 3.53 Lead 11.1 4 FRIEDMAN & BRUYA, INC. ENVIRONMENTAL CHEMISTS Analysis For Total Metals By EPA Method 6020B Client ID: ML-1-04a Client: PBS Engineering and Environmental Date Received: 10/01/18 Project: Mirror Lake As/Pb Inv. 41519.002.0004 Date Extracted: 10/02/18 Lab ID: 810016-04 Date Analyzed: 10/02/18 Data File: 810016-04.181 Matrix: Soil Instrument: ICPMS2 Units: mg/kg (ppm) Dry Weight Operator: SP Concentration Analyte: mg/kg (ppm) Arsenic 5.61 Lead 13.5 5 FRIEDMAN & BRUYA, INC. ENVIRONMENTAL CHEMISTS Analysis For Total Metals By EPA Method 6020B Client ID: ML-1-04b Client: PBS Engineering and Environmental Date Received: 10/01/18 ) Project: Mirror Lake As/Pb Inv. 41519.002.0004 Date Extracted: 10/02/18 Lab ID: 810016-05 Date Analyzed: 10/02/18 Data File. 810016-05.182 Matrix: Soil Instrument: ICPMS2 Units: mg/kg (ppm) Dry Weight Operator: SP Concentration Analyte: mg/kg (ppm) Arsenic 7.17 Lead 15.9 IT FRIEDMAN & BRUYA, INC. ENVIRONMENTAL CHEMISTS Analysis For Total Metals By EPA Method 6020B Client ID: ML-1-05 Client: PBS Engineering and Environmental Date Received: 10/01/18 Project: Mirror Lake As/Pb Inv. 41519.002.0004 Date Extracted: 10/02/18 Lab ID: 810016-06 Date Analyzed: 10/02/18 Data File: 810016-06.185 Matrix: Soil Instrument: ICPMS2 Units: mg/kg (ppm) Dry Weight Operator: SP Concentration Analyte: mg/kg (ppm) Arsenic 4.49 Lead 11.5 7 FRIEDMAN & BRUYA, INC. ENVIRONMENTAL CHEMISTS Analysis For Total Metals By EPA Method 6020B Client ID: ML-1-06 Client: PBS Engineering and Environmental Date Received: 10/01/18 Project: Mirror Lake As/Pb Inv. 41519.002.0004 Date Extracted: 10/02/18 Lab ID: 810016-07 Date Analyzed: 10/02/18 Data File: 810016-07.186 Matrix: Soil Instrument: ICPMS2 Units: mg/kg (ppm) Dry Weight Operator: SP Concentration Analyte: mg/kg (ppm) Arsenic 4.36 Lead 11.3 FRIEDMAN & BRUYA, INC. ENVIRONMENTAL CHEMISTS Analysis For Total Metals By EPA Method 6020B Client ID: ML-1-07a Client: PBS Engineering and Environmental Date Received: 10/01/18 Project: Mirror Lake As/Pb Inv. 41519.002.0004 Date Extracted: 10/02/18 Lab ID: 810016-08 Date Analyzed: 10/02/18 Data File: 810016-08.187 Matrix: Soil Instrument: ICPMS2 Units: mg/kg (ppm) Dry Weight Operator: SP Concentration Analyte: mg/kg (ppm) Arsenic 5.02 Lead 12.4 WE FRIEDMAN & BRUYA, INC. ENVIRONMENTAL CHEMISTS Analysis For Total Metals By EPA Method 6020B Client ID: ML-1-07b Client: PBS Engineering and Environmental Date Received: 10/01/18 Project: Mirror Lake As/Pb Inv. 41519.002.0004 Date Extracted: 10/02/18 Lab II]: 810016-09 Date Analyzed: 10/02/18 Data File: 810016-09.188 Matrix: Soil Instrument: ICPMS2 Units: mg/kg (ppm) Dry Weight Operator: SP Concentration Analyte: mg/kg (ppm) Arsenic 9.28 Lead 21.6 10 FRIEDMAN & BRUYA, INC. ENVIRONMENTAL CHEMISTS Analysis For Total Metals By EPA Method 6020B Client ID: ML-1-08 Client: Date Received: 10/01/18 Project: Date Extracted: 10/02/18 Lab ID: Date Analyzed: 10/02/18 Data File: Matrix: Soil Instrument: Units: mg/kg (ppm) Dry Weight Operator: Concentration Analyte: mg/kg (ppm) Arsenic 5.40 Lead 30.9 11 PBS Engineering and Environmental Mirror Lake As/Pb Inv. 41519.002.0004 810016-10 810016-10.189 ICPMS2 SP FRIEDMAN & BRUYA, INC. ENVIRONMENTAL CHEMISTS Analysis For Total Metals By EPA Method 6020B Client ID: ML-1-09 Client: PBS Engineering and Environmental Date Received: 10/01/18 Project: Mirror Lake As/Pb Inv. 41519.002.0004 Date Extracted: 10/02/18 Lab ID: 810016-11 Date Analyzed: 10/02/18 Data File: 810016-11.190 Matrix: Soil Instrument: ICPMS2 Units: mg/kg (ppm) Dry Weight Operator: SP Concentration Analyte: mg/kg (ppm) Arsenic 4.27 Lead 13.6 12 FRIEDMAN & BRUYA, INC. ENVIRONMENTAL CHEMISTS Analysis For Total Metals By EPA Method 6020B Client ID: ML-1-10 Client: PBS Engineering and Environmental Date Received: 10/01/18 Project: Mirror Lake As/Pb Inv. 41519.002.0004 Date Extracted: 10/02/18 Lab ID: 810016-12 Date Analyzed: 10/02/18 Data File: 810016-12.191 Matrix: Soil Instrument: ICPMS2 Units: mg/kg (ppm) Dry Weight Operator: SP Concentration Analyte: mg/kg (ppm) Arsenic 5.44 Lead 10.8 13 FRIEDMAN & BRUYA, INC. ENVIRONMENTAL CHEMISTS Analysis For Total Metals By EPA Method 6020B Client ID: ML-1-11 Client: PBS Engineering and Environmental Date Received: 10/01/18 Project: Mirror Lake As/Pb Inv. 41519.002.0004 Date Extracted: 10/02/18 Lab ID: 810016-13 Date Analyzed: 10/02/18 Data File: 810016-13.192 Matrix: Soil Instrument: ICPMS2 Units: mg/kg (ppm) Dry Weight Operator: SP Concentration Analyte: mg/kg (ppm) Arsenic 4.08 Lead 13.7 14 FRIEDMAN & BRUYA, INC. ENVIRONMENTAL CHEMISTS Analysis For Total Metals By EPA Method 6020B Client ID: ML-1-12a Client: PBS Engineering and Environmental Date Received: 10/01/18 Project: Mirror Lake As/Pb Inv. 41519.002.0004 Date Extracted: 10/02/18 Lab ID: 810016-14 Date Analyzed: 10/02/18 Data File: 810016-14.193 Matrix: Soil Instrument: ICPMS2 Units: mg/kg (ppm) Dry Weight Operator: SP Concentration Analyte: mg/kg (ppm) Arsenic 5.18 Lead 9.76 15 FRIEDMAN & BRUYA, INC. ENVIRONMENTAL CHEMISTS Analysis For Total Metals By EPA Method 6020B Client ID: ML-1-12b Client: PBS Engineering and Environmental Date Received: 10/01/18 Project: Mirror Lake As/Pb Inv. 41519.002.0004 Date Extracted: 10/02/18 Lab ID: 810016-15 Date Analyzed: 10/02/18 Data File: 810016-15.194 Matrix: Soil Instrument: ICPMS2 Units: mg/kg (ppm) Dry Weight Operator: SP Concentration Analyte: mg/kg (ppm) Arsenic 6.34 Lead 10.5 16 FRIEDMAN & BRUYA, INC. ENVIRONMENTAL CHEMISTS Analysis For Total Metals By EPA Method 6020B Client ID: ML-1-13 Client: Date Received: 10/01/18 Project: Date Extracted: 10/02/18 Lab ID - Date Analyzed: 10/02/18 Data File: Matrix: Soil Instrument: Units: mg/kg (ppm) Dry Weight Operator: Concentration Analyte: mg/kg (ppm) Arsenic 6.30 Lead 14.9 17 PBS Engineering and Environmental Mirror Lake As/Pb Inv. 41519,002.0004 810016-16 810016-16.197 ICPMS2 SP FRIEDMAN & BRUYA, INC. ENVIRONMENTAL CHEMISTS Analysis For Total Metals By EPA Method 6020B Client ID: ML-1-14 Client: PBS Engineering and Environmental Date Received: 10/01/18 Project: Mirror Lake As/Pb Inv. 41519.002.0004 Date Extracted: 10/02/18 Lab ID: 810016-17 Date Analyzed: 10/02/18 Data File: 810016-17.198 Matrix: Soil Instrument: ICPMS2 Units: mg/kg (ppm) Dry Weight Operator: SP Concentration Analyte: mg/kg (ppm) Arsenic 2.00 Lead 2.27 FRIEDMAN & BRUYA, INC. ENVIRONMENTAL CHEMISTS Analysis For Total Metals By EPA Method 6020B Client ID: MI-1-15 Client: PBS Engineering and Environmental Date Received: 10/01/18 Project: Mirror Lake As/Pb Inv. 41519.002.0004 Date Extracted: 10/02/18 Lab ID: 810016-18 Date Analyzed: 10/02/18 Data File: 810016-18.199 Matrix: Soil Instrument: ICPMS2 Units: mg/kg (ppm) Dry Weight Operator: SP Concentration Analyte: mg/kg (ppm) Arsenic 2.27 Lead 2.67 we, FRIEDMAN & BRUYA, INC. ENVIRONMENTAL CHEMISTS Analysis For Total Metals By EPA Method 6020B Client ID: ML-1-16a Client: PBS Engineering and Environmental Date Received: 10/01/18 Project: Mirror Lake As/Pb Inv. 41519.002.0004 Date Extracted: 10/02/18 Lab ID: 810016-19 Date Analyzed: 10/02/18 Data File: 810016-19.200 Matrix: Soil Instrument: ICPMS2 Units: mg/kg (ppm) Dry Weight Operator: SP Concentration Analyte: mg/kg (ppm) Arsenic 7.87 Lead 15.2 20 FRIEDMAN & BRUYA, INC. ENVIRONMENTAL CHEMISTS Analysis For Total Metals By EPA Method 6020B Cheat ID: ML-1-16b Client: PBS Engineering and Environmental Date Received: 10/01/18 Project: Mirror Lake As/Pb Inv. 41519.002.0004 Date Extracte d: 10/02/18 Lab ID: 810016-20 ' Date Analyzed: 10/02/18 Data File: 810016-20.201 Matrix: Soil Instrument: ICPMS2 Units: mg/kg (ppm) Dry Weight Operator: SP Concentration Analyte: mg/kg (ppm) Arsenic 8.74 Lead 17.3 21 FRIEDMAN & BRUYA, INC. ENVIRONMENTAL CHEMISTS Analysis For Total Metals By EPA Method 6020B Client ID: ML-1-17 Client: PBS Engineering and Environmental Date Received: 10/01/18 Project: Mirror Lake As/Pb Inv. 41519.002.0004 Date Extracted: 10/02/18 Lab ID: 810016-21 Date Analyzed: 10/02/18 Data File: 810016-21.132 Matrix: Soil Instrument: ICPMS2 Units: mg/kg (ppm) Dry Weight Operator: SP Concentration Analyte: mg/kg (ppm) Arsenic 2.21 Lead 2.89 22 FRIEDMAN & BRUYA, INC. ENVIRONMENTAL CHEMISTS Analysis For Total Metals By EPA Method 6020B Client ID: ML-1-18 Client: PBS Engineering and Environmental Date Received: 10/01/18 Project: Mirror Lake As/Pb Inv. 41519.002.0004 Date Extracted: 10/02/18 Lab ID: 810016-22 Date Analyzed: 10/02/18 Data File: 810016-22.203 Matrix: Soil Instrument: ICPMS2 Units: mg/kg (ppm) Dry Weight Operator: SP Concentration Analyte: mg/kg (ppm) Arsenic 2.04 Lead 2.11 23 FRIEDMAN & BRUYA, INC. ENVIRONMENTAL CHEMISTS Analysis For Total Metals By EPA Method 6020B Client ID: ML-1-19 Client: PBS Engineering and Environmental Date Received; 10/01/18 Project: Mirror Lake As/Pb Inv. 41519.002.0004 Date Extracted: 10/02/18 Lab ID: 810016-23 Date Analyzed: 10/02/18 Data File: 810016-23.204 Matrix: Soil Instrument: ICPMS2 Units: mg/kg (ppm) Dry Weight Operator: SP Concentration Analyte: mg/kg (ppm) Arsenic 9.37 Lead 28.6 24 FRIEDMAN & BRUYA, INC. ENVIRONMENTAL CHEMISTS . Analysis For Total Metals By EPA Method 6020B Client ID: ML-1-20 Client: PBS Engineering and Environmental Date Received: 10/01/18 Project: Mirror Lake As/Pb Inv. 41519.002.0004 Date Extracted: 10/02/18 Lab ID: 810016-24 Date Analyzed: 10/02/18 Data File: 810016-24.205 Matrix: Soil Instrument: ICPMS2 Units_ mg/kg (ppm) Dry Weight operator: SP Concentration Analyte: mg/kg (ppm) Arsenic 2.62 Lead 4.40 25 FRIEDMAN & BRUYA, INC. ENVIRONMENTAL CHEMISTS Analysis For Total Metals By EPA Method 6020B Client ID: ML-1-21a Client: PBS Engineering and Environmental Date Received: 10/01/18 Project: Mirror Lake As/Pb Inv. 41519.002.0004 Date Extracted: 10/02/18 Lab ID: 810016-25 - Date Analyzed: 10/02/18 Data File: 810016-25.206 Matrix: Soil Instrument: ICPMS2 Units: mg/kg (ppm) Dry Weight Operator: SP Concentration Analyte: mg/kg (ppm) Arsenic 4.16 Lead 6.93 26 FRIEDMAN & BRUYA, INC. ENVIRONMENTAL CHEMISTS Analysis For Total Metals By EPA Method 6020B Client ID: ML-1-21b Client: PBS Engineering and Environmental Date Received: 10/01/18 Project: Mirror Lake As/Pb Inv. 41519.002.0004 Date Extracted: 10/02/18 Lab ID: 810016-26 Date Analyzed: 10/02/18 Data File: 810016-26.209 Matrix: Soil Instrument: ICPMS2 Units: mg/kg (ppm) Dry Weight Operator: SP Concentration Analyte: mg/kg (ppm) Arsenic 4.64 Lead 7.46 27 FRIEDMAN & BRUYA, INC. ENVIRONMENTAL CHEMISTS Analysis For Total Metals By EPA Method 6020B Client 1D: Mt-1-22a Client: PBS Engineering and Environmental Date Received: 10/01/18 Project: Mirror Lake As/Pb Inv. 41519.002.0004 Date Extracted: 10/02/18 Lab ID: 810016-27 Date Analyzed: 10/02/18 Data File: 810016-27.210 Matrix: Soil Instrument: ICPMS2 Units: mg/kg (ppm) Dry Weight Operator: SP Concentration Analyte: mg/kg (ppm) Arsenic 1.80 Lead 2.02 RM FRIEDMAN & BRUYA, INC. ENVIRONMENTAL CHEMISTS Analysis For Total Metals By EPA Method 6020B Client ID: ML-1-22b Client: PBS Engineering and Environmental Date Received: 10/01/18 Project: Mirror Lake As/Pb Inv. 41519.002.0004 Date Extracted: 10/02/18 Lab ID: 810016-28 Date Analyzed: 10/02/18 Data File: 810016-28.211 Matrix: Soil Instrument: ICPMS2 Units: mg/kg (ppm) Dry Weight Operator: SP Concentration Analyte: mg/kg (ppm) Arsenic 5.37 Lead 7.48 29 FRIEDMAN & BRUYA, INC. ENVIRONMENTAL CHEMISTS Analysis For Total Metals By EPA Method 6020B Client ID: ML-1-23 Client: PBS Engineering and Environmental Date Received: 10/01/18 Project: Mirror Lake As/Pb Inv. 41519.002.0004 Date Extracted: 10/02/18 Lab ID: 810016-29 Date Analyzed: 10/02/18 Data File: 810016-29.212 Matrix: Soil Instrument: ICPMS2 Units: mg/kg (ppm) Dry Weight Operator: SP Concentration Analyte: mg/kg (ppm) Arsenic 3.23 Lead 5.48 30 FRIEDMAN & BRUYA, INC. ENVIRONMENTAL CHEMISTS Analysis For Total Metals By EPA Method 6020B Client ID: ML-1-24 Client: PBS Engineering and Environmental Date Received: 10/01/18 Project: Mirror Lake As/Pb Inv. 41519.002.0004 Date Extracted: 10/02/18 Lab II]: 810016-30 Date Analyzed: 10/02/18 Data File: 810016-30.213 Matrix: Soil Instrument: ICPMS2 Units: mg/kg (ppm) Dry Weight Operator: SP Concentration Analyte: mg/kg (ppm) Arsenic 2.15 Lead 2.78 31 FRIEDMAN & BRUYA, INC. ENVIRONMENTAL CHEMISTS Analysis For Total Metals By EPA Method 6020B Client ID: Method Blank Client: PBS Engineering and Environmental Date Received: Not Applicable Project: Mirror Lake As/Pb Inv. 41519.002.0004 Date Extracted: 10/02/18 Lab ID: I8-657 mb Date Analyzed: 10/02/18 Data File: I8-657 mb.125 Matrix: Soil Instrument: ICPMS2 Units: mg/kg (ppm) Dry Weight Operator: SP Concentration Analyte: mg/kg (ppm) Arsenic <1 Lead <1 32 FRIEDMAN & BRUYA, INC. ENVIRONMENTAL CHEMISTS Analysis For Total Metals By EPA Method 6020B Client ID: Method Blank Client: PBS Engineering and Environmental Date Received; Not Applicable Project: Mirror Lake As/Pb Inv. 41519.002.0004 Date Extracted. 10/02/18 Lab ID: I8-658 mb Date Analyzed: 10/02/18 Data File: I8-658 mb.130 Matrix: Soil Instrument: ICPMS2 Units: mg/kg (ppm) Dry Weight Operator: SP Concentration Analyte: mg/kg (ppm) Arsenic <1 Lead <1 33 FRIEDMAN & BRUYA, INC. ENVIRONMENTAL CHEMISTS Date of Report: 10/08/18 Date Received: 10/01/18 Project: Mirror Lake As/Pb Inv. 41519.002.0004, F&BI 810016 QUALITY ASSURANCE RESULTS FOR THE ANALYSIS OF SOIL SAMPLES FOR TOTAL METALS USING EPA METHOD 6020B Laboratory Code: 810016-01 (Matrix Spike) Sample Percent Percent Reporting Spike Result Recovery Recovery Acceptance RPD Analyte Units Level (Wet wt) MS MSD Criteria Limit 20 Arsenic mg/kg (ppm) 10 4.58 98 102 75-125 4 Lead mg/kg (ppm) 50 12.5 97 102 75-125 5 Laboratory Code: Laboratory Control Sample Percent Reporting Spike Recovery Acceptance Analyyte Units Level LCS Criteria Arsenic mg/kg (ppm) 10 100 80-120 Lead mg/kg (ppm) 50 103 80-120 34 FRIEDMAN & BRUYA, INC. ENVIRONMENTAL CHEMISTS Date of Report: 10/08/18 Date Received: 10/01/18 Project: Mirror Lake As/Pb Inv. 41519.002.0004, F&BI 810016 QUALITY ASSURANCE RESULTS FOR THE ANALYSIS OF SOIL SAMPLES FOR TOTAL METALS USING EPA METHOD 6020B Laboratory Code: 810016-21 (Matrix Spike) Sample Percent Percent Reporting Spike Result Recovery Recovery Acceptance RPD Anal e Units Level (Wet wt) MS MSD Criteria (Limit 20 Arsenic mg/kg (ppm) 10 2.08 98 98 75-125 0 Lead mg/kg (ppm) 50 2.71 97 95 75-125 2 Laboratory Code: Laboratory Control Sample Percent Reporting Spike Recovery Analyte Units Level LCS Arsenic mg/kg (ppm) 10 101 Lead mg/kg (ppm) 50 104 35 Acceptance Criteria 80-120 80-120 FRIEDMAN & BRUYA, INC. ENVIRONMENTAL CHEMISTS Data Qualifiers & Definitions a - The analyte was detected at a level less than five times the reporting limit. The RPD results may not provide reliable information on the variability of the analysis. b - The analyte was spiked at a level that was less than five times that present in the sample. Matrix spike recoveries may not be meaningful. ca - The calibration results for the analyte were outside of acceptance criteria. The value reported is an estimate. c - The presence of the analyte may be due to carryover from previous sample injections. cf - The sample was centrifuged prior to analysis. d - The sample was diluted. Detection limits were raised and surrogate recoveries may not be meaningful. dv - Insufficient sample volume was available to achieve normal reporting limits. f - The sample was laboratory filtered prior to analysis. fb - The analyte was detected in the method blank. fc - The compound is a common laboratory and field contaminant. hr - The sample and duplicate were reextracted and reanalyzed. RPD results were still outside of control limits. Variability is attributed to sample inhomogeneity. hs - Headspace was present in the container used for analysis. ht — The analysis was performed outside the method or client -specified holding time requirement. ip - Recovery fell outside of control limits. Compounds in the sample matrix interfered with the quantitation of the analyte. j - The analyte concentration is reported below the lowest calibration standard. The value reported is an estimate. J - The internal standard associated with the analyte is out of control limits. The reported concentration is an estimate. jl - The laboratory control sample(s) percent recovery and/or RPD were out of control limits. The reported concentration should be considered an estimate. - The surrogate associated with the analyte is out of control limits. The reported concentration should te The an estimate. lc - The presence of the analyte is likely due to laboratory contamination. L - The reported concentration was generated from a library search. nm - The analyte was not detected in one or more of the duplicate analyses. Therefore, calculation of the RPD is not applicable. pc - The sample was received with incorrect preservation or in a container not approved by the method. The value reported should be considered an estimate. ve - The analyte response exceeded the valid instrument calibration range. The value reported is an estimate. vo - The value reported fell outside the control limits established for this analyte. x - The sample chromatographic pattern does not resemble the fuel standard used for quantitation. 36 n o o ` o� �' a 1 it 1 10a o as � C6 4 � :� ""' ;; •: .�,.. ri 00 kv, foe G 'R d A a� 01 :: NONE slim, - " -. � o LI z z �N f d rn i rL fl Rp vu .�f ya •.. �o -- b i eta �0. ON � qp [Y m• ^�i _y ri ��rV � _ •-.. vj E' _ -r�. �r r •'�' ��Pppr S7. '� d z e a a p Q o rn a co �H i m � K � ro TPH-Diesel Cn TPH-Gasoline B'T'EX by 8021B VOCs by 8260 SVOCs by 8270 a z HFS _.. �6a i 10 y G �a t3 oaf N V4 . i 2 o W Hy r V `'� (7 � a f •� O im � x o :eV 5! �m 0 m C a " 4M * •� � m TA � ¢. � # QD • co N 0 9 `� tj* \ \ »� bƒt.�§J� 00 / / k % to ` � �� FRIEDMAN & BRUYA, INC. ENVIRONMENTAL CHEMISTS James E. Bruya, Ph.D. Yelena Aravkina, M.S. Michael Erdahl, B.S. Arina Podnozova, B.S. Eric Young, B.S. October 8, 2018 James Welles, Project Manager PBS Engineering and Environmental, Inc. 2517 Eastlake Ave E, Suite 100 Seattle, WA 98102 Dear Mr Welles: 3012 16th Avenue West Seattle, WA 98119-2029 (206) 285-8282 fbi@isomedia.com www.friedmanandbruya.com Included are the results from the testing of material submitted on October 1, 2018 from the Mirror Lake Pb/As Investigation 41519.002.0004, F&BI 810017 project. There are 20 pages included in this report. Any samples that may remain are currently scheduled for disposal in 30 days. If you would like us to return your samples or arrange for long term storage at our offices, please contact us as soon as possible. We appreciate this opportunity to be of service to you and hope you will call if you should have any questions. Sincerely, FRIEDMAN & BRUYA, INC. Michael Erdahl Project Manager Enclosures PBS 1008R.DOC FRIEDMAN & BRUYA, INC_ ENVIRONMENTAL CHEMISTS CASE NARRATIVE This case narrative encompasses samples received on October 1, 2018 by Friedman & Bruya, Inc. from the PBS Engineering and Environmental Mirror Lake Pb/As Investigation 41519.002.0004, F&BI 810017 project. Samples were logged in under the laboratory ID's listed below. Laboratory ID PBS Engineering and Environmental 810017 -01 ML-2-01 810017 -02 ML-2-02 810017 -03 ML-2-03A 810017 -04 ML-2-03B 810017 -05 ML-2-04 810017 -06 ML-2-05 810017 -07 ML-2-06A 810017 -08 ML-2-06B 810017 -09 ML-2-07 810017 -10 ML-2-08 810017 -11 ML-2-09 810017 -12 ML-2-10 810017 -13 ML-2-11A 810017 -14 ML-2-1113 810017 -15 ML-2-12 810017 -16 ML-2-13 All quality control requirements were acceptable. 1 FRIEDMAN & BRUYA, INC. ENVIRONMENTAL CHEMISTS Analysis For Total Metals By EPA Method 6020B Client ID: ML-2-01 Client: PBS Engineering and Environmental Date Received: 10/01/18 Project: Mirror Lake Pb/As Investigation 41519.002.0004 Date Extracted: 10/02/18 Lab ID: 810017-01 Date Analyzed 10/02/18 Data File: 810017-01.139 Matrix: Soil Instrument: ICPMS2 Units: mg/kg (ppm) Dry Weight Operator: SP Concentration Analyte: mg/kg (ppm) Arsenic 8.80 Lead 12.9 F FRIEDMAN & BRUYA, INC. ENVIRONMENTAL CHEMISTS Analysis For Total Metals By EPA Method 6020B Client ID: ML-2-02 Client: PBS Engineering and Environmental Date Recei►aed: 10/01/18' Project: Mirror Lake Pb/As Investigation 41519.002.0004 Date Extracted: 10/02/18 Lab ID: 810017-02 Date Analyzed: 10/03/18 Data File: 810017-02.229 Matrix: Soil Instrument: ICPMS2 Units: mg/kg (ppm) Dry Weight Operator: SP Concentration Analyte: mg/kg (ppm) Arsenic 5.03 Lead 8.04 3 FRIEDMAN & BRUYA, INC. ENVIRONMENTAL CHEMISTS Analysis For Total Metals By EPA Method 6020B Client ID: ML-2-03A Client: PBS Engineering and Environmental Date Received: 10/01/18 Project: Mirror Lake Pb/As Investigation 41519.002.0004 Date Extracted: 10/02/18 Lab ID: 810017-03 Date Analyzed: 10/03/18 Data File: 810017-03.230 Matrix: Soil Instrument: ICPMS2 Units: mg/kg (ppm) Dry Weight Operator: SP Concentration Analyte: mg/kg (ppm) Arsenic 4.59 Lead 10.3 4 FRIEDMAN & BRUYA, INC. ENVIRONMENTAL CHEMISTS Analysis For Total Metals By EPA Method 6020B Client ID: ML-2-03B Client: PBS Engineering and Environmental Date Received: 10/01/18 Project: Mirror Lake Pb/As Investigation 41519.002.0004 Date Extracted: 10/02/18 Lab ID: 810017-04 Date Analyzed: 10/03/18 Data File: 810017-04.233 Matrix: Soil Instrument: ICPMS2 Units: mg/kg (ppm) Dry Weight Operator: SP Concentration Analyte: mg/kg (ppm) Arsenic 3.80 Lead 9.25 5 FRIEDMAN & BRUYA, INC. ENVIRONMENTAL CHEMISTS Analysis For Total Metals By EPA Method 6020B Client ID: MI-2-04 Client: Date Received: 10/01/18 Project: Date Extracted: 10/02/18 Lab ID: Date Analyzed: 10/03/18 Data File: Matrix: Soil Instrument Units: mg/kg (ppm) Dry Weight Operator: Concentration Analyte: mg/kg (ppm) Arsenic 4.32 Lead 6.67 L PBS Engineering and Environmental Mirror Lake Pb/As Investigation 41519.002.0004 810017-05 810017-05.234 ICPMS2 SP FRIEDMAN & BRUYA, INC. ENVIRONMENTAL CHEMISTS Analysis For Total Metals By EPA Method 6020B Client ID: ML-2-05 Client: Date Received: 10/01/18 Project: Date Extracted: 10/02/18 Lab ID: Date Analyzed: 10/03/18 Data File: Matrix: Soil Instrument: Units: mg/kg (ppm) Dry Weight Operator: Concentration Analyte: mg/kg (ppm) Arsenic 4.57 Lead 5.81 7 PBS Engineering and Environmental Mirror Lake Pb/As Investigation 41519.002.0004 810017-06 810017-06.235 ICPMS2 SP FRIEDMAN & BRUYA, INC. ENVIRONMENTAL CHEMISTS Analysis For Total Metals By EPA Method 6020B Client ID: ML-2-06A Client: PBS Engineering and Environmental Date Received: 10/01/18 Project: Mirror Lake Pb/As Investigation 41519.002.0004 Date Extracted. 10/02/18 Lab ID: 810017-07 Date Analyzed: 10/03/18 Data File: 810017-07.236 Matrix: Soil Instrument: ICPMS2 Units: mg/kg (ppm) Dry Weight Operator: SP Concentration Analyte: mg/kg (ppm) Arsenic 4.76 Lead 9.27 0 FRIEDMAN & BRUYA, INC. ENVIRONMENTAL CHEMISTS Analysis For Total Metals By EPA Method 6020B Client ID: ML-2-06B Client: PBS Engineering and Environmental Date Received: 10/01/18 Project: Mirror Lake Pb/As Investigation 41519.002.0004 Date Extracted: 10/02/18 Lab ID: 810017-08 Date Analyzed: 10/03/18 Data File: 810017-08.237 Matrix: Soil Instrument: ICPMS 2 Units: mg/kg (ppm) Dry Weight Operator: SP Concentration Analyte: mg/kg (ppm) Arsenic 4.78 Lead 13:i FRIEDMAN & BRUYA, INC. ENVIRONMENTAL CHEMISTS Analysis For Total Metals By EPA Method 6020B Client ID: ML-2-07 Client: PBS Engineering and Environmental Date Received: 10/01/18 Project: Mirror Lake Pb/As Investigation 41519.002.0004 Date Extracted: 10/02/18 Lab ID: 810017-09 Date Analyzed: 10/03/18 Data File: 810017-09.238 Matrix: Soil Instrument: ICPMS2 Units: mg/kg (ppm) Dry Weight Operator: SP Concentration Analyte: mg/kg (ppm) Arsenic 5.51 Lead 11.5 10 FRIEDMAN & BRUYA, INC. ENVIRONMENTAL CHEMISTS Analysis For Total Metals By EPA Method 6020B Client ID: ML-2-08 Client: PBS Engineering and Environmental Date Received: 10/01/18 Project: Mirror Lake Pb/As Investigation 41519.002.0004 Date Extracted 10/02/18 Lab ID: 810017-10 Date Analyzed: 10/03/18 Data File: 810017-10.239 Matrix: Soil Instrument: ICPMS2 Units: mg/kg (ppm) Dry Weight Operator: SP- Concentration Analyte: mg/kg (ppm) Arsenic 6.79 Lead 16.0 11 FRIEDMAN & BRUYA, INC. ENVIRONMENTAL CHEMISTS Analysis For Total Metals By EPA Method 6020B Client ID: ML-2-09 Client: PBS Engineering and Environmental Date Received: 10/01/18 Project: Mirror Lake Pb/As Investigation 41519.002.0004 Date Extracted: 10/02/18 Lab ID: 810017-11 Date Analyzed: 10/03/18 Data File: 810017-11.240 Matrix: Soil Instrument: ICPMS2 Units: mg/kg (ppm) Dry Weight Operator: SP Concentration Analyte: mg/kg (ppm) Arsenic 33.1 Lead 9.09 12 FRIEDMAN & BRUYA, INC. ENVIRONMENTAL CHEMISTS Analysis For Total Metals By EPA Method 6020B Client ID: ML-2-10 Client: PBS Engineering and Environmental Date Received: 10/01/18 Project: Mirror Lake Pb/As Investigation 41519.002.0004 Date Extracted: 10/02/18 Lab ID: 810017-12 Date Analyzed: 10/03/18 Data File: 810017-12.241 Matrix: Soil Instrument: ICPMS2 Units: mg/kg (ppm) Dry Weight Operator: SP Concentration Analyte: mg/kg (ppm) Arsenic 9.74 Lead 30.3 13 FRIEDMAN & BRUYA, INC. ENVIRONMENTAL CHEMISTS Analysis For Total Metals By EPA Method 6020B Client ID: ML-2-11A Client: PBS Engineering and Environmental Date Received: 10/01/18 Project: Mirror Lake Pb/As Investigation 41519.002.0004 Date Extracted: 10/02/18 Lab ID: 810017-13 Date Analyzed: 10/03/18 Data File: 810017-13.242 Matrix: Soil Instrument: ICPMS2 Units: mg/kg (ppm) Dry Weight Operator: SP Concentration Analyte: mg/kg (ppm) Arsenic 6.52 Lead 16.1 14 FRIEDMAN & BRUYA, INC. ENVIRONMENTAL CHEMISTS Analysis For Total Metals By EPA Method 6020B Client ID: ML-2-11B Client: PBS Engineering and Environmental Date Received: 10/01/18 Project: Mirror Lake Pb/As Investigation 41519.002.0004 Date Extracted: 10/02/18 Lab ID: 810017-14 Date Analyzed: 10/03/18 Data File: 810017-14.245 Matrix: Soil Instrument: ICPMS2 Units: mg/kg (ppm) Dry Weight Operator: SP Concentration Analyte: mg/kg (ppm) Arsenic 4.45 Lead 9.19 15 FRIEDMAN & BRUYA, INC. ENVIRONMENTAL CHEMISTS Analysis For Total Metals By EPA Method 6020B Client ID: AM-2-12 Client: PBS Engineering and Environmental Date Received: 10/01/18 Project: Mirror Lake Pb/As Investigation 41519.002.0004 Date Extracted: 10/02/18 Lab ID: 810017-15 Date Analyzed: 10/03/18 Data File: 810017-15.246 Matrix: Soil Instrument: ICPMS2 Units: mg/kg (ppm) Dry Weight Operator: SP Concentration Analyte: mg/kg (ppm) Arsenic 7.71 Lead 17.5 16 FRIEDMAN & BRUYA, INC. ENVIRONMENTAL CHEMISTS Analysis For Total Metals By EPA Method 6020B Client ID: ML-2-13 Client: PBS Engineering and Environmental Date Received; 10/01/18 Project: Mirror Lake Pb/As Investigation 41519.002.0004 Date Extracted: 10/02/18 Lab ID: 810017-16 Date Analyzed. 10/03/18 ❑ata File: 810017-16.247 Matrix: Soil Instrument: ICPMS2 Units: mg/kg (ppm) Dry Weight Operator: SP Concentration Analyte: mg/kg (ppm) Arsenic 7.93 Lead 24.2 17 FRIEDMAN & BRUYA, INC. ENVIRONMENTAL CHEMISTS Analysis For Total Metals By EPA Method 6020B Client ID: Method Blank Client: PBS Engineering and Environmental Date Received: Not Applicable Project: Mirror Lake Pb/As Investigation 41519.002.0004 Date Extracted: 10/02/18 Lab ID: I8-659 mb Date Analyzed: 10/02/18 Data File: I8-659 mb.137 Matrix: Soil Instrument: ICPMS2 Units: mg/kg (ppm) Dry Weight Operator: SP Concentration Analyte: mg/kg (ppm) Arsenic <1 Lead <1 In FRIEDMAN & BRUYA, INC. ENVIRONMENTAL CHEMISTS Date of Report: 10/08/18 Date Received: 10/01/18 Project: Mirror Lake Pb/As Investigation 41519.002.0004, F&BI 810017 QUALITY ASSURANCE RESULTS FOR THE ANALYSIS OF SOIL SAMPLES FOR TOTAL METALS USING EPA METHOD 6020B Laboratory Code: 810017-01 (Matrix Spike) Sample Percent Percent Reporting Spike Result Recovery Recovery Acceptance RPD Analyte Units Level (Wet wt) MS MSD Criteria (Limit 20 Arsenic mg/kg (ppm) 10 6.90 ca 90 94 75-125 4 Lead mg/kg (ppm) 50 12.2 96 101 75-125 5 Laboratory Code: Laboratory Control Sample Percent Reporting Spike Recovery Acceptance Analyte Units Level LCS Criteria Arsenic mg/kg (ppm) 10 100 80-120 Lead mg/kg (ppm) 50 105 80-120 19 FRIEDMAN & BRUYA, INC. ENVIRONMENTAL CHEMISTS Data Qualifiers & Definitions a - The analyte was detected at a level less than five times the reporting limit. The RPD results may not provide reliable information on the variability of the analysis. b - The analyte was spiked at a level that was less than five times that present in the sample. Matrix spike recoveries may not be meaningful. ca - The calibration results for the analyte were outside of acceptance criteria. The value reported is an estimate. c - The presence of the analyte may be due to carryover from previous sample injections. cf - The sample was centrifuged prior to analysis. d - The sample was diluted. Detection limits were raised and surrogate recoveries may not be meaningful. dv - Insufficient sample volume was available to achieve normal reporting limits. f - The sample was laboratory filtered prior to analysis. fb - The analyte was detected in the method blank. fc - The compound is a common laboratory and field contaminant. hr - The sample and duplicate were reextracted and reanalyzed. RPD results were still outside of control limits. Variability is attributed to sample inhomogeneity. hs - Headspace was present in the container used for analysis. ht — The analysis was performed outside the method or client -specified holding time requirement. ip - Recovery fell outside of control limits. Compounds in the sample matrix interfered with the quantitation of the analyte. j - The analyte concentration is reported below the lowest calibration standard. The value reported is an estimate. J - The internal standard associated with the analyte is out of control limits. The reported concentration is an estimate. jl - The laboratory control sample(s) percent recovery and/or RPD were out of control limits. The reported concentration should be considered an estimate. s The surrogate associated with the analyte is out of control limits. The reported concentration should e considered an estimate. le - The presence of the analyte is likely due to laboratory contamination. L - The reported concentration was generated from a library search. nm - The analyte was not detected in one or more of the duplicate analyses. Therefore, calculation of the RPD is not applicable. pc - The sample was received with incorrect preservation or in a container not approved by the method. The value reported should be considered an estimate. ve - The analyte response exceeded the valid instrument calibration range. The value reported is an estimate. vo - The value reported fell outside the control limits established for this analyte. x - The sample chromatographic pattern does not resemble the fuel standard used for quantitation. 20 tp DO 70 rL Ol %P TPH-DiesfA TPH-Gasoline BTEX by 8021B VOCs by 8260 SVOC& by 8270 lJFS N >b co o � H . u-, P. t p 91 rl 110, C� O OF, ti rd z■ ❑ u � iJ2 O y CF] �i m i co m m FRIEDMAN & BRUYA, INC. ENVIRONMENTAL CHEMISTS James E. Bruya, Ph.D. Yelena Aravkina, M.S. Michael Erdahl, B.S. Arina Podnozova, B.S. Eric Young, B.S. October 8, 2018 James Welles, Project Manager PBS Engineering and Environmental, Inc. 2517 Eastlake Ave E; Suite 100 Seattle, WA 98102 Dear Mr Welles: 3012 16th Avenue West Seattle, WA 98119-2029 (206) 285-8282 fbi@isomedia.com www.friedmanandbruya.com Included are the results from the testing of material submitted on October 1, 2018 from the Mirror Lake As/Pb Investigation 41519.002.0004, F&BI 810018 project. There are 20 pages included in this report. Any samples that may remain are currently scheduled for disposal in 30 days. If you would like us to return your samples or arrange for long term storage at our offices, please contact us as soon as possible. We appreciate this opportunity to be of service to you and hope you will call if you should have any questions. Sincerely, FRIEDMAN & BRUYA, INC. Michael Erdahl Project Manager Enclosures PBS 1008R.DOC FRIEDMAN & BRUYA, INC. ENVIRONMENTAL CHEMISTS CASE NARRATIVE This case narrative encompasses samples received on October 1, 2018 by Friedman & Bruya, Inc. from the PBS Engineering and Environmental Mirror Lake As/Pb Investigation 41519.002.0004, F&BI 810018 project. Samples were logged in under the laboratory ID's listed below. Laboratory ID PBS Engineering and Environmental 810018 -01 ML-3-01A 810018 -02 ML-3-01B 810018 -03 ML-3-02 810018 -04 ML-3-03 810018 -05 ML-3-04 810018 -06 ML-3-05A 810018 -07 ML-3-05B 810018 -08 ML-3-06 810018 -09 ML-3-07 810018 -10 ML-3-08 810018 -11 ML-3-09A 810018 -12 ML-3-09B 810018 -13 ML-3-10 810018 -14 ML-3-11 All quality control requirements were acceptable. 1 FRIEDMAN & BRUYA, INC. ENVIRONMENTAL CHEMISTS Analysis For Total Metals By EPA Method 6020B Client ID: ML-3-01A Client: PBS Engineering and Environmental Date Received: 10/01/18 Project: Mirror Lake As/Pb Investigation 41519.002.0004 Date Extracted: 10/02/18 Lab ID: 810018-01 Date Analyzed: 10/03/18 Data File: 810018-01.214 Matrix: Soil Instrument: ICPMS2 Units: mg/kg (ppm) Dry Weight Operator: SP Concentration Analyte: mg/kg (ppm) Arsenic 5.84 Lead 17.7 2 FRIEDMAN & BRUYA, INC. ENVIRONMENTAL CHEMISTS Analysis For Total Metals By EPA Method 6020B Client ID: ML-3-01B Client: PBS Engineering and Environmental Date Received: 10/01/18 Project: Mirror Lake As/Pb Investigation 41519.002.0004 Date Extracted: 10/02/18 Lab ID: 810018-02 Date Analyzed: 10/03/18 Data File: 810018-02.215 Matrix: Soil Instrument: ICPMS2 Units: mg/kg (ppm) Dry Weight Operator: SP Concentration Analyte: mg/kg (ppm) Arsenic 6.34 Lead 13.5 3 FRIEDMAN & BRUYA, INC. ENVIRONMENTAL CHEMISTS Analysis For Total Metals By EPA Method 6020B Client ID: ML-3-02 Client: PBS Engineering and Environmental Date Received: 10/01/18 Project: Mirror Lake As/Pb Investigation 41519.002.0004 Date Extracted: 10/02/18 Lab ID: 810018-03 Date Analyzed: 10/03/18 Data File: 81001-8-03.216 Matrix: Soil Instrument: ICPMS2 Units: mg/kg (ppm) Dry Weight Operator: SP Concentration Analyte: mg/kg (ppm) Arsenic 11.2 Lead 31.5 Cd FRIEDMAN & BRUYA, INC. ENVIRONMENTAL CHEMISTS Analysis For Total Metals By EPA Method 6020B Client ID: ML-3-03 Client: PBS Engineering and'Environmental Date Received: 10/01/18 Project: Mirror Lake As/Pb Investigation 41519.002.0004 Date Extracted: 10/02/18 Lab ID: 810018-04 Date Analyzed: 10/03/18 Data File: 810018-04.217 Matrix: Soil Instrument: ICPMS2 Units: mg/kg (ppm) Dry Weight Operator: SP Concentration Analyte: mg/kg (ppm) Arsenic 2.52 Lead 6.19 5 FRIEDMAN & BRUYA, INC. ENVIRONMENTAL CHEMISTS Analysis For Total Metals By EPA Method 6020B Client ID: ML-3-04 Client: PBS Engineering and Environmental Date Received: 10/01/18 Project: Mirror Lake As/Pb Investigation 41519.002.0004 Date Extracted: 10/02/18 Lab ID: 810018-05 Date Analyzed: 10/03/18 Data File: 810018-05.218 Matrix: Soil Instrument: ICPMS2 Units: mg/kg (ppm) Dry Weight Operator: SP Concentration Analyte: mg/kg (ppm) Arsenic 21.6 Lead 49.4 1 FRIEDMAN & BRUYA, INC. ENVIRONMENTAL CHEMISTS Analysis For Total Metals By EPA Method 6020B Client ID: ML-3-05A Client: PBS Engineering and Environmental Date Received: 10/01/18 Project: Mirror Lake As/Pb Investigation 41519.002.0004 Date Extracted: 10/02/18 Lab ID: 810018-06 Date Analyzed: 10/03/18 Data File: 810018-06.224 Matrix: Soil Instrument: ICPMS2 Units: mg/kg (ppm) Dry Weight Operator: SP Concentration Analyte: mg/kg (ppm) Arsenic 4.37 Lead 12.4 7 FRIEDMAN & BRUYA, INC. ENVIRONMENTAL CHEMISTS Analysis For Total Metals By EPA Method 6020B Client ID: NM-3-05B Client: PBS Engineering and Environmental Date Received: 10/01/18 Project: Mirror Lake As/Pb Investigation 41519.002.0004 Date Extracted: 10/02/18 Lab ID: 810018-07 Date Analyzed: 10/03/18 Data File: 810018-07.225 Matrix: Soil Instrument: ICPMS2 Units: mg/kg (ppm) Dry Weight Operator: SP Concentration Analyte: mg/kg (ppm) Arsenic 4.74 Lead 12.7 L1 FRIEDMAN & BRUYA, INC. ENVIRONMENTAL CHEMISTS Analysis For Total Metals By EPA Method 6020B Client ID: ML-3-06 Client: PBS Engineering and Environmental Date Received: 10/01/18 Project: Mirror Lake As/Pb Investigation 41519.002.0004 Date Extracted: 10/02/18 Lab ID: 810018-08 Date Analyzed: 10/03/18 Data File: 810018-08.226 Matrix: Soil Instrument: ICPMS2 Units: mg/kg (ppm) Dry Weight Operator: SP Concentration Analyte: mg/kg (ppm) Arsenic 4.63 Lead 13.9 I FRIEDMAN & BRUYA, INC. ENVIRONMENTAL CHEMISTS Analysis For Total Metals By EPA Method 6020B Client ID: ML-3-07 Client: PBS Engineering and Environmental Date Received: 10/01/18 Project: Mirror Lake As/Pb Investigation 41519.002.0004 Date Extracted: 10/02/18 Lab ID: 810018-09 Date Analyzed: 10/03/18 Data File: 810018-09.227 Matrix: Soil Instrument: ICPMS2 Units: mg/kg (ppm) Dry Weight Operator: SP Concentration Analyte: mg/kg (ppm) Arsenic 6.66 Lead 16.7 10 FRIEDMAN & BRUYA, INC. ENVIRONMENTAL CHEMISTS Analysis For Total Metals By EPA Method 6020B Client ID: ML-3-08 Client: PBS Engineering and Environmental Date Received: 10/01/18 Project: Mirror Lake As/Pb Investigation 41519.002.0004 Date Extracted: 10/02/18 Lab ID: 810018-10 Date Analyzed: 10/03/18 Data File: 810018-10.228 Matrix: Soil Instrument: ICPMS2 Units: mg/kg (ppm) Dry Weight Operator: SP Concentration Analyte: mg/kg (ppm) Arsenic 3.21 Lead 15.1 11 FRIEDMAN & BRUYA, INC. ENVIRONMENTAL CHEMISTS Analysis For Total Metals By EPA Method 6020B Client ID: MI-3-09A Client: PBS Engineering and Environmental Date Received: 10/01/18 Project: Mirror Lake As/Pb Investigation 41519.002.0004 Date Extracted: 10/02/18 Laic ID: 810018-11 Date Analyzed: 10/03/18 Data File: 810018-11.248 Matrix: Soil Instrument: ICPMS2 Units: mg/kg (ppm) Dry Weight Operator: SP Concentration Analyte: mg/kg (ppm) Arsenic 3.71 Lead 8.62 12 FRIEDMAN & BRUYA, INC. ENVIRONMENTAL CHEMISTS Analysis For Total Metals By EPA Method 6020B Client ID: ML-3-09B Client: PBS Engineering and Environmental Date Received: 10/01/18 Project: Mirror Lake As/Pb Investigation 41519.002.0004 Date Extracted: 10/02/18 Lab ID: 810018-12 Date Analyzed: 10/03/18 __ Data File: 810018-12.249 Matrix: Soil Instrument: ICPMS2 Units: mg/kg (ppm) Dry Weight Operator:_ SP Concentration Analyte: mg/kg (ppm) Arsenic 5.93 Lead 13.3 13 FRIEDMAN & BRUYA, INC. ENVIRONMENTAL CHEMISTS Analysis For Total Metals By EPA Method 6020B Client ID: MI-3-10 Client: PBS Engineering and Environmental Date Received: 10/01/18 Project: Mirror Lake As/Pb Investigation 41519.002.0004 Date Extracted: 10/02/18 Lab ID: 810018-13 Date Analyzed: 10/03/ 18 Data File: 810018-13.250 Matrix: Soil Instrument: ICPMS2 Units: mg/kg (ppm) Dry Weight Operator: SP Concentration Analyte: mg/kg (ppm) Arsenic 7.35 Lead 21.1 14 FRIEDMAN & BRUYA, INC. ENVIRONMENTAL CHEMISTS Analysis For Total Metals By EPA Method 6020B Client ID: ML-3-11 Client: PBS Engineering and Environmental Date Received: 10/01/18 Project: Mirror Lake As/Pb Investigation 41519.002.0004 Date Extracted 10/02/18 Lab ID: 810018-14 Date Analyzed. 10/03/18 Data File: 810018-14.251 Matrix: Soil Instrument: ICPMS2 Units: mg/kg (ppm) Dry Weight Operator: SP Concentration Analyte: mg/kg (ppm) Arsenic 11.1 Lead 24.0 15 FRIEDMAN & BRUYA, INC. ENVIRONMENTAL ,CHEMISTS Analysis For Total Metals By EPA Method 6020B Client ID: Method Blank Client: PBS Engineering and Environmental Date Received: Not Applicable Project: Mirror Lake As/Pb Investigation 41519.002.0004 Date Extracted: 10/02/18 Lab ID: I8-658 mb Date Analyzed: 10/02/18 Data File: I8-658 mb.130 Matrix: Soil Instrument: ICPMS2 Units: mg/kg (ppm) Dry Weight Operator: SP Concentration Analyte: mg/kg (ppm) Arsenic <1 Lead <1 16 FRIEDMAN & BRUYA, INC. ENVIRONMENTAL CHEMISTS Analysis For Total Metals By EPA Method 6020B Client. ID: Method Blank Client: PBS Engineering and Environmental Date Received: Not Applicable Project. Mirror Lake As/Pb Investigation 41519.002.0004 Date Extracted: 10/02/18 Lab ID: I8-659 mb Date Analyzed: 10/02/18 Data File: I8-659 mb.137 Matrix: Soil Instrument. ICPMS2 Units: mg/kg (ppm) Dry Weight Operator: SP Concentration Analyte: mg/kg (ppm) Arsenic <1 Lead <1 17 FRIEDMAN & BRUYA, INC. ENVIRONMENTAL CHEMISTS Date of Report: 10/08/18 Date Received: 10/01/18 Project: Mirror Lake As/Pb Investigation 41519.002.0004, F&BI 810018 QUALITY ASSURANCE RESULTS FOR THE ANALYSIS OF SOIL SAMPLES FOR TOTAL METALS USING EPA METHOD 6020B Laboratory Code: 810016-21 (Matrix Spike) Sample Percent Percent Reporting Spike Result Recovery Recovery Acceptance RPD Analvte Units Level (_Wet wt_) MS MSD Criteria (Limit 20) Arsenic mg/kg (ppm) _ 10 2.08 98 98 75-125 0 Lead mg/kg (ppm) 50 2.71 97 95 75-125 2 Laboratory Code: Laboratory Control Sample Percent Reporting Spike Recovery Acceptance Analyte Units Level LCS Criteria Arsenic mg/kg (ppm) 10 101 80-120 Lead mg/kg (ppm) 50 104 80-120 FRIEDMAN & BRUYA, INC. ENVIRONMENTAL CHEMISTS Date of Report: 10/08/18 Date Received: 10/01/18 Project: Mirror Lake As/Pb Investigation 41519.002.0004, F&BI 810018 QUALITY ASSURANCE RESULTS FOR THE ANALYSIS OF SOIL SAMPLES FOR TOTAL METALS USING EPA METHOD 6020B Laboratory Code: 810017-01 (Matrix Spike) Sample Percent Percent Reporting Spike Result Recovery Recovery Acceptance RPD Analyte Units Level (Wet wt) MS MSD Criteria (Limit 20) Arsenic mg/kg (ppm) 10 6.90 ca 90 94 75-125 4 Lead mg/kg (ppm) 50 12.2 96 101 75-125 5 Laboratory Code: Laboratory Contrd Sample Percent Reporting Spike Recovery Acceptance Analyte Units Level LCS Criteria Arsenic mg/kg (ppm) 10 100 80-120 Lead mg/kg (ppm) 50 105 80-120 19 FRIEDMAN & BRUYA, INC. ENVIRONMENTAL CHEMISTS Data Qualifiers & Definitions a - The analyte was detected at a level less than five times the reporting limit. The RPD results may not provide reliable information on the variability of the analysis. b - The analyte was spiked at a level that was less than five times that present in the sample. Matrix spike recoveries may not be meaningful. ca - The calibration results for the analyte were outside of acceptance criteria. The value reported is an estimate. c - The presence of the analyte may be due to carryover from previous sample injections. cf - The sample was centrifuged prior to analysis. d - The sample was diluted. Detection limits were raised and surrogate recoveries may not be meaningful. dv - Insufficient sample volume was available to achieve normal reporting limits. f - The sample was laboratory filtered prior to analysis. fb - The analyte was detected in the method blank. fc - The compound is a common laboratory and field contaminant. hr - The sample and duplicate were reextracted and reanalyzed. RPD results were still outside of control limits. Variability is attributed to sample inhomogeneity. hs - Headspace was present in the container used for analysis. lit — The analysis was performed outside the method or client -specified holding time requirement. ip - Recovery fell outside of control limits. Compounds in the sample matrix interfered with the quantitation of the analyte. j - The analyte concentration is reported below the lowest calibration standard. The value reported is an estimate. J - The internal standard associated with the analyte is. out of control limits. The reported concentration is an estimate. jl - The laboratory control samples) percent recovery and/or RPD were out of control limits. The reported concentration should be considered an estimate. - The surrogate associated with the analyte is out of control limits. The reported concentration should to The an estimate. lc - The presence of the analyte is likely due to laboratory contamination. L - The reported concentration was generated from a library search. nm - The analyte was not detected in one or more of the duplicate analyses. Therefore, calculation of the RPD is not applicable. pc - The sample was received with incorrect preservation or in a container not approved by the method. The value reported should be considered an estimate. ve - The analyte response exceeded the valid instrument calibration range. The value reported is an estimate. vo - The value reported fell outside the control limits established for this analyte. x - The sample chromatographic pattern does not resemble the fuel standard used for quantitation. 20 R" 5, c < Cb Ili- all, t� . cn 4 � � � o n wft ray+ ! _ fi TPH-Diesel TPH-Gasoline BTEX by 8021E VOCs by 8260 a SVOCs by 9270 HFSI �h r� IN � C r-7 N Jt o N� ri m c4 Zp Ct2 4y 5 0 31 1� ll� � r MRS., Inmr-im , �bll RN 03 CD O tv Go co 'Of Z 10 cn Im 011ya cn Lakehaven WATER St SEWER DISTRICT 316271st Avenue South • P.O. Box 4249 Federal Way, WA 98063-4249 253-941-1516 Federal Way V 253-927-2922 Tacoma www.lakehaven.org October 23, 2018 Mike Benzien FW PS 1211 South 332nd Street Federal Way, Washington 98003 RE: MIRROR LAKE ELEMENTARY SCHOOL — PO 18802268 Lakehaven Project No. 6318021 Mr. Benzien: RECEIVED JAN 10 2019 CITY OF FEDEPAL WAy Xkulmry bt-v 4P EN T PO# OCT 7 9 16 RECV BY: INV TO AP; Enclosed is the original Developer Extension (DE) Agreement for the referenced project. Please have the appropriate party, or parties, execute and return the DE Agreement to this office within 30 days from the date of this letter. In accordance with applicable King County rules, please do not make any markings/etc. in the one -inch (1") clear margins of the DE Agreement pages. You will receive a fully executed copy when completed. Lakehaven will process the original DE Agreement for recording. If the executed DE Agreement is not returned within 30 days the project will be suspended without further notice, and a new DE Agreement application (and deposit) to Lakehaven may be required. Execution and return of the DE agreement is required for all Lakehaven plan review tasks/services beyond the initial review. Pursuant to Paragraph 3, the required sum has been submitted to initiate the project. All actual labor and materials expenses, plus overhead, incurred by Lakehaven for the project will be expensed to the project account. Lakehaven will review the project account on a regular basis and issue invoices as necessary to keep the project account current. These invoices (sample enclosed) are due and payable as noted on each invoice and the account shall remain current at all times. PLEASE BE ADVISED THAT IF AN INVOICE PAYMENT IS 30+ DAYS "PAST DUE", THEN ALL WORK ASSOCIATED WITH THE DE PROJECT WILL BE SUSPENDED UNTIL THE "DELINQUENT" INVOICE AMOUNT, INCLUDING ANY INTEREST, IS PAID IN FULL. For projects under construction, please be advised that any work involving existing or future Lakehaven facilities, including any new service connections/stubs, will also be suspended pending receipt of any "delinquent" payment(s). You are required to provide accurate "as -built" data upon completion of construction. To ensure this, a written statement from your professional consultant shall be provided prior to (and as a condition of) scheduling the Lakehaven preconstruction meeting; confirming that accurate data will be collected in the field by said engineer or surveyor, or employee under his/her supervision, during construction. The engineer or surveyor is also required to provide certificates of insurance as set forth in Paragraph 9 of the referenced DE Agreement. It would be helpful if the Lakehaven project number listed above is indicated or referenced on the certificates. You may wish to provide a copy of the DE Agreement to the engineer or surveyor to inform him/her of the specific requirements. Lakehaven has updated the Hydraulic Model Report previously generated for the site (FF #345c, copy attached), to indicate the amount of new 12-inch diameter water main required to achieve the required onsite fire flow requirement of 2,750 GPM. Please have your engineering consultant prepare & submit water plans accordingly. When Lakehaven has declared the plan(s) adequate for approval, one (1) rolled (do not fold) copy of each plan sheet shall be submitted to Lakehaven for approval by Lakehaven (alternatively, the plans submitted for approval can be submitted as PDF files via email attachment(s)). A copy of the approved plan set(s) will be provided to your design engineer, and to your professional consultant for "as-builting" upon completion of construction. Lakehaven will use Mike Benzien - FWPS October 23, 2018 Page 2 copies of the approved plan set(s) for our use and in applying for right-of-way (ROW) construction permits, and other permits and approvals, as necessary. After Lakehaven has approved the plan(s), received all necessary permits and approvals, & all other Lakehaven preconstruction requirements are satisfied; the developer (or designated representative) and developer's utility contractor will be required to meet with Lakehaven representatives for a preconstruction meeting (typically held on the 2nd or 4th Thursdays of the month, 9:00 a.m. or 10:00 a.m.). At the developer's discretion, including any additional or associated costs, the "as -built" consultant and/or the design engineer are welcome & encouraged to attend Lakehaven's preconstruction meeting. Please be advised that any/all construction work &/or assembly of underground piping associated with a non-residential fire protection supply line (from, & including, the premise isolation device vault to/into the building) must be performed by a person holding a valid Washington State "Level U" certification. Enforcement of this standard will be managed by the jurisdictional fire marshal. Lakehaven also requires a (developer's) certificate of insurance in the amounts indicated in Paragraph 17 of the agreement; including Lakehaven as an additional insured. It would be helpful if the Lakehaven project number listed above is indicated or referenced on the certificate. Said certificate must be received by Lakehaven prior to (and as a condition of) scheduling the Lakehaven preconstruction meeting. Lakehaven will not allow any new domestic or irrigation service connections to the water system to be activated until the project is complete and accepted by Lakehaven, or has achieved substantial completion status as determined by Lakehaven. The enclosed cost estimate worksheet is provided for your convenience. Please keep in mind that this estimate is based on information provided with your application and is subject to change as additional information becomes available. Changes in project scope or Lakehaven fees and charges will impact this estimate. Lakehaven fees and charges are subject to change without prior notification. Please read the DE Agreement carefully. Conditions and requirements are detailed and laid out in chronological order for your benefit, as well as for ease of administration. Please refer to the enclosed Project Checklist for items/issues that need to be submitted/resolved/approved prior to scheduling the Lakehaven preconstruction meeting (typically held on the 2nd or 4th Thursdays of the month, 9:00 a.m. or 10:00 a.m.). Please note that in accordance with Section W/S.1.A of Lakehaven's adopted standards, all requests for modifications to Lakehaven's standards, specifications, policies &/or Resolution shall be made in writing (Plan Review Checklist comment, email, letter, or fax) to Lakehaven. Please contact me at BAsbury@Lakehaven.org or 253-946-5407 if you have any questions or need additional information regarding the project or the enclosed DE Agreement. Sincerely, , L 'Z Brian Asbury Development Engineering Super - r Enclosures Ec: LPD Engineering PLLC Ray Vefik - FWPS Casey Moore - FWPS Lakehaven WATER & SEWER DISTRICT MIRROR LAKE ELEMENTARY SCHOOL — PO 18802268 Lakehaven Project No. 6318021 AGREEMENT THIS AGREEMENT, entered into in duplicate between the LAKEHAVEN TIATER AND SEWER DISTRICT, King County, a municipal corporation of the State of Washington, hereinafter referred to as "the District" and FEDERAL WAY PUBLIC SCHOOLS, hereinafter referred to as "the Developer". WITNESSETH: WHEREAS, the District operates and maintains a water distribution system within its boundaries which can serve property of the Developer, and WHEREAS, the Developer desires to construct certain water mains and appurtenances at its own cost to serve the Developer's property, for delivery to and operation by the District, NOW, THEREFORE, IT IS HEREBY AGREED that: 1. The land for which domestic water service is requested and to which this Agreement applies, is realty in King County, Washington, legally described in Exhibit "A" and generally depicted in Exhibit "B", attached hereto and by this reference incorporated herein. By executing this Agreement, the Developer represents and warrants that it is the owner of record of the above -described property. If such representation of ownership is invalid, this Agreement shall be void as to the portion of the property not owned by the Developer. The Developer agrees that the District may require the Developer to furnish a title report for the property at the Developer's expense. 2. All newly created legal descriptions shall be furnished by the Developer and shall be stamped and signed by a professional land surveyor licensed in the State of Washington. Each newly created legal description shall be accompanied by a drawing that graphically depicts the legal description. 3. The Developer has paid the required deposit as set forth in District Resolution No. 2017-1300, or any subsequent amendment thereto. Said deposit shall be applied against actual expenses of the District, including all bacteriological testing and sampling. The District shall determine, on a regular basis, its actual costs associated with the project, including taxes, and shall submit to the Developer an invoice to repay the District for actual costs in excess of the amount previously collected. Payment shall be due as noted on said invoice. Off -hours labor, including overhead, costs for such inspections will be charged to the project on an DE Agr-6318021.docx (Form Update 12119/17) Page 1 of 8 overtime basis. The Developer agrees that the project account shall remain current for the life of the project and delinquency of any kind shall induce work stop action/orders, suspension/termination of service or any other action necessary to effect collection of monies owed the District. In the event monies are owed the District for work on, or unpaid charges allocated to, the project, as determined by the District, Developer agrees that the District shall be entitled to recover such monies by withholding and making application for payment to itself, any assignment of funds, cash deposits or latecomer reimbursements otherwise owing to the Developer. In the event that the deposit exceeds the District's actual expenses, the District shall issue to the Developer, at project closing, a refund of such unused amounts. 4. Except as noted herein, all work conducted by the District will be performed during normal work hours. The Developer may, at their discretion, submit a written request to the District for District non-exempt staff to expend overtime for tasks and services related to the completion of this Agreement. Said written request(s) shall state the Developer's reasons for the request(s) that would qualify it as an "emergency" (e.g., "excessive" additional expenses for any delays in plan review (actual/estimated figures should be provided), approaching unfavorable weather conditions for construction, permit expirations, etc.). Each written request submitted to the District for this purpose should also specify any component limitations the Developer desires (e.g., request for plan review/approval, request for construction inspections, etc.). 5. In the event work and construction described herein is not completed within five (5) years from the date of application for this Agreement, said application date being OCTOBER 5, 2018, the District can terminate the Agreement without notice, the Agreement shall then be void, and a new Developer Extension Agreement Application, along with applicable fee, will be required to re -commence and subsequently complete said work. 6. It is agreed by the parties that time is of the essence in all matters relating to the performance of this Agreement. 7. The Developer agrees that all requests for modification to District standards, specifications, policies or Resolution shall be submitted in writing to the District. Such requests shall be reviewed and the District will provide a written response to each submitted written request. S. The District shall review final plans and specifications for water distribution system construction to be performed by the Developer under this Agreement. If preliminary plans are not deemed acceptable by the District, the Developer shall be obligated to revise the plans and specifications in accordance with design standards deemed acceptable by the District. In the event that more than three (3) items are found to remain deficient by the District on the third submittal of plans, subsequent review by District staff may be billed at a factor of 1.5 times the standard rate without further notice to the Developer. The Developer shall submit final plans for construction in AutoCAD format (on disk or via email attachment), and on standard print media (24"x36" or 22"x34" size), prior to scheduling the preconstruction meeting. After the Developer has been notified in writing by the District that final plans and specifications have been approved, and all other necessary items have been addressed and resolved, the Developer and the Developer's contractor shall meet with the District's representatives for a preconstruction meeting before construction is commenced. DE Agr-6318021.docx (Form Update 12/19/17) Page 2 of 8 9. The Developer agrees that it shall be responsible for providing to the District accurate and reliable information concerning the actual location of the facilities constructed. In furtherance of this obligation, the Developer shall- procure from LPE ENGINEERING PLLC, or other licensed engineer or surveyor that the Developer has indicated will be consulting on the construction phase of the project, a written statement, which shall be submitted to the District prior to scheduling the preconstruction meeting, stating that accurate data will be collected during construction of the facilities to enable the engineer/surveyor to submit actual and reliable "as -built" locations to the District, based upon the information available to the engineer/surveyor during construction and also by field survey of the constructed facilities that are accessible at the ground surface. The Developer shall cause such engineer/surveyor to submit to the District, prior to scheduling the preconstruction meeting, a certificate of insurance for the engineer's/surveyor's Errors and Omissions policy. The Developer shall also cause such engineer/surveyor to submit to the District, prior to scheduling the preconstruction meeting, a certificate of insurance and a copy of an endorsement to the engineer's/surveyor's General Liability policy, naming the District as an additional insured as respects the obligations set forth in this section. The limits for Errors and Omissions and General Liability Insurance shall not be less than $1,000,000.00 for each claim; $1,000,000.00 aggregate. At the conclusion of construction and prior to and as a condition of acceptance, the engineer/surveyor shall deliver to the District its certification that it has made periodic field investigations and measurements during construction and that the "as -built" drawings submitted to the District, which drawings shall be provided in AutoCAD format (on disk or via email attachment) and on original or fixed -line photo mylar, are accurate and reliable. The District shall have the right to approve any change in the consulting engineer or surveyor during the project and the Developer agrees that the District may refuse any change in the consulting engineer or surveyor or may condition the same on resubmittal of the certification of location described above. No approval of any new engineer or surveyor shall be unreasonably withheld by the District. 10. The District will make application for the CITY OF FEDERAL WAY 'Right-of-way Construction Permit(s)'. The Developer acknowledges familiarity with the provisions of such Right-of-way Construction Permit(s) and agrees that it or its contractor's failure to comply with any of the provisions of the permit(s) shall entitle the District, in addition to the right to enforce any other remedy available to the CITY OF FEDERAL WAY as the permitting party, to immediately stop all construction activity on the right-of-way until the violation or violations have been eliminated and corrected to the satisfaction of the District and the District should not be held liable for any damages, either direct or indirect, for the delay and expense of such work stoppage. The Developer shall procure all other state, county and city licenses or permits. 11. The Developer agrees this Agreement shall create twenty -foot (20') wide [pipe(s) offset five -feet (5') from nearest margin] non-exclusive easement areas and right-of- way granted to the District for water distribution facilities and all appurtenances related thereto, as indicated on water facility construction plans approved by the District for the project, respectively, through, over and across the Developer's property. This easement shall be maintained in full force and effect unless superseded and replaced by another easement as determined acceptable by the District. 12. In the event an easement is required over realty other than realty described in Paragraphs No. 1 & No. 11 herein, such easement, in form acceptable to the District, together with title report or other sufficient proof of ownership of such realty, shall be delivered to the DE Agr-6318021.dooc (Form Update 12/19/17) Page 3 of 8 District prior to scheduling the preconstruction meeting. The Developer shall be obligated to obtain a written release from any property owner across whose property construction is performed pursuant to the grant of an easement, sufficient to indicate that the site restoration on the easement is satisfactory and complete. 13. Prior to scheduling the preconstruction meeting, the Developer shall deliver to the District a restoration performance bond in a sum to be determined by the District after receipt of any required Right -of -Way Construction Permit(s) and/or after the determination of off -site restoration requirements related to the work described herein, conditioned that the Developer will restore to the satisfaction of the District, and state, county, and city agencies as applicable, all work to be performed hereunder in public rights -of -way and the District's easements. Form and contents of bond shall be determined by the District. This requirement is waived for public authorities; however, Developer shall be held accountable for any such restoration. Should any restoration work be determined necessary, Developer will be notified to complete the restoration work. If such work is not corrected within the specified time, the District will perform the work and issue an invoice to the Developer. Said invoice shall be paid within thirty (30) days of issue date. 14. Construction shall be performed in accordance with the District's approved plans, standards and specifications and only under the supervision of a licensed contractor experienced in the installation of water distribution system facilities and the related work. 15. Two (2) sets of materials submittals shall be submitted to the District as one package, bound and indexed with a table of contents, for all equipment/material to be furnished for this project. Each submitted piece of equipment/material shall be fully defined by catalog number and reference made as to its applicable section of the District's standard specifications. Materials submittals shall be submitted prior to scheduling the preconstruction meeting. ifx. By execution of this Agreement, the District does not guarantee water service will be provided to realty described herein. In the event that any of the District's facilities, such as storage tanks, wells, and water transmission mains become utilized beyond their design or approved capacity or become inoperable for any cause, the District reserves the right to refuse any connections which would use such facility until remedial action has been completed, and the District shall not be liable for any direct or consequential damages which occur to the Developer arising out of such the District's refusal to connect or time delay necessary to take remedial action. 17. The Developer and its agents agree to indemnify and hold the District harmless from any and all claims which may be assessed against the District as a result of the construction or maintenance of the work described in this Agreement prior to acceptance by the District. The Developer shall maintain in full force and effect during the construction period, the following insurance: a. Commercial General Liability Insurance with bodily injury and property damage limits of not less than: $1,000,000.00 Each Occurrence $2,000,000.00 General Aggregate $2,000,000.00 Products -Completed Operations Aggregate Limit DE Agr-6318021.docx (Form Update 12/19/17) Page 4 of 8 b. Business Auto Liability coverage for all owned, non -owned, and hired autos with bodily injury and property damage limits of not less than: $1,000,000.00 Each Accident A certificate of insurance and a copy of an endorsement to the Developer's Commercial General Liability Insurance policy, showing the District as additional insured as respects the work to be performed under this Agreement, shall be provided prior to scheduling the preconstruction meeting. Thirty (30) days written notice shall be given to the District for cancellation or expiration of this insurance. 18. The Developer shall notify the District the date work and construction described in this Agreement will commence, and said notice shall be given not less than 72 hours (not including Saturday, Sunday, or national holidays) prior to such date. No water distribution system facility shall be covered prior to inspection by the District. After work is commenced, it shall vigorously, consistently, and in a first-class workmanlike manner be carried to completion. The Developer shall maintain at the construction area at all times during construction, a representative to whom District notices may be given regarding construction. Said representative shall be designated in writing by the Developer before start of work. The Developer may request inspections during construction upon two (2) days notice to the District. 19. Testing of water system facilities shall be performed as required by the District and only after satisfactory tests have been completed and witnessed by the District's designated agent, will the work be accepted. The Developer agrees that at such time as the District has performed inspection of the water distribution system facilities & system connections and has delivered itemized punch lists to the Developer and/or the Developer's contractor, that the project will be pursued to final completion, including the performance of all necessary site restoration. 20. Upon completion of construction, the Developer or the Developer's contractor shall deliver to the District a guarantee in the amount of ten percent (10%) of construction costs or $5,000.00, whichever is greater, that a reliable contractor will make and pay for repairs necessary within two (2) years from the date of acceptance of said construction, arising from faulty labor or material. Form of guarantee is to be approved by general counsel for the District. This requirement is waived for public authorities; however, Developer shall be held accountable for any such repairs. Should any defects be discovered within the specified 2-year time period, Developer will be notified and given ample time to correct same. If defects are not corrected within the specified time, Lakehaven will perform the work and issue an invoice to the Developer. Said invoice shall be paid within thirty (30) days of issue date. This paragraph shall be valid beyond the release of this Agreement and until the District closes out the associated project account. 21. Upon completion of construction, the Developer shall submit, for acceptance and approval of the District, Bills of Sale for water distribution system facilities, mains and appurtenances installed and constructed pursuant to this Agreement, in a form acceptable to the District, together with such other engineering records and project cost data as may be required by the District. DE Agr-6318021.docx (Form Update 12/19/17) Page 5 of 8 22. As a condition of District acceptance of the project, the Developer shall submit to the District a non-refundable warranty inspection fee for water, as set forth in District Resolution No. 2017-1300, or any subsequent amendment thereto, to be held by the District and applied against actual expenses of the District incurred to complete warranty inspections following the two-year warranty period. 23. In the event new or modified District easements are required over Developer's property described herein, such easements, in form acceptable to the District, shall be delivered to the District as a condition of & prior to the activation of any new or modified service connections for the property. 24. In the event the Developer requests and the District provides water meters for the realty described herein, prior to the District's acceptance of work, the Developer agrees to be solely responsible for any loss or damage to such water meters or their installation, which occurs prior to said acceptance of work by the District. 25. Work and construction performed under this Agreement shall not be connected to the District's water distribution systems until all provisions and requirements of this Agreement and District Resolutions, on the part of the Developer, have been fully complied with. 26. The District and the Developer agree that in carrying out the terms of this contract, the Developer shall be acting as an independent contractor and in no respect shall Developer be deemed an agent or partner of the District. 27. The Developer shall not assign this contract without the written consent of the District. 28. The District shall provide water service following the District's acceptance of the water distribution facilities for operation and maintenance and upon payment of the connection charges as set forth and in accordance with District Resolution No.2017-1300. Said connection charges shall consist of the Capital Facilities Charge (CFC), Service &/or Meter Installation Charge &/or Deposit, and any other such charges levied in accordance with said District Resolution No. 2017-1300 or amendments thereto or any other applicable District Resolution at time service is requested. 29. The parties agree that, if determined applicable by the District, the provision of latecomer reimbursements for system facilities constructed pursuant to this Agreement will be handled by separate agreement to be executed between the parties within a reasonable time following acceptance of the facilities and establishment of the appropriate latecomer reimbursement area by the District's Board of Commissioners. Any applicable latecomer reimbursement period will be limited to 15 years, or longer, pursuant to the provisions of state law. 30. Partial waiver or waiver by acquiescence by the District of any provision or condition of this Agreement shall not be a waiver of any other provision or condition of this Agreement. - 31. This Agreement shall constitute an easement and servitude upon the property described herein and shall be binding upon the heirs, assigns and successors in interest to the DE Agr-6318021.docx (Form Update 12/19/17) Page 6 of 8 Developer. This Agreement shall constitute an equitable lien against property described herein and in the event of nonperformance by the Developer, as stated herein, the District may foreclose said lien in the manner authorized by law. 32. This writing constitutes the full and only agreement between the parties, there being no promises, agreements or understandings, written or oral, except as herein set forth, or as hereinafter may be amended in writing. 33. Upon execution of this Agreement, the parties agree in the event either of them is required to enforce any provision or provisions of this Agreement against the other, that the prevailing party shall be entitled, in addition to all other amounts to which it is otherwise entitled by this Agreement, to its actual attorney's fees and costs, including those incurred on appeal. DE Agr-6318021.docx (Form Update 12/19/17) Page 7 of 8 WITNESS our hands and seals. FEDERAL WAY PUBLIC SCHOOLS By Its Date: State of County of �L LAKEHAVEN WATER & SEWER DISTRICT King County, Washington De elopm t Engineering Manager Dated: INN This record was acknowledged before me on _ �t �, 2 (Date) by as Name) (Type of Authority, Title) of�i(c.i �d S (Company Na e) rf4eXft &aft of ���la�l�t r3to,a � � dv For recording in the State of Washington, the Notarial Seal must be fully legible and cannot intrude into document margins. Please affix seal in the space provided. DE Agr-6318021.docx (Form Update 12/19/17) DATED: ZdALt&44,4 9) 2-0 1q (Signatu 0 Nota[y Mblic Title J My appointment expires Page 8 of 8 EXHIBIT "A" LEGAL- PROPERTY DESCRIPTION THE SOUTHEAST QUARTER OF THE NORTHEAST QUARTER OF THE SOUTHWEST QUARTER OF SECTION 8, TOWNSHIP 21 NORTH, RANGE 4 EAST, W.M., IN KING COUNTY, WASHINGTON; LESS THE EAST 30 FEET OF THE NORTH THREE -FOURTHS THEREOF; LESS THE WEST 30 FEET; LESS THE NORTH 30 FEET; AND LESS THE SOUTH 30 FEET. TAX PARCEL NO. 0821049035 EXHIBIT "B" PROPERTY DEPICTION 860.3400010 8603400075 31248 31249 M-03400005 86034f 0080 31256 31257 j" l�r Nz 0821049035 625 16 000 020 , PL �9416 0t 9416 00( � 31604 S314M87- �t��uuu Li 559fi 0 Q'13D� 001 713 r858000035 31249 8588000040 31255 85980 OL1045 31407 05080 0Q050 31415 85.880 00055 31423 85so'GaOO6.0 ju 31431 858�30 000 65 � 31439 S 315TH S7 ufl 85990 W070 31507 FeEt f 9508000075 31513 7941500060 94150007 31610 858800ON 31521 31511 9588000085 7 41500050 1614 31529 ca 94150004 O 'J'I C']F, 8589000090 31605 1 SAMPLE INVOICE ONLY --DO NOT SUBMIT PAYMENT LAt(EHAVEN WATER AND SEWER DISTRICT Invoice Date: 3r"17 Invoice Projeca 631♦ 0ne,des Mmi..Vh U2M lr} Due Date: 4r-V2017 Water SubTotal: $2,033.80 WastewaterSubTotal: $2,t179.14 Total Amount Due: $4,112 94 Online payments cannot be accepted DEVELOPER NAME COMPANY ADDRESS CITYSTAZIP Project', Project Name 63 M Project Cbarges: 31+Days Last 30 Days LTD Water: $4,386.A6 S8.66 $4,395.12 Wastewater: S5555 $8.91 55.554_43 Total: s9,941M $17.57 $9.959.5fl: Project Payments and Other Credhs: 31+Days Water: (S2,36132) Wastewater.. to Total: ($5,846.61) Last 30 Days LTD $D_OD ($2:351.32) SD.OD (55a845Z1) Total: $4,112,94 Meludes accru-d ingest churgas ofS1,327.97an previous unrdbalance For q sl osrs, please cast 25394_ or 9=1 us at I1111111111111111@1akehavenorg --------------------------------------------------------------------------------------------------- To ansuro proper credit to your accounrpMaso deftch and return this portion with your payment Water Arnount $127425 Neater Irt Charges- $759.55 Invoice Date: 332017 SewerAmount $1,3110.72 Serer Interest $768,42 Proj et# Total Amount $4,112.94 Due Date: 4r"17 Please Pay: $4,112 94 Online payments cannot bs accepted Please romit Payments to: LAKEHAVEN WATER AND SEWER DISTRICT PO Box4249 Fed%W Way. WA 98063 TIN # 91-0874464 For propercmditng, please pay any utility service charges separately SAMPLE INVOICE ONLY - DO NOT SUBMIT PAYMENT LAKEHAVEN WATER 8r SEWER DISTRICT - DEVELOPER EXTENSION PROJECTS Preliminary Estimate - Deposits, Fees and Charges (2018 Schedule) Property Within the City of Federal Way 8.4% Imposed Excise Tax) ' = Includes C' rW Exciso Tax — = Sub oct to Additional Cf Fw Excise Tax Project: MIRROR LAKE ELEMENTARY SCHOOL - PO 18802268 Date: 10/23/18 Prepared by: BIA Project No.: 6318021 DESCRIPTION CURRENT AMOUNT J I ESTIMATED ESTIMATED TIME PAID Water Amount Sewer Amount DEVELOPER EXTENSIONS DE -MAINLINE) 'Developer Pre -Design Application $500A0 Fee With Application $54200 Developer Extension Agreement Application $2,000.00 4 ' ee $1600 "Deposit $2.033-6 'Charge(s) Payable in Lieu of Extension - Water 'Charge(s) Payable in Lieu of Extension - Sewer 'Oeveloper Latecomer Charge(s) - Water 'Developer Latecomer Charge(s) - Sewer 'Temporary Connection [Earlycomed Charge - Water 'Temporary Connection [Eartycomerj Charge - Sewer Variable charge(s). Project & property speck Prior to scheduling the Preconstruction Meeting "DE Acceptance Guarantee - Water (Opfiarral ] "DE Acceptance Guarantee - Sewer [OpfigRalj $4,000 00 Deposit $2.900.00 Waived for Public Agencies 'DE Warranty Inspection - Water 'DE Warranty Inspection - Sewer $330,00 $620.00 Fee Prior to Project Acceptance $357.72 DEVELOPER EXTENSION (OE -MAINLINE) SU5TOTALS $2.933.321 $0.00 SERVICE CONNECTIONS er Service connMon Permit S29000 Fee Prior to Issuance of Service Connection Permil $303.52 Water Meter Installation: Developer Installed Service Connections with Lakehaven Installed Meter(s) FIRE-PROTECTIQNI LOW -DETECTION per meter 5/8' per meter 518" w/Meter Adapters per meter 1' per meter Vw/MeterAdapters per meter I'A' per meter I W w/M eter Adapters PRELIM. DOMESTIC SIZE per meter 2" per meter Y PRELIM. DOMESTIC SIZE per meter 4' $430.00 $460.00 $490.00 $710.00 $680.00 $1.030.00 $800.00 $2,380.00 $2,990.00 'Charge S466.12 $888.3 $3,245,34 Water Service Connection Installation: Lakehaven Installed Servioes and Melere per service connection 5/8' per service connection V per service connection 1'1W per service connection 2- per service connection 3' per service connection 4- per service connection 6' r service connection 8' $4,190,Do S4,430.00 $5,350,00 $5,830.0D $30,630.00 $33,620.00 $39,300.00 S454W,00 _Deposit 'Service Connection regiment s - Priv. PS. Tem . Servlre, etc. $150.00 Charge(s) 'County Document Recording Feels) Based on # of P 'Right-of-way Construction Permit C 4 of Fe&rat W $170,00 Fee 'Capital FwAilies Charge: r Equivalent Ripidarift Unit - ERU Water Lakehaven Service Area applications Sewer: Lakehaven Service Area applicatiarts Sewer: Mf Sewer District Service Area applications $3,707.00 $3,509.00 $2,063.00 per ERU emporary annectlon arlycamer rge • f:edleral Way CirlyMenter -Sewer 32,570.00 per ERU ERU CALCULATION S ERU amounts for Non -Residential domestic & irrigation service connections are determined by Lakehaven using estimated domestic water usage figures provided by the owner/applicant. One (1) ERU Is equivalent to an annual average of 24e gals/day of water usage and 210 gpd of associated sewer discharge (from domestic only). All properties with service connections will be responsible for any rental opacity charges for water usage and/or sewage discharge, as applicable, that exceeds the respective water or sewer system capacity purchased/credtted/albcated for the property for each billing cycle. The rate(s) for any such excess water usage I sewage discharge will be as set by takehaven's Board of Commissioners, and will be in addition to the standard base and volume charges. SERVICE CONNECTIONS SUBTOTALS1 $4.579.781 $303.52 TOTAL PROJECT ESTIMATE: WATER $7,513.10 TOTAL PROJECT ESTIMATE: SEWER 303.52 The above figures are estimates based upon the information available at the time of preparation. Any change in project scope, requirements, plumbing code revisions, etc., may render these estimates inaccurate. Actual service connection charges shall be calculated at time application for service connection is submitted. Fees and charges are typically reviewed annually, and are subject to change without notice. NOTES: All deposits are held against and applied to actual Lakehaven labor and material costs associated with the project, including Lakehaven overhead, Actual costs for developer extension (DE) projects / processing are dependent on the size and complexity of the project, and there is no precise method of estimating total actual project All DE project accounts will be analyzed regularly. Invoices are issued monthly, when appropriate, with payment due as noted on the invoiGe(s) and the account must be kept current to avoid suspension of project activities &/or other penalties. Lakehaven WATER & SEWER MSTRICI Hydraulic Model Fire Flow Estimate Request/Reporting Form Requested By: Date: Federal Way Public Schools 10/4/18 Location to be Modeled: Proposed Hydrants for Mirror Lake Elementary — With Modifications Lakehaven '/4 Section Grid: U8 Intersection: S 315"' St & 6th Ave S Add, Description: See attached map Pressure Zone: 538 Results By: John Bowm� Date: 10/16/18 Model Run No.: Master Water System Model 2007.net FF #345c Condition Pressure (psi) Flow (gpm) Static 36 0 Fire Flow 20 3300 NOTES: Lakehaven's adopted level of service goals for fire flow rates are 1000 gpm within single family residential areas (including duplexes) and 2500 gpm for multi -family, commercial, industrial areas. Model results depict the theoretical performance of the water system under high demand conditions and are not guaranteed to represent actual system performance. A design professional should be consulted for site specific design purposes. The calculated fire flow capacity in the above table is based on a currently available residual system pressure of 20 psi at the location modeled. The model indicates that Lakehaven's standard maximum allowable velocity of 10 ft/s (for existing pipes) is exceeded at a fire flow rate above 2800 gpm. Fire flow capacities greater than 2800 gpm may be accommodated through water system improvements. 101618FF 345c - Mirror Lake (Form Update 1/6/17) Lakehaven tDE VELOPER EXTENSIOND - • - Project Name: MIRROR LAKE ELEMENTARY Project No.: 6318021 SCHOOL - PO 18802267 Project Tech.: BIA Updated. 10 23 2018 Notes: A. Any/all requests for modifications to Lakehaven's standards, specifications, policies &/or resolutions shall be made in writing (Plan Review Checklist comment, email, or letter) to Lakehaven. B. IFees, charges &/or deposits indicated are based on current Lakehaven schedule, are typically reviewed annuall , & are subject to change without notice. S PRIOR TO C0NSTRUCTION 1 DE Agreement Application & Deposit. 2 DE Agreement executed by Developer. Agreement expires 1015123. 3 Water Plan(s) Approval by Lakehaven. 4 N/A AppFayal by Lakehaven. 5 AutoCAD Files. 6 As -built Consultant's Guarantee Letter. 7 As -built Consultant's Certificate of Insurance (Errors & Omissions). 8 As -built Consultant's Certificate of Insurance (General Liability). 9 N/A 10 N A 11 ROW Permit - Water. 12 N/A wPefitSewer. 13 N/A E)ff site Easement(s) Water� 14 N/A Off -site Easernerit(s 15 WAIVED Restoration Guarantee - ROW &/or Off -site Easement(s). 16 Material Submittals. 17 Developer's Certificate of Insurance (General & Business Auto Liability). 18 Water/Sewer Utility Contractor Information. 19 IDE Preconstruction Meeting. PRIOR TO SUBSTANTIAL COMPLETION 20 Substantial Completion Request by Developer. 21 Operational Inspection(s) - Water. 22 N/A . 23 Construction Record Drawings & AutoCAD Files - Water 24 N/A L4 f�TCS,T�GRLT-! 1fCJ Sewe Ge Ar rtm b_c�.ceFel, ram. o n. GAF) Files S 25 WAIVED Warranty (2-year) Guarantee. 26 Bill of Sale - Water. 27 N/A Bull of Sale Sewer. 28 N/A Gtff F Related nF, eet Lest _1ri fer alien. 29 On -site Easement. 30 WAIVED DE Acceptance Guarantee(s). 31 WAIVED SubCompl Guarantee. 32 SubCompl Agreement executed by Developer. Project Checklist-6318021.xlsx (Form Update 09-01-17) Page 1 of 8 Lakehaven PEVELOPER EXTENSIONi9 �.I Project Name: MIRROR LAKE ELEMENTARY SCHOOL - PO 18802267 Project No.: 6318021 Project Tech.: BIA 7 Updated: 10 23 2018 Notes: A. Any/all requests for modifications to Lakehaven's standards, specifications, policies &/or resolutions shall be made in writing (Plan Review Checklist comment, email, or letter) to Lakehaven. B. Fees, charges &/or deposits indicated are based on current Lakehaven schedule, are typically reviewed annually, & are suWect to change without notice. s PRIOR TO ACCEPTANCE BY LAKEHAVEN 33 N/A bate eigger ,ngFeement ProV 34 Acceptance Inspection(s) - Water. 35 N/A Aceeptanee`ligspeetieflEs_, S__ ef. 36 ROW Permit Release - Water. 37 N/A eWPermT1=Release Sewer 38 N/A Off site Easement R..stOFatiOn Reiease(s) 39 N/A Recorded Rnal PlaVBSPJBiA-. 40 1 DE Warranty Inspection Fee(s). PRIOR TO PR03ECT ACCOUNT INITIAL CLOSEOUT 41 Final DE Project Invoice or Refund. PRIOR TO FINAL PR03ECT CLOSEOUT AFTER 2-YEAR WARRANTY PERIOD 42 Warranty Inspection - Water. 43 N/A Project Checklist-6318021.xlsx (Form Update 09-01-17) Page 2 of 8 4Lakehaven t.. WATER & SEWER DISTRICT a • ' J o-- -- - ITEM PROJECT ITEM DETAILS & DESCRIPTIONS RECORDED FINAL PLAT/BSP/BLA. Copy of the recorded final plat/BSP/BLA. 39 Proposed/preliminary final plat/BSP/BLA documents should be submitted to Lakehaven for review as part of the Substantial Completion process summarized above, to be certain easement requirements are satisfactorily addressed. 40 DE WARRANTY INSPECTION FEE(S). Payment of the applicable DE Warranty Inspection Fees: Water $330.00 [2017], Sewer = $610.00 [2017]. PRIOR TO PROJECT ACCOUNT INITIAL CLOSEOUT 41TFINAL DE PROJECT INVOICE OR REFUND. Payment by Developer of the final DE project voice or final project Refund by Lakehaven, whichever is applicable. PRIOR TO FINAL PROJECT CLOSEOUT AFTER 2-YEAR WARRANTY PERIOD WARRANTY INSPECTION - WATER. Satisfactory "Warranty" inspection of the water facilities 42 constructed for the project, including correction of all defects noted during the "Warranty" inspection. If provided notice of any items requiring correction, please contact Lakehaven's assigned project technician, NAME (EMAIL@ Lakehaven.org), to coordinate re -inspection. WARRANTY INSPECTION - SEWER. Satisfactory "Warranty" inspection of the sewer facilities 43 constructed for the project, including correction of all defects noted during the "Warranty" inspection. If provided notice of any items requiring correction, please contact Lakehaven's assigned project technician, NAME (EMAIL@ Lakehaven.org), to coordinate re -inspection. Project Checklist-6318021.x1sx (09-01-17) Lakehaven WATER & SEWER DISTRICT DEVELOPER1PROJECT ITEM PROJECT ITEM DETAILS & DESCRIPTIONS PRIOR TO CONSTRUCTION 1 DE AGREEMENT APPLICATION & DEPOSIT. Submitted by Developer as the initial step in Lakehaven's DE Agreement process. DE AGREEMENT EXECUTED BY DEVELOPER. Developer has executed (i.e., signed with Z notary) & returned the DE Agreement to Lakehaven. Execution and return of the DE Agreement within 30 days is required or the project will be suspended without further notice, and for all Lakehaven plan review tasks/services beyond an initial review. WATER PLAN(S) APPROVAL BY LAKEHAVEN. Execution and return of the DE Agr is required 3 for all Lakehaven plan review tasks/services beyond an initial review. Plan approval expires M D YY if construction has not commenced by that date, or M D YY if construction was commenced prior to M D . (Paragraph No. #) SEWER PLAN(S) APPROVAL BY LAKEHAVEN. Execution and return of the DE Agr is required for all Lakehaven plan review tasks/services beyond an initial review. Plan approval expires 4 M D YY if construction has not commenced by approval date, or M D YY if construction was commenced prior to M D YY. (Paragraph No. #) 5 AUTOCAD FILES. All related AutoCAD files submitted to Lakehaven. (Paragraph No. #) AS -BUILT CONSULTANT'S GUARANTEE LETTER. Letter from the engineer/surveyor who will 6 be preparing the construction record drawings ("as-builts") for the project following construction, confirming that accurate data will be collected in the field by the engineer/surveyor or employee(s) under his/her supervision. (Paragraph No. #) AS -BUILT CONSULTANT'S CERTIFICATE OF INSURANCE (ERRORS & OMISSIONS). Coverage for General Liability ($1M each claim/$1M aggregate). Lakehaven shall be identified as 7 the "Certificate Holder" and included as additional insured. It would be helpful if the Lakehaven project number listed above is indicated or referenced on the certificate. (Paragraph No. #) AS -BUILT CONSULTANT'S CERTIFICATE OF INSURANCE (GENERAL LIABILITY). Coverage for Errors and Omissions ($1M each claim/$1M aggregate). It would be helpful if the Lakehaven 8 project number listed above is indicated or referenced on the certificate. It would be helpful if the Lakehaven project number listed above is indicated or referenced on the certificate. (Paragraph No. #) CHARGE -PAYABLE -IN -LIEU -OF -EXTENSION PAYMENT(S)-WATER. Payment in the amount of $XX,YYY.ZZ for water facilities previously constructed by a publicly -funded project that provides direct benefit to Developer's property. (Paragraph #) 9 CHARGE -PAYABLE -IN -LIEU -OF -EXTENSION PAYMENT(S)-SEWER. Payment in the amount of $XX,YYY.ZZ for sewer facilities previously constructed by a publicly -funded project that provides direct benefit to Developer's property. (Paragraph #) DEVELOPER LATECOMER CHARGE PAYMENT(S)-WATER. Payment in the amount of $XX,YYY.ZZ for water facilities previously constructed by a developer -funded project that 10 Provides direct benefit to Developer's property. (Paragraph #) DEVELOPER LATECOMER CHARGE PAYMENT(S)-SEWER. Payment in the amount of $XX,YYY.ZZ for sewer facilities previously constructed by a developer -funded project that provides direct benefit to Developer's property. (Paragraph #) Project Checklist-6318021.x1sx (09-01-17) 40 Lakehaven DEVELOPER !PROJECT ITEM PROJECT ITEM DETAILS & DESCRIPTIONS ROW PERMIT -WATER. Lakehaven receipt of the AGENCY ROW Permit required for water 11 facilities to be constructed for the project. Lakehaven will apply for this permit after water plans have been approved. (Paragraph #) ROW PERMIT -SEWER. Lakehaven receipt of the AGENCY ROW Permit required for sewer 12 facilities to be constructed for the project. Lakehaven will apply for this permit after sewer plans have been approved. (Paragraph #) 13 OFFSITE EASE MENT(S)-WATER. Lakehaven receipt of the executed offsite easement(s) required for water facilities to be constructed for the project. (Paragraph #) 14 OFFSITE EASEMENT(S)-SEWER. Lakehaven receipt of the executed offsite easement(s) required for sewer facilities to be constructed for the project. (Paragraph #) RESTORATION GUARANTEE. Lakehaven receipt of the Restoration Guarantee required for water &/or sewer facilities to be constructed for the project, in the amount of $X,XXX.00, on 15 Lakehaven approved bond form. Amount is determined by Lakehaven after receipt of all required ROW Permits &/or offsite easements. Assignment of Funds or cash deposit is also acceptable. (Paragraph #) MATERIAL SUBMITTALS. Two (2) sets of material (shop/working) drawings, submitted as one 16 package, bound & indexed with a table of contents, for all equipment & material to be furnished for the project. (Paragraph #) DEVELOPER'S CERTIFICATE OF INSURANCE. Coverage for Commercial General Liability ($1M each occurrence/$2M general aggregate/$2M products) & Business Auto Liability ($1M 17 each accident; all owned, non -owned & hired autos). Lakehaven shall be identified as the "Certificate Holder" and included as additional insured. It would be helpful if the Lakehaven project number listed above is indicated or referenced on the certificate. (Paragraph No. #) WATER/SEWER UTILITY CONTRACTOR INFORMATION. Lakehaven receipt of the 1s contractor's address, email address, phone number, emergency phone number, and the name of the contractor's foreman or superintendent; including proof of current/valid state contractor license. (Paragraph #) DE PRECONSTRUCTION MEETING. Separate Lakehaven preconstruction meeting, to review 19 the water &/or sewer construction plans for the project, with Lakehaven Inspections staff. Lakehaven DE meetings are typically held on either the 2nd or 4th Thursday of each month, at either 9:00 a.m. or 10:00 a.m. (Paragraph #) Project Checklist-6318021.x1sx (09-01-17) Lakehaven ITEM PROJECT ITEM DETAILS & DESCRIPTIONS WARRANTY (2-YEAR) GUARANTEE. Warranty Guarantee on Lakehaven approved bond form. The amount of the guarantee shall be ten percent (10%) of the cost of water/sewer construction 25 or $5,000.00, whichever is greater. This bond should be executed jointly for water and sewer (if applicable) —separate bonds are subject to the aforestated $5,000.00 minimum. You may execute an Assignment of Funds in lieu of the actual bond. Please contact Lakehaven for the proper form, should you choose to utilize this option. A cash deposit is also acceptable. BILL OF SALE - WATER. Bill of Sale for Water Facilities on Lakehaven approved form. Exhibit "A" of the form is a new facility inventory report, Exhibit "B" is a 'de -activated' facility inventory 26 report. Back-up invoices must be included in order for this form to be valid & the figures included in any Latecomers that may be applicable as a result of the project. If back up is not included, this form will not be valid & Latecomer reimbursement amounts will not be calculated or collected by Lakehaven. BILL OF SALE - SEWER. Bill of Sale for Sewer Facilities on Lakehaven approved form. Exhibit "A" of the form is a new facility inventory report, Exhibit "B" is a 'de -activated' facility inventory 27 report. Back-up invoices must be included in order for this form to be valid & the figures included in any Latecomers that may be applicable as a result of the project. If back up is not included, this form will not be valid & Latecomer reimbursement amounts will not be calculated or collected by Lakehaven. OTHER RELATED PROJECT COST INFORMATION. Other project cost information related to 28 the project but not directly associated with any Water &/or Sewer system facilities construction (e.g., easement acquisition costs, facilities/pipe removal costs, etc.), submitted by separate report/letter to Lakehaven. ONSITE EASEMENT. On -site easements for Water &/or Sewer facilities constructed for the project. The on -site easement descriptions will need to be verified against the "as -built" locations. Please have your engineer or surveyor prepare/compile legal descriptions and graphic depictions of the off -site property and easement areas, using a minimum one inch (1"), clear margin on all sides. Newly created descriptions must be stamped and signed by a professional land surveyor with registration in the State of Washington. Also, please provide 81/2" x 11" 29 drawings that graphically depict the easements for the facilities. The legal property descriptions should be labeled as Exhibit "A", the easement area descriptions as Exhibit "B", and the drawings should be labeled as Exhibit "C." We will forward the easement forms for execution when said descriptions/depictions have been approved. IF APPLICABLE, Lakehaven will accept easement dedication on the final plat/BSP/BLA documents, in lieu of separate on -site easement dedication(s). We will require a copy of the recorded final plat/BSP/BLA prior to initial project acceptance, if easements are so dedicated. Please submit the proposed/preliminary final plat/BSP/BLA documents to Lakehaven for review, when available. DE ACCEPTANCE GUARANTEE. Payment of the DE Acceptance Guarantee Deposit(s), as 30 applicable: $4,100.00 [2017] for Water, $3,200.00 [2017] for sewer. Only required if Substantial Completion requested by Developer. SUBSTANTIAL COMPLETION GUARANTEE. Payment of the Substantial Completion Guarantee 31 Deposit (Assignment of Funds or cash deposit) of $TBD-by-Lakehaven. Only required if Substantial Completion requested by Developer. Project Checklist-6318021.x1sx (09-01-17) Lakehaven WATER & SEWER DFSTRTCr DEVELOPER EXTENSION (DE) PROJECT CHECKLIST ITEM PROJECT ITEM DETAILS & DESCRIPTIONS 7- PRIOR TO SUBSTANTIAL COMPLETION (IF REQUESTED BY DEVELOPER) SUBSTANTIAL COMPLETION REQUEST BY DEVELOPER. Developer written request (email or 20 letter) for Lakehaven Substantial Completion status. OPERATION INSPECTION - WATER. Satisfactory operational inspection of the water facilities constructed for the project, including satisfactory results of pressure and purity (bacteriological) 21 tests. Please contact Lakehaven's assigned project inspector directly (NAME, PHONE#), for coordination of this task. OPERATION INSPECTION - SEWER. Satisfactory operational inspection of the sewer facilities constructed for the project, including satisfactory results of pipe pressure tests, manhole vacuum 22 tests and video camera inspection. Please contact Lakehaven's assigned project inspector directly (NAME, PHONE#), for coordination of this task. CONSTRUCTION RECORD DRAWINGS & AUTOCAD FILES - WATER. The original Mylar Water construction record drawings, which have been conformed to construction records. These record drawings must be certified "as -built" by a surveyor or engineer licensed in the State of Washington. The project engineer should first submit prints of said plans for Lakehaven review, along with Exhibit "A" of the Bill of Sale document(s). The originals may be submitted as soon as the prints are acceptable. Water-soluble ink and/or reverse -read drawings are not acceptable. All related AutoCAD files shall also be provided for our records. The AutoCAD dwg 23 format files need to include any cross-referenced or x-referenced files; any font files (e.g., shp, shx, ttf, or txt); any plot style or configuration files (e.g., ctb, pc3, or stb); and other files referenced in any of the drawing files (e.g., lin or pat) associated with the project. It is preferred that x-referenced files be bound to the referencing drawing file, and the drawing file(s) be clearly identifiable by name (e.g., project name &/or number (W_AsBuilt_01of07.dwg)) or similar naming convention, whether each plot sheet is assigned its own drawing file or all the finished plots are layouts in a single drawing file. CONSTRUCTION RECORD DRAWINGS & AUTOCAD FILES - SEWER. The original Mylar Sewer construction record drawings, which have been conformed to construction records. These record drawings must be certified "as -built" by a surveyor or engineer licensed in the State of Washington. The project engineer should first submit prints of said plans for Lakehaven review, along with Exhibit "A" of the Bill of Sale document(s). The originals may be submitted as soon as the prints are acceptable. Lakehaven will accept the initial submittal of sewer record drawings that are absent of final manhole rim elevations on paper media, but final manhole rim elevations shall be provided on new Mylar record drawings prior to initial project acceptance. Water-soluble 24 ink and/or reverse -read drawings are not acceptable. All related AutoCAD files shall also be provided for our records. The AutoCAD dwg format files need to include any cross-referenced or x-referenced files; any font files (e.g., shp, shx, ttf, or txt); any plot style or configuration files (e.g., ctb, pc3, or stb); and other files referenced in any of the drawing files (e.g., lin or pat) associated with the project. It is preferred that x-referenced files be bound to the referencing drawing file, and the drawing file(s) be clearly identifiable by name (e.g., project name &/or number (S_AsBuilt_01of07.dwg)) or similar naming convention, whether each plot sheet is assigned its own drawing file or all the finished plots are layouts in a single drawing file. Project Checklist-6318021.x1sx (09-01-17) Lakehaven DEVELOPER rPROJECT ITEM PROJECT ITEM DETAILS & DESCRIPTIONS # WARRANTY (2-YEAR) GUARANTEE. Warranty Guarantee on Lakehaven approved bond form. The amount of the guarantee shall be ten percent (10%) of the cost of water/sewer construction 25 or $5,000.00, whichever is greater. This bond should be executed jointly for water and sewer (if applicable) —separate bonds are subject to the aforestated $5,000.00 minimum. You may execute an Assignment of Funds in lieu of the actual bond. Please contact Lakehaven for the proper form, should you choose to utilize this option. A cash deposit is also acceptable. BILL OF SALE - WATER. Bill of Sale for Water Facilities on Lakehaven approved form. Exhibit "A" of the form is a new facility inventory report, Exhibit "B" is a 'de -activated' facility inventory 26 report. Back-up invoices must be included in order for this form to be valid & the figures included in any Latecomers that may be applicable as a result of the project. If back up is not included, this form will not be valid & Latecomer reimbursement amounts will not be calculated or collected by Lakehaven. BILL OF SALE - SEWER. Bill of Sale for Sewer Facilities on Lakehaven approved form. Exhibit "A" of the form is a new facility inventory report, Exhibit "B" is a 'de -activated' facility inventory 27 report. Back-up invoices must be included in order for this form to be valid & the figures included in any Latecomers that may be applicable as a result of the project. If back up is not included, this form will not be valid & Latecomer reimbursement amounts will not be calculated or collected by Lakehaven. OTHER RELATED PROJECT COST INFORMATION. Other project cost information related to 28 the project but not directly associated with any Water &/or Sewer system facilities construction (e.g., easement acquisition costs, facilities/pipe removal costs, etc.), submitted by separate report/letter to Lakehaven. ONSITE EASEMENT. On -site easements for Water &/or Sewer facilities constructed for the project. The on -site easement descriptions will need to be verified against the "as -built" locations. Please have your engineer or surveyor prepare/compile legal descriptions and graphic depictions of the off -site property and easement areas, using a minimum one inch (1"), clear margin on all sides. Newly created descriptions must be stamped and signed by a professional land surveyor with registration in the State of Washington. Also, please provide 81/2" x 11" Z9 drawings that graphically depict the easements for the facilities. The legal property descriptions should be labeled as Exhibit "A", the easement area descriptions as Exhibit "B", and the drawings should be labeled as Exhibit "C." We will forward the easement forms for execution when said descriptions/depictions have been approved. IF APPLICABLE, Lakehaven will accept easement dedication on the final plat/BSP/BLA documents, in lieu of separate on -site easement dedication(s). We will require a copy of the recorded final plat/BSP/BLA prior to initial project acceptance, if easements are so dedicated. Please submit the proposed/preliminary final plat/BSP/BLA documents to Lakehaven for review, when available. DE ACCEPTANCE GUARANTEE. Payment of the DE Acceptance Guarantee Deposit(s), as 30 applicable: $4,100.00 [2017] for Water, $3,200.00 [2017] for sewer. Only required if Substantial Completion requested by Developer. SUBSTANTIAL COMPLETION GUARANTEE. Payment of the Substantial Completion Guarantee 31 Deposit (Assignment of Funds or cash deposit) of $TBD-by-Lakehaven. Only required if Substantial Completion requested by Developer. Project Checklist-6318021.xisx (09-01-17) Lakehaven ITEM PR03ECT ITEM DETAILS & DESCRIPTIONS ROW PERMIT -WATER. Lakehaven receipt of the AGENCY ROW Permit required for water 11 facilities to be constructed for the project. Lakehaven will apply for this permit after water plans have been approved. (Paragraph #) ROW PERMIT -SEWER. Lakehaven receipt of the AGENCY ROW Permit required for sewer 12 facilities to be constructed for the project. Lakehaven will apply for this permit after sewer plans have been approved. (Paragraph #) 13 OFFSITE EASE MENT(S)-WATER. Lakehaven receipt of the executed offsite easement(s) required for water facilities to be constructed for the project. (Paragraph #) 14 OFFSITE EASE MENT(S)-SEWER. Lakehaven receipt of the executed offsite easement(s) required for sewer facilities to be constructed for the project. (Paragraph #) RESTORATION GUARANTEE. Lakehaven receipt of the Restoration Guarantee required for water &/or sewer facilities to be constructed for the project, in the amount of $X,XXX.00, on 15 Lakehaven approved bond form. Amount is determined by Lakehaven after receipt of all required ROW Permits &/or offsite easements. Assignment of Funds or cash deposit is also acceptable. (Paragraph #) MATERIAL SUBMITTALS. Two (2) sets of material (shop/working) drawings, submitted as one 16 package, bound & indexed with a table of contents, for all equipment & material to be furnished for the project. (Paragraph !) DEVELOPER'S CERTIFICATE OF INSURANCE. Coverage for Commercial General Liability ($1M each occurrence/$2M general aggregate/$2M products) & Business Auto Liability ($1M 17 each accident; all owned, non -owned & hired autos). Lakehaven shall be identified as the "Certificate Holder" and included as additional insured. It would be helpful if the Lakehaven project number listed above is indicated or referenced on the certificate. (Paragraph No. #) WATER/SEWER UTILITY CONTRACTOR INFORMATION. Lakehaven receipt of the 18 contractor's address, email address, phone number, emergency phone number, and the name of the contractor's foreman or superintendent; including proof of current/valid state contractor license. (Paragraph #) DE PRECONSTRUCTION MEETING. Separate Lakehaven preconstruction meeting, to review 19 the water &/or sewer construction plans for the project, with Lakehaven Inspections staff. Lakehaven DE meetings are typically held on either the 2nd or 4th Thursday of each month, at either 9:00 a.m. or 10:00 a.m. (Paragraph #) Project Checklist-6318021.x1sx (09-01-17) Lak& SEWER ehave n DEVELOPER,. WN ITEM PROJECT ITEM DETAILS & DESCRIPTIONS SUBSTANTIAL COMPLETION AGREEMENT EXECUTED BY DEVELOPER. Execution (by 32 Developer) & return of the Substantial Completion Agreement that was forwarded by Lakehaven on DATE. PRIOR TO PROJECT ACCEPTANCE BY:LAKEHAVEN LATECOMER AGREEMENT PROCESS - LATECOMER WAIVED PROPERTIES. If applicable, identification of any properties deemed by Lakehaven to be eligible for latecomer reimbursement, but for which Developer chooses to waive its right to latecomer reimbursement. LATECOMER AGREEMENT PROCESS - LEGAL DESCRIPTIONS FOR WATER ELIGIBLE PROPERTIES. If applicable, legal descriptions of all properties that are benefited by the construction of water facilities for the project. Descriptions shall be prepared on 81/2" x 11" paper, with one inch (1"), clear margins on all sides, and shall be labeled as Exhibit "A." If required, they shall then be stamped and signed by a professional land surveyor with registration in the State of Washington. 33 LATECOMER AGREEMENT PROCESS - LEGAL DESCRIPTIONS FOR SEWER ELIGIBLE PROPERTIES. If applicable, legal descriptions of all properties that are benefited by the construction of sewer facilities for the project. Descriptions shall be prepared on 81/2" x 11" paper, with one inch (1"), clear margins on all sides, and shall be labeled as Exhibit "A." If required, they shall then be stamped and signed by a professional land surveyor with registration in the State of Washington. LATECOMER AGREEMENT PROCESS - LATECOMER AGREEMENT. Execution and return of the Latecomer Agreement by the Developer. Reimbursements are typically issued for each payment received and are subject to a payment -processing fee in accordance with the fee established in Lakehaven's current 'Fees and Charges' Resolution at the time of each reimbursement. ACCEPTANCE INSPECTION - WATER. Satisfactory "Acceptance" inspection of the water facilities constructed for the project. Please contact Lakehaven's assigned project inspector 34 directly (NAME, PHONE#), for coordination of completion of construction. If provided notice of any items requiring correction (i.e., "punchlist"), please contact Lakehaven's assigned project technician (NAME, EMAIL), to coordinate re -inspection. ACCEPTANCE INSPECTION - SEWER. Satisfactory "Acceptance" inspection of the sewer facilities constructed for the project. Please contact Lakehaven's assigned project inspector 35 directly (NAME, PHONE#), for coordination of completion of construction. If provided notice of any items requiring correction (i.e., "punchlist"), please contact Lakehaven's assigned project technician (NAME, EMAIL), to coordinate re -inspection. ROW PERMIT RELEASE - WATER. Written notice received by Lakehaven from (ROW AGENCY), 36 indicating satisfactory restoration of the ROW under their permit for water construction (No. TBD). ROW PERMIT RELEASE - SEWER. Written notice received by Lakehaven from (ROW AGENCY), 37 indicating satisfactory restoration of the ROW under their permit for sewer construction (No. TBD). OFF -SITE EASEMENT RESTORATION RELEASE(S). Written notice from the adjacent property 38 owner(s), indicating satisfactory restoration of their property (off -site easements) following construction. Project Checklist-6318021.xisx (09-01-17) Lakehaven ITEM PROJECT ITEM DETAILS & DESCRIPTIONS # RECORDED FINAL PLAT/BSP/BLA. Copy of the recorded final plat/BSP/BLA. 39 Proposed/preliminary final plat/BSP/BLA documents should be submitted to Lakehaven for review as part of the Substantial Completion process summarized above, to be certain easement reiQuirements are satisfactorilyaddressed. 40 DE WARRANTY INSPECTION FEE(S). Payment of the applicable DE Warranty Inspection Fees: Water = $330.00 [20171, Sewer = $610.00 [2017]. PRIOR TO PR03ECT ACCOUNT INITIAL CLOSEOUT 41 FINAL DE PROJECT INVOICE OR REFUND. Payment by Developer of the final DE project invoice or final project Refund by Lakehaven, whichever is applicable. PRIOR TO FINAL PR03ECT CLOSEOUT AFTER 2-YEAR WARRANTY PERIOD WARRANTY INSPECTION - WATER. Satisfactory "Warranty" inspection of the water facilities 42 constructed for the project, including correction of all defects noted during the "Warranty" inspection. If provided notice of any items requiring correction, please contact Lakehaven's assigned project technician, NAME (EMAIL@ Lakehaven.org), to coordinate re -inspection. WARRANTY INSPECTION - SEWER. Satisfactory "Warranty" inspection of the sewer facilities 43 constructed for the project, including correction of all defects noted during the "Warranty" inspection. If provided notice of any items requiring correction, please contact Lakehaven's assigned project technician, NAME (EMAIL@ Lakehaven.org), to coordinate re -inspection. Project Checklist-6318021.x1sx (09-01-17) 4 ty Lakehaven �Project Name: MIRROR LAKE ELEMENTARY SCHOOL - PO 18802267 Project No.: 6318021 Project Tech.: BIA Updated: 10 23/2018 Notes: Any/all requests for modifications to Lakehaven's standards, specifications, policies &/or A. resolutions shall be made in writing (Plan Review Checklist comment, email, or letter) to Lakehaven. Fees, charges &/or deposits indicated are based on current Lakehaven schedule, are typically B' reviewed annually, & are subject to chan e without notice. PRIOR TO ACCEPTANCE BY LAKEHAVEN 33 N/A . 34 Acceptance Inspection(s) - Water. 35 N/A weF. 36 ROW Permit Release - Water. 7 A TLT.]Release GC9Pe'r7 38 N/A 1Gff- ReSt-Fati5H Rele. se(s-)L asefnen tue.. N/A_ n,.,,rpi .1 -; .,E niaVzCnlQn39 .. •..vsfi .. LEr 40 DE Warranty Inspection Fee(s). PRIOR TO PROJECT ACCOUNT INITIAL CLOSEOUT 41 Final DE Project Invoice or Refund. PRIOR TO FINAL PROJECT CLOSEOUT AFTER 2-YEAR WARRANTY PERIOD 42 lWarranty Inspection - Water. 43 NIA . Project Checklist-6318021.x1sx (Form Update 09-01-17) Page 2 of 8 u 9 ra�r��rg C&& $LtAlLffj r u. q 33) N ]0 0 � scale T=301 PALPESY LIDS/��� IX CUMDOUR 0000) IX CIITTOUR PROPoSED GGNrouR WIN) �I PROPOSED GD LTR ®C8 LINE SPOT ELEVATION IFF]RO F➢1@® Rnm E-EVAION EX BUILDING �l/I/I Lb�N a PROPOSED BUILDING COIICFErE PAVEYENT HEAVY DUTY CONCRET ._.'._�._....., AspWLT(AC) PAVEUENT NIM SURFACING WEWEL VEHIM CURB CURB A40 GUTTER E- PRE-SETTUNG CASHIIA D FILTER GRAVEL DISPERSION TFSKH a � LEVEL FADER SHEEF Raw DISPEZsa is DTHRTY SPALL DECWAGE PAD APF� DRAIN GM1 BASIN TPE T f� GTaI BAD! 71'FF 2 r PGOTMG/SUFSTIRFACE DIEM MOON PFE n STORN GRAM ClEANOUT g1CaO F X DRAIN CTFATIOUT ramp caRm5011r m— DU NWOUTS w/ scN BLOCK Ezra Q-00 T BOUATm [•lE "OR"' TLGH FITTINGS wTATrZi SERVKZ UNES wYi NERER )oM S WE UNES eF� SRJICE LINE fkU SEIMM VADLT FK SA COtINE.TION WATER AVAILABILITY AVAILABLE 2100 GPM FLOWS STATIC 33-42 PSI PRESSURE RESIDUAL NOT AVAILABLE 8" LOOP AND RECOMMENDATION BOOSTER PUMP IPA cau� days before you 69. SCHEMATIC DESIGN 00 E T= pry ® r�s LL x 3 �a ch ED L.1 N m W LLI LU LU 1- LL LU w LL LL 0� pale T-15�18 .wb � ream a BL: EVW Che�ai by LIP ReN4o- s Rw a—w- PAVING AND UTILITIES G-300 MIRROR LAKE ELEMENTARY SCHOOL — PO 18802268 Lakehaven Project No. 6318021 AGREEMENT THIS AGREEMENT, entered into in duplicate between the LAKEHAVEN WATER AND SEWER DISTRICT, King County, a municipal corporation of the State of Washington, hereinafter referred to as "the District" and FEDERAL WAY PUBLIC SCHOOLS, hereinafter referred to as "the Developer". WITNESSETH: WHEREAS, the District operates and maintains a water distribution system within its boundaries which can serve property of the Developer, and WHEREAS, the Developer desires to construct certain water mains and appurtenances at its own cost to serve the Developer's property, for delivery to and operation by the District, NOW, THEREFORE, IT IS HEREBY AGREED that: 1. The land for which domestic water service is requested and to which this Agreement applies, is realty in King County, Washington, legally described in Exhibit "A" and generally depicted in Exhibit "B", attached hereto and by this reference incorporated herein. By executing this Agreement, the Developer represents and warrants that it is the owner of record of the above -described property. If such representation of ownership is invalid, this Agreement shall be void as to the portion of the property not owned by the Developer. The Developer agrees that the District may require the Developer to furnish a title report for the property at the Developer's expense. 2. All newly created legal descriptions shall be furnished by the Developer and shall be stamped and signed by a professional land surveyor licensed in the State of Washington. Each newly created legal description shall be accompanied by a drawing that graphically depicts the legal description. 3. The Developer has paid the required deposit as set forth in District Resolution No. 2017-1300, or any subsequent amendment thereto. Said deposit shall be applied against actual expenses of the District, including all bacteriological testing and sampling. The District shall determine, on a regular basis, its actual costs associated with the project, including taxes, and shall submit to the Developer an invoice to repay the District for actual costs in excess of the amount previously collected. Payment shall be due as noted on said invoice. Off -hours labor, including overhead, costs for such inspections will be charged to the project on an DE Agr-6318021.docx (Form Update 12/19/17) Page 1 of 8 overtime basis. The Developer agrees that the project account shall remain current for the life of the project and delinquency of any kind shall induce work stop action/orders, suspension/termination of service or any other action necessary to effect collection of monies owed the District. In the event monies are owed the District for work on, or unpaid charges allocated to, the project, as determined by the District, Developer agrees that the District shall be entitled to recover such monies by withholding and making application for payment to itself, any assignment of funds, cash deposits or latecomer reimbursements otherwise owing to the Developer. In the event that the deposit exceeds the District's actual expenses, the District shall issue to the Developer, at project closing, a refund of such unused amounts. 4. Except as noted herein, all work conducted by the District will be performed during normal work hours. The Developer may, at their discretion, submit a written request to the District for District non-exempt staff to expend overtime for tasks and services related to the completion of this Agreement. Said written request(s) shall state the Developer's reasons for the request(s) that would qualify it as an "emergency" (e.g., "excessive" additional expenses for any delays in plan review (actual/estimated figures should be provided), approaching unfavorable weather conditions for construction, permit expirations, etc.). Each written request submitted to the District for this purpose should also specify any component limitations the Developer desires (e.g., request for plan review/approval, request for construction inspections, etc.). S. In the event work and construction described herein is not completed within five (5) years from the date of application for this Agreement, said application date being OCTOBER 5, 2018, the District can terminate the Agreement without notice, the Agreement shall then be void, and a new Developer Extension Agreement Application, along with applicable fee, will be required to re -commence and subsequently complete said work. 6. It is agreed by the parties that time is of the essence in all matters relating to the performance of this Agreement. 7. The Developer agrees that all requests for modification to District standards, specifications, policies or Resolution shall be submitted in writing to the District. Such requests shall be reviewed and the District will provide a written response to each submitted written request. S. The District shall review final plans and specifications for water distribution system construction to be performed by the Developer under this Agreement. If preliminary plans are not deemed acceptable by the District, the Developer shall be obligated to revise the plans and specifications in accordance with design standards deemed acceptable by the District. In the event that more than three (3) items are found to remain deficient by the District on the third submittal of plans, subsequent review by District staff may be billed at a factor of 1.5 times the standard rate without further notice to the Developer. The Developer shall submit final plans for construction in AutoCAD format (on disk or via email attachment), and on standard print media (24"06" or 22"04" size), prior to scheduling the preconstruction meeting. After the Developer has been notified in writing by the District that final plans and specifications have been approved, and all other necessary items have been addressed and resolved, the Developer and the Developer's contractor shall meet with the District's representatives for a preconstruction meeting before construction is commenced. DE Agr-6318021.docx (Form Update 12/19/17) Page 2 of 8 9. The Developer agrees that it shall be responsible for providing to the District accurate and reliable information concerning the actual location of the facilities constructed. In furtherance of this obligation, the Developer shall procure from LPE ENGINEERING PLLC, or other licensed engineer or surveyor that the Developer has indicated will be consulting on the construction phase of the project, a written statement, which shall be submitted to the District prior to scheduling the preconstruction meeting, stating that accurate data will be collected during construction of the facilities to enable the engineer/surveyor to submit actual and reliable "as -built" locations to the District, based upon the information available to the engineer/surveyor during construction and also by field survey of the constructed facilities that are accessible at the ground surface. The Developer shall cause such engineer/surveyor to submit to the District, prior to scheduling the preconstruction meeting, a certificate of insurance for the engineer's/surveyor's Errors and Omissions policy. The Developer shall also cause such engineer/surveyor to submit to the District, prior to scheduling the preconstruction meeting, a certificate of insurance and a copy of an endorsement to the engineer's/surveyor's General Liability policy, naming the District as an additional insured as respects the obligations set forth in this section. The limits for Errors and Omissions and General Liability Insurance shall not be less than $1,000,000.00 for each claim; $1,000,000.00 aggregate. At the conclusion of construction and prior to and as a condition of acceptance, the engineer/surveyor shall deliver to the District its certification that it has made periodic field investigations and measurements during construction and that the "as -built" drawings submitted to the District, which drawings shall be provided in AutoCAD format (on disk or via email attachment) and on original or fixed -line photo mylar, are accurate and reliable. The District shall have the right to approve any change in the consulting engineer or surveyor during the project and the Developer agrees that the District may refuse any change in the consulting engineer or surveyor or may condition the same on resubmittal of the certification of location described above. No approval of any new engineer or surveyor shall be unreasonably withheld by the District. 10. The District will make application for the CITY OF FEDERAL WAY 'Right-of-way Construction Permit(s)'. The Developer acknowledges familiarity with the provisions of such Right-of-way Construction Permit(s) and agrees that it or its contractor's failure to comply with any of the provisions of the permit(s) shall entitle the District, in addition to the right to enforce any other remedy available to the CITY OF FEDERAL WAY as the permitting party, to immediately stop all construction activity on the right-of-way until the violation or violations have been eliminated and corrected to the satisfaction of the District and the District should not be held liable for any damages, either direct or indirect, for the delay and expense of such work stoppage. The Developer shall procure all other state, county and city licenses or permits. 11. The Developer agrees this Agreement shall create twenty -foot (20') wide [pipe(s) offset five -feet (5') from nearest margin] non-exclusive easement areas and right-of- way granted to the District For water distribution facilities and all appurtenances related thereto, as indicated on water facility construction plans approved by the District for the project, respectively, through, over and across the Developer's property. This easement shall be maintained in full force and effect unless superseded and replaced by another easement as determined acceptable by the District. 12. In the event an easement is required over realty other than realty described in Paragraphs No. 1 & No. 11 herein, such easement, in form acceptable to the District, together with title report or other sufficient proof of ownership of such realty, shall be delivered to the DE Agr-6318021.docx (Form Update 12/19/17) Page 3 of 8 District prior to scheduling the preconstruction meeting. The Developer shall be obligated to obtain a written release from any property owner across whose property construction is performed pursuant to the grant of an easement, sufficient to indicate that the site restoration on the easement is satisfactory and complete. 13. Prior to scheduling the preconstruction meeting, the Developer shall deliver to the District a restoration performance bond in a sum to be determined by the District after receipt of any required Right -of -Way Construction Permit(s) and/or after the determination of off -site restoration requirements related to the work described herein, conditioned that the Developer will restore to the satisfaction of the District, and state, county, and city agencies as applicable, all work to be performed hereunder in public rights -of -way and the District's easements. Form and contents of bond shall be determined by the District. This requirement is waived for public authorities; however, Developer shall be held accountable for any such restoration. Should any restoration work be determined necessary, Developer will be notified to complete the restoration work. If such work is not corrected within the specified time, the District will perform the work and issue an invoice to the Developer. Said invoice shall be paid within thirty (30) days of issue date. 14. Construction shall be performed in accordance with the District's approved plans, standards and specifications and only under the supervision of a licensed contractor experienced in the installation of water distribution system facilities and the related work. 15. Two (2) sets of materials submittals shall be submitted to the District as one package, bound and indexed with a table of contents, for all equipment/material to be furnished for this project. Each submitted piece of equipment/material shall be fully defined by catalog number and reference made as to its applicable section of the District's standard specifications. Materials submittals shall be submitted prior to scheduling the preconstruction meeting. 16. By execution of this Agreement, the District does not guarantee water service will be provided to realty described herein. In the event that any of the District's facilities, such as storage tanks, wells, and water transmission mains become utilized beyond their design or approved capacity or become inoperable for any cause, the District reserves the right to refuse any connections which would use such facility until remedial action has been completed, and the District shall not be liable for any direct or consequential damages which occur to the Developer arising out of such the District's refusal to connect or time delay necessary to take remedial action. 17. The Developer and its agents agree to indemnify and hold the District harmless from any and all claims which may be assessed against the District as a result of the construction or maintenance of the work described in this Agreement prior to acceptance by the District. The Developer shall maintain in full force and effect during the construction period, the following insurance: Commercial General Liability Insurance with bodily injury and property damage limits of not less than: $1,000,000.00 Each Occurrence $2,000,000.00 General Aggregate $2,000,000.00 Products -Completed Operations Aggregate Limit DE Agr-6318021.docx (Form Update 12/19/17) Page 4 of 8 b. Business Auto Liability coverage for all owned, non -owned, and hired autos with bodily injury and property damage limits of not less than: $1,000,000.00 Each Accident A certificate of insurance and a copy of an endorsement to the Developer's Commercial General Liability Insurance policy, showing the District as additional insured as respects the work to be performed under this Agreement, shall be provided prior to scheduling the preconstruction meeting. Thirty (30) days written notice shall be given to the District for cancellation or expiration of this insurance. 18. The Developer shall notify the District the date work and construction described in this Agreement will commence, and said notice shall be given not less than 72 hours (not including Saturday, Sunday, or national holidays) prior to such date. No water distribution system facility shall be covered prior to inspection by the District. After work is commenced, it shall vigorously, consistently, and in a first-class workmanlike manner be carried to completion. The Developer shall maintain at the construction area at all times during construction, a representative to whom District notices may be given regarding construction. Said representative shall be designated in writing by the Developer before start of work. The Developer may request inspections during construction upon two (2) days notice to the District. 19. Testing of water system facilities shall be performed as required by the District and only after satisfactory tests have been completed and witnessed by the District's designated agent, will the work be accepted. The Developer agrees that at such time as the District has performed inspection of the water distribution system facilities & system connections and has delivered itemized punch lists to the Developer and/or the Developer's contractor, that the project will be pursued to final completion, including the performance of all necessary site restoration. 20. Upon completion of construction, the Developer or the Developer's contractor shall deliver to the District a guarantee in the amount of ten percent (10%) of construction costs or $5,000.00, whichever is greater, that a reliable contractor will make and pay for repairs necessary within two (2) years from the date of acceptance of said construction, arising from faulty labor or material. Form of guarantee is to be approved by general counsel for the District. This requirement is waived for public authorities; however, Developer shall be held accountable for any such repairs. Should any defects be discovered within the specified 2-year time period, Developer will be notified and given ample time to correct same. If defects are not corrected within the specified time, Lakehaven will perform the work and issue an invoice to the Developer. Said invoice shall be paid within thirty (30) days of issue date. This paragraph shall be valid beyond the release of this Agreement and until the District closes out the associated project account. 21. Upon completion of construction, the Developer shall submit, for acceptance and approval of the District, Bills of Sale for water distribution system facilities, mains and appurtenances installed and constructed pursuant to this Agreement, in a form acceptable to the District, together with such other engineering records and project cost data as may be required by the District. DE Agr-6318021.docx (Form Update 12/19/17) Page 5 of 8 22. As a condition of District acceptance of the project, the Developer shall submit to the District a non-refundable warranty inspection fee for water, as set forth in District Resolution No. 2017-1300, or any subsequent amendment thereto, to be held by the District and applied against actual expenses of the District incurred to complete warranty inspections following the two-year warranty period. 23. In the event new or modified District easements are required over Developer's property described herein, such easements, in form acceptable to the District, shall be delivered to the District as a condition of & prior to the activation of any new or modified service connections for the property. 24. In the event the Developer requests and the District provides water meters for the realty described herein, prior to the District's acceptance of work, the Developer agrees to be solely responsible for any loss or damage to such water meters or their installation, which occurs prior to said acceptance of work by the District. 25. Work and construction performed under this Agreement shall not be connected to the District's water distribution systems until all provisions and requirements of this Agreement and District Resolutions, on the part of the Developer, have been fully complied with. 26. The District and the Developer agree that in carrying out the terms of this contract, the Developer shall be acting as an independent contractor and in no respect shall Developer be deemed an agent or partner of the District. 27. The Developer shall not assign this contract without the written consent of the District. 28. The District shall provide water service following the District's acceptance of the water distribution facilities for operation and maintenance and upon payment of the connection charges as set forth and in accordance with District Resolution No. 2017-1300. Said connection charges shall consist of the Capital Facilities Charge (CFC), Service &/or Meter Installation Charge &/or Deposit, and any other such charges levied in accordance with said District Resolution No. 2017-1300 or amendments thereto or any other applicable District Resolution at time service is requested. 29. The parties agree that, if determined applicable by the District, the provision of latecomer reimbursements for system facilities constructed pursuant to this Agreement will be handled by separate agreement to be executed between the parties within a reasonable time following acceptance of the facilities and establishment of the appropriate latecomer reimbursement area by the District's Board of Commissioners. Any applicable latecomer reimbursement period will be limited to 15 years, or longer, pursuant to the provisions of state law. 30. Partial waiver or waiver by acquiescence by the District of any provision or condition of this Agreement shall not be a waiver of any other provision or condition of this Agreement. 31. This Agreement shall constitute an easement and servitude upon the property described herein and shall be binding upon the heirs, assigns and successors in interest to the DE Agr-6318021.docx (Form Update 12/19/17) Page 6 of 8 Developer. This Agreement shall constitute an equitable lien against property described herein and in the event of nonperformance by the Developer, as stated herein, the District may foreclose said lien in the manner authorized by law. 32. This writing constitutes the full and only agreement between the parties, there being no promises, agreements or understandings, written or oral, except as herein set forth, or as hereinafter may be amended in writing. 33. Upon execution of this Agreement, the parties agree in the event either of them is required to enforce any provision or provisions of this Agreement against the other, that the prevailing party shall be entitled, in addition to all other amounts to which it is otherwise entitled by this Agreement, to its actual attorney's fees and costs, including those incurred on appeal. DE Agr-6318021.docx (Form Update 12/19/17) Page 7 of 8 WITNESS our hands and seals. FEDERAL WAY PUBLIC SCHOOLS Its Date: JLVWLA {5 2-1, 1 State of �V&SkLtjg4r: +-t County of KL LAKEHAVEN WATER & SEWER DISTRICT King County, Washington De/elopmght Engineering Manager Dated: (2 This record was acknowledged before me on ja-Ab 9' 20 (bate) by {Dt r tvb� Celt b� � � as Sze t�icZ�L'r�c� t�� — Narne) (Type ofAuthority, Title) (Company N a e) chary Lucille Helbling Notary Public State of Washln®ton My AppoWmrs Wres =8021 For recording in the State of Washington, the Notarial Seal must be fully legible and cannot intrude into document margins. Please affix seal in the space provided. DATED: Ta 64-L Ugo 2V (Signatu� Nota P(iblic Title My appointment expires o'�'l)t f 2-C 2-1 DE Agr-6318021.docx (Form Update 12/19/17) Page 8 of 8 EXHIBIT "A" LEGAL PROPERTY ❑ESCRI_PTION THE SOUTHEAST QUARTER OF THE NORTHEAST QUARTER OF THE SOUTHWEST QUARTER OF SECTION 8, TOWNSHIP 21 NORTH, RANGE 4 EAST, W.M., IN KING COUNTY, WASHINGTON; LESS THE EAST 30 FEET OF THE NORTH THREE -FOURTHS THEREOF; LESS THE WEST 30 FEET; LESS THE NORTH 30 FEET; AND LESS THE SOUTH 30 FEET. TAX PARCEL NO. 0821049035 41 PROPERTY DEPICTION II [8603400010 ^ 8603400075 31248 31249 8603400005 8603400080 31256 31257 h f l EXHIBIT "B" u5buuuuulu 559600130•, 5 596001fl 713 8588000035 31249 85880 00040 7 F 1 31255 S 314TH Sr 8588000045 31407 8588000050 31415 fl 8588000055 v' 31423 I w I 0821049035 858800006�O w 625 31431 � w 8588000065 31439 S 315TH S T 0 100 200 B588000070 31507 FEET 8508000075 31513 4160006 \ 7941500060 8588000080 620 94150007 31610/f 31521 � 31611 8588010085 S 396TH FLU-- 94160005 41500050 31529 3�6a8 ( 31614 7�J41600040 31604 8588000090 94150004 31605 n 0-i a"n