23-102539City of Federal Way
Community Development Dept
33325 Sth Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: UW PHYSICIANS NETWORK
Project Address: 32018 23RD AVE S
Plumbing
Permit #:23-102539-00-PL
Inspection Request Line: (253) 835-3050
Parcel Number: 162104 9028
Project Description: BLUEBEAM - Plumbing for tenant improvements - (5) new fixtures.
Owner
Applicant
Contractor
FW TOWNE SQUARE L L C
TAYLOR KENNEYENVIROMECH
ENVIROMECH (PLUMBING)
PO BOX 98922
430 SW 153RD ST
ENVIR**79504 (9/15/23)
TACOMA, WA 98498
BURIEN WA 98166
430 SW 153RD ST
BURTEN WA 98166
i'lumbing Fixtures u �' ; "iY-.. .•�. i
Drinking Fountains 1 Lavatories 1 Sinks 2
Water Closets l
PERMIT EXPIRES Sunday, 14 January, 2024
Permit Issued on Tuesday, July 18, 2023
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the City of Federal Way.
Owner or agent: ! ! Date-
._.
Flti�•-�D
THIS CARD IS TO REMAIN ON -SITE
CITY OF Construction Inspection Record
Federal Way INSPECTION REQUESTS: (253) 835-3050
PERMIT #: 23 102539 00 Address: 32018 23RD AVE S
Project: FW TOWNE SQUARE L L C FEDERAL WAY WA 98003-6031
Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
0 Plumbing Groundwork (4190) Rough Plumbing (4230) Final - Plumbing (4075)
Approved to cover PP Approved Approved
By Date 116 By Date � By Date
0�/23 -j G -?LOk-
Rough Electrical
Final Electrical
❑
Right of Way
Approved
Approved
Approved
By Date
By
Date
By
Date