RE: FILE #11-100058-00-AD; MODIFICATION OF PROCESS IV SITE PLAN APPROVAL
St. Luke's Lutheran Church, 515 South 312th Street, Federal Way
Dear Mr. Hammer:
The Community and Economic Development Department hereby approves your request to modify the
Process IV site plan approved by the city's Hearing Examiner. The approved modification is limited to
the 109 square -foot increase to the storage addition on the existing church building. The applicant has
stated the modification is needed due to unforeseen below -grade infrastructure conflicts.
Department staff fmds the following modification criteria set forth in Federal Way Revised Code
19.15.090(2) have been met:
• there is no change in use; and
• no substantial changes in the impacts on the neighborhood or the city as a result of the change.
Please contact Matthew Herrera, Associate Planner, at 253-835-2638 or
matt.lierreLa@cityoffedera[way.com if you have any questions regarding this letter.
Sincerely,
Isaac Conlen
Planning Division Manager
for Patrick Doherty, Director
enc: Approved Site Plan
Doc I D. 56694
Ault I I - (cI)Do5R-,
B R 0 W E L E I T
P E T E R S 0 N
HAMMER
l
ARCHITECTS
St. Luke's Lutheran Church
Request for Modification to Use Permit
Federal Way Planning Staff,
St. Luke's Lutheran Church respectfully requests a modification to the approved Use Permit, 10-
100599-00-UP. During construction a water line was discovered that is running right where we
had shown the exterior wall line of the storage addition portion of the project. It is technically
infeasible to have the footing over the waterline, and moving the waterline would be extremely
expensive. So we are requesting that the footprint of the storage addition be increased slightly to
miss the waterline
This will actually be an improvement to the look off the addition because the east wall of the
addition will now align with the existing wall, and the roofline will be simplified. We are not
increasing the height of the building and we are still within the building setback requirement for
the site.
This request is only being made because the footprint of the storage addition will increase slightly
from 600 SF to 709 SF. See attached revised elevations and site plan with the area in question
clouded.
Please feel free to call or email if you have any questions.
Si erely".
eve ammer, Prime•
PH Architects
(425) 774-4701, Ext. 14
Steve@bpharcfi.cam
RECEIVED
BAN U 7 2011
CITY OF FEDERAL WAY
CDS
19624A 76TH AVENUE WEST, LYNNWOOD, WA 98036 PH (425) 774.4701 FAX (425) 776.5177 WWW BPHARCH.COM