Loading...
17-105489-Process IV Plan Set-12-21-2023n SCALE: 1" = 200'C O N S U L T I N G E N G I N E E R SL L CFederal Way, WA 9800333400 8th Ave S, Suite 205FEDERAL WAY CAMPUS, LLCWOODBRIDGE BUSINESS PARKCV-01 1 17 DATUM: N.G.V.D. 29 BUILDING "1" EXISTING WTC BUILDING POND 2 DETENTION BUILDING "2" POND 3 DETENTION BUILDING "3" POND 4 DETENTION POND 5 DETENTION PROJECT CONTACTS: SHEET INDEX: CIVIL PLANS ARCHITECTURAL PLANS Vicinity Map SITE ST-02 / EX-02 / SD-02 / GR-02 ST-01 / EX-01 / SD-01 / GR-01 INTERSTATE 5WEYERHAEUSER WAY S.S 336TH STWEYERHAEUSERWAY S.NOT A PART NORTH LAKE NORTH LAKE LOT 3 LOT 2 LOT 1 LOT 3 LOT 1 NOT A PART EXISTING PARCELS BUILDABLE LAND CALCULATIONS SITE DATA: IMPERVIOUS AREAS VAULT 1A DETENTION VAULT 1B DETENTION NOT A PART PARKING COUNT PER BUILDING 12/21/2023 n SCALE: 1" = 80' BUILDING "1" 605,195 SF FF=VARIES 442.38-448.45 EXISTING WTC BUILDING FF=437.00 C O N S U L T I N G E N G I N E E R SL L CFederal Way, WA 9800333400 8th Ave S, Suite 205FEDERAL WAY CAMPUS, LLCWOODBRIDGE BUSINESS PARKST-01 2 17INTERSTATE 5WEYERHAEUSER WAY S.Vicinity Map SITE DATUM: N.G.V.D. 29 POND 2 DETENTION SEE SHEET ST-02 FOR CONTINUATION TYPICAL 8.5'x18' PARKING WETLAND LEGEND NOT A PART NOT A PARTVAULT 1A DETENTION VAULT 1B DETENTION 12/21/2023 S 336 T H S T n SCALE: 1" = 80' BUILDING "2" 240,675 SF FF=VARIES 420.28-424.53 BUILDING "3" 125,520 SF FF=VARIES 422.13-424.50 EXISTING WTC BUILDING FF=437.00 C O N S U L T I N G E N G I N E E R SL L CFederal Way, WA 9800333400 8th Ave S, Suite 205FEDERAL WAY CAMPUS, LLCWOODBRIDGE BUSINESS PARKST-02 3 17INTERSTATE 5WEYERHAEUSE R WAY S. DATUM: N.G.V.D. 29 POND 3 DETENTION POND 4 DETENTION POND 5 DETENTION WEYERHAEUSER WAY S.SEE SHEET ST-01 FOR CONTINUATION WETLAND LEGEND NOT A PART NOT A PART 12/21/2023 C O N S U L T I N G E N G I N E E R SL L CFederal Way, WA 9800333400 8th Ave S, Suite 205A PORTION OF SECTIONS 15, 16, 21 AND 22, T. 21 N., R. 4 E., W.M.FEDERAL WAY CAMPUS, LLCWOODBRIDGE BUSINESS PARKEX-01 4 17 n SCALE: 1" = 80' EXISTING WTC BUILDINGINTERSTATE 5WEYERHAEUSER WAY S.DATUM: N.G.V.D. 29 SEE SHEET EX-02 FOR CONTINUATION BASIS OF BEARING LEGAL DESCRIPTION BASIS OF HORIZONTAL DATUM VERTICAL DATUM TEMPORARY BENCH MARKSWETLANDS WITHIN SHORELINE MANAGEMENT ZONE WETLANDS: LOT 2 LOT 3 LOT 1 LEGEND (ABBREVIATED) NOT A PART SITE AREA OP-1 ZONE RS9.6 ZONE OP-1 ZONERS9 . 6 ZONE NOT A PART 12/21/2023 C O N S U L T I N G E N G I N E E R SL L CFederal Way, WA 9800333400 8th Ave S, Suite 205A PORTION OF SECTIONS 15, 16, 21 AND 22, T. 21 N., R. 4 E., W.M.FEDERAL WAY CAMPUS, LLCWOODBRIDGE BUSINESS PARKEX-02 5 17 S 336 T H S T EXISTING WTC BUILDING INTERSTATE 5WEYER HAEUSER WAY S.WEYERHAEUSER WAY S.SEE SHEET EX-01 FOR CONTINUATION n SCALE: 1" = 80' DATUM: N.G.V.D. 29 LOT 1 LOT 4 NOT A PART LEGEND (ABBREVIATED) NOT A PART NOT A PART 12/21/2023 C O N S U L T I N G E N G I N E E R SL L CFederal Way, WA 9800333400 8th Ave S, Suite 205FEDERAL WAY CAMPUS, LLCWOODBRIDGE BUSINESS PARKLG-01 6 17 ABBREVIATIONSLEGEND 12/21/2023 n SCALE: 1" = 80' BUILDING "1" 605,195 SF FF=VARIES 442.38-448.45 EXISTING WTC BUILDING FF=437.00 C O N S U L T I N G E N G I N E E R SL L CFederal Way, WA 9800333400 8th Ave S, Suite 205FEDERAL WAY CAMPUS, LLCWOODBRIDGE BUSINESS PARKSD-01 7 17INTERSTATE 5WEYERHAEUSER WAY S.DATUM: N.G.V.D. 29 POND 2 DETENTION VAULT 1A DETENTION SEE SHEET SD-02 FOR CONTINUATION ARTERIAL / COLLECTOR SECTION K VAULT 1B DETENTION NOT A PART 12/21/2023 S 336 T H S T n SCALE: 1" = 80' BUILDING "2" 240,675 SF FF=VARIES 420.28-424.53 BUILDING "3" 125,520 SF FF=VARIES 422.13-424.50 EXISTING WTC BUILDING FF=437.00 C O N S U L T I N G E N G I N E E R SL L CFederal Way, WA 9800333400 8th Ave S, Suite 205FEDERAL WAY CAMPUS, LLCWOODBRIDGE BUSINESS PARKSD-02 8 17INTERSTATE 5WEYER HAEUSER WAY S. DATUM: N.G.V.D. 29 POND 3 DETENTION POND 4 DETENTION POND 5 DETENTION WEYERHAEUSER WAY S.SEE SHEET SD-01 FOR CONTINUATION NOT A PART NOT A PART NOT A PART 12/21/2023 n SCALE: 1" = 200'WE Y E R H A E U S E R W A Y S INTER S T A T E 5 HWY 1 8 WAREHOUSE "A" WAREHOUSE "B" PROPOSED BUSINESS PARKS 323RD STS 320TH STS 3 3 6 T H S T 3 3 R D P L S C O N S U L T I N G E N G I N E E R SL L CFederal Way, WA 9800333400 8th Ave S, Suite 205FEDERAL WAY CAMPUS, LLCWOODBRIDGE BUSINESS PARKFR-01 9 17 FULL PAVEMENT RECONSTRUCTION PAVEMENT SECTIONA LEGEND WTC A 12/21/2023 ASPHALT PAVEMENTDIRT ROAD DIRT ROADT T 8" 7" 15" 8" 7"15"G G ASPHALT PAVEMENTG S S S 12"CP 12"CPWETLAND FA WAS DETERMINED TO NOT BE A WETLAND IN CONJUNCTION WITH THE PLAN APPROVAL FOR THE DAVITA SITE.AAAAAA AAA AAAAAA AAAAAAAAA AAA XFMRE002E002AAAAAA AAA AAA AAA AAA AAA AAA AAA AAA AAA AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAT NEXT SIGNAL" "SO. 320th PSEPV NEXT SIGNAL" "SO. 320th T PSEPV S S S S SS FORCE MAIN SHOT ON 90%%d BEND UNDERGROUND GAS MARKER WP T G SS FORCE MAIN SHOT ON 90%%d BEND UNDERGROUND GAS MARKER S S T 12" AAA AAA AAA AAA AAAAAAAAA201200ΑΤΗΚΧΗΜΦ !0! ∆ΩΗΡΣΗΜΦ ςΣΒ ΑΤΗΚΧΗΜΦ NO.DESCRIPTION/DATE BY REVISIONS DWG. NAME DESIGNED BY: DRAWN BY: CHECKED BY: DATE: OF SHEETS JOB NO.\\\\esm8\\engr\\esm-jobs\\1886\\001\\016-0016\\plots\\process iii\\LA-01.dwg12/14/2023 5:31 PMPlotted:File:Plotted By: Leanne KuhlmanLYNNWOODFEDERAL WAYΒ Ν Μ Ρ Τ Κ Σ Η Μ Φ ∆ Μ Φ Η Μ ∆ ∆ Θ ΡΚ Κ ΒCivil EngineeringProject ManagementLand SurveyingLandscape ArchitectureLand Planningwww.esmcivil.com(253) 838-6113(425) 297-9900Public WorksΕδχδθκ ςξ+ ς≅ 87//2223// 7σγ ≅υδ Ρ+ Ρτησδ 1/4Ε∆Χ∆Θ≅Κ ς≅Ξ Β≅ΛΟΤΡ+ ΚΚΒςΝΝΧΑΘΗΧΦ∆ ΑΤΡΗΜ∆ΡΡ Ο≅ΘϑPRELIMINARY LANDSCAPE PLANWASHINGTONCITY OF FEDERAL WAY1886-001-016 LA-01 LDK LDK 12/11/2023 Κ≅,/0 0/06ΗΜΣ∆ΘΡΣ≅Σ∆ 4ς∆Ξ∆ΘΓ≅∆ΤΡ∆Θ ς≅Ξ Ρ−ΟΝΜΧ 1 Χ∆Σ∆ΜΣΗΝΜ Ρ∆∆ ΡΓ∆∆Σ Κ≅,/1 ΕΝΘ ΒΝΜΣΗΜΤ≅ΣΗΝΜ \A1;100' MANAGED FOREST BUFFER \A1;25' MANAGED FOREST BUFFER ΟΘ∆ΚΗΛΗΜ≅ΘΞ ΟΚ≅ΜΣ Ο≅Κ∆ΣΣ∆ 2-1/2" cal.126 144 53 2-1/2" cal. %%USymbol %%UComments%%UBotanical / Common Name %%USize %%UQuantity 2-1/2" cal. Full, vigorous, B&B TR-18 TR-65 TR-01 97 Full, vigorous, B&B" 94 Full, vigorous, B&B TR-10 TR-30 91" 1192-1/2" cal. TR-09 TR-14 Full, vigorous, B&B (D) AFTER PLANT NAME DENOTES "DROUGHT TOLERANT" A MINIMUM OF 25% OF PROPOSED PLANTS ARE DROUGHT TOLERANT PURSUANT TO FWC22-1564(f) Tsuga heterophylla / WESTERN HEMLOCK Interior parking area- deciduous, species to be determined (D) Interior parking area- deciduous, species to be determined (D) Street tree species per City of Federal Way Approved Street Tree List (D) Street tree species per City of Federal Way Approved Street Tree List (D) Chamaecyparis nootkatensis / ALASKAN CEDAR Thuja plicata 'Hogan' / HOGAN CEDAR Full, balanced branching, B&B Full, balanced branching, B&B Full, balanced branching, B&B PER 1994 FWCC CHAPTER 22 PARKING LOT LANDSCAPE SCREENING ADJACENT TO PUBLIC RIGHTS-OF-WAY IS REQUIRED AND SHALL INCORPORATE BERMS AT LEAST 3' IN HEIGHT WITHIN PERIMETER LANDSCAPE AREAS. ALTERNATIVELY, IF APPROVED BY THE COMMUNITY DEVELOPMENT DIRECTOR, SUBSTANTIAL SHRUB PLANTINGS MUST BE ADDED TO THE REQUIRED PERIMETER LANDSCAPING...TO ACT AS AN EFFICIENT SUBSTITUTE FOR THE 3' BERM, TO REDUCE VISUAL IMPACT OF PARKING AREAS AND SCREEN AUTOMOBILES. {THE UNDISTURBED 50' WIDTH NATURAL FORESTED BUFFER IS AN EFFICIENT SUBSTITUTE FOR THE 3' BERM OR ADDITIONAL SHRUB PLANTINGS}. PER THE CONCOMITANT AGREEMENT, SECTION XI, LANDSCAPING: ALL UNDEVELOPED AREA SHALL BE LEFT IN A NATIVE STATE ALL PROPOSED VEGETATION SHALL BE DETERMINED TO BE COMPATIBLE WITH EXISTING VEGETATION. NEW PARKING LOT LANDSCAPING SHALL MEET THE MINIMUM STANDARDS OF THE 1994 FEDERAL WAY ΟΘ∆ΚΗΛΗΜ≅ΘΞ Κ≅ΜΧΡΒ≅Ο∆ Χ∆ΡΗΦΜ 1. GROUND COVERS SHALL BE PLANTED AND SPACED USING A TRIANGULAR PLANTING ARRANGEMENT, TO RESULT IN TOTAL COVERAGE OF LANDSCAPED AREA WITHIN TREE YEARS PURSUANT TO FWCC SECTION 22-1564(j) 2. GRASS AND REQUIRED LANDSCAPING AREAS SHALL CONTAIN AT LEAST FOUR INCHES OF TOPSOIL AT FINISH GRADE PURSUANT TO FWCC SECTION 22-164(l) 3. EXISTING CLAY OR SANDY SOILS SHALL BE AUGMENTED WITH AN ORGANIC SUPPLEMENT PURSUANT TO FWCC SECTION 22-164(m). 4. LANDSCAPE AREAS SHALL BE COVERED WITH AT LEAST TWO INCHES OF MULCH TO MINIMIZE EVAPORATION PURSUANT TO FWCC SECTION 22-164(n) 5. SOIL IN PARKING LOT LANDSCAPED AREAS MUST BE NON-COMPACTED TO A DEPTH OF 18 INCHES PRIOR TO PLANTING OF ANY SHRUBS, TREES, OR GROUND COVERS PURSUANT TO FWCC SECTION 22-164(y). Κ≅ΜΧΡΒ≅Ο∆ ΜΝΣ∆Ρ \pxsm1.5;PER FWCC 22-1564(o-t), IRRIGATION SHALL BE PROVIDED TO ESTABLISH NEW PLANTINGS. THE IRRIGATION SYSTEM WILL BE DESIGNED TO INCLUDE SEPARATE IRRIGATION ZONES FOR LANDSCAPE PERIMETER BUFFER (WHERE THERE ARE NEW PLANTINGS), LAWN, AND INTERIOR PARKING LOT AREAS. ΗΘΘΗΦ≅ΣΗΝΜ Χ∆ΡΗΦΜ ΜΝΣ∆Ρ LANDSCAPE ARCHITECT LEANNE D. KUHLMAN CERTIFICATE No. 743 WASHINGTON REGISTERED STATE OF µ Χ≅ΣΤΛ9 Μ−Φ−Υ−Χ− 18 ΡΒ≅Κ∆9 0! < 0 40 7/& 16080 \A1;106' DEVELOPMENT RESERVATION NOTE: REFER TO SHEET LA-02 FOR TYPICAL PLANTING SCHEMES ΝΟ,0 ΨΝΜ∆ ΝΟ,0 ΨΝΜ∆ ΘΡ 8−5 ΨΝΜ∆ \A1;50' MANAGED FOREST BUFFER ΘΡ 8−5 ΨΝΜ∆ BELOW-GRADE POND WITH 4:1 SIDE SLOPES AND NO FENCING- TYPICAL. Υ≅ΤΚΣ 0≅ Χ∆Σ∆ΜΣΗΝΜ ΜΝΣ ≅ Ο≅ΘΣ Υ≅ΤΚΣ 0Α Χ∆Σ∆ΜΣΗΝΜ 6'-10' varying heights* \pxi-1,l1;*EVERGREEN SPECIES TO BE PLANTED IN A RANGE OF HEIGHTS BETWEEN 6' AND 10' AT THE TIME OF INSTALLATION. THE CITY OF FEDERAL WAY MAY REQUIRE, AS A CONDITION OF APPROVAL, THAT THE AREA WEST OF THE WTC BUILDING BE ASSESSED POST-CONSTRUCTION AND ADDITIONAL SUPPLEMENTAL PLANTINGS CONDITIONED IF NEEDED. ALL TREES ALONG THE WESTERN PARKING LOT PERIMETER SHALL BE 10' HT. MIN. AT THE TIME OF INSTALLATION. 12/21/2023 S 336 T H S T n SCALE: 1" = 80'BUILDING "2" BUILDING "3" EXISTING WTC BUILDING C O N S U L T I N G E N G I N E E R SL L CFederal Way, WA 9800333400 8th Ave S, Suite 205FEDERAL WAY CAMPUS, LLCWOODBRIDGE BUSINESS PARKLA-02 11 17 WEYERHAEUSER WAY S. DATUM: N.G.V.D. 29 POND 3 DETENTION POND 4 DETENTION POND 5 DETENTION WEYERHAEUSER WAY S.SEE SHEET LA-01 FOR CONTINUATION TYPICAL PLANTING SCHEMESINTERSTATE 5NOT A PART NOT A PART 12/21/2023 C O N S U L T I N G E N G I N E E R SL L CFederal Way, WA 9800333400 8th Ave S, Suite 205FEDERAL WAY CAMPUS, LLCWOODBRIDGE BUSINESS PARKLA-03 12 17 PRELIMINARY LANDSCAPE CALCULATIONS SPACING DETAILSHRUB AND GROUNDCOVER SHRUB PLANTING DETAIL DECIDUOUS TREE PLANTING & STAKING DETAIL CONIFEROUS TREE PLANTING AND STAKING DETAIL 12/21/2023 n SCALE: 1" = 80' EXISTING WTC BUILDING FF=437.00 C O N S U L T I N G E N G I N E E R SL L CFederal Way, WA 9800333400 8th Ave S, Suite 205FEDERAL WAY CAMPUS, LLCWOODBRIDGE BUSINESS PARKGR-01 13 17INTERSTATE 5WEYERHAEUSER WAY S.DATUM: N.G.V.D. 29 VAULT 1A DETENTION SEE SHEET GR-02 FOR CONTINUATION EARTHWORK QUANTITIES: A A B B C C BUILDING 1 605,195 SF FF=VARIES 442.38-448.45 I J POND 2 DETENTION J J NOT A PART Q Q R R S S T T VAULT 1B DETENTION 12/21/2023 S 336 T H S T n SCALE: 1" = 80' EXISTING WTC BUILDING FF=437.00 C O N S U L T I N G E N G I N E E R SL L CFederal Way, WA 9800333400 8th Ave S, Suite 205FEDERAL WAY CAMPUS, LLCWOODBRIDGE BUSINESS PARKGR-02 14 17 WEYE R HAE USER WAY S. DATUM: N.G.V.D. 29 WEYERHAEUSER WAY S.SEE SHEET GR-01 FOR CONTINUATION D D E E F F K L M P POND 4 DETENTION K L M N N P O BUILDING 3 125,520 SF FF=VARIES 422.13-424.50 POND 3 DETENTION INTERSTATE 5BUILDING 2 240,675 SF FF=VARIES 420.28-424.53 O POND 5 DETENTION NOT A PART NOT A PART NOT A PART 12/21/2023 C O N S U L T I N G E N G I N E E R SL L CFederal Way, WA 9800333400 8th Ave S, Suite 205FEDERAL WAY CAMPUS, LLCWOODBRIDGE BUSINESS PARKGR-03 15 17 SCALE: SITE CROSS SECTION A-A SCALE: SITE CROSS SECTION B-B SCALE: SITE CROSS SECTION C-C SCALE: SITE CROSS SECTION D-D SCALE: SITE CROSS SECTION E-E SCALE: SITE CROSS SECTION F-F SCALE: POND 2 CROSS SECTION I-I SCALE: POND 2 CROSS SECTION J-J POND 2 VOLUMES: SCALE: SITE CROSS SECTION F-F 12/21/2023 C O N S U L T I N G E N G I N E E R SL L CFederal Way, WA 9800333400 8th Ave S, Suite 205FEDERAL WAY CAMPUS, LLCWOODBRIDGE BUSINESS PARKGR-04 16 17 SCALE: POND 3 CROSS SECTION K-K SCALE: POND 3 CROSS SECTION L-L SCALE: POND 4 CROSS SECTION M-M SCALE: POND 4 CROSS SECTION N-N SCALE: POND 5 CROSS SECTION O-O SCALE: POND 5 CROSS SECTION P-P POND 3 VOLUMES:POND 4 VOLUMES: POND 5 VOLUMES: TYPICAL FIRE TRUCK MOVEMENT STUDY n SCALE: 1" = 20' WEYERHAEUSER WAY S SCALE: VAULT 1A CROSS SECTION Q-Q SCALE: VAULT 1A CROSS SECTION R-R SCALE: VAULT 1B CROSS SECTION S-S SCALE: VAULT 1B CROSS SECTION T-T 12/21/2023 n SCALE: 1" = 200'C O N S U L T I N G E N G I N E E R SL L CFederal Way, WA 9800333400 8th Ave S, Suite 205FEDERAL WAY CAMPUS, LLCWOODBRIDGE BUSINESS PARKTR-01 17 17 DATUM: N.G.V.D. 29 TREE PRESERVATION UNDISTURBED VEGETATION BUILDING "1" 605,757 SF FF=VARIES 442.38-448.45 EXISTING WTC BUILDING FF=437.00 POND 2 DETENTION BUILDING "2" 240,855 SF FF=VARIES 420.28-424.75 POND 3 DETENTION BUILDING "3" 125,710 SF FF=VARIES 422.13-424.50 POND 4 DETENTION POND 5 DETENTION UNDISTURBED VEGETATION UNDISTURBED VEGETATION INTERSTATE 5S 336TH ST WEYERHAUSER WAY STOTAL # OF SIGNIFICANT TREES IN BUILDABLE AREA OF PROJECT (50 TREES/ACRE X 84.54 ACRES)4,227 REQUIRED TREE RETENTION (25% X 4,277)1,057 MANAGED FOREST BUFFER - SIGNIFICANT TREES RETAINED 206 OTHER RETAINED SIGNIFICANT INTERIOR TREES - (10.98 ACRES X 50 TREES/AC. X2)1,098 TOTAL HEALTHY SIGNIFICANT TREES RETAINED ON SITE 1,304 SURPLUS OF TREE RETENTION ABOVE MINIMUM REQUIREMENT 247 OP-1 ZONE RS 9.6 ZONE RS 9.6 ZONE OP-1 ZONE UNDISTURBED VEGETATION UNDISTURBED VEGETATION UNDISTURBED VEGETATION NOT A PART