Loading...
13-102906FILE Rev August 15, 2013 G EOTECHNICAL REPORT FOR STORMWATER RESIGN, APPENDIX C KING COUNTY SWM Tim Johnson Residence 44thAve SW and SW 310th°Street Federal Way, WA 98023 Parcel# 112103-9009 Prepared for Tryge Pohlman RESUBMITTED 122 Pershing Ave Carbonado, WA 98323 SEP 0 4 2013 CITY OF FEDERAL WAY CDS -1 WAJason Geotechnical Engineering Rev Date: 8-15-2013 Engineering & Retaining Wall / Pavement Design Project Tim Johnson, 44th 7�d Consulting Construction Management Ave SW and SW 3101h St, Business, Inc. WABO/ AASHTO Inspection & Testing Federal Way File #:13024 TM Pohlman Construction Inc 122 Pershing Ave Carbonado, WA 98323 Attu Tim Johnson c/o Mr. Tryge Pohlman: Re: Johnson Residence, Parcel# 112103-9009 At your request, we have conducted a soils exploration for the above mentioned project. During our exploration, two test pits were advanced to determine soil characteristic per KCSWM, Appendix C. Permeability is expected to be rapid, on the order of 5 minutes/inch. The remaining results of this investigation are found in the following report , We would be pleased to continue our role as geotechnjcal engineers during the project We appreciate this I pportunity to be of service to you and we look forward to working with you in the future. If you have any questions concerning this report, the procedures used, or if we can be of any further assistance please call us at (206) 786-8645. Respectfully, JASON ENGINEERING &CONS NG BUSINESS, INC 0 ; %VA President �� a trr 7_ 373439. Phone: 206-786-8645 Email: Jason@jasonengineering.com Page 2 of 18 PO Box 181 Auburn WA. 98071 Jason IgEngineering & Consulting Business, Inc Table of Contents Geotechnical Engineering Retaining Wall / Pavement Design Construction Management WABO/ AASHTO Inspection & Testing Table of Contents Investigation Information Introduction Scope: Sampling & Laboratory Testing Procedures: ,Site Tnformatinn Project Description Geology of Area Alderwood gravelly sandy loam (AgC) Geoseismic Setting - Liquefaction Potential Description of Foundation Materials: Groundwater and Surface Runoff "Control• Climate of Area: Conclusion Appendix I: TestPit Logs Log, Typical SCS Soil Survey Vicinity Map Site Plan Rev Date. 8-15-2013 Project: .Tim Johnson, 44th Ave SW and SW 310th St, Federal Way File #:13024 Phone: 206-786-8645 Email: Jason@jasonengineering.com Page 3 of 18 PO Box 181 Auburn WA. 98071 3 4 4 4 5 5 5 5 6 7 7 _8 8 _9 9 10 10 14 Jason Engineering & Consulting Business, Inc. Geotechnical Engineering Rev Date: 8-15-2013 Retaining Wall / Pavement Design Pr°ject-Tim Johnson, 44th Construction Management Ave SW and SW 310f St, WABO / AASHTO Inspection & Testing Federal Way Investigation Information Introduction: This report presents the results of a soils exploration and analysis for the proposed new construction located at 44fl,ave SW and SW 3101h Street in Federal Way. The provides the soil profile components, the engineering characteristics of the foundation materials and provides criteria for the design engineers and architects to prepare or verify aspects of the stormwater design per AppendixC of the King County Storm Water manual. This report was requested by Tryge Pohhnan Written authorization to perform this exploration and analysis was provided by Tryge Pohlman Legal Description BEG 523 FT N & 40 FT W OF SE COR GL 3 TH W 556.64 FT TH N 470 FT TH N 87-23-30 E 255.14 FT TH S TO PT 860 FT N & 341.76 FT W OF SE COR OF GL 3 TH S 89-54-50 E TO ELY MGN OF 44TH AVE SW HOIT RD 132.90 FT TH SLY ALG A 413.07 FT RAD CURVE TO RGT AN ARC DIST OF 107.72 FT TH S 84-43-40 E 205.14 FT TO W LN OF E 40 FT OF GL 3 TH S ALG SD W LN 217 FT TO POB LESS POR PLTD AS DUMAS HEIGHTS Scope: The scope of this report and analysis included; a review of geological maps of the area, review of geologic and related literature, a reconnaissance of the immediate site, subsurface exploration, and laboratory testing. We were not requested to provide an Environmental Site Assessment for this property. Any comments concerning onsite conditions and/or observations, including soil appearances and odors, are provided as general information Information in this report is not intended to describe, quantify or evaluate any environmental concern or situation We were not requested to provide landslide or slope stability analysis. The soils engineer warrants that the findings, recommendations, specifications, or professional advice contained herein, have been promulgated after being prepared according to generally accepted professional engineering practice in the fields of foundation engineering, soil mechanics and engineering geology. No other warranties are implied or expressed. This investigative report has been prepared for the exclusive use of Tryge Pohhnan and retained design consultants thereof. Findings and recommendations within this report are for specific application to the proposed project. All recommendations are in accordance with generally accepted soils and foundation engineering practices. Sampling & Laboratory Testing Procedures: The test pits were performed by hand excavation. Representative samples were obtained from the test pits at various soil intervals. The samples obtained by this procedure were classified in the field by a soils technician, identified according to test pit number and depth, placed in plastic bags to protect against moisture loss and transported to the laboratory for additional testing. Along with the field investigation, a supplemental laboratory testing program was conducted to determine additional pertinent engineering characteristics of the foundation materials necessary in analyzing the behavior of the proposed building structure. The laboratory testing program included supplementary visual classification and water content determinations on all samples. In addition, selected samples were subjected to: Moisture Content Analysis - D4959, and Grain Size Analysis - ASTM designation C-117, C 136. All phases of the laboratory testing program were conducted according to applicable ASTM Specifications and the results of these tests are to be found on the accompanying logs located in the Appendix. Phone: 206-786-8645 Email:- Jason@jasonengirneering.com Page 4 of 18 PO Box 181 Auburn WA. 98071 Jason Geotechnical Engineering Rev Date: 8-15-2013 Engineering & Retaining Wall / Pavement Design Project Tim Johnson, 44th Consulting Construction Management Ave SW and SW 310th St, Business, Inc. WABO/AASHTO Inspection & Testing Federal Way Site Information Project Description The purpose of this section is to provide details of the proposed structure. The following information was provided by the project contractor. The building will be a wood framed, single family residence structure. A large garage basement is planned. The site topography consists of mostly flat ground to the west There is a slope on the east side of the property downward to a ravine. The slope is approximately 50% with a vertical elevation difference of about 30 feet. A large retaining wall is to be constructed to create the driveway on the north side. Geology of Area: Alderwood gravelly sandy loam (AgC) The geology of the site and surrounding, area as taken from the USDA Soil Conservation Service Survey consists of Alderwood gravelly sandy loam (AgC). Typical Alderwood soils are moderately well drained, undulating to hilly soils that have dense, very slowly permeable glacial till at a depth of 20 to 40 inches; on uplands and terraces formed under conifers in glacial deposits. This soil is rolling. Areas are irregular in shape and range from 10 to about 600 acres in size. A typical profile is a very dark brown gravelly sandy loam on the top two inches. It is weak, fine, granular structure, friable, non sticky and non plastic. Layers at 2 to 12 inches are a dark brown; dry, slightly hard, friable soil. It is non sticky, non plastic strongly acidic, with a sub angular blocky structure. From 12 to 27 inches the soil is grayish brown to light gray hard friable, non sticky, non plastic and medium acidic. Boundaries are wavy with distinct mottles of light olive. At 27 to 60 inches the soil is grayish brown to light gray weakly to strongly consolidated till. It is dry, medium acidic with distinct mottles of light olive and yellowish brown. Permeability is moderately rapid in the surface layer and subsoil, however it is very slow within the cemented layer and dense glacial till. Roots penetrate easily to the consolidated substratum where they tend to mat on the surface. Alderwood soils are in a cool marine climate. The summers are cool and dry, and the winters are mild and wet. Water moves on top of the substratum in winter. A perched water table is as high as 18 to 36 inches at times from January through March. Runoff is slow to medium and erosion hazard is moderate. Geoseismic Setting: EXPLANATION El Site class F Reywres sire -specific inir+iigaiwm ❑ Site class E Site class D to E ❑ z 7R ❑ Site class D Site class C to D ❑ c ❑ Site class C Site class B to C ❑ y ❑ Site class B Foundation soils on this site are designated a Site Class C, from Table 1615.1.1 per the International Building Code (I.B.C.). All building structures on this project should be designed per the Code Requirements for such a seismic classification. These types of soils have a shear wave velocity in the Phone: 206-786-8645 Email: Jason@jasoneogineering.com Page 5 of 18 PO Box 181 Auburn WA. 98071 Jason Geotechnical Engineering Rev Date: 8-15-2013 Engineering & Retaining Wall/ Pavement Design pt_oject: Tim Johnson, 44th Consulting Construction Management Ave SW and SW 310th St, Business, Inc. WABO/AASHTO Inspection & Testing Federal Way File #:13024 range of 1,200 to 2,500 ft/sec. The undrained shear strength is typically greater than 2000 psf with blow counts greater than 50 blows per foot. The following may be used for the seismic coefficients. Design Response Spectrum 90.00 N c 80.00 _O 70.00 m 60.00 s0.00 $ 40.00 30.00 Q 20.00 10.00 N 0.00 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 Period, T Liquefaction Potential: EXPLANATION ElLiquefaction susceptibility: HIGH Liquefaction susceptibility: MODERATE to HIGH ❑ Liquefaction susceptibility: MODERATE ❑ Liquel'action susceptibility: LOW to MODERATE ❑ Liquefaction susceptibility: LOW ❑ Liquefaction susceptibility: VERY LOW to LOW ❑ Liquefaction susceptibility: VERY LOW Period, T Sa Sds Sms 0 0.00 33.33 To 0.08 83.33 83.33 125.00 Ts 0.42 83.33 83.33 125.00 1 1.00 34.67 2 2.00 1 17.33 • Sds and Sms values acceleration o Sm1 = 52, Sd1= 34.7 given at max Liquefaction is when saturated, cohesionless soils are temporarily turned in to a liquid state usually from a seismic event. If ground motion lasts for extended amounts of time, the grain to grain contact shifts and the grain structure can collapse. If the water within the soil cannot flow easily between the grain and out of a collapsing area, the water pressure increases. When pore pressures build up within the soil and exceed the effective contact pressure of the soil, the water can push the soil particles apart When the particles lose contact with each other, the soil mass can behave like a liquid. If pore pressures are great enough, water may discharge out of the ground like a geyser leaving characteristic signs, such as sand boils. Liquefaction is generally related to; soil characteristics, water table depths and the degree of seismic activity. The results are lower bearing capacities, increased settlement issues, landslides, and lateral spreading to name a few things. Liquefaction potential for this site is provided within the boundaries of the site. Seismic events which affect land masses on a greater scale are beyond the scope of this report. The Liquefaction Susceptibility Map of King County Washington provided by the Department of natural Resources classifies the area as VERY LOW to LOW. We are in agreement with this susceptibility rating and have used this information within our design recommendations. Phone: 206-786-8645 Email: JasonOjasonengineering.com Page 6 of 18 PO Box 181 Auburn WA. 98071 It Jason Geotechnical Engineering Rev Date: 8-15-2013 Engineering & Retaining Wall / Pavement Design Prrniect Trim Johnson, 44th Consulting Construction Management Ave SW and SW 310th St, Business, Inc. WABO/AASHTO Inspection & Testing Federal Way File #:13024 Description of Foundation Materials: Test pit #1 Test Pit #2 The surface of the proposed construction site is covered with about 2 to 6 inches of topsoil that should be removed prior to the start of any construction due to the high compressibility of these soils. Silt with sand layers were encountered beneath the existing topsoil and extended to depths beyond the scope of this investigation. Lines of demarcation represent the approximate boundary between the soil types, but the transition may be gradual Below 4 feet, the excavation was difficult for the machine to excavate the dense silty sandy till layers. Groundwater and Surface Runoff Control: Groundwater was not encountered when the field exploration was conducted. Groundwater is not expected to cause difficulties during construction of this project. The on -site drainage (roof downspouts& catch basins for pavement areas) should be collected and directed away from the property. This can be acconiplislied by tight -lining the drainage toan on -site storm drainage system. All impervious surfaces are expected to connect to the storm drain system Mottled soil indicates seasonal soil saturation (alternate oxidizing and reducing conditions). In other words, water flows through this layer periodically creating a saturated soil condition at times and at other times the soil may be dry. This can create a soft, saturated yard area, problems for basements and septic fields, and poor aeration for landscape plantings. Implementation of perimeter footing drains should alleviate many difficulties associated with these soil conditions. Proper grading of the ground surface to direct runoff to the collection points is required. Phone: 206-786-8645 Email:- Jason@jasanengineering.com Page 7 of 18 PO Box 181 Auburn WA. 98071 Jason Geotechnical Engineering Rev Date: 8-15-2013 Of/ Engineering & Retaining Wall/ Pavement Design Project Tim Johnson, 44th _ Consulting Construction Management Ave SW and SW 3101h St, Business, Inc. WABO/ AASHTO Inspection & Testing Federal Way Climate of Area: The climate of the site and surrounding area as taken from the USDA Soil Conservation Service Survey consists of mean annual precipitation ranging from 35 to 60 inches, most of which falls as rain from November through March. Mean January temperature is 38 degrees F, mean July temperature is. 60 degrees F, and mean annual temperature is 50 degrees F. The frost free season (28 degrees F) is about 200 days. Conclusion The on -site drainage (new and existing, roof downspouts & catch basins for pavement areas) should be collected and directed away from the property by tight -lining the drainage to the bottom of the slope. A retaining wall is scheduled to constructed to create a driveway to the property. This area could serve as a large drywell reservoir to collect roof runoff and allow it to filtrate into the ground. Any overflow could be dispersed to the existing drain trench on the north side of the property. Proper grading of the ground surface to direct runoff to the collection points is also required. When the plans and specifications are complete, or if significant changes are made in the character or location of the proposed structures, a consultation should be arranged to review them regarding the prevailing soil conditions. Then, it may be necessary to submit supplementary recommendations. While the recommendations made herein are considered sufficient in detail for the construction of the proposed project, there are many alternative methods of construction which are available. We can discuss various other options for construction at your request. Phone: 206-786-8645 Email: Jason@jasonengineering.com Page 8 of 18 PO Box 181 Auburn WA. 98071 Jason Geotechnical Engineering Rev Date: 8-15-2013 Engineering & Retaining Wall/ Pavement Design Project Tim Johnson, 44th Consulting Construction Management Ave SW and SW 3101h St, Business, Inc. WABO/ AASHTO Inspection & Testing Federal Way Appendix I: TestPit Logs Log Typical Boring ID: Typical for 1,2 Method of Sample: Track Excavator Date of Excavation: 4-12-2013 Surface Elevation (ft): 75 Project Name: Tim Johnson Total depth (ft): 6 File #: 13024-001 Technician: JECB Depth(ft): Profile SPT (N) Moisture Percent passing Sample Description 3/4" #4 #200 (feet) (meters) USC S (blows/ft) % Type 1 0.30 'Topsoil 2 0.61 ML 10 Silt with Sand, dense, mottled in top 12 inches 3 0.91 (estimated) 30 Silt with Sand, very dense, 4 1.22 ML 5 1.52 (estimated) 6 1.83 7 2.13 8 2.44 9 2.74 10 3.05 End Boring Boring ID: Typical for 3,4 Method of Sample: Track Excavator Date of Excavation: 8-15-2013 Surface Elevation (ft): 75 Project Name. Tim Johnson Total depth (ft): 6 File #: 13024-001 Technician: JECB Depth(ft): Profile SPT (i) Moisture Percent passing Sample Description 3/4" #4 #200 (feet) (meters) USCS (blows/ft) % Type 1 0.30 Topsoil 2 0.61 ML Silt with Sand, med dense, slightly mottled 3 0.91 4 1.22 ML ;Silt with Sand, medium dense, 5 1.52 6 1.83 7 2.13 8 2.44 9 2.74 10 3.05 End Boring Phone: 206-786-8645 Email: Jason@jasonengineering.com Page 9 of 18 PO Box 181 Auburn WA. 98071 Rev August 15, 2013 GEOTECHNICAL REPORT FOR STORMWATER DESIGN, APPENDIX _C KING COUNTY SWM Tim Johnson Residence 44til Ave SW and SW 310th Street Federal Way, WA 98023 Parcel# 112103-9009 Prepared for Tryge Pohlman 122 Pershing Ave Carbonado, WA 98323 Jason Geotechnical Engineering Rev Date: 8-15-2013 Engineering & Retaining Wall / Pavement Design Project: Tim Johnson, 44th Consulting Construction Management Ave SW and SW 310h St, Business, Inc. WABO/AASHTO Inspection & Testing Federal Way Appendix II: Drywell Area C.2.24 USE OF DRYWELLS FOR FULL INFILTRATION (2009 SWDM Appdx C) Drywells are gravel filled holes as opposed to trenches and therefore may allow for a more compact design in areas where the depth to the maximum wet -season water table is relatively deep (e.g., 6 feet or greater). Figure C.2.2.0 on page C-47 illustrates the specifications for drywell infiltration systems as outlined below: 1. When located in coarse sands and cobbles, drywells must contain a volume of gravel equal to or greater than 60 cubic feet per 1,000 square feet of impervious surface served. When located in medium sands, drywells must contain at least 90 cubic feet of gravel per 1,000 square feet of impervious surface served. 2. Drywells must be at least 48 inches in diameter and deep enough to contain the gravel amounts specified above for the soil type and impervious surface area served. 3. The gravel used for drywells must be 1-1/2-inch to 3-inch washed drain rock The drain rock may be covered with backfill material as shown in Figure C.2.2.0 (p. C-47) or remain exposed at least 6 inches below the lowest surrounding ground surface. 4. Filter fabric (geotextile) must be placed on top of the drain rock (if proposed to be covered with backfill material) and on the drywell sides prior to filling with the drain rock 5. Spacing between drywells shall be a minimum of 10 feet. 6. Drywells must be setback at least 15 feet from buildings with crawl space or basement elevations that are below the overflow point of the drywell Soils is the drywell area are a medium dense, sandy loam. Limited infiltration may be used. Per C.2.3.4 USE OF DRYWELLS FOR LIMITED INFILTRATION, the specifications for use of drywells for limited infiltration are the same as those used for full infiltration, except that every 1,000 square feet of tributary impervious surface requires different gravel volumes as follows: (a) 230 cubic feet if the soil is a fine sand/loamy sand, (b) 380 cubic feet if the soil is a sandy loam, or (c) 570 cubic feet if the soil is a loam Impervious (SF) Req'd CF/SF impervious House 5460 Driveway 3180 Gravel required for dryweU Fine loamy sand (a) 230 1256 731 Sandy loam (b) Loam (c) 380 570 2075 3112 1208 1813 Totals 8640 1 1987 1 3283 4925 Various configurations and/or dimensions may be used to obtain the required 3,283 cubic foot volume, however the overall volume is the goal. For instance; 15 x 15x 15 feet = 3,375 CF (125 Cubic yards) 20 x 20 x 8.5 feet = 3,400 CF (125 Cubic yards) Phone: 206- 886-8645 Email: Jason@jasonengineering.com Page 11 of 18 PO Box 181 Auburn WA. 98071 Jason w 'Geotechnical Engineering Rev Date: 8-15-2013 Engineering & Retaining Wall/Pavement Design Project: Tim Johnson, 44th __ Consulting Construction Management Ave SW and SW 310thSt, T Business, Inc. WABO/AASHTO Inspection & Testing Federal Way File #13024 Drywelllocation'-pic 1 Drpi location pic.2 Phone: 206-786-8645Email•,Jason@jasonengineering.com I Page 12 of 18 PO Box 181 , Auburn WA. 98071 Jason Geotechnical Engineering Rev Date: 8-15-2013 Engineering & Retaining Wall/ Pavement Design Project: Tim Johnson, 44th Consulting Construction Management Ave SW and SW 310th St, Business, Inc. WABO/AASHTO Inspection & Testing Federal Way File #:13024 SECTION C? FLOW CONTROL 111`Ps FIGURE C.2.2.0 TYPICAL DRYR'ELL Lk;FILTRATIO\ SYSTE-1I ` f Roof Downspout House If' —0 Roof flow Downspout Catch Basin (Yard Drain) r112V W=t I PLAN VIEW NTS } Roof Downspout House l Overflow l Splash Block —1► flow 't Fine Mesh Screen' Catch Basin (Yard Drain) 15' min. DRY WELL SECTION NTS Topsoil Min. 4" dia. PVC Pipe Sides of Hole ' Lined with Filter Fabric O 48 Inch Diameter Hole Filled with 11/2-3" Washed Drain Rock Mark Center of Hole with 1" Capped PVC or Other means Flush with Surface I r I'min. 48 Inch Diameter 4' min_ Hole Filled with 11/2-3" Washed Drain Rock Min. V above Seasonal High Groundwater Table t Phone: 206-786-8645 Email: Jason@jasonengineering.com Page 13 of 18 PO Box 181 Auburn WA. 98071 Jason Geotechnical Engineering Engineering & -Retaining Wall/Pavement Design Consulting Construction Management Business, Inc. WABO/ AASHTO Inspection & Testing Site Plan — Dry well Phone: 206-786-8645, Email• jasongaksonengineering.com PO Box 181 Auburn WA. 98071 Rev Date: 845-2013 Project: Tim Johnson, 44th Ave SW and SW 310!h St, Federal Way File #:13024 Page 14 of T8 DUMAS BAY PARK ENTRANCE ROAD OVERFLOW TOEMSPING DITCH LINE / LOCATION. ENCLOSED IN CONCRETE FILLED WITH CRUSHED GRAVEL NO F1I3ES (1-1/2'to 3' AGG) WN 15 FOOT SEPARATION FROM HOUSE -WN DRYWELL DIMENSIONS SHOWN �`,t0'x20'x8.5'�$ItUCP — ' Yx15'z15'9,VSCF(optional) x , 3oa T�o 1 2ra tt 1 i ♦� r SURVEY PROVIDED BY JEFF DALQUIST, ARCHITECT • IMPERVIOUS (SF) GRAVEL FOR DRYWELL (CF) HOUSE 5460 2075 DRIVEWAY 918A 1206 TOTALS 8640 3283 0 20 40 60 0 w n m g ^ ^ E2. E m �a Tim Johnson Residence 44th Ave SW and SW 310th Street �' 8 aeon Geotechnical En eerieMIC: _ L Federal Way, WA 98023 Retaining Wall / Pavement Designngineering & Parcel#112103-9009 Construction Managementonsulting WABO / AASHTO Inspection & TestingBasiness, Inc o W PO Box 781 Anbuai WA- 96071'(206)78h-8613 `jason�jasonengincYing.com .. @ DRY WELL Jason Geotechnical Engineering Rev Date: 8-15-2013 Engineering & Retaining Wall/ Pavement Design Proiec - Tim Johnson, 44th -_ Consulting Construction Management Ave SW and SW 310th St, Z�d Business, Inc. WABO / AASHTO Inspection & Testing Federal Way File #:13024 Appendix III: Full Dispersion (with city permission) Full dispersion of the full 8,640 impervious surface may be handled with a single 50 foot gravel trench, IFF there is a 200 foot vegetated flow path from the trench. Since the property line is only 30 feet from the house, there is insufficient room on the property. The neighboring property is owned by the City of Federal Way as Dumas Bay park Typically, homeowners are expected to maintain their own runoff on their own property. The options of limited infiltration (125 cubic yards of material) and a 50 foot trench (about 19 cubic yards) are both acceptable per the design manual Special permission must be granted for dispersion to accepted as noted in the design manual; Section C.3 Storm Water Design Manual The intent of ESC measures is to prevent, to the maximum extent practicable, the transport of sediment and other construction -related pollutants to streams, wetlands, lakes, drainage systems, and adjacent ro erties during and after construction. Erosion of disturbed areas on construction sites can result in excessive sediment transport to adjacent properties and to surface waters. This sediment can result in major adverse impacts, such as flooding due to obstructed drainage ways, smothering of salmonid spawning beds, creation of algal blooms in lakes, and violation of State water quality standards for turbidity. In addition to sediment, other construction - related pollutants can be generated by uncovered waste materials, stockpiles, and demolition debris, de - watering; maintenance and operation of heavy equipment; chemical spills; oil spills; placement of concrete; and application of fertilizers andpesticides. Such pollutants can be toxic to both fish and humans and may violate State water quality standards and the prohibited discharges section of KCC 9.12. TABLE C.2.1.A SU_ BNURY OF DISPERSION DEVICE FLO'%VPATH LENGTHS & CAPACITIES Full Dispersion Device Native Vegetated Flowpath Length Maximum Impervious Surface Amount Maximum Non -Native Pervious Surface Amount Non -Pasture Pasture Splash Block 100 feet 700 sq ft NA NA 200 feet 1,400 sq ft NA NA Rock Pad 100 feet 700 sq ft 2,500 sq ft 8,000 sq ft 200 feet 1,400 sq ft 5,000 sq ft 16,000 sq ft 10-foot Gravel Trench 100 feet 1,400 sq ft 5,000 sq ft 16,000 sq ft 200 feet 2,800 sq It 10,000 sq ft 32,000 sq ft 50-foot Gravel Trench 100 feet 5,000 sq ft 17.500 sq ft 54,450 sq It 200 feet 10,000 sq ft 35,000 sq ft 108,900 sq ft Sheet Flow from Impervious Surface 100 feet* 25-ft strip width NA NA 200 feet" 50-ft strip width NA NA Sheet Flow from Non -Native Pervious Surface 25 feet NA 25 feet of width in direction of flow 50 feet NA 100 feet of width in direction of flow 75 feet NA 175 feet of width in direction of flow 100 feet NA 250 feet of width in direction of flow ' Reducible to 10 feet for each 20 feet of strip width when dispersing over outwash soils outside the UGA. Phone: 206-786-8645 Email- Jason@jasonengineering.com j Page 15 of 18 PO Box 181 Auburn WA. 98071 Jason Geotechnical Engineering Rev Date: 8-15-2013 Engineering & Retaining Wall / Pavement Design Pr�0'im Johnson, 44th Consulting Construction Management Ave SW and SW 310th St, Business, Inc. WABO/AASHTO Inspection & Testing Federal Way File #:13024 FIGURE C.2.1.1) 50-FOOT DISPERSION TRENCH IVITH -NOTCHED BOARD pipe O.D. in Mill end cap or plug 7 clean out wye from pipe a r vain I 4" or 6- perforated pipe laid flaVli notched grade board a a" P7 M77) 2"x 2" notches ra 7 type I CB w/solid cover (locking) 18" O.C. A a t a influent pipe (max design a° a flow!:-, 0.5 CFS per trench) C d 7° v; vclean out wye from pipe Q 8 n a PLAN NTS galvanized bolts y51� ma�1 2" X12" t pressure treated grade - board 4" x 4' support post filter fabric pipe O.D. l 1'-0 1'-0 ax Mini illin 31". M 4" or 6" perforated v , v pipe laid flat as clean (<_5%fines) ° A 1112" - 3l4 "washed rock SECTION A -A NTS flow to second dispersal trench if necessary B :over -.0-- flow to other branching CB's as necessary 18" O.C. �.1 2" 2" grade board notches 2" NOTES: 1. This trench shall be constructed so as to prevent point discharge and/or erosion. 2. Trenches may be placed no closer than 50 feet to one another. (100 feet along flowline) 3. Trench and grade board must be level. Align to follow contours of site. 4. Support post spacing as required by soil conditions to ensure grade board remains level. Phone: 206-786-8645 Email: Jason@jasonengineering.com Page 16 of 18 PO Box 181 Auburn WA. 98071 Jason Geotechnical Engineering Rev Date. 8-15-2013 0/71 Engineering & Retaining WaR.1- Pavement Design Project Tim Johnson, 44th Qf-_ Consulting Construction Management Ave SW and SW,310Ih St, z�Business, Inc. WAB-O/AASHTO-Iftgpection & Testing Federal Way File #:13024 AMP contours of site and adjacent property, Dumas Bay Park Federal Way Phone: 206-786-8645 Email: Jason@Jasonengineering-com Page 17 of 18 PO Box 181 Auburn WA. 98091 ' I Jason Geotechnical Engineering Rev Date: 8-15-2013 Engineering & Retaining Wall/ Pavement Design Project Tim Johnson, 44th Consulting Construction Management Ave SW and SW 310th St, Business, Inc. WABO/AASHTO Inspection & Testing Federal Way Site Plan - 50 foot dispersion trench Phone: 206-786-8645 Email: Jason@jasonengineering.com I Page 18 of 18 PO Box 181 Auburn WA. 98071 DUMASBAY PARK ENTRANCEROAD 1 `t PROPERTY LINE �, WEEPMOLE5INRETArNINGWALL OVERFLOW TOEXLSTING DTTCH LINE i j of �_--- ----------- OINV I 1 � Ir--------------'k _ 6i5P6i stoN TRENCH W1TH i�D7CHEDJARD � 5R PEAH CZLD; ~ �~ 7isitll- _ ALL DOWNSPOUTS AND DRVEWAY D"NACG W. � � L�LLEC1EIi AND TiGFiR•1NET- SURVEY PROVIDED BYJEFFDALQUJST.ARCfin= IMpi:RVIQi15(m MO[ISE 5460 DRIVEWAY 3180 TOTALS 8"o 0 20 40 60 Ng. U 'o' R Tvn7ohaganResidence 44th Ave S W and SW 310th Street Geotechnica)Engineering ]aeon _ m N g .. 0 g IL f Federal Way, WA98023 Retaining Wall / Pave ment Design Gngiaeering & n � N N b o �, o .- g "' " a Parcel# 112103-9009 Construction Management WABO / AASHTO Inspection & Testing Conavltiag $usiaeae, bw g c c ton PO Box 181 Auburn IVA. 9MM' (206) 7-8648615 •Jason@jasonalginc+-�ring.mm m 50 FOOT DISPERSION TRENCH