07-103903October 28, 2007 SUBJECT: 07-1039032-00 CN; Steel Lake Crest Plat Federal Way, WA Concurrency Decision Attached for your review is the Transportation Concurrency Analysis for the subject project, consisting of 29 Single Family Residences on existing four parcels. Based on this analysis, Traffic Division staff has made the following determinations: Either construct the im acted Trans ortation hnprovement Plan oiect list below 1Project Map Location Description Total Pro - Rata ($) ID 150 la City Center Access Phase 2 Design Study, Environmental analysis to $ 2,332.00 improve access to City Center 150 lb City Center Access Phase 3 Add 2nd SB left -turn lane, 3rd SB right -turn $ 1,522.00 lane 150 lc City Center Access Phase 4 Widen S 320th St bridge over I-5, realign loop $ 7,864.00 ramp and NB off -ramp Add HOV lanes, 2nd SB left -turn lane @ 288th, 141 2 SR 99 HOV Lanes Phase 3• install raised median, signal @ SR 509 @ $ 14,474.00 S 284th St - SR 509 Redondo Wy S with interconnect to 1 lth PI S 139 10 S 320th St @ 20th Ave S Add 2nd left -turn lanes EB, WB $ 788.00 159 12 SR 99 HOV Lanes Phase 4: Add HOV lanes, install raised median $ 4,413.00 SR 509 - S 312th St 154 16 S 304th St @ 28th Ave S Add NB right -turn lane, signal $ 5,887.00 166 20 Military Rd S: S Star Lake Widen to 5 lanes, sidewalks, street lights $ 9,247.00 Rd - S 288th St 161 22 S 312th St @ 28th Ave S Add SB right -turn lane $ 1,494.00 Total $ 48,021.00 Credit (5.7%) $ 2,737.00 Net Total $ 45,284.00 Or 2. Pay pro-rata share mitigation towards this project in the amount of $45,284.00. You have 14 calendar days from the date of this letter to inform us which of the following Options you will pursue in response. If you fail to respond to this letter within 14 days of the date of this letter, your project will not be approved. Please indicate with a checkmark in the appropriate box of your decision, sign, and date this letter in the space below, and return a copy to us. If you are providing additional information under Options B or C below, these submittals are also due within 14 calendar days from the date of this letter. Once we have reached agreement on the subject project, we will issue a Capacity Reserve Certificate, allowing your project to proceed with other applicable permit processes. If you have any questions or need additional information, please feel free to contact me at 206-450-5845 or sanicev.tandle@city.offederalw.ay.com. Sincerely, ,— L Sanjeev Tan le, P.E., PTOE Senior Transportation Engineer OPTIONS: ❑ A. I accept the staff determination for mitigating the transportation impacts of the subject project. ❑ B. I am reducing the trip generation of the subject project by any combination of revised land uses and travel demand management measures. Attached is the revised project description. ❑ C. I am submitting an analysis rebutting the staff analysis and/or provide alternative mitigation measures. Attached is the analysis supporting my proposal. ❑ D. I will appeal the underlying development permit decision. Applicant Date October 28, 2007 SUBJECT: 07-1039032-00 CN; Steel Lake Crest Plat Federal Way, WA Concurrency Decision Attached for your review is the Transportation Concurrency Analysis for the subject project, consisting of 29 Single Family Residences on existing four parcels. Based on this analysis, Traffic Division staff has made the following determinations: Fithar rnnOnirt the. imnacted Trnnsnnrtation Irnorovement Plan ❑roiect list below Projecty Map Location Description Total Pro - Rata ($) ID ID 150 la City Center Access Phase 2 Design Study, Environmental analysis to $ 2,332.00 improve access to City Center 150 lb City Center Access Phase 3 Add 2nd SB left -turn lane, 3rd SB right -turn $ 1,522.00 lane 150 lc City Center Access Phase 4 Widen S 320th St bridge over I-5, realign loop $ 7,864.00 ramp and NB off -ramp Add HOV lanes, 2nd SB left -turn lane @ 288th, 141 2 SR 99 HOV Lanes Phase 3: install raised median, signal @ SR 509 @ $ 14,474.00 S 284th St - SR 509 Redondo Wy S with interconnect to 1 Ith PI S 139 10 S 320th St @ 20th Ave S Add 2nd left -turn lanes EB, WB $ 788.00 159 12 SR 99 HOV Lanes Phase 4: Add HOV lanes, install raised median $ 4,413.00 SR 509 - S 312th St 154 16 S 304th St @ 28th Ave S Add NB right -turn lane, signal $ 5,887.00 166 20 Military Rd S: S Star Lake Widen to 5 lanes, sidewalks, street lights $ 9,247.00 Rd - S 288th St 161 22 S 312th St @ 28th Ave S Add SB right -turn lane $ 1,494.00 Total $ 48,021.00 Credit (17.14%) 1 $ 8,231.00 Net Total $ 39,790.00 Or 2. Pay pro-rata share mitigation towards this project in the amount of $39,790.00. You have 14 calendar days from the date of this letter to inform us which of the following Options you will pursue in response. If you fail to respond to this letter within 14 days of the date of this letter, your project will not be approved. Please indicate with a checkmark in the appropriate box of your decision, sign, and date this letter in the space below, and return a copy to us. If you are providing additional information under Options B or C below, these submittals are also due within 14 calendar days from the date of this letter. Once we have reached agreement on the subject project, we will issue a Capacity Reserve Certificate, allowing your project to proceed with other applicable permit processes. If you have any questions or need additional information, please feel free to contact me at 206-450-5845 or sanicev.tandleCCcit offederalwa .com. Sincerely, t Sanjeev Tan le, P.E., PTOE Senior Transportation Engineer OPTIONS: ❑ A. I accept the staff determination for mitigating the transportation impacts of the subject project. ❑ B. I am reducing the trip generation of the subject project by any combination of revised land uses and travel demand management measures. Attached is the revised project description. ❑ C. I am submitting an analysis rebutting the staff analysis and/or provide alternative mitigation measures. Attached is the analysis supporting my proposal. ❑ D. I will appeal the underlying development permit decision. Applicant Date CITY OF Federal Aly Public Works Department 33325 Bth Avenue South PO Box 9718 Federal Way WA 98063-9718 253-835-2607: Fax 253-835-2609 TRANSPORTATION CONCURRENCY ANALYSIS Steel Lake Crest Plat 07-103 903 -CN Prepared by S anj eev Tandle City of Federal Way Public Works Traffic Division __._ Introduction This report documents the transportation capacity impacts associated with the proposed Steel Lake Crest Plat in Federal Way, Washington. The study focuses on evening peak hour traffic operations at all intersections that are monitored for transportation concurrency and impacted by at least one (1) new evening peak hour trip. All other transportation impacts are addressed by other applicable development review processes. The analysis was conducted for 2009, the anticipated year of opening of the development proposal for conditions with and without the project. Purpose and Objectives This study has been performed on behalf of the project applicant by the City of Federal Way, Public Works Department, Traffic Services Division, and is consistent with the City of Federal Way Transportation Concurrency Management Code as described in Federal Way City Code Chapter 19, Article IV. The purpose of this code is to implement the transportation concurrency requirements of the Growth Management Act, RCW 36A.70.070(6)(e), consistent with the City's Comprehensive Plan and WAC 365-195-510 and 365-195-835. These requirements apply to all new developments and expansions of existing developments and specify that the City may not permit development if adequate capacity in the transportation system cannot be provided concurrent with the development. Adequate capacity is deemed to be provided if the City's adopted Level of Service (LOS) standard is met. The City's adopted LOS standard is contained in Comprehensive Plan TP16 and is summarized in the table below: Table 1 - Level of Service Thresholds Impact Parameter Threshold Minimum Level of Service Signalized Intersection E Unsignalized Intersection None Maximum Volume/Capacity Ratio (Xc) 1.00 Project Location and Description The proposed development is located at 30642 28`h Avenue South, Federal Way, WA 98003. A vicinity map is shown in Figure 1 below. The project would subdivide existing parcels into twenty- eight lots with site improvements. Steel Lake Crest Plat (07-103903-CN) Transportation Concurrency Analysis City of Federal Way Page 2 10/23/07 Figure 1 Site Vicinity Map 2 p 4 Miles Q OT Steel Lake Crest Plat (07-103903-CN) Transportation Concurrency Analysis City of Federal Way Page 3 10/23/07 Background Conditions Traffic forecasts for year 2009 conditions without the project are presented in this section, representing the anticipated year of opening for the project. In addition, all projects shown on the City's currently adopted Transportation Improvement Plan are assumed to be constructed consistent with the Growth Management Act's definition of "concurrent with development". The 2009 evening peak hour future volume for each study intersection was derived by applying a 2% annual growth rate to the latest available volumes and adding trips reserved for approved development projects. The background volumes are illustrated in Figure 2. Figure 2 — 2009 Evening Peak Hour Background Traffic Volumes Steel Lake Crest Plat (07-103903-CN) Transportation Concurrency Analysis City of Federal Way Page 4 10/23/07 Figure 2 Horizon Without Project 3 Z�y 9 S Sur Lakc Rd TS a to I H L' 04 V S� a� t6B a' iL'fi)v 86 sm N $ 233 5 °� 7 S 233 St y 23�-172 139, � M �J Q' 159 as p f54 �1 71 Sol St ie S St Se ! IB7i 1241 351-1 yh 2, 3791 47 S310S1 3i'S 1� g $L N ¢' 4 1-131 ��14 74 147 152 F877 0S S 312 St I i 1 161 � 1 N st 3Y b�O 9 b� S9�b w N Q 530451 01 \• w 3 9 ko r1 N TV S S310FJ Figure 2 Horizon Without Project Site Generated Traffic Evening peak hour trips generated by the proposed project were forecasted. The evening peak hour trips were then distributed and assigned to the adjacent roadways and intersection within the study area using the City's latest transportation model. No reduction in vehicle trips was made to account for a potential shift away from the automobile. ITE trip rates are based on observed vehicle trip patterns at each land use and thereby account for a basic amount of non -auto travel. Trip Generation The project would plat existing four lots into twenty-nine lots with site improvements. Currently, there are three single-family residential units on the existing lots and full credit for these existing residential units would be provided and is documented in Table 2. The proposed development consists of twenty-eight new Single family residential lots. Trips generated by the project were forecasted using trip generation rates found in the 7th Edition of Trip Generation (ITE, 2003). ITE Land Use Code 210 was used to calculate the trip generation. Procedures outlined in ITE's Trip Generation Handbook were used to determine when to use rates or regression equations and calculating weighted averages between different independent variables. These calculations are shown in Appendix A. As the concurrency application indicated that the project includes twenty-nine units, the traffic model assumed that number of units. However, we understand that the number of units were reduced to twenty-eight and therefore a proportionate credit has been provided for the lot that was reduced from the original count. The project is expected to generate a net total of 29 new evening peak hour trips. Table 2 below summarizes the trip generation for the proposed development. Table 2. Evening Peak Hour Trip Generation* Number of Land Use Dwelling Entering Trips Exiting Trips Total Trips Units Proposed Units** 29 22 13 35 Number of Units eligible 4 4 2 6 for credit*** Net New Trips 25 18 11 29 (17.14%) Notes: *Sources: Inp veneration (iib, t > anion, zuu_i), ianu use cuuc /_iu Trip Generation Handbook (ITE, 2"d Edition, 2001) **As the concurrency application indicated that the project includes 29 lots, the analysis was conducted for that number of units, however, a proportionate credit is provided for one unit since the number of lots were reduced to 28 ***includes three existing units and one reduced unit Trip Distribution and Assignment The evening peak hour trips generated by the proposed project were distributed and assigned to the roadway system as shown in Figure 3. The distribution is based on the City's travel demand model, taking into account surrounding land uses and existing traffic patterns. Steel Lake Crest Plat (07-103903-CN) Transportation Concurrency Analysis City of Federal Way Page 7 10/23/07 v �m C e a 0 e 0 0 0 v o e'da v v 0o P oe p� t z f f q i boa a o i a G jai ,i 9 q� P q 0 a a o o e o a o o a 0 Horizon Year Traffic Forecast The evening peak hour traffic generated by the proposed project was added to the background forecasts in Figure 2. The Horizon Year volumes are illustrated in Figure 4 below. Figure 4 — 2009 Horizon Year Evening Peak Hour Traffic Volumes Steel Lake Crest Plat (07-103903-CN) Transportation Concurrency Analysis City of Federal Way Page 9 10/23/07 Figure 4 Horizon With Project Figure 4 Horizon With Project Traffic Analysis The quality of traffic flow at the key study intersections is presented in this section of the report. Table 3 shows a summary of the LOS analysis for the study intersections. Where a performance measure does not apply to the entire intersection, the table shows the measure for the worst movement of the intersection. Calculations are shown in Appendix B for Background and Horizon Year conditions. Steel Lake Crest Plat (07-103903-CN) Transportation Concurrency Analysis City of Federal Way Page 12 10/23/07 Tahle 3 - I.nS 5ummary Worksheet Intersection 2009 Background Conditions LOS Standard 2009 With -Project Conditions LOS Standard ID North -South Street East-West Street LOS V/C Met? LOS V/C Met? 256 S Star Lake Rd 25 Dr S 0.20 Y 0.20 Y 451 Pacific Hwy S 16 Ave S 0.79 Y 0.79 Y 458 S Star Lake Rd Militag Rd S B 0.80 Y B 0.80 Y 1050 Pacific Hwy S S 288 St C 0.64 Y C 0.64 Y 1056 Military Rd S S 288 St D 0.82 Y D 0.83 Y 1557 Military Rd S S 296 PI 0.59 Y 0.60 Y 1651 Pacific Hwy S S Dash Point Rd C 0.75 Y C 0.75 Y 1751 Pacific Hwy S 18 Ave S 0.50 Y 0.50 Y 2051 Pacific Hwy S S 304 St B 0.62 Y B 0.62 Y 2054 23 Ave S S 304 St 0.20 Y 0.20 Y 2057 28 Ave S S 304 St B 0.58 Y B 0.60 Y 2058 Military Rd S S 304 St C 0.62 Y C 0.63 Y 2542 4 Ave S S 312 St 0.61 Y 0.61 Y 2546 8 Ave S S 312 St A 0.58 Y A 0.58 Y 2549 14 Ave S S 312 St B 0.36 Y B 0.36 Y 2550 Pacific Hwy S S 312 St D 0.82 Y D 0.83 Y 2551 18 Ave S S 312 St 0.33 Y 0.34 Y 2552 20 Ave S S 312 St B 0.38 Y B 0.38 Y 2553 22 Ave S S 312 St 0.34 Y 0.35 Y 2554 23 Ave S S 312 St C 0.54 Y C 0.54 Y 2557 28 Ave S S 312 St 0.68 Y 0.69 Y 2750 Pacific Hwy S S 316 St B 0.62 Y B 0.62 Y 2855 23 Ave S S 317 St B 0.37 Y B 0.37 Y 3050 Pacific Hwy S S 320 St C 0.79 Y C 0.79 Y 3052 20 Ave S S 320 St C 0.66 Y C 0.66 Y 3055 23 Ave S S 320 St D 0.84 Y D 0.84 Y 3350 Pacific Hwy S S 324 St C 0.78 Y C 0.78 Y 3650 Pacific Hwy S S 330 St B 0.49 Y B 0.49 Y 3850 Pacific Hn S S 333 St 0.43 Y 0.43 Y 4050 Pacific Hwy S S 336 St D 0.79 Y D 0.79 Y Steel Lake Crest Plat (07-103903-CN) Transportation Concurrency Analysis City of Federal Way Page 13 10/23/07 Pro-rata Share Traffic Mitigation The City requires all new development projects impacting projects listed in the City's currently adopted Transportation Improvement Plan (TIP) to either construct the impacted projects or provide pro-rata share contributions towards these projects. The pro-rata contribution for each TIP project is calculated as the number of new peak hour trips generated by the development divided by the estimated total peak hour traffic volume at the time that phase of the development is completed. If a TIP project has been deemed to be fully funded by the Public Works Director, the pro-rata share will be calculated based on the design engineer's current cost estimate subtracting funding from federal and state grants. If frontage improvements are also provided on a TIP project, the cost of the frontage improvements provided by the development would be subtracted from the cost of the TIP project before calculating pro-rata share of mitigation for off -site improvements. If the development's impacts on a TIP project vary within the TIP project, depending on the operational or safety issue the TIP project is intended to resolve, pro-rata shares may be calculated separately for each segment that is impacted differently by dividing the cost of the TIP project on a per -lineal -foot basis. Based on the estimated trip generation and distribution of the project traffic, the project would impact 9 TIP projects by one or more trips during the weekday evening peak hour. In order to mitigate the impacts of the new trips generated by the project and meeting the LOS standards, the applicant shall: 1. Prior to the issuance of final plat approval, construct the TIP projects identified in Table 4; or 2. Prior to the issuance of final plat approval, voluntarily pay the project's pro-rata share contribution in the amount of $39,790.00. Please note that a credit of $8,231.00 (17.14%) has been applied for the existing units and for one unit that was reduced from the original count. The pro-rata share calculations are shown in Appendix C. Table -4 Map TIP PROJECTS ID* Location Description Design Study, Environmental analysis to improve la City Center Access Phase 2 access to City Center lb City Center Access Phase 3 Add 2nd SB left -turn lane, 3rd SB right -turn lane Widen S 320th St bridge over I-5, realign loop ramp lc City Center Access Phase 4 and NB off -ramp Add HOV lanes, 2nd SB left -turn lane @ 288th, 2 SR 99 HOV Lanes Phase 3: S 284th St install raised median, signal @ SR 509 @ - SR 509 Redondo Wy S with interconnect to 1 lth PI S 10 S 320th St @ 20th Ave S Add 2nd left-tum lanes EB, WB 12 SR 99 HOV Lanes Phase 4: SR 509 - S Add HOV lanes, install raised median 312th St 16 S 304th St @ 28th Ave S Add NB right-tum lane, signal 20 Military Rd S: S Star Lake Rd - S 288th Widen to 5 lanes, sidewalks, street lights St 22 S 312th St @ 28th Ave S Add SB right -turn lane Steel Lake Crest Plat (07-103903-CN) Transportation Concurrency Analysis City of Federal Way Page 14 10/23/07 No level of service (LOS) deficiencies were noted at any of the City of Federal Way study intersections. Therefore, no supplemental offsite mitigation is necessary. However, King County's Military Road S/S 320th Street intersection would experience 7 p.m. peak hour project trips and the intersection would operate at LOS F under both baseline and project conditions. King County uses a 30 p.m. peak hour trip threshold to assess location -specific mitigation; therefore no mitigation is required. Summary and Conclusions The proposed development would subdivide existing parcels into twenty-eight lots with site improvements. The proposed development is forecast to generate net new 29 new evening peak hour trips. All City intersections impacted by one or more evening peak hour trips from the proposed development would meet City of Federal Way LOS standards with programmed improvements, thus the transportation system provides adequate capacity concurrent with the development. However, King County's Military Road S/S 320th Street intersection would experience 7 p.m. peak hour project trips and the intersection would operate at LOS F under both baseline and project conditions. King County uses a 30 p.m. peak hour trip threshold to assess location -specific mitigation; therefore no mitigation is required. The proposed development will either construct all TIP projects impacting by one or more trips or voluntarily contribute $39,790.00 in pro-rata share contributions. Steel Lake Crest Plat (07-103903-CN) Transportation Concurrency Analysis City of Federal Way Page 15 10/23/07 Appendix A ■ Trip Generation Spreadsheets Steel Lake Crest Plat (07-103903-CN) Transportation Concurrency Analysis City of Federal Way Page 16 10/23/07 Use Steel Lake Crest SF Detached Housing Weekday Evening Street Period Peak Code 210 Parameter Dwelling Units Quantity 29.000 Studies 302 Outliers 0 Lower Data Range 0.000 Upper Data Range 2950.000 %Entering 63 Rate 1.01 Std Dev 1.05 Equation Type Log Coefficient A 0.900 Constant C 0.53 R^2 0.91 Data Close to Rate? Y Data Close to Equation? Y Closest Data Point E Trips by Rate 29.29 0.00 0.00 0.00 Trips by Equation 35.18 0.00 0.00 0.00 Within Data Range? YES NO NO NO N>2? YES NO NO NO N>19? YES NO NO NO Outliers<5%? YES NA NA NA y-intercept 1.70 NA NA NA Near 0? NO NA NA NA Std Dev/Rate>1.10? NO NA NA NA R^2>0.75? YES NO NO NO RECOMMENDATION EQUATION STUDY STUDY STUDY Trips 35.18 0.00 0.00 0.00 Weight by Rate 0.96 0.00 0.00 0.00 Weight by Equation 0.91 0.00 0.00 0.00 RESULTS RATE EQUATION AVERAGE Weighted Average 29.29 35.18 32.24 Entering Trips 18.45 22.17 20.31 Exiting Trips 10.84 13.02 11.93 Pass -By% 0.00% 0.00s 0.00s Total New Trips 29.29 35.18 32.24 Entering New Trips 18.45 22.17 20.31 Exiting New Trips 10.84 13.02 11.93 Steel Lake Crest Plat (07-103903-C1) Transportation Concurrency Analysis City of Federal Way Page 17 10/23/07 Trip Generation for the Existing Four Units Use Steel Lake Crest SF Detached Housing Period Weekday Evening Street Peak Code 210 Parameter Dwelling Units Quantity 4.000 Studies 302 Outliers 0 Lower Data Range 0.000 Upper Data Range 2950.000 %Enterina 63 Rate 1.01 Std Dev 1.05 Equation Type Log Coefficient A 0.900 Constant C 0.53 R^2 0.91 Data Close to Rate? Y Data Close to Equation? Y Closest Data Point E Trips by Rate 4.04 0.00 0.00 0.00 Trips by Equation 5.92 0.00 0.00 0.00 Within Data Range? YES NO NO NO N>2? YES NO NO NO N>19? YES NO NO NO Outliers<5%? YES NA NA NA -intercept 1.70 NA NA NA Near 0? NO NA NA NA Std Dev/Rate>1.10? NO NA NA NA R^2>0.75? YES NO NO NO RECOMMENDATION EQUATION STUDY STUDY STUDY Trips 5.92 0.00 0.00 0.00 Weight by Rate 0.96 1 0.00 0.00 0.00 Weight by E uation 0.91 0.00 0.00 0.00 RESULTS RATE EQUATION AVERAGE Weighted Average 4.04 5.92 4.98 Entering Trips 2.55 3.73 3.14 Exiting Trips 1.49 2.19 1.84 Pass -By$ 0.00 0.00- 0.00% Total New Trips 4.04 5.92 4.98 Entering New Trips 2.55 3.73 3.14 Exitin<j New Trips 1 1.49 2.19 1.84 Steel Lake Crest Plat (07-103903-CN) Transportation Concurrency Analysis City of Federal Way Page 18 10/23/07 Appendix B • Background Level of Service Summary Sheets R Horizon Level of Service Summary Sheets Steel Lake Crest Plat (07-103903-CN) Transportation Concurrency Analysis City of Federal Way Page 19 10/23/07 9/10/07 256: S Star Lake Rd & 25 Dr S Horizon Without HCM Unsignalized Intersection Capacity Analysis Movement SET SER NWL NWT NEL NER Lane Configurations $1 4 Y Sign Control Free Free Stop Grade 5% -6% -2% Volume (veh/h) 229 114 68 108 53 24 Peak Hour Factor 1.00 1.00 1.00 1.00 1.00 1.00 Hourly flow rate (vph) 229 114 68 108 53 24 Pedestrians 10 10 10 Lane Width (ft) 12.0 12.0 12.0 Walking Speed (ft/s) 4.0 4.0 4.0 Percent Blockage 1 1 1 Right turn flare (veh) Median type None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 353 550 306 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 353 550 306 tC, single (s) 4.1 6.4 6.2 tC, 2 stage (s) tF (s) 2.2 3.5 3.3 p0 queue free % 94 88 97 cM capacity (veh/h) 1196 460 722 Direction, Lane # SE 1 NW 1 NE 1 Volume Total 343 176 77 Volume Left 0 68 53 Volume Right 114 0 24 cSH 1700 1196 519 Volume to Capacity 0.20 0.06 0.15 Queue Length 95th (ft) 0 5 13 Control Delay (s) 0.0 3.5 13.1 Lane LOS A B Approach Delay (s) 0.0 3.5 13.1 Approach LOS B Intersection Summary Average Delay 2.7 Intersection Capacity Utilization 48.5% ICU Level of Service A Analysis Period (min) 15 Steel Lake Crest Parametrix, Inc. Concurrency File No.: 07-103903-00-CN City of Federal Way 9/10/07 Horizon Without 451: Pacific Hwy S & 16 Av S HCM Unsignalized Intersection Capacity Analysis t II t 1j ..� � * f-% *-- Movement NBL NBT NBR SBL SBT SBR SEL SET SER NWL NWT NWR Lane Configurations A TtT T+I r r Sign Control Free Free Stop Stop Grade -3% 2% 4% 0% Volume (veh/h) 173 1004 9 38 1757 21 0 0 406 0 0 50 Peak Hour Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Hourly flow rate (vph) 173 1004 9 38 1757 21 0 0 406 0 0 50 Pedestrians 10 10 10 Lane Width (ft) 12.0 12.0 12.0 Walking Speed (ft/s) 4.0 4.0 4.0 Percent Blockage 1 1 1 Right turn flare (veh) Median type None None Median storage veh) Upstream signal (ft) 986 pX, platoon unblocked 0.93 0.93 0.93 0.93 0.93 0.93 vC, conflicting volume 1788 1013 2594 3212 616 2432 3218 349 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 1700 1013 2565 3228 443 2391 3234 349 tC, single (s) 4.1 4.1 7.5 6.5 6.9 7.5 6.5 6.9 tC, 2 stage (s) tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 p0 queue free % 50 94 100 100 21 100 100 92 cM capacity (veh/h) 343 680 6 4 516 2 4 642 Direction, Lane # NB 1 NB 2 NB 3 NB 4 SB 1 SB 2 SB 3 SE 1 NW 1 Volume Total 173 402 402 210 477 878 460 406 50 Volume Left 173 0 0 0 38 0 0 0 0 Volume Right 0 0 0 9 0 0 21 406 50 cSH 343 1700 1700 1700 680 1700 1700 516 642 Volume to Capacity 0.50 0.24 0.24 0.12 0.06 0.52 0.27 0.79 0.08 Queue Length 95th (ft) 68 0 0 0 4 0 0 182 6 Control Delay (s) 25.8 0.0 0.0 0.0 1.6 0.0 0.0 33.2 11.1 Lane LOS D A D B Approach Delay (s) 3.8 0.4 33.2 11.1 Approach LOS D B Intersection Summary Average Delay 5.6 Intersection Capacity Utilization 93.5% ICU Level of Service F Analysis Period (min) 15 Steel Lake Crest Parametrix, Inc. Concurrency File No.: 07-103903-00-CN City of Federal Way 9/10/07 Horizon Without 1557: Military Rd S & Camelot Dr S HCM Unsignalized Intersection Capacity Analysis Movement SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR Lane Configurations + r 1� 4� 4- Sign Control Free Free Stop Stop Grade 4% -6% 0% 4% Volume (veh/h) 36 1010 0 0 525 50 0 0 0 28 0 51 Peak Hour Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Hourly flow rate (vph) 36 1010 0 0 525 50 0 0 0 28 0 51 Pedestrians 10 10 10 Lane Width (ft) 12.0 12.0 12.0 Walking Speed (ft/s) 4.0 4.0 4.0 Percent Blockage 1 1 1 Right turn flare (veh) Median type None None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 585 1010 1668 1667 1020 1652 1642 570 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 585 1010 1668 1667 1020 1652 1642 570 tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2 tC, 2 stage (s) tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 p0 queue free % 96 100 100 100 100 62 100 90 cM capacity (veh/h) 981 686 66 92 285 74 95 512 Direction. Lane # SE 1 SE 2 SE 3 NW 1 NW 2 NE 1 SW 1 Volume Total 36 1010 0 0 575 0 79 Volume Left 36 0 0 0 0 0 28 Volume Right 0 0 0 0 50 0 51 cSH 981 1700 1700 1700 1700 1700 166 Volume to Capacity 0.04 0.59 0.00 0.00 0.34 0.00 0.48 Queue Length 95th (ft) 3 0 0 0 0 0 56 Control Delay (s) 8.8 0.0 0.0 0.0 0.0 0.0 45.0 Lane LOS - A A E Approach Delay (s) 0.3 0.0 0.0 45.0 A roach LOS A E Pp Intersection Summary Average Delay 2.3 Intersection Capacity Utilization 69.1% ICU Level of Service Analysis Period (min) 15 Steel Lake Crest Parametrix, Inc. Concurrency File No.: 07-103903-00-CN City of Federal Way 9/10/07 Horizon Without 1751: 18 Av S & Pacific Hwy S HCM Unsignalized Intersection Capacity Analysis ,or, 4-- t /*� \0. I Movement WBL WBR NBT NBR SBL SBT Lane Configurations Y tti ttt Sign Control Stop Free Free Grade -10% -4% 3% Volume (veh/h) 80 43 1163 59 24 1788 Peak Hour Factor 1.00 1.00 1.00 1.00 1.00 1.00 Hourly flow rate (vph) 80 43 1163 59 24 1788 Pedestrians 10 10 10 Lane Width (ft) 12.0 12.0 12.0 Walking Speed (ft/s) 4.0 4.0 4.0 Percent Blockage 1 1 1 Right turn flare (veh) Median type TW LTL Median storage veh) 1 Upstream signal (ft) 720 pX, platoon unblocked 0.84 vC, conflicting volume 1856 437 1232 vC1, stage 1 conf vol 1202 vC2, stage 2 conf vol 654 vCu, unblocked vol 1636 437 1232 tC, single (s) 6.8 6.9 4.1 tC, 2 stage (s) 5.8 tF (s) 3.5 3.3 2.2 p0 queue free % 58 92 96 cM capacity (veh/h) 188 559 557 Direction, Lane # WB 1 NB 1 NB 2 NB 3 SB 1 SB 2 SB 3 SB 4 Volume Total 123 465 465 292 Volume Left 80 0 0 0 Volume Right 43 0 0 59 cSH 245 1700 1700 1700 Volume to Capacity 0.50 0.27 0.27 0.17 Queue Length 95th (ft) 65 0 0 0 Control Delay (s) 33.6 0.0 0.0 0.0 Lane LOS D Approach Delay (s) 33.6 0.0 Approach LOS D Intersection Summary Average Delay 1.4 Intersection Capacity Utilization 52.0% Analysis Period (min) 15 Steel Lake Crest Parametrix, Inc. 24 596 596 596 24 0 0 0 0 0 0 0 557 1700 1700 1700 0.04 0.35 0.35 0.35 3 0 0 0 11.8 0.0 0.0 0.0 B 0.2 ICU Level of Service A Concurrency File No.: 07-103903-00-CN City of Federal Way 9/10/07 2054: S 304 St & 23 Av S Horizon Without HCM Unsignalized Intersection Capacity Analysis Movement EBL EBT WBT WBR SBL SBR Lane Configurations *' '+ Y Sign Control Free Free Stop Grade 0% 4% -3% Volume (veh/h) 6 187 316 20 14 20 Peak Hour Factor 1.00 1.00 1.00 1.00 1.00 1.00 Hourly flow rate (vph) 6 187 316 20 14 20 Pedestrians 10 10 10 Lane Width (ft) 12.0 12.0 12.0 Walking Speed (ft/s) 4.0 4.0 4.0 Percent Blockage 1 1 1 Right turn flare (veh) Median type None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 346 545 346 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 346 545 346 tC, single (s) 4.1 6.4 6.2 tC, 2 stage (s) tF (s) 2.2 3.5 3.3 p0 queue free % 100 97 97 cM capacity (veh/h) 1203 489 686 Direction, Lane # EB 1 WB 1 SIB 1 Volume Total 193 336 34 Volume Left 6 0 14 Volume Right 0 20 20 cSH 1203 1700 588 Volume to Capacity 0.00 0.20 0.06 Queue Length 95th (ft) 0 0 5 Control Delay (s) 0.3 0.0 11.5 Lane LOS A B Approach Delay (s) 0.3 0.0 11.5 Approach LOS B Intersection Summary Average Delay 0.8 Intersection Capacity Utilization 32.4% ICU Level of Service A Analysis Period (min) 15 Steel Lake Crest Parametrix, Inc. Concurrency File No.: 07-103903-00-CN City of Federal Way 9/10/07 2542: S 312 St & 4 Av S Horizon Without HCM Unsignalized Intersection Capacity Analysis Movement EBT EBR WBL WBT NBL NBR Lane Configurations 1� I + Y Sign Control Free Free Stop Grade 8% -6% 0% Volume (veh/h) 731 11 28 1038 11 17 Peak Hour Factor 1.00 1.00 1.00 1.00 1.00 1.00 Hourly flow rate (vph) 731 11 28 1038 11 17 Pedestrians 10 10 10 Lane Width (ft) 12.0 12.0 12.0 Walking Speed (ft/s) 4.0 4.0 4.0 Percent Blockage 1 1 1 Right turn flare (veh) Median type TWLTL Median storage veh) 1 Upstream signal (ft) 1307 pX, platoon unblocked 0.88 0.88 0.88 vC, conflicting volume 752 1850 756 vC1, stage 1 conf vol 746 vC2, stage 2 conf vol 1104 vCu, unblocked vol 717 1971 722 tC, single (s) 4.1 6.4 6.2 tC, 2 stage (s) 5.4 tF (s) 2.2 3.5 3.3 p0 queue free % 96 94 95 cM capacity (veh/h) 768 186 367 Direction. Lane # EB 1 WB 1 WB 2 NB 1 Volume Total 742 28 1038 28 Volume Left 0 28 0 11 Volume Right 11 0 0 17 cSH 1700 768 1700 266 Volume to Capacity 0.44 0.04 0.61 0.11 Queue Length 95th (ft) 0 3 0 9 Control Delay (s) 0.0 9.9 0.0 20.1 Lane LOS A C Approach Delay (s) 0.0 0.3 20.1 Approach LOS C Intersection Summary Average Delay 0.5 Intersection Capacity Utilization 69.1% ICU Level of Service C Analysis Period (min) 15 Steel Lake Crest Parametrix, Inc. Concurrency File No.: 07-103903-00-CN City of Federal Way 9/10/07 Horizon Without 2551: S 312 St & 18 Av S HCM Unsignalized Intersection Capacity Analysis --* - '- 4.. 4\ t I' 10. .� -► , Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations fl 0 4 r + Sign Control Free Free Stop Stop Grade 5% 0% 0% 0% Volume (veh/h) 40 545 134 20 588 55 74 14 29 32 18 64 Peak Hour Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1 .00 Hourly flow rate (vph) 40 545 134 20 588 55 74 14 29 32 18 64 Pedestrians 10 10 10 10 Lane Width (ft) 12.0 12.0 12.0 12.0 Walking Speed (ft/s) 4.0 4.0 4.0 4.0 Percent Blockage 1 1 1 1 Right turn flare (veh) Median type TWLTL TWLTL Median storage veh) 1 1 Upstream signal (ft) 631 659 pX, platoon unblocked 0.98 0.92 0.93 0.93 0.92 0.93 0.93 0.98 vC, conflicting volume 653 689 1119 1395 360 1064 1434 342 vC1, stage 1 conf vol 702 702 666 666 vC2, stage 2 conf vol 417 693 398 769 vCu, unblocked vol 621 573 978 1275 215 919 1317 302 tC, single (s) 4.1 4.1 7.5 6.5 6.9 7.5 6.5 6.9 tC, 2 stage (s) 6.5 5.5 6.5 5.5 tF (s) 2.2 2.2 3.5 - 4.0 3.3 3.5 4.0 3.3 p0 queue free % 96 98 72 94 96 89 93 90 cM capacity (veh/h) 926 907 265 252 714 296 248 667 Direction, Lane # EB 1 EB 2 EB 3 WB 1 WB 2 WB 3 NB 1 NB 2 SB 1 Volume Total 40 363 316 20 392 251 88 29 114 Volume Left 40 0 0 20 0 0 74 0 32 Volume Right 0 0 134 0 0 55 0 29 64 cSH 926 1700 1700 907 1700 1700 263 714 412 Volume to Capacity 0.04 0.21 0.19 0.02 0.23 0.15 0.33 0.04 0.28 Queue Length 95th (ft) 3 0 0 2 0 0 35 3 28 Control Delay (s) 9.1 0.0 0.0 9.1 0.0 0.0 25.4 10.3 17.1 Lane LOS A A D B C Approach Delay (s) 0.5 0.3 21.7 17.1 Approach LOS C C Intersection Summary Average Delay 3.1 Intersection Capacity Utilization 49.3% ICU Level of Service A Analysis Period (min) 15 Steel Lake Crest Parametrix, Inc. Concurrency File No.: 07-103903-00-CN City of Federal Way 9/10/07 2553: S 312 St & 22 Av S Horizon Without HCM Unsignalized Intersection Capacity Analysis Movement EBL EBT WBT WBR SBL SBR Lane Configurations tt ti� Y Sign Control Free Free Stop Grade -3% 4% 0% Volume (veh/h) 6 883 877 19 20 8 Peak Hour Factor 1.00 1.00 1.00 1.00 1.00 1.00 Hourly flow rate (vph) 6 883 877 19 20 8 Pedestrians 10 10 10 Lane Width (ft) 12.0 12.0 12.0 Walking Speed (ft/s) 4.0 4.0 4.0 Percent Blockage 1 1 1 Right turn flare (veh) Median type TW LTL Median storage veh) 1 Upstream signal (ft) 670 316 pX, platoon unblocked vC, conflicting volume 906 1360 468 vC1, stage 1 conf vol 896 vC2, stage 2 conf vol 464 vCu, unblocked vol 906 1360 468 tC, single (s) 4.1 6.8 6.9 tC, 2 stage (s) 5.8 tF (s) 2.2 3.5 3.3 p0 queue free % 99 92 98 cM capacity (veh/h) 740 259 533 Direction, Lane # EB 1 EB 2 EB 3 WB 1 WB 2 SB 1 Volume Total 6 442 442 585 311 28 Volume Left 6 0 0 0 0 20 Volume Right 0 0 0 0 19 8 cSH 740 1700 1700 1700 1700 304 Volume to Capacity 0.01 0.26 0.26 0.34 0.18 0.09 Queue Length 95th (ft) 1 0 0 0 0 8 Control Delay (s) 9.9 0.0 0.0 0.0 0.0 18.0 Lane LOS A C Approach Delay (s) 0.1 0.0 18.0 Approach LOS C Intersection Summary Average Delay 0.3 Intersection Capacity Utilization 39.4% ICU Level of Service A Analysis Period (min) 15 Steel Lake Crest Parametrix, Inc. Concurrency File No.: 07-103903-00-CN City of Federal Way 9/10/07 2557: S 312 St & 28 Av S Horizon Without HCM Unsignalized Intersection Capacity Analysis Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Sign Control Volume (vph) Peak Hour Factor 346 1.00 4 Stop 3 1.00 45 1.00 2 1.00 *T+ Stop 1 1.00 0 1.00 37 1.00 4 Stop 183 1.00 1 1.00 0 1.00 4 Stop 197 1.00 F 445 1.00 H I fl t h 346 3 45 2 1 0 37 183 1 0 197 445 our w y ora a (v) p Direction, Lane # EB 1 WB 1 NB 1 SB 1 SB 2 Volume Total (vph) 394 3 221 197 445 Volume Left (vph) 346 2 37 0 0 Volume Right (vph) 45 0 1 0 445 Hadj (s) 0.14 0.17 0.06 0.03 -0.67 Departure Headway (s) 6.1 7.2 6.2 6.2 5.5 Degree Utilization, x 0.66 0.01 0.38 0.34 0.68 Capacity (veh/h) 564 417 535 561 630 Control Delay (s) 20.2 10.2 13.1 11.2 18.2 Approach Delay (s) 20.2 10.2 13.1 16.1 Approach LOS C B B C Intersection Summary Delay 16.8 HCM Level of Service C Intersection Capacity Utilization 64.5% ICU Level of Service C Analysis Period (min) 15 Steel Lake Crest Parametrix, Inc. Concurrency File No.: 07-103903-00-CN City of Federal Way 9/10/07 Horizon Without 2857: S 317 St & 28 Av S HCM Unsignalized Intersection Capacity Analysis 'A --.w -*--- 'k, \W 4/ Movement EBL EBT WBT WBR SBL SBR Right Turn Channelized Volume (veh/h) 0 0 0 0 0 0 Peak Hour Factor 1.00 1.00 1.00 1.00 1.00 1.00 Hourly flow rate (vph) 0 0 0 0 0 0 Approach Volume (veh/h) 0 0 0 Crossing Volume (veh/h) 0 0 0 High Capacity (veh/h) 1385 1385 1385 High v/c (veh/h) 0.00 0.00 0.00 Low Capacity (veh/h) 1161 1161 1161 Low v/c (veh/h) 0.00 0.00 0.00 Intersection Summary Maximum v/c High 0.00 Maximum v/c Low 0.00 Intersection Capacity Utilization 0.0% ICU Level of Service A Steel Lake Crest Concurrency File No.: 07-103903-00-CN City of Federal Way Parametrix, Inc. 9/10/07 3053: S 320 St & 21 PI S Horizon Without HCM Unsignalized Intersection Capacity Analysis '-* --v 4--- 4- 4\ I /0. i -► 'r Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations tti� A tO F r Sign Control Free Free Stop Stop Grade 5% 2% 0% 0% Volume (veh/h) 0 40 1 0 56 0 0 0 0 0 0 2 Peak Hour Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Hourly flow rate (vph) 0 40 1 0 56 0 0 0 0 0 0 2 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type Raised Raised Median storage veh) 0 0 Upstream signal (ft) 641 567 pX, platoon unblocked vC, conflicting volume 56 41 61 96 14 69 97 19 vC1, stage 1 conf vol 40 40 56 56 vC2, stage 2 conf vol 21 56 13 41 vCu, unblocked vol 56 41 61 96 14 69 97 19 tC, single (s) 4.1 4.1 7.5 6.5 6.9 7.5 6.5 6.9 tC, 2 stage (s) 6.5 5.5 6.5 5.5 tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 p0 queue free % 100 100 100 100 100 100 100 100 cM capacity (veh/h) 1547 1567 647 560 1063 639 559 1055 Direction, Lane # EB 1 EB 2 EB 3 EB 4 WB 1 WB 2 WB 3 WB 4 NB 1 SB 1 Volume Total 0 16 16 9 0 22 22 11 0 2 Volume Left 0 0 0 0 0 0 0 0 0 0 Volume Right 0 0 0 1 0 0 0 0 0 2 cSH 1700 1700 1700 1700 1700 1700 1700 1700 1700 1055 Volume to Capacity 0.00 0.01 0.01 0.01 0.00 0.01 0.01 0.01 0.00 0.00 Queue Length 95th (ft) 0 0 0 0 0 0 0 0 0 0 Control Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 8.4 Lane LOS A A Approach Delay (s) 0.0 0.0 0.0 8.4 A roach LOS A A pp Intersection Summary Average Delay 0.2 Intersection Capacity Utilization 15.0% ICU Level of Service A Analysis Period (min) 15 Steel Lake Crest Parametrix, Inc. Concurrency File No.: 07-103903-00-CN City of Federal Way 9/10/07 Horizon Without 3566: S 328 St & Military Rd S HCM Unsignalized Intersection Capacity Analysis --* --* 4\ t Movement EBL EBR NBL NBT SBT SBR Lane Configurations + + r Sign Control Stop Free Free Grade 0% 0% 0% Volume (veh/h) 0 0 0 0 0 0 Peak Hour Factor 1.00 1.00 1.00 1.00 1.00 1.00 Hourly flow rate (vph) 0 0 0 0 0 0 Pedestrians 10 10 10 Lane Width (ft) 12.0 12.0 12.0 Walking Speed (ft/s) 4.0 4.0 4.0 Percent Blockage 1 1 1 Right turn flare (veh) Median type None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 20 20 10 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 20 20 10 tC, single (s) 6.4 6.2 4.1 tC, 2 stage (s) tF (s) 3.5 3.3 2.2 p0 queue free % 100 100 100 cM capacity (veh/h) 981 1040 1596 Direction. Lane # EB 1 EB 2 NB 1 NB 2 SB 1 SB 2 Volume Total 0 0 0 0 0 0 Volume Left 0 0 0 0 0 0 Volume Right 0 0 0 0 0 0 cSH 1700 1700 1700 1700 1700 1700 Volume to Capacity 0.00 0.00 0.00 0.00 0.00 0.00 Queue Length 95th (ft) 0 0 0 0 0 0 Control Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 Lane LOS A A Approach Delay (s) 0.0 0.0 0.0 Approach LOS A Intersection Summary Average Delay 0.0 Intersection Capacity Utilization 20.7% ICU Level of Service A Analysis Period (min) 15 Steel Lake Crest Parametrix, Inc. Concurrency File No.: 07-103903-00-CN City of Federal Way 9/10/07 Horizon Without 3850: S 333 St & Pacific Hwy S HCM Unsignalized Intersection Capacity Analysis 'r t /0 \I,. 4 Movement WBL WBR NBT NBR SBL SBT Lane Configurations ttT+ +tt Sign Control Stop Free Free Grade -2% 2% -2% Volume (veh/h) 0 15 1634 9 0 2193 Peak Hour Factor 1.00 1.00 1.00 1.00 1.00 1.00 Hourly flow rate (vph) 0 15 1634 9 0 2193 Pedestrians 10 10 10 Lane Width (ft) 12.0 12.0 12.0 Walking Speed (ft/s) 4.0 4.0 4.0 Percent Blockage 1 1 1 Right turn flare (veh) Median type Raised Median storage veh) 1 Upstream signal (ft) 890 1110 pX, platoon unblocked 0.81 0.81 0.81 vC, conflicting volume 2390 569 1653 vC1, stage 1 conf vol 1648 vC2, stage 2 conf vol 741 vCu, unblocked vol 2248 4 1340 tC, single (s) 6.8 6.9 4.1 tC, 2 stage (s) 5.8 tF (s) 3.5 3.3 2.2 p0 queue free % 100 98 100 cM capacity (veh/h) 121 860 411 Direction, Lane # WB 1 NB 1 NB 2 NB 3 SB 1 SB 2 SB 3 SB 4 Volume Total 15 654 654 336 0 731 731 731 Volume Left 0 0 0 0 0 0 0 0 Volume Right 15 0 0 9 0 0 0 0 cSH 860 1700 1700 1700 1700 1700 1700 1700 Volume to Capacity 0.02 0.38 0.38 0.20 0.00 0.43 0.43 0.43 Queue Length 95th (ft) 1 0 0 0 0 0 0 0 Control Delay (s) 9.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Lane LOS A Approach Delay (s) 9.3 0.0 0.0 Approach LOS A Intersection Summary Average Delay 0.0 Intersection Capacity Utilization 56.9% ICU Level of Service B Analysis Period (min) 15 Steel Lake Crest Parametrix, Inc. Concurrency File No.: 07-103903-00-CN City of Federal Way 9/10/07 Horizon Without 458: S Star Lake Rd & Military Rd S HCM Signalized Intersection Capacity Analysis Movement SEL SER NEL NET SWT SWR Lane Configurations Y + 1� Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Grade (%) -2% -5% 1 % Total Lost time (s) 5.0 5.0 5.0 5.0 Lane Util. Factor 1.00 1.00 1.00 1.00 Frpb, ped/bikes 0.97 1.00 1.00 0.99 Flpb, ped/bikes 1.00 1.00 1.00 1.00 Frt 0.90 1.00 1.00 0.99 Fit Protected 0.99 0.95 1.00 1.00 Satd. Flow (prot) 1618 1814 1909 1811 Fit Permitted 0.99 0.15 1.00 1.00 Satd. Flow (perm) 1618 291 1909 1811 Volume (vph) 72 200 66 514 1006 125 Peak -hour factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Adj. Flow (vph) 72 200 66 514 1006 125 RTOR Reduction (vph) 89 0 0 0 3 0 Lane Group Flow (vph) 183 0 66 514 1128 0 Confl. Peds. (#/hr) 10 10 10 10 Bus Blockages (#/hr) 0 2 0 0 0 0 Turn Type Perm Protected Phases 4 2 6 Permitted Phases 2 Actuated Green, G (s) 16.6 93.4 93.4 93.4 Effective Green, g (s) 16.6 93.4 93.4 93.4 Actuated g/C Ratio 0.14 0.78 0.78 0.78 Clearance Time (s) 5.0 5.0 5.0 5.0 Vehicle Extensions 2.0 2.0 2.0 2.0 Lane Grp Cap (vph) 224 226 1486 1410 v/s Ratio Prot c0.11 0.27 c0.62 v/s Ratio Perm 0.23 v/c Ratio 0.82 0.29 0.35 0.80 Uniform Delay, d1 50.2 3.8 4.0 7.8 Progression Factor 1.00 1.13 0.93 1,.00 Incremental Delay, d2 19.2 2.9 0.6 4.8 Delay (s) 69.5 7.2 4.3 12.7 Level of Service E A A B Approach Delay (s) 69.5 4.7 12.7 Approach LOS E A B Intersection Summary HCM Average Control Delay 18.1 HCM Level of Service B HCM Volume to Capacity ratio 0.80 Actuated Cycle Length (s) 120.0 Sum of lost time (s) 10.0 Intersection Capacity Utilization 86.0% ICU Level of Service E Analysis Period (min) 15 c Critical Lane Group Steel Lake Crest Parametrix, Inc. Concurrency File No.: 07-103903-00-CN City of Federal Way 9/10/07 Horizon Without 1050: S 288 St & Pacific Hwy S HCM Signalized Intersection Capacity Analysis --p- f- 4--- ,- t 1 # Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations 4 4 r A tO Al M+ Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Grade (%) 14% -7% -2% 2% Total Lost time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Lane Util. Factor 1.00 0.95 0.95 1.00 1.00 0.91 0.97 0.91 Frpb, ped/bikes 0.99 1.00 1.00 0.97 1.00 0.99 1.00 1.00 Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.96 1.00 1.00 0.85 1.00 0.96 1.00 1.00 Fit Protected 0.98 0.95 0.96 1.00 0.95 1.00 0.95 1.00 Satd. Flow (prot) 1629 1698 1756 1585 1787 4881 3399 4971 Fit Permitted 0.98 0.95 0.96 1.00 0.95 1.00 0.95 1.00 Satd. Flow (perm) 1629 1698 1756 1585 1787 4881 3399 4971 Volume (vph) 25 23 17 424 34 186 30 859 309 359 1546 36 Peak -hour factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj. Flow (vph) 25 23 17 424 34 186 30 859 309 359 1546 36 RTOR Reduction (vph) 0 13 0 0 0 154 0 39 0 0 1 0 Lane Group Flow (vph) 0 52 0 220 238 32 30 1129 0 359 1581 0 Confl. Peds. (#/hr) 10 10 10 10 10 10 10 10 Bus Blockages (#/hr) 2 0 6 6 0 2 0 2 0 0 6 0 Turn Type Split Split Perm Prot Prot Protected Phases 4 4 8 8 5 2 1 6 Permitted Phases 8 Actuated Green, G (s) 10.5 20.5 20.5 20.5 4.5 54.8 14.2 64.5 Effective Green, g (s) 9.5 20.5 20.5 20.5 5.0 55.3 14.7 65.0 Actuated g/C Ratio 0.08 0.17 0.17 0.17 0.04 0.46 0.12 0.54 Clearance Time (s) 4.0 5.0 5.0 5.0 5.5 5.5 5.5 5.5 Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lane Grp Cap (vph) 129 290 300 271 74 2249 416 2693 v/s Ratio Prot c0.03 0.13 c0.14 0.02 0.23 c0.11 c0.32 v/s Ratio Perm 0.02 v/c Ratio 0.40 0.76 0.79 0.12 0.41 0.50 0.86 0.59 Uniform Delay, d1 52.6 47.4 47.7 42.1 56.1 22.7 51.7 18.5 Progression Factor 1.00 1.09 1.09 1.85 1.00 1.00 0.95 0.91 Incremental Delay, d2 0.8 9.5 12.4 0.1 1.3 0.8 15.7 0.9 Delay (s) 53.3 61.0 64.4 78.1 57.4 23.5 64.9 17.8 Level of Service D E E E E C E B Approach Delay (s) 53.3 67.2 24.3 26.5 Approach LOS D E C C Intersection Summary HCM Average Control Delay 33.1 HCM Level of Service C HCM Volume to Capacity ratio 0.64 Actuated Cycle Length (s) 120.0 Sum of lost time (s) 15.0 Intersection Capacity Utilization 75.9% ICU Level of Service D Analysis Period (min) 15 c Critical Lane Group Steel Lake Crest Parametrix, Inc. Concurrency File No.: 07-103903-00-CN City of Federal Way 9/10/07 Horizon Without 1056: S 288 St & Military Rd S HCM Signalized Intersection Capacity Analysis Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations +T +I Vi + r + r Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Grade (%) -5% 8% 3% -3% Total Lost time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Lane Util. Factor 1.00 0.95 1.00 0.95 1.00 1.00 1.00 1.00 1.00 1.00 Frpb, ped/bikes 1.00 0.98 1.00 0.99 1.00 1.00 0.97 1.00 1.00 0.97 Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 0.95 1.00 0.96 1.00 1.00 0.85 1.00 1.00 0.85 Fit Protected 0.95 1.00 0.95 1.00 0.95 1.00 1.00 0.95 1.00 1.00 Satd. Flow (prot) 1799 3351 1699 3239 1743 1820 1500 1782 1891 1556 Fit Permitted 0.95 1.00 0.95 1.00 0.95 1.00 1.00 0.95 1.00 1.00 Satd. Flow (perm) 1799 3351 1699 3239 1743 1820 1500 1782 1891 1556 Volume (vph) 118 244 139 273 375 131 150 344 153 320 648 201 Peak -hour factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj. Flow (vph) 118 244 139 273 375 131 150 344 153 320 648 201 RTOR Reduction (vph) 0 68 0 0 30 0 0 0 87 0 0 0 Lane Group Flow (vph) 118 315 0 273 476 0 150 344 66 320 648 201 Confl. Peds. (#/hr) 10 10 10 10 10 10 10 10 Bus Blockages (n'/hr) 2 2 0 0 0 2 0 2 2 2 0 0 Turn Type Prot Prot Prot Perm Prot Perm Protected Phases 5 2 1 6 3 8 7 4 Permitted Phases 8 4 Actuated Green, G (s) 11.0 14.9 21.3 25.2 12.4 39.4 39.4 24.4 51.4 51.4 Effective Green, g (s) 11.0 14.9 21.3 25.2 12.4 39.4 39.4 24.4 51.4 51.4 Actuated g/C Ratio 0.09 0.12 0.18 0.21 0.10 0.33 0.33 0.20 0.43 0.43 Clearance Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Vehicle Extension s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lane Grp Cap (vph) 165 416 302 680 180 598 493 362 810 666 v/s Ratio Prot 0.07 0.09 c0.16 c0.15 0.09 0.19 c0.18 c0.34 v/s Ratio Perm 0.04 0.13 v/c Ratio 0.72 0.76 0.90 0.70 0.83 0.58 0.13 0.88 0.80 0.30 Uniform Delay, di 53.0 50.8 48.3 43.9 52.8 33.4 28.3 46.4 29.8 22.5 Progression Factor 1.09 0.73 1.00 1.00 0.93 0.65 0.50 0.94 0.91 0.90 Incremental Delay, d2 11.5 6.8 27.9 2.6 23.6 3.6 0.5 14.5 5.2 0.7 Delay (s) 69.2 44.0 76.3 46.5 72.8 25.4 14.6 58.0 32.3 20.9 Level of Service E D E D E C B E C C Approach Delay (s) 49.9 56.9 33.9 37.4 Approach LOS D E C D Intersection Summary HCM Average Control Delay 43.6 HCM Level of Service D HCM Volume to Capacity ratio 0.82 Actuated Cycle Length (s) 120.0 Sum of lost time (s) 15.0 Intersection Capacity Utilization 86.8% ICU Level of Service E Analysis Period (min) 15 c Critical Lane Group Steel Lake Crest Concurrency File No.: 07-103903-00-CN City of Federal Way Parametrix, Inc. 9/10/07 Horizon Without 1651: S Dash Point Rd & Pacific Hwy S II HCM Signalized Intersection Capacity Analysis -1, 4\ t i W Movement EBL EBR NBL NBT SBU SBT SBR Lane Configurations M if A+++ A ttf r Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 Grade (%) 0% 0% -1% Total Lost time (s) 5.0 5.0 5.0 5.0 5.0 5.0 Lane Util. Factor 0.97 1.00 1.00 0.91 0.91 1.00 Frpb, ped/bikes 1.00 0.96 1.00 1.00 1.00 0.97 Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 0.85 1.00 1.00 1.00 0.85 Flt Protected 0.95 1.00 0.95 1.00 1.00 1.00 Satd. Flow (prot) 3419 1488 1770 5072 5070 1548 Flt Permitted 0.95 1.00 0.95 1.00 1.00 1.00 Satd. Flow (perm) 3419 1488 1770 5072 5070 1548 Volume (vph) 278 116 218 927 0 1363 926 Peak -hour factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj. Flow (vph) 278 116 218 927 0 1363 926 RTOR Reduction (vph) 0 93 0 0 0 0 37 Lane Group Flow (vph) 278 23 218 927 0 1363 889 Confl. Peds. (#/hr) 10 10 10 10 10 Bus Blockages (#/hr) 2 6 0 2 0 6 0 Turn Type Perm Prot Prot pm+ov Protected Phases 8 5 2 1 6 8 Permitted Phases 8 6 Actuated Green, G (s) 26.3 26.3 19.1 98.2 74.1 100.4 Effective Green, g (s) 26.3 26.3 19.1 98.7 74.6 100.9 Actuated g/C Ratio 0.19 0.19 0.14 0.73 0.55 0.75 Clearance Time (s) 5.0 5.0 5.0 5.5 5.5 5.0 Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 Lane Grp Cap (vph) 666 290 250 3708 2802 1214 v/s Ratio Prot 0.08 c0.12 0.18 0.27 c0.14 v/s Ratio Perm 0.02 0.43 v/c Ratio 0.42 0.08 0.87 0.25 0.49 0.73 Uniform Delay, d1 47.6 44.4 56.8 6.0 18.5 9.5 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 0.2 0.0 25.9 0.2 0.6 2.0 Delay (s) 47.8 44.5 82.7 6.1 19.1 11.5 Level of Service D D F A B B Approach Delay (s) 46.8 20.7 16.0 Approach LOS D C B Intersection Summary HCM Average Control Delay 20.6 HCM Level of Service C HCM Volume to Capacity ratio 0.75 Actuated Cycle Length (s) 135.0 Sum of lost time (s) 10.0 Intersection Capacity Utilization 78.8% ICU Level of Service D Analysis Period (min) 15 c Critical Lane Group Steel Lake Crest Parametrix, Inc. Concurrency File No.: 07-103903-00-CN City of Federal Way 9/10/07 Horizon Without 2051: S 304 St & Pacific Hwy S HCM Signalized Intersection Capacity Analysis --* -,* 4-- 4-- .4\ t /P. I --,I. Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations *' r 4 h tti� A +0 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Grade (%) -4% 5% -1% 2% Total Lost time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Lane Util. Factor 1.00 1.00 1.00 1.00 0.91 1.00 0.91 Frpb, ped/bikes 1.00 0.97 0.99 1.00 0.99 1.00 1.00 Flpb, ped/bikes 1.00 1.00 0.99 1.00 1.00 1.00 1.00 Frt 1.00 0.85 0.97 1.00 0.98 1.00 0.99 Fit Protected 0.98 1.00 0.97 0.95 1.00 0.95 1.00 Satd. Flow (prot) 1859 1532 1689 1778 4973 1752 4954 Fit Permitted 0.84 1.00 0.78 0.95 1.00 0.95 1.00 Satd. Flow (perm) 1596 1532 1350 1778 4973 1752 4954 Volume (vph) 26 42 38 171 54 59 43 1085 134 52 1486 58 Peak -hour factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj. Flow (vph) 26 42 38 171 54 59 43 1085 134 52 1486 58 RTOR Reduction (vph) 0 0 29 0 9 0 0 9 0 0 3 0 Lane Group Flow (vph) 0 68 9 0 275 0 43 1210 0 52 1541 0 Confl. Peds. (#/hr) 10 10 10 10 10 10 10 10 Bus Blockages (#/hr) 2 0 6 6 0 2 0 2 0 0 6 0 Turn Type Perm Perm Perm Prot Prot Protected Phases 4 8 5 2 1 6 Permitted Phases 4 4 8 Actuated Green, G (s) 29.6 29.6 29.6 12.0 69.4 7.0 64.4 Effective Green, g (s) 28.6 28.6 28.6 12.0 69.4 7.0 64.4 Actuated g/C Ratio 0.24 0.24 0.24 0.10 0.58 0.06 0.54 Clearance Time (s) 4.0 4.0 4.0 5.0 5.0 5.0 5.0 Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lane Grp Cap (vph) 380 365 322 178 2876 102 2659 v/s Ratio Prot 0.02 c0.24 0.03 c0.31 v/s Ratio Perm 0.04 0.01 c0.20 v/c Ratio 0.18 0.02 0.85 0.24 0.42 0.51 0.58 Uniform Delay, d1 36.4 35.0 43.7 49.8 14.1 54.8 18.7 Progression Factor 1.00 1.00 1.00 0.52 0.19 1.00 1.00 Incremental Delay, d2 0.1 0.0 18.5 0.2 0.4 1.5 0.9 Delay (s) 36.4 35.0 62.3 25.9 3.1 56.3 19.6 Level of Service D D E C A E B Approach Delay (s) 35.9 62.3 3.9 20.8 Approach LOS D E A C Intersection Summary HCM Average Control Delay 18.3 HCM Level of Service B HCM Volume to Capacity ratio 0.62 Actuated Cycle Length (s) 120.0 Sum of lost time (s) 10.0 Intersection Capacity Utilization 76.0% ICU Level of Service D Analysis Period (min) 15 c Critical Lane Group Steel Lake Crest Concurrency File No.: 07-103903-00-CN City of Federal Way Parametrix, Inc. 9/10/07 2057: S 304 St & 28 Av S Horizon Without HCM Signalized Intersection Capacity Analysis Movement EBT EBR WBL WBT NBL NBR Lane Configurations Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Grade (%) 6% -2% 4% Total Lost time (s) 5.0 5.0 5.0 5.0 5.0 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 Frpb, ped/bikes 0.98 1.00 1.00 1.00 0.93 Flpb, ped/bikes 1.00 0.96 1.00 1.00 1.00 Frt 0.96 1.00 1.00 1.00 0.85 Fit Protected 1.00 0.95 1.00 0.95 1.00 Satd. Flow (prot) 1694 1711 1881 1734 1438 Fit Permitted 1.00 0.64 1.00 0.95 1.00 Satd. Flow (perm) 1694 1162 1881 1734 1438 Volume (vph) 124 54 533 194 64 411 Peak -hour factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Adj. Flow (vph) 124 54 533 194 64 411 RTOR Reduction (vph) 13 0 0 0 0 300 Lane Group Flow (vph) 165 0 533 194 64 111 Confl. Peds. (#/hr) 10 10 10 10 Turn Type Perm Perm Protected Phases 4 8 2 Permitted Phases 8 2 Actuated Green, G (s) 77.6 77.6 77.6 32.4 32.4 Effective Green, g (s) 77.6 77.6 77.6 32.4 32.4 Actuated g/C Ratio 0.65 0.65 0.65 0.27 0.27 Clearance Time (s) 5.0 5.0 5.0 5.0 5.0 Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 Lane Grp Cap (vph) 1095 751 1216 468 388 v/s Ratio Prot 0.10 0.10 0.04 v/s Ratio Perm c0.46 c0.08 v/c Ratio 0.15 0.71 0.16 0.14 0.29 Uniform Delay, d1 8.3 13.8 8.4 33.2 34.6 Progression Factor 1.10 0.47 0.53 1.00 1.00 Incremental Delay, d2 0.0 2.2 0.0 0.6 1.8 Delay (s) 9.1 8.7 4.4 33.8 36.5 Level of Service A A A C D Approach Delay (s) 9.1 7.5 36.1 Approach LOS A A D Intersection Summary HCM Average Control Delay 17.6 HCM Level of Service B HCM Volume to Capacity ratio 0.58 Actuated Cycle Length (s) 120.0 Sum of lost time (s) 10.0 Intersection Capacity Utilization 61.3% ICU Level of Service B Analysis Period (min) 15 c Critical Lane Group Steel Lake Crest Parametrix, Inc. Concurrency File No.: 07-103903-00-CN City of Federal Way 9/10/07 Horizon Without 2058: S 304 St & Military Rd S HCM Signalized Intersection Capacity Analysis } -,* -*--- t /0� \ i Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Vi 1� 4� I 1 + r Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Grade (%) -1% 4% 5% -4% Total Lost time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frpb, ped/bikes 1.00 0.93 1.00 1.00 1.00 1.00 1.00 0.95 Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 0.96 1.00 1.00 Frt 1.00 0.85 1.00 1.00 1.00 1.00 1.00 0.85 Flt Protected 0.95 1.00 0.95 0.95 1.00 0.95 1.00 1.00 Satd. Flow (prot) 1778 1476 1734 1725 1816 1737 1900 1535 Flt Permitted 0.95 1.00 0.95 0.36 1.00 0.60 1.00 1.00 Satd. Flow (Perm) 1778 1476 1734 662 1816 1091 1900 1535 Volume (vph) 351 2 379 1 0 0 307 263 0 1 404 494 Peak -hour factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj. Flow (vph) 351 2 379 1 0 0 307 263 0 1 404 494 RTOR Reduction (vph) 0 295 0 0 0 0 0 0 0 0 0 155 Lane Group Flow (vph) 351 86 0 0 1 0 307 263 0 1 404 339 Confl. Peds. (#/hr) 10 10 10 10 10 10 10 10 Turn Type Split Split pm+pt Perm pm+ov Protected Phases 4 4 8 8 5 2 6 4 Permitted Phases 2 6 6 Actuated Green, G (s) 27.0 27.0 3.2 76.3 76.3 55.8 55.8 82.8 Effective Green, g (s) 26.5 26.5 2.2 76.3 76.3 55.8 55.8 82.3 Actuated g/C Ratio 0.22 0.22 0.02 0.64 0.64 0.46 0.46 0.69 Clearance Time (s) 4.5 4.5 4.0 5.0 5.0 5.0 5.0 4.5 Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lane Grp Cap (vph) 393 326 32 558 1155, 507 884 1117 v/s Ratio Prot c0.20 0.06 c0.00 c0.07 0.14 0.21 0.07 v/s Ratio Perm c0.28 0.00 0.15 v/c Ratio 0.89 0.26 0.03 0.55 0.23 0.00 0.46 0.30 Uniform Delay, d1 45.4 38.7 57.9 11.8 9.3 17.2 21.8 7.5 Progression Factor 1.01 1.12 1.00 1.17 0.59 0.70 0.75 0.79 Incremental Delay, d2 20.4 0.1 0.1 0.5 0.3 0.0 1.1 0.0 Delay (s) 66.4 43.4 58.0 14.3 5.9 12.0 17.4 5.9 Level of Service E D E B A B B A Approach Delay (s) 54.4 58.0 10.4 11.1 Approach LOS D E B B Intersection Summary HCM Average Control Delay 25.3 HCM Level of Service C HCM Volume to Capacity ratio 0.62 Actuated Cycle Length (s) 120.0 Sum of lost time (s) 15.0 Intersection Capacity Utilization 75.4% ICU Level of Service D Analysis Period (min) 15 c Critical Lane Group Steel Lake Crest Concurrency File No.: 07-103903-00-CN City of Federal Way Parametrix, Inc. 9/10/07 2546: S 312 St & 8 Av S Horizon Without HCM Signalized Intersection Capacity Analysis 4,\ /01 Movement EBT EBR WBL WBT NBL NBR Lane Configurations 1� t Y Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Grade (%) 3% 0% 0% Total Lost time (s) 5.0 5.0 5.0 5.0 Lane Util. Factor 1.00 1.00 1.00 1.00 Frpb, ped/bikes 1.00 1.00 1.00 0.98 Flpb, ped/bikes 1.00 0.98 1.00 1.00 Frt 0.99 1.00 1.00 0.94 Fit Protected 1.00 0.95 1.00 0.97 Satd. Flow (prot) 1820 1741 1863 1674 Fit Permitted 1.00 0.40 1.00 0.97 Satd. Flow (perm) 1820 732 1863 1674 Volume (vph) 605 25 53 841 61 47 Peak -hour factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Adj. Flow (vph) 605 25 53 841 61 47 RTOR Reduction (vph) 1 0 0 0 27 0 Lane Group Flow (vph) 629 0 53 841 81 0 Confl. Peds. (#/hr) 10 10 10 10 Turn Type Perm Protected Phases 1 4 8 2 Permitted Phases 8 Actuated Green, G (s) 101.7 87.8 87.8 10.3 Effective Green, g (s) 100.7 87.8 87.8 9.3 Actuated g/C Ratio 0.84 0.73 0.73 0.08 Clearance Time (s) 5.0 5.0 4.0 Vehicle Extension (s) 2.0 2.0 2.0 Lane Grp Cap (vph) 1527 536 1363 130 v/s Ratio Prot c0.35 c0.45 c0.05 v/s Ratio Perm 0.07 v/c Ratio 0.41 0.10 0.62 0.62 Uniform Delay, di 2.4 4.7 7.9 53.7 Progression Factor 0.07 0.27 0.47 1.16 Incremental Delay, d2 0.1 0.3 2.0 5.3 Delay (s) 0.2 1.6 5.7 67.4 Level of Service A A A E Approach Delay (s) 0.2 5.5 67.4 Approach LOS A A E Intersection Summary HCM Average Control Delay 7.5 HCM Level of Service A HCM Volume to Capacity ratio 0.58 Actuated Cycle Length (s) 120.0 Sum of lost time (s) 10.0 Intersection Capacity Utilization 60.2% ICU Level of Service B Analysis Period (min) 15 c Critical Lane Group Steel Lake Crest Parametrix, Inc. Concurrency File No.: 07-103903-00-CN City of Federal Way 9/10/07 Horizon Without 2549: S 312 St & 14 Av S HCM Signalized Intersection Capacity Analysis Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations +'+ I fib 4� 4 er Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Lane Util. Factor 1.00 0.95 1.00 0.95 1.00 1.00 1.00 Frpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Flpb, ped/bikes 1.00 1.00 0.99 1.00 1.00 1.00 1.00 Frt 1.00 1.00 1.00 0.99 0.98 1.00 0.85 Fit Protected 0.95 1.00 0.95 1.00 0.97 0.96 1.00 Satd. Flow (prot) 1766 3522 1746 3504 1756 1788 1583 Fit Permitted 0.29 1.00 0.40 1.00 0.97 0.96 1.00 Satd. Flow (perm) 548 3522 733 3504 1756 1788 1583 Volume (vph) 68 649 16 30 763 40 37 10 9 37 7 109 Peak -hour factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj. Flow (vph) 68 649 16 30 763 40 37 10 9 37 7 109 RTOR Reduction (vph) 0 1 0 0 2 0 0 6 0 0 0 102 Lane Group Flow (vph) 68 664 0 30 801 0 0 50 0 0 44 7 Confl. Peds. (#/hr) 10 10 10 10 10 10 10 10 Turn Type pm+pt Perm Split Split Prot Protected Phases 7 4 8 5 5 6 6 6 Permitted Phases 4 8 Actuated Green, G (s) 88.9 88.9 78.3 78.3 8.7 7.4 7.4 Effective Green, g (s) 88.9 88.9 78.3 78.3 8.7 7.4 7.4 Actuated g/C Ratio 0.74 0.74 0.65 0.65 0.07 0.06 0.06 Clearance Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lane Grp Cap (vph) 463 2609 478 2286 127 110 98 v/s Ratio Prot 0.01 c0.19 c0.23 c0.03 c0.02 0.00 v/s Ratio Perm 0.10 0.04 v/c Ratio 0.15 0.25 0.06 0.35 0.39 0.40 0.07 Uniform Delay, d1 5.0 5.0 7.6 9.4 53.1 54.2 53.1 Progression Factor 1.46 1.60 0.60 0.51 1.00 1.00 1.00 Incremental Delay, d2 0.1 0.2 0.2 0.3 0.7 0.9 0.1 Delay (s) 7.3 8.2 4.7 5.1 53.8 55.0 53.2 Level of Service A A A A D E D Approach Delay (s) 8.1 5.1 53.8 53.7 Approach LOS A A D D Intersection Summary HCM Average Control Delay 12.1 HCM Level of Service B HCM Volume to Capacity ratio 0.36 Actuated Cycle Length (s) 120.0 Sum of lost time (s) 20.0 Intersection Capacity Utilization 52.2% ICU Level of Service A Analysis Period (min) 15 c Critical Lane Group Steel Lake Crest Concurrency File No.: 07-103903-00-CN City of Federal Way Parametrix, Inc. 9/10/07 Horizon Without 2550: S 312 St & Pacific Hwy S HCM Signalized Intersection Capacity Analysis Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Vi +T+ fiT A tTi� A ttt r Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Grade (%) 1 % 0% 0% 0% Total Lost time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Lane Util. Factor 1.00 0.95 1.00 0.95 1.00 0.91 1.00 0.91 1.00 Frpb, ped/bikes 1.00 0.99 1.00 1.00 1.00 1.00 1.00 1.00 0.97 Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 0.97 1.00 0.98 1.00 0.98 1.00 1.00 0.85 Fit Protected 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00 1.00 Satd. Flow (prot) 1747 3373 1741 3417 1741 4967 1755 5058 1517 Fit Permitted 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00 1.00 Satd. Flow (perm) 1747 3373 1741 3417 1741 4967 1755 5058 1517 Volume (vph) 250 358 100 147 431 77 330 801 99 167 1061 272 Peak -hour factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj. Flow (vph) 250 358 100 147 431 77 330 801 99 167 1061 272 RTOR Reduction (vph) 0 22 0 0 13 0 0 12 0 0 0 63 Lane Group Flow (vph) 250 436 0 147 495 0 330 888 0 167 1061 209 Confl. Peds. (#/hr) 10 10 10 10 10 10 10 10 Bus Blockages (#/hr) 2 2 4 4 4 2 4 2 2 2 4 4 Turn Type Prot Prot Prot Prot pm+ov Protected Phases 7 4 3 8 5 2 1 6 7 Permitted Phases 6 Actuated Green, G (s) 19.3 26.7 13.4 20.8 25.1 42.9 19.0 36.8 56.1 Effective Green, g (s) 18.3 25.7 12.4 19.8 25.1 42.9 19.0 36.8 55.1 Actuated g/C Ratio 0.15 0.21 0.10 0.17 0.21 0.36 0.16 0.31 0.46 Clearance Time (s) 4.0 4.0 4.0 4.0 5.0 5.0 5.0 5.0 4.0 Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lane Grp Cap (vph) 266 722 180 564 364 1776 278 1551 760 v/s Ratio Prot c0.14 0.13 0.08 c0.14 c0.19 0.18 0.10 c0.21 0.04 v/s Ratio Perm 0.10 v/c Ratio 0.94 0.60 0.82 0.88 0.91 0.50 0.60 0.68 0.28 Uniform Delay, di 50.3 42.6 52.7 48.9 46.3 30.2 47.0 36.5 20.1 Progression Factor 1.04 0.67 1.04 0.79 0.63 0.63 0.88 0.85 0.16 Incremental Delay, d2 37.8 1.0 22.6 13.8 22.4 0.9 2.2 2.2 0.1 Delay (s) 89.9 29.4 77.3 52.3 51.6 19.9 43.7 33.1 3.2 Level of Service F C E D D B D C A Approach Delay (s) 50.8 57.9 28.4 28.8 Approach LOS D E C C Intersection Summary HCM Average Control Delay 37.2 HCM Level of Service D HCM Volume to Capacity ratio 0.82 Actuated Cycle Length (s) 120.0 Sum of lost time (s) 20.0 Intersection Capacity Utilization 85.4% ICU Level of Service E Analysis Period (min) 15 c Critical Lane Group Steel Lake Crest Concurrency File No.: 07-103903-00-CN City of Federal Way Parametrix, Inc. 9/10/07 Horizon Without 2552: S 312 St & 20 Av S HCM Signalized Intersection Capacity Analysis --* ■-- *-- 4\ t /0- \0. I 4/ --a. Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations +T +T 4 F 41� Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Grade (%) 5% -4% -1% 0% Total Lost time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Lane Util. Factor 1.00 0.95 1.00 0.95 1.00 1.00 1.00 Frpb, ped/bikes 1.00 0.99 1.00 1.00 1.00 0.97 1.00 Flpb, ped/bikes 0.97 1.00 0.99 1.00 0.99 1.00 1.00 Frt 1.00 0.96 1.00 0.99 1.00 0.85 0.99 Flt Protected 0.95 1.00 0.95 1.00 0.96 1.00 0.98 Satd. Flow (prot) 1678 3249 1784 3547 1776 1527 1801 At Permitted 0.48 1.00 0.43 1.00 0.70 1.00 0.74 Satd. Flow (perm) 850 3249 815 3547 1295 1527 1364 Volume (vph) 9 392 161 152 436 28 170 45 148 38 52 5 Peak -hour factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj. Flow (vph) 9 392 161 152 436 28 170 45 148 38 52 5 RTOR Reduction (vph) 0 22 0 0 2 0 0 0 115 0 2 0 Lane Group Flow (vph) 9 531 0 152 462 0 0 215 33 0 93 0 Confl. Peds. (#/hr) 10 10 10 10 10 10 10 10 Bus Blockages (#/hr) 0 2 0 0 2 0 2 0 2 2 0 2 Turn Type Perm Perm Perm Perm Perm Protected Phases 6 2 4 8 Permitted Phases 6 2 4 4 8 Actuated Green, G (s) 83.6 83.6 83.6 83.6 27.4 27.4 27.4 Effective Green, g (s) 83.6 83.6 83.6 83.6 26.4 26.4 26.4 Actuated g/C Ratio 0.70 0.70 0.70 0.70 0.22 0.22 0.22 Clearance Time (s) 5.0 5.0 5.0 5.0 4.0 4.0 4.0 Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lane Grp Cap (vph) 592 2263 568 2471 285 336 300 v/s Ratio Prot 0.16 0.13 v/s Ratio Perm 0.01 c0.19 c0.17 0.02 0.07 v/c Ratio 0.02 0.23 0.27 0.19 0.75 0.10 0.31 Uniform Delay, di 5.6 6.6 6.8 6.3 43.8 37.3 39.2 Progression Factor 0.66 0.56 0.80 0.75 0.83 0.85 1.00 Incremental Delay, d2 0.0 0.2 1.1 0.2 8.6 0.0 0.2 Delay (s) 3.7 3.9 6.5 4.9 44.9 31.7 39.4 Level of Service A A A A D C D Approach Delay (s) 3.9 5.3 39.5 39.4 Approach LOS A A D D Intersection Summary HCM Average Control Delay 14.4 HCM Level of Service B HCM Volume to Capacity ratio 0.38 Actuated Cycle Length (s) 120.0 Sum of lost time (s) 10.0 Intersection Capacity Utilization 55.7% ICU Level of Service B Analysis Period (min) 15 c Critical Lane Group Steel Lake Crest Concurrency File No.: 07-103903-00-CN City of Federal Way Parametrix, Inc. 9/10/07 2554: S 312 St & 23 Av S Horizon Without HCM Signalized Intersection Capacity Analysis _10. _V *-- 4\ /01 Movement EBT EBR WBL WBT NBL NBR Lane Configurations + r + ? Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Grade (%) -8% 8% 0% Total Lost time (s) 5.0 5.0 5.0 5.0 5.0 5.0 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frpb, ped/bikes 1.00 0.96 1.00 1.00 1.00 0.95 Flpb, ped/bikes 1.00 1.00 1.00 1.00 0.98 1.00 Frt 1.00 0.85 1.00 1.00 1.00 0.85 Fit Protected 1.00 1.00 0.95 1.00 0.95 1.00 Satd. Flow (prot) 1937 1575 1685 1774 1722 1503 Fit Permitted 1.00 1.00 0.95 1.00 0.95 1.00 Satd. Flow ( erm) 1937 1575 1685 1774 1722 1503 Volume (vph) 436 271 101 474 317 80 Peak -hour factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Adj. Flow (vph) 436 271 101 474 317 80 RTOR Reduction (vph) 0 147 0 0 0 53 Lane Group Flow (vph) 436 124 101 474 317 27 Confl. Peds. (#/hr) 10 10 10 10 Bus Blockages (#/hr) 0 2 2 2 2 0 Turn Type Perm Prot custom Protected Phases 6 5 2 Permitted Phases 6 4 4 Actuated Green, G (s) 54.7 54.7 11.3 70.0 41.0 41.0 Effective Green, g (s) 54.7 54.7 10.3 70.0 40.0 40.0 Actuated g/C Ratio 0.46 0.46 0.09 0.58 0.33 0.33 Clearance Time (s) 5.0 5.0 4.0 5.0 4.0 4.0 Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 Lane Grp Cap (vph) 883 718 145 1035 574 501 v/s Ratio Prot c0.23 c0.06 0.27 v/s Ratio Perm 0.08 c0.18 0.02 v/c Ratio 0.49 0.17 0.70 0.46 0.55 0.05 Uniform Delay, di 22.9 19.3 53.3 14.2 32.7 27.1 Progression Factor 0.87 0.62 1.00 1.00 0.80 0.41 Incremental Delay, d2 2.0 0.5 11.1 1.5 3.8 0.2 Delay (s) 21.9 12.6 64.5 15.7 30.0 11.3 Level of Service C B E B C B Approach Delay (s) 18.3 24.2 26.3 Approach LOS B C C Intersection Summary HCM Average Control Delay 22.2 HCM Level of Service C HCM Volume to Capacity ratio 0.54 Actuated Cycle Length (s) 120.0 Sum of lost time (s) 15.0 Intersection Capacity Utilization 58.6% ICU Level of Service B Analysis Period (min) 15 c Critical Lane Group Steel Lake Crest Parametrix, Inc. Concurrency File No.: 07-103903-00-CN City of Federal Way 9/10/07 Horizon Without 2750: S 316 St & Pacific Hwy S HCM Signalized Intersection Capacity Analysis --t 4--- ',- 4\ t ',*. I --,, Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations 1 T I TTT A +0 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Grade (%) -2% 0% 2% =2% Total Lost time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 0.91 1.00 0.91 Frpb, ped/bikes 1.00 0.99 1.00 0.98 1.00 0.99 1.00 1.00 Flpb, ped/bikes 0.99 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 0.92 1.00 0.91 1.00 0.98 1.00 0.99 Fit Protected 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00 Satd. Flow (prot) 1761 1707 1739 1677 1752 4883 1787 5052 Fit Permitted 0.60 1.00 0.23 1.00 0.95 1.00 0.95 1.00 Satd. Flow (perm) 1120 1707 414 1677 1752 4883 1787 5052 Volume (vph) 107 87 99 207 84 112 167 1127 193 107 1291 70 Peak -hour factor, PH 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj. Flow (vph) 107 87 99 207 84 112 167 1127 193 107 1291 70 RTOR Reduction (vph) 0 39 0 0 46 0 0 15 0 0 4 0 Lane Group Flow (vph) 107 147 0 207 150 0 167 1305 0 107 1357 0 Confl. Peds. (#/hr) 10 10 10 10 10 10 10 10 Bus Blockages (#/hr) 2 0 4 4 0 2 0 2 0 0 4 0 Turn Type pm+pt pm+pt Prot Prot Protected Phases 7 4 3 8 5 2 1 6 Permitted Phases 4 8 Actuated Green, G (s) 23.3 14.9 33.8 21.4 22.1 63.0 9.2 50.1 Effective Green, g (s) 21.3 13.9 32.8 20.4 22.1 63.0 9.2 50.1 Actuated g/C Ratio 0.18 0.12 0.27 0.17 0.18 0.52 0.08 0.42 Clearance Time (s) 4.0 4.0 4.0 4.0 5.0 5.0 5.0 5.0 Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lane Grp Cap (vph) 238 198 267 285 323 2564 137 2109 v/s Ratio Prot 0.03 0.09 c0.09 0.09 0.10 c0.27 0.06 c0.27 v/s Ratio Perm 0.05 c0.12 v/c Ratio 0.45 0.74 0.78 0.53 0.52 0.51 0.78 0.64 Uniform Delay, di 43.2 51.3 36.7 45.4 44.1 18.5 54.4 27.8 Progression Factor 1.00 1.00 0.95 0.91 0.64 0.37 1.15 0.35 Incremental Delay, d2 0.5 12.3 11.8 0.8 0.3 0.4 18.6 1.2 Delay (s) 43.7 63.7 46.7 42.0 28.4 7.3 81.2 10.9 Level of Service D E D D C A F B Approach Delay (s) 56.4 44.4 9.7 16.0 Approach LOS E D A B Intersection Summary HCM Average Control Delay 19.8 HCM Level of Service B HCM Volume to Capacity ratio 0.62 Actuated Cycle Length (s) 120.0 Sum of lost time (s) 10.0 Intersection Capacity Utilization 77.9% ICU Level of Service D Analysis Period (min) 15 c Critical Lane Group Steel Lake Crest Concurrency File No.: 07-103903-00-CN City of Federal Way Parametrix, Inc. 9/10/07 Horizon Without 2855: S 317 St & 23 Av S HCM Signalized Intersection Capacity Analysis Movement EBL EBT EBR WBL WBT WBR SEL SET SER NWL NWT NWR Lane Configurations �` '� t F Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Grade (%) 0% -3% 0% -1 % Total Lost time (s) 5.0 5.0 5.0 5.0 5.0 5.0 Lane Util. Factor 1.00 1.00 1.00 0.95 1.00 1.00 Frpb, ped/bikes 1.00 0.96 1.00 1.00 1.00 0.95 Flpb, ped/bikes 0.97 1.00 0.99 1.00 1.00 1.00 Frt 1.00 0.85 1.00 1.00 1.00 0.85 Flt Protected 0.95 1.00 0.95 1.00 1.00 1.00 Satd. Flow (prot) 1739 1536 1747 3539 1872 1519 Flt Permitted 0.76 1.00 0.48 1.00 1.00 1.00 Satd. Flow (perm) 1386 1536 887 3539 1872 1519 Volume (vph) 0 0 0 136 0 64 58 606 0 0 456 125 Peak -hour factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj. Flow (vph) 0 0 0 136 0 64 58 606 0 0 456 125 RTOR Reduction (vph) 0 0 0 0 56 0 0 0 0 0 0 26 Lane Group Flow (vph) 0 0 0 136 8 0 58 606 0 0 456 99 Confl. Peds. (# /hr) 10 10 10 10 Turn Type Perm Perm Perm Perm Perm Protected Phases 4 8 2 6 Permitted Phases 4 8 2 6 6 Actuated Green, G (s) 14.8 14.8 96.2 96.2 95.7 95.7 Effective Green, g (s) 14.8 14.8 95.2 95.2 95.2 95.2 Actuated g/C Ratio 0.12 0.12 0.79 0.79 0.79 0.79 Clearance Time (s) 5.0 5.0 4.0 4.0 4.5 4.5 Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 Lane Grp Cap (vph) 171 189 704 2808 1485 1205 v/s Ratio Prot 0.01 0.17 c0.24 v/s Ratio Perm c0.10 0.07 0.07 v/c Ratio 0.80 0.04 0.08 0.22 0.31 0.08 Uniform Delay, d1 51.1 46.4 2.7 3.1 3.4 2.7 Progression Factor 1.00 1.00 1.11 1.08 1.16 1.59 Incremental Delay, d2 20.7 0.0 0.2 0.2 0.3 0.1 Delay (s) 71.8 46.4 3.3 3.5 4.3 4.5 Level of Service E D A A A A Approach Delay (s) 0.0 63.7 3.5 4.3 Approach LOS A E A A Intersection Summary HCM Average Control Delay 12.1 HCM Level of Service B HCM Volume to Capacity ratio 0.37 Actuated Cycle Length (s) 120.0 Sum of lost time (s) 10.0 Intersection Capacity Utilization 48.7% ICU Level of Service A Analysis Period (min) 15 c Critical Lane Group Steel Lake Crest Concurrency File No.: 07-103903-00-CN City of Federal Way Parametrix, Inc. 9/10/07 Horizon Without 3050: S 320 St & Pacific Hwy S HCM Signalized Intersection Capacity Analysis -.* --v 4­ *�- 4\ I ,} /W • -0. 'r Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations M +0 M ttt r �) tti� A) +tt F Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Grade (%) -6% 0% 2% -2% Total Lost time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Lane Util. Factor 0.97 0.91 0.97 0.91 1.00 0.97 0.91 0.97 0.91 1.00 Frpb, ped/bikes 1.00 1.00 1.00 1.00 0.98 1.00 0.99 1.00 1.00 0.98 Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 0.99 1.00 1.00 0.85 1.00 0.97 1.00 1.00 0.85 Fit Protected 0.95 1.00 0.95 1.00 1.00 0.95 1.00 0.95 1.00 1.00 Satd. Flow (prot) 3522 5119 3433 5045 1536 3358 4832 3426 5136 1522 Fit Permitted 0.95 1.00 0.95 1.00 1.00 0.95 1.00 0.95 1.00 1.00 Satd. Flow (perm) 3522 5119 3433 5045 1536 3358 4832 3426 5136 1522 Volume (vph) 460 897 83 377 1024 296 237 840 234 335 889 325 Peak -hour factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj. Flow (vph) 460 897 83 377 1024 296 237 840 234 335 889 325 RTOR Reduction (vph) 0 8 0 0 0 172 0 43 0 0 0 232 Lane Group Flow (vph) 460 972 0 377 1024 124 237 1031 0 335 889 93 Confl. Peds. (#/hr) 10 10 10 10 10 10 10 10 Bus Blockages (#/hr) 2 6 0 0 6 2 6 2 6 6 0 6 Turn Type Prot Prot Perm Prot Prot Perm Protected Phases 7 4 3 8 5 2 1 6 Permitted Phases 8 6 Actuated Green, G (s) 20.0 42.3 14.7 37.0 37.0 12.1 28.2 14.8 30.9 30.9 Effective Green, g (s) 20.0 42.3 14.7 37.0 37.0 12.1 28.2 14.8 30.9 30.9 Actuated g/C Ratio 0.17 0.35 0.12 0.31 0.31 0.10 0.23 0.12 0.26 0.26 Clearance Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lane Grp Cap (vph) 587 1804 421 1556 474 339 1136 423 1323 392 v/s Ratio Prot c0.13 0.19 c0.11 c0.20 0.07 c0.21 c0.10 0.17 v/s Ratio Perm 0.08 0.06 v/c Ratio 0.78 0.54 0.90 0.66 0.26 0.70 0.91 0.79 0.67 0.24 Uniform Delay, di 47.9 31.1 51.9 36.0 31.2 52.2 44.6 51.1 40.0 35.2 Progression Factor 0.69 0.61 0.78 0.63 0.57 0.68 0.53 0.59 0.49 0.57 Incremental Delay, d2 4.3 0.8 16.4 1.7 1.0 3.2 6.9 7.1 0.8 0.1 Delay (s) 37.5 19.7 57.0 24.5 18.9 38.5 30.6 37.4 20.5 20.1 Level of Service D B E C B D C D C C Approach Delay (s) 25.4 30.7 32.0 24.1 Approach LOS C C C C Intersection Summary HCM Average Control Delay 28.0 HCM Level of Service C HCM Volume to Capacity ratio 0.79 Actuated Cycle Length (s) 120.0 Sum of lost time (s) 20.0 Intersection Capacity Utilization 90.3% ICU Level of Service E Analysis Period (min) 15 c Critical Lane Group Steel Lake Crest Concurrency File No.: 07-103903-00-CN City of Federal Way Parametrix, Inc. 9/10/07 Horizon Without 3052: S 320 St & 20 Av S HCM Signalized Intersection Capacity Analysis ---* --lb. 4--- 4\ t /W i 4/ Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations A) ++T M ttT V1 T 11 1� Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Grade (%) -3% 2% -1 % -3% Total Lost time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Lane Util. Factor 0.97 0.91 0.97 0.91 1.00 1.00 1.00 1.00 Frpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 0.99 1.00 0.98 Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 0.99 1.00 0.99 1.00 0.93 1.00 0.90 Fit Protected 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00 Satd. Flow (prot) 3485 5067 3399 4898 1718 1711 1747 1678 Fit Permitted 0.95 1.00 0.95 1.00 0.27 1.00 0.36 1.00 Satd. Flow (perm) 3485 5067 3399 4898 492 1711 660 1678 Volume (vph) 243 1064 66 50 1438 145 151 84 81 191 88 160 Peak -hour factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj. Flow (vph) 243 1064 66 50 1438 145 151 84 81 191 88 160 RTOR Reduction (vph) 0 4 0 0 8 0 0 32 0 0 62 0 Lane Group Flow (vph) 243 1126 0 50 1575 0 151 133 0 191 186 0 Confl. Peds. (#/hr) 10 10 10 10 10 10 10 10 Bus Blockages (#/hr) 0 6 0 0 8 0 8 0 6 6 0 8 Turn Type Prot Prot pm+pt pm+pt Protected Phases 5 2 1 6 7 4 3 8 Permitted Phases 4 8 Actuated Green, G (s) 12.0 68.0 5.2 61.2 26.0 15.2 29.6 17.0 Effective Green, g (s) 12.0 68.0 5.2 61.2 25.0 14.7 28.6 16.5 Actuated g/C Ratio 0.10 0.57 0.04 0.51 0.21 0.12 0.24 0.14 Clearance Time (s) 5.0 5.0 5.0 5.0 4.5 4.5 4.5 4.5 Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lane Grp Cap (vph) 349 2871 147 2498 208 210 267 231 v/s Ratio Prot c0.07 0.22 0.01 c0.32 0.06 0.08 c0.07 c0.11 v/s Ratio Perm 0.09 0.10 v/c Ratio 0.70 0.39 0.34 0.63 0.73 0.63 0.72 0.80 Uniform Delay, d1 52.2 14.5 55.7 21.2 41.7 50.1 39.4 50.2 Progression Factor 0.80 0.85 1.00 1.01 1.00 1.00 1.01 1.01 Incremental Delay, d2 3.6 0.3 0.5 1.2 10.2 4.5 6.7 15.7 Delay (s) 45.6 12.7 56.1 22.6 51.8 54.6 46.3 66.5 Level of Service D B E C D D D E Approach Delay (s) 18.5 23.6 53.3 57.7 Approach LOS B C D E Intersection Summary HCM Average Control Delay 28.2 HCM Level of Service C HCM Volume to Capacity ratio 0.66 Actuated Cycle Length (s) 120.0 Sum of lost time (s) 15.0 Intersection Capacity Utilization 79.3% ICU Level of Service D Analysis Period (min) 15 c Critical Lane Group Steel Lake Crest Concurrency File No.: 07-103903-00-CN City of Federal Way Parametrix, Inc. 9/10/07 Horizon Without 3055: S 320 St & 23 Av S HCM Signalized Intersection Capacity Analysis --* --v '- *-- 4\ T r �► 1 -V -. 'r Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations A) ttT )) tTT I t F 1� Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Grade (%) 5% -5% 1 % 0% Total Lost time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Lane Util. Factor 0.97 0.91 0.97 0.91 1.00 1.00 1.00 0.97 1.00 Frpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 0.99 1.00 0.99 Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 1.00 1.00 0.98 1.00 1.00 0.85 1.00 0.96 Fit Protected 0.95 1.00 0.95 1.00 0.95 1.00 1.00 0.95 1.00 Satd. Flow (prot) 3334 4824 3519 5026 1704 1839 1456 3323 1771 Fit Permitted 0.95 1.00 0.95 1.00 0.95 1.00 1.00 0.95 1.00 Satd. Flow (perm) 3334 4824 3519 5026 1704 1839 1456 3323 1771 Volume (vph) 114 1026 34 389 1557 256 116 257 457 501 217 86 Peak -hour factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj. Flow (vph) 114 1026 34 389 1557 256 116 257 457 501 217 86 RTOR Reduction (vph) 0 3 0 0 17 0 0 0 6 0 12 0 Lane Group Flow (vph) 114 1057 0 389 1796 0 116 257 451 501 291 0 Confl. Peds. (#/hr) 10 10 10 10 10 10 10 10 Bus Blockages (#/hr) 2 16 0 0 8 2 8 2 16 16 0 8 Turn Type Prot Prot Prot pm+ov Prot Protected Phases 7 4 3 8 5 2 3 1 6 Permitted Phases 2 Actuated Green, G (s) 10.0 40.8 19.0 49.8 11.9 20.5 39.5 20.7 29.3 Effective Green, g (s) 10.0 40.8 19.0 49.8 11.4 20.0 39.0 20.2 28.8 Actuated g/C Ratio 0.08 0.34 0.16 0.41 0.10 0.17 0.32 0.17 0.24 Clearance Time (s) 5.0 5.0 5.0 5.0 4.5 4.5 5.0 4.5 4.5 Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lane Grp Cap (vph) 278 1640 557 2086 162 307 534 559 425 v/s Ratio Prot 0.03 0.22 0.11 c0.36 0.07 0.14 c0.13 c0.15 0.16 v/s Ratio Perm 0.18 v/c Ratio 0.41 0.64 0.70 0.86 0.72 0.84 0.84 0.90 0.68 Uniform Delay, d1 52.2 33.5 47.8 31.9 52.7 48.4 37.7 48.9 41.5 Progression Factor 1.01 1.00 0.73 0.43 1.00 1.00 1.00 0.85 0.81 Incremental Delay, d2 0.4 2.0 2.1 3.3 11.8 17.0 11.2 16.1 3.5 Delay (s) 52.9 35.5 36.9 17.0 64.5 65.4 48.9 57.5 37.0 Level of Service D D D B E E D E D Approach Delay (s) 37.2 20.5 56.2 49.8 Approach LOS D C E D Intersection Summary HCM Average Control Delay 35.0 HCM Level of Service D HCM Volume to Capacity ratio 0.84 Actuated Cycle Length (s) 120.0 Sum of lost time (s) 10.0 Intersection Capacity Utilization 87.4% ICU Level of Service E Analysis Period (min) 15 c Critical Lane Group Steel Lake Crest Concurrency File No.: 07-103903-00-CN City of Federal Way Parametrix, Inc. 9/10/07 Horizon Without 3350: S 324 St & Pacific Hwy S HCM Signalized Intersection Capacity Analysis -.4 --v '- t t \0. 4 4/ --► Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations } r M 1� N tti� N tO Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Grade (%) -1% 1% 0% 0% Total Lost time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Lane Util. Factor 1.00 1.00 1.00 0.97 1.00 1.00 0.91 1.00 0.91 Frpb, ped/bikes 1.00 1.00 0.97 1.00 1.00 1.00 0.99 1.00 1.00 Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 1.00 0.85 1.00 0.98 1.00 0.98 1.00 0.99 Fit Protected 0.95 1.00 1.00 0.95 1.00 0.95 1.00 0.95 1.00 Satd. Flow (prot) 1778 1812 1500 3361 1786 1755 4934 1713 4943 Fit Permitted 0.95 1.00 1.00 0.95 1.00 0.95 1.00 0.95 1.00 Satd. Flow (perm) 1778 1812 1500 3361 1786 1755 4934 1713 4943 Volume (vph) 196 207 208 328 251 49 267 1186 234 184 1130 122 Peak -hour factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj. Flow (vph) 196 207 208 328 251 49 267 1186 234 184 1130 122 RTOR Reduction (vph) 0 0 169 0 6 0 0 21 0 0 9 0 Lane Group Flow (vph) 196 207 39 328 294 0 267 1399 0 184 1243 0 Confl. Peds. (#/hr) 10 10 10 10 10 10 10 10 Bus Biockacges (#/hr) 0 8 8 8 2 0 2 0 8 8 8 2 Turn Type Prot Perm Prot Prot Prot Protected Phases 7 4 3 8 5 2 1 6 Permitted Phases 4 Actuated Green, G (s) 15.0 22.9 22.9 15.4 23.3 24.0 46.8 15.9 38.7 Effective Green, g (s) 14.5 22.4 22.4 14.9 22.8 24.0 46.8 15.9 38.7 Actuated g/C Ratio 0.12 0.19 0.19 0.12 0.19 0.20 0.39 0.13 0.32 Clearance Time (s) 4.5 4.5 4.5 4.5 4.5 5.0 5.0 5.0 5.0 Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lane Grp Cap (vph) 215 338 280 417 339 351 1924 227 1594 v/s Ratio Prot c0.11 0.11 0.10 c0.16 0.15 c0.28 0.11 c0.25 v/s Ratio Perm 0.03 v/c Ratio 0.91 0.61 0.14 0.79 0.87 0.76 0.73 0.81 0.78 Uniform Delay, d1 52.1 44.8 40.7 51.0 47.1 45.3 31.2 50.6 36.8 Progression Factor 0.64 0.58 0.45 1.00 1.00 0.72 0.61 0.79 0.48 Incremental Delay, d2 34.5 2.1 0.1 8.7 19.4 8.0 2.3 13.8 2.8 Delay (s) 68.0 28.1 18.6 59.8 66.5 40.4 21.3 53.7 20.5 Level of Service E C B E E D C D C Approach Delay (s) 37.7 63.0 24.3 24.7 Approach LOS D E C C Intersection Summary HCM Average Control Delay 31.9 HCM Level of Service C HCM Volume to Capacity ratio 0.78 Actuated Cycle Length (s) 120.0 Sum of lost time (s) 15.0 Intersection Capacity Utilization 84.8% ICU Level of Service E Analysis Period (min) 15 c Critical Lane Group Steel Lake Crest Parametrix, Inc. Concurrency File No.: 07-103903-00-CN City of Federal Way 9/10/07 Horizon Without 3650: S 330 St & Pacific Hwy S HCM Signalized Intersection Capacity Analysis Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations '+ I T.), A tTT,* A tt1a Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Grade (%) -4% 0% 2% -2% Total Lost time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 0.91 1.00 0.91 Frpb, ped/bikes 1.00 0.98 1.00 0.98 1.00 1.00 1.00 1.00 Flpb, ped/bikes 0.99 1.00 0.99 1.00 1.00 1.00 1.00 1.00 Frt 1.00 0.88 1.00 0.87 1.00 0.99 1.00 1.00 Fit Protected 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00 Satd. Flow (prot) 1737 1628 1689 1573 1752 4951 1787 5067 Fit Permitted 0.72 1.00 0.73 1.00 0.95 1.00 0.95 1.00 Satd. Flow (perm) 1314 1628 1292 1573 1752 4951 1787 5067 Volume (vph) 72 8 38 22 6 53 138 1231 51 202 1541 21 Peak -hour factor, PH 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj. Flow (vph) 72 8 38 22 6 53 138 1231 51 202 1541 21 RTOR Reduction (vph) 0 35 0 0 49 0 0 3 0 0 1 0 Lane Group Flow (vph) 72 11 0 22 10 0 138 1279 0 202 1561 0 Confl. Peds. (#/hr) 10 10 10 10 10 10 10 10 Bus Blockages (#/hr) 6 0 8 8 0 6 0 6 0 0 8 0 Turn Type Perm Perm Prot Prot Protected Phases 4 8 5 2 1 6 Permitted Phases 4 8 Actuated Green, G (s) 11.0 11.0 11.0 11.0 12.9 65.0 30.0 82.1 Effective Green, g (s) 10.0 10.0 10.0 10.0 12.9 65.0 30.0 82.1 Actuated g/C Ratio 0.08 0.08 0.08 0.08 0.11 0.54 0.25 0.68 Clearance Time (s) 4.0 4.0 4.0 4.0 5.0 5.0 5.0 5.0 Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lane Grp Cap (vph) 110 136 108 131 188 2682 447 3467 v/s Ratio Prot 0.01 0.01 c0.08 c0.26 0.11 c0.31 v/s Ratio Perm c0.05 0.02 v/c Ratio 0.65 0.08 0.20 0.08 0.73 0.48 0.45 0.45 Uniform Delay, d1 53.3 50.8 51.3 50.8 51.9 17.0 38.0 8.7 Progression Factor 1.00 1.00 1.00 1.00 0.99 1.00 0.56 0.34 Incremental Delay, d2 10.2 0.1 0.3 0.1 12.0 0.6 0.2 0.3 Delay (s) 63.5 50.9 51.6 50.8 63.3 17.6 21.6 3.2 Level of Service E D D D E B C A Approach Delay (s) 58.6 51.1 22.1 5.3 Approach LOS E D C A Intersection Summary HCM Average Control Delay 15.3 HCM Level of Service B HCM Volume to Capacity ratio 0.49 Actuated Cycle Length (s) 120.0 Sum of lost time (s) 10.0 Intersection Capacity Utilization 63.7% ICU Level of Service B Analysis Period (min) 15 c Critical Lane Group Steel Lake Crest Concurrency File No.: 07-103903-00-CN City of Federal Way Parametrix, Inc. 9/10/07 Horizon Without 4050: S 336 St & Pacific Hwy S HCM Signalized Intersection Capacity Analysis 4--- *-- 4\ I Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations + r +T M tti� 1) ttt F Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Grade (%) 1 % 1 % 3% -3% Total Lost time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Lane Util. Factor 1.00 1.00 1.00 1.00 0.95 0.97 0.91 1.00 0.91 1.00 Frpb, ped/bikes 1.00 1.00 0.98 1.00 0.99 1.00 1.00 1.00 1.00 0.98 Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 1.00 0.85 1.00 0.95 1.00 0.98 1.00 1.00 0.85 Flt Protected 0.95 1.00 1.00 0.95 1.00 0.95 1.00 0.95 1.00 1.00 Satd. Flow (prot) 1718 1853 1502 1717 3290 3368 4872 1796 5120 1557 Flt Permitted 0.16 1.00 1.00 0.19 1.00 0.95 1.00 0.95 1.00 1.00 Satd. Flow (perm) 296 1853 1502 345 3290 3368 4872 1796 5120 1557 Volume (vph) 269 428 402 191 395 223 269 1088 131 156 1309 265 Peak -hour factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj. Flow (vph) 269 428 402 191 395 223 269 1088 131 156 1309 265 RTOR Reduction (vph) 0 0 210 0 71 0 0 11 0 0 0 68 Lane Group Flow (vph) 269 428 192 191 547 0 269 1208 0 156 1309 197 Confl. Peds. (#/hr) 10 10 10 10 10 10 10 10 Bus Blockages (#/hr) 6 0 6 6 2 6 2 6 0 0 6 2 Turn Type pm+pt Perm pm+pt Prot Prot pm+ov Protected Phases 7 4 3 8 5 2 1 6 7 Permitted Phases 4 4 8 6 Actuated Green, G (s) 48.9 32.7 32.7 39.7 28.1 14.0 42.9 12.8 41.7 57.9 Effective Green, g (s) 48.9 32.7 32.7 39.7 28.1 14.0 42.9 12.8 41.7 57.9 Actuated g/C Ratio 0.41 0.27 0.27 0.33 0.23 0.12 0.36 0.11 0.35 0.48 Clearance Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lane Grp Cap (vph) 313 505 409 247 770 393 1742 192 1779 751 v/s Ratio Prot c0.12 0.23 0.07 0.17 0.08 c0.25 0.09 c0.26 0.04 v/s Ratio Perm c0.23 0.13 0.18 0.09 v/c Ratio 0.86 0.85 0.47 0.77 0.71 0.68 0.69 0.81 0.74 0.26 Uniform Delay, di 27.5 41.3 36.4 31.9 42.2 50.9 32.9 52.4 34.3 18.4 Progression Factor 0.95 0.94 1.04 0.57 0.69 1.00 1.00 1.02 1.02 0.96 Incremental Delay, d2 17.5 10.7 0.3 7.2 1.4 3.9 2.3 21.3 2.8 0.1 Delay (s) 43.7 49.4 38.3 25.5 30.4 54.8 35.2 74.7 37.6 17.7 Level of Service D D D C C D D E D B Approach Delay (s) 44.0 29.2 38.8 37.9 Approach LOS D C D D Intersection Summary HCM Average Control Delay 38.1 HCM Level of Service D HCM Volume to Capacity ratio 0.79 Actuated Cycle Length (s) 120.0 Sum of lost time (s) 15.0 Intersection Capacity Utilization 86.1% ICU Level of Service E Analysis Period (min) 15 c Critical Lane Group Steel Lake Crest Parametrix, Inc. Concurrency File No.: 07-103903-00-CN City of Federal Way 9/10/07 Horizon With 256: S Star Lake Rd & 25 Dr S HCM Unsignalized Intersection Capacity Analysis N jr, -A Movement SET SER NWL NWT NEL NER Lane Configurations 1� *T Y Sign Control Free Free Stop Grade 5% -6% -2% Volume (veh/h) 230 114 68 108 53 24 Peak Hour Factor 1.00 1.00 1.00 1.00 1.00 1.00 Hourly flow rate (vph) 230 114 68 108 53 24 Pedestrians 10 10 10 Lane Width (ft) 12.0 12.0 12.0 Walking Speed (ft/s) 4.0 4.0 4.0 Percent Blockage 1 1 1 Right turn flare (veh) Median type None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 354 551 307 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 354 551 307 IC, single (s) 4.1 6.4 6.2 tC, 2 stage (s) tF (s) 2.2 3.5 3.3 p0 queue free % 94 88 97 cM capacity (veh/h) 1195 460 721 Direction. Lane # SE 1 NW 1 NE 1 Volume Total 344 176 77 Volume Left 0 68 53 Volume Right 114 0 24 cSH 1700 1195 518 Volume to Capacity 0.20 0.06 0.15 Queue Length 95th (ft) 0 5 13 Control Delay (s) 0.0 3.5 13.2 Lane LOS A B Approach Delay (s) 0.0 3.5 13.2 Approach LOS B Intersection Summary Average Delay 2.7 Intersection Capacity Utilization 48.5% ICU Level of Service A Analysis Period (min) 15 Steel Lake Crest Parametrix, Inc. Concurrency File No.: 07-103903-00-CN City of Federal Way 9/10/07 Horizon With . 451 : Pacific Hwy S & 16 Ay S HCM Unsignalized Intersection Capacity Analysis * I f'� I �l I # *J ` * *--Ai f-% *�, 4\ Movement NBL NBT NBR SBL SBT SBR SEL SET SER NWL NWT NWR Lane Configurations +t'+ ttT F F Sign Control Free Free Stop Stop Grade -3% 2% 4% 0% Volume (veh/h) 173 1004 9 38 1758 21 0 0 406 0 0 50 Peak Hour Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Hourly flow rate (vph) 173 1004 9 38 1758 21 0 0 406 0 0 50 Pedestrians 10 10 10 Lane Width (ft) 12.0 12.0 12.0 Walking Speed (ft/s) 4.0 4.0 4.0 Percent Blockage 1 1 1 Right turn flare (veh) Median type None None Median storage veh) Upstream signal (ft) 986 pX, platoon unblocked 0.93 0.93 0.93 0.93 0.93 0.93 vC, conflicting volume 1789 1013 2595 3214 616 2432 3220 349 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 1701 1013 2566 3229 443 2391 3236 349 tC, single (s) 4.1 4.1 7.5 6.5 6.9 7.5 6.5 6.9 tC, 2 stage (s) tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 p0 queue free % 49 94 100 100 21 100 100 92 cM capacity (veh/h) 342 680 6 4 515 2 4 642 Direction, Lane # NB 1 NB 2 NB 3 NB 4 SB 1 SB 2 SB 3 SE 1 NW 1 Volume Total 173 402 402 210 478 879 460 406 50 Volume Left 173 0 0 0 38 0 0 0 0 Volume Right 0 0 0 9 0 0 21 406 50 cSH 342 1700 1700 1700 680 1700 1700 515 642 Volume to Capacity 0.51 0.24 0.24 0.12 0.06 0.52 0.27 0.79 0.08 Queue Length 95th (ft) 68 0 0 0 4 0 0 182 6 Control Delay (s) 25.8 0.0 0.0 0.0 1.6 0.0 0.0 33.2 11.1 Lane LOS D A D B Approach Delay (s) 3.8 0.4 33.2 11.1 Approach LOS D B Intersection Summary Average Delay 5.6 Intersection Capacity Utilization 93.5% ICU Level of Service F Analysis Period (min) 15 Steel Lake Crest Parametrix, Inc. Concurrency File No.: 07-103903-00-CN City of Federal Way 9/10/07 1557: Military Rd S & Camelot Dr S Horizon With HCM Unsignalized Intersection Capacity Analysis Movement SEL SET SER NWL NWT NWR NEL NET NER SWL SWT SWR Lane Configurations * r 1,, 4 14 Sign Control Free Free Stop Stop Grade 4% -6% 0% 4% Volume (veh/h) 36 1015 0 0 528 51 0 0 0 28 0 51 Peak Hour Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Hourly flow rate (vph) 36 1015 0 0 528 51 0 0 0 28 0 51 Pedestrians 10 10 10 Lane Width (ft) 12.0 12.0 12.0 Walking Speed (ft/s) 4.0 4.0 4.0 Percent Blockage 1 1 1 Right turn flare (veh) Median type None None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 589 1015 1676 1676 1025 1660 1650 574 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 589 1015 1676 1676 1025 1660 1650 574 tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2 tC, 2 stage (s) tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 p0 queue free % 96 100 100 100 100 62 100 90 cM capacity (veh/h) 978 683 65 91 283 73 94 510 Direction, Lane # SE 1 SE 2 SE 3 NW 1 NW 2 NE 1 SW 1 Volume Total 36 1015 0 0 579 0 79 Volume Left 36 0 0 0 0 0 28 Volume Right 0 0 0 0 51 0 51 cSH 978 1700 1700 1700 1700 1700 164 Volume to Capacity 0.04 0.60 0.00 0.00 0.34 0.00 0.48 Queue Length 95th (ft) 3 0 0 0 0 0 57 Control Delay (s) 8.8 0.0 0.0 0.0 0.0 0.0 45.8 Lane LOS A A E Approach Delay (s) 0.3 0.0 0.0 45.8 AP proach LOS A E Intersection Summary Average Delay 2.3 Intersection Capacity Utilization 69.4% ICU Level of Service C Analysis Period (min) 15 Steel Lake Crest Parametrix, Inc. Concurrency File No.: 07-103903-00-CN City of Federal Way 9/10/07 Horizon With 1751: 18 Av S & Pacific Hwy S HCM Unsignalized Intersection Capacity Analysis vr t /P. 4 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Y ttl Zi ttf Sign Control Stop Free Free Grade -10% -4% 3% Volume (veh/h) 80 43 1163 59 24 1790 Peak Hour Factor 1.00 1.00 1.00 1.00 1.00 1.00 Hourly flow rate (vph) 80 43 1163 59 24 1790 Pedestrians 10 10 10 Lane Width (ft) 12.0 12.0 12.0 Walking Speed (ft/s) 4.0 4.0 4.0 Percent Blockage 1 1 1 Right turn flare (veh) Median type TW LTL Median storage veh) 1 Upstream signal (ft) 720 pX, platoon unblocked 0.84 vC, conflicting volume 1857 437 1232 vC1, stage 1 conf vol 1202 vC2, stage 2 conf vol 655 vCu, unblocked vol 1637 437 1232 tC, single (s) 6.8 6.9 4.1 tC, 2 stage (s) 5.8 tF (s) 3.5 3.3 2.2 p0 queue free % 58 92 96 cM capacity (veh/h) 188 559 557 Direction, Lane # WB 1 NB 1 NB 2 NB 3 SB 1 SB 2 SB 3 SB 4 Volume Total 123 465 465 292 24 597 597 597 Volume Left 80 0 0 0 24 0 0 0 Volume Right 43 0 0 59 0 0 0 0 cSH 245 1700 1700 1700 557 1700 1700 1700 Volume to Capacity 0.50 0.27 0.27 0.17 0.04 0.35 0.35 0.35 Queue Length 95th (ft) 65 0 0 0 3 0 0 0 Control Delay (s) 33.6 0.0 0.0 0.0 11.8 0.0 0.0 0.0 Lane LOS D B Approach Delay (s) 33.6 0.0 0.2 Approach LOS D Intersection Summary Average Delay 1.4 Intersection Capacity Utilization 52.0% ICU Level of Service A Analysis Period (min) 15 Steel Lake Crest Parametrix, Inc. Concurrency File No.: 07-103903-00-CN City of Federal Way 9/10/07 2054: S 304 St & 23 Av S Horizon With HCM Unsignalized Intersection Capacity Analysis Movement EBL EBT WBT WBR SBL SBR Lane Configurations *' 1� Y Sign Control Free Free Stop Grade 0% 4% -3% Volume (veh/h) 6 189 316 20 14 20 Peak Hour Factor 1.00 1.00 1.00 1.00 1.00 1.00 Hourly flow rate (vph) 6 189 316 20 14 20 Pedestrians 10 10 10 Lane Width (ft) 12.0 12.0 12.0 Walking Speed (ft/s) 4.0 4.0 4.0 Percent Blockage 1 1 1 Right turn flare (veh) Median type None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 346 547 346 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 346 547 346 tC, single (s) 4.1 6.4 6.2 tC, 2 stage (s) tF (s) 2.2 3.5 3.3 p0 queue free % 100 97 97 cM capacity (veh/h) 1203 488 686 Direction, Lane # EB 1 W B 1 SIB 1 Volume Total 195 336 34 Volume Left 6 0 14 Volume Right 0 20 20 cSH 1203 1700 587 Volume to Capacity 0.00 0.20 0.06 Queue Length 95th (ft) 0 0 5 Control Delay (s) 0.3 0.0 11.5 Lane LOS A B Approach Delay (s) 0.3 0.0 11.5 Approach LOS B Intersection Summary Average Delay 0.8 Intersection Capacity Utilization 32.4% ICU Level of Service A Analysis Period (min) 15 Steel Lake Crest Parametrix, Inc. Concurrency File No.: 07-103903-00-CN City of Federal Way 9/10/07 2542: S 312 St & 4 Av S Horizon With HCM Unsignalized Intersection Capacity Analysis Movement EBT EBR WBL WBT NBL NBR Lane Configurations 1� I + Y Sign Control Free Free Stop Grade 8% -6% 0% Volume (veh/h) 732 11 28 1039 11 17 Peak Hour Factor 1.00 1.00 1.00 1.00 1.00 1.00 Hourly flow rate (vph) 732 11 28 1039 11 17 Pedestrians 10 10 10 Lane Width (ft) 12.0 12.0 12.0 Walking Speed (ft/s) 4.0 4.0 4.0 Percent Blockage 1 1 1 Right turn flare (veh) Median type TW LTL Median storage veh) 1 Upstream signal (ft) 1307 pX, platoon unblocked 0.88 0.88 0.88 vC, conflicting volume 753 1852 758 vC1, stage 1 conf vol 748 vC2, stage 2 conf vol 1105 vCu, unblocked vol 718 1974 723 tC, single (s) 4.1 6.4 6.2 tC, 2 stage (s) 5.4 tF (s) 2.2 3.5 3.3 p0 queue free % 96 94 95 cM capacity (veh/h) 767 186 367 Direction, Lane # EB 1 WB 1 WB 2 NB 1 Volume Total 743 28 1039 28 Volume Left 0 28 0 11 Volume Right 11 0 0 17 cSH 1700 767 1700 266 Volume to Capacity 0.44 0.04 0.61 0.11 Queue Length 95th (ft) 0 3 0 9 Control Delay (s) 0.0 9.9 0.0 20.1 Lane LOS A C Approach Delay (s) 0.0 0.3 20.1 Approach LOS C Intersection Summary Average Delay 0.5 Intersection Capacity Utilization 69.2% ICU Level of Service C Analysis Period (min) 15 Steel Lake Crest Parametrix, Inc. Concurrency File No.: 07-103903-00-CN City of Federal Way 9/10/07 2551: S 312 St & 18 Av S Horizon With HCM Unsignalized Intersection Capacity Analysis Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Vi 0 0 4 r Sign Control Free Free Stop Stop Grade 5% 0% 0% 0% Volume (veh/h) 40 547 134 20 590 55 74 14 29 32 18 64 Peak Hour Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Hourly flow rate (vph) 40 547 134 20 590 55 74 14 29 32 18 64 Pedestrians 10 10 10 10 Lane Width (ft) 12.0 12.0 12.0 12.0 Walking Speed (ft/s) 4.0 4.0 4.0 4.0 Percent Blockage 1 1 1 1 Right turn flare (veh) Median type TWLTL TWLTL Median storage veh) 1 1 Upstream signal (ft) 631 659 pX, platoon unblocked 0.98 0.92 0.93 0.93 0.92 0.93 0.93 0.98 vC, conflicting volume 655 691 1122 1399 360 1067 1438 342 vC1, stage 1 conf vol 704 704 668 668 vC2, stage 2 conf vol 418 695 400 771 vCu, unblocked vol 622 575 979 1277 215 920 1319 302 tC, single (s) 4.1 4.1 7.5 6.5 6.9 7.5 6.5 6.9 tC, 2 stage (s) 6.5 5.5 6.5 5.5 tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 p0 queue free % 96 98 72 94 96 89 93 90 cM capacity (veh/h) 924 906 265 252 713 295 247 666 Direction, Lane # EB 1 EB 2 EB 3 WB 1 WB 2 WB 3 NB 1 NB 2 SIB 1 Volume Total 40 365 316 20 393 252 88 29 114 Volume Left 40 0 0 20 0 0 74 0 32 Volume Right 0 0 134 0 0 55 0 29 64 cSH 924 1700 1700 906 1700 1700 263 713 411 Volume to Capacity 0.04 0.21 0.19 0.02 0.23 0.15 0.34 0.04 0.28 Queue Length 95th (ft) 3 0 0 2 0 0 36 3 28 Control Delay (s) 9.1 0.0 0.0 9.1 0.0 0.0 25.5 10.3 17.1 Lane LOS A A D B C Approach Delay (s) 0.5 0.3 21.7 17.1 Approach LOS C C Intersection Summary Average Delay 3.1 Intersection Capacity Utilization 49.3% ICU Level of Service A Analysis Period (min) 15 Steel Lake Crest Concurrency File No.: 07-103903-00-CN City of Federal Way Parametrix, Inc. 9/10/07 2553: S 312 St & 22 Av S Horizon With HCM Unsignalized Intersection Capacity Analysis __w ■-- Al \11 4/ Movement EBL EBT WBT WBR SBL SBR Lane Configurations tt 0 Y Sign Control Free Free Stop Grade -3% 4% 0% Volume (veh/h) 6 885 880 19 20 8 Peak Hour Factor 1.00 1.00 1.00 1.00 1.00 1.00 Hourly flow rate (vph) 6 885 880 19 20 8 Pedestrians 10 10 10 Lane Width (ft) 12.0 12.0 12.0 Walking Speed (ft/s) 4.0 4.0 4.0 Percent Blockage 1 1 1 Right turn flare (veh) Median type TWLTL Median storage veh) 1 Upstream signal (ft) 670 316 pX, platoon unblocked vC, conflicting volume 909 1364 470 vC1, stage 1 cont vol 900 vC2, stage 2 conf vol 464 vCu, unblocked vol 909 1364 470 tC, single (s) 4.1 6.8 6.9 tC, 2 stage (s) 5.8 tF (s) 2.2 3.5 3.3 p0 queue free % 99 92 98 cM capacity (veh/h) 739 258 531 Direction, Lane # EB 1 EB 2 EB 3 WB 1 WB 2 SB 1 Volume Total 6 442 442 587 312 28 Volume Left 6 0 0 0 0 20 Volume Right 0 0 0 0 19 8 cSH 739 1700 1700 1700 1700 303 Volume to Capacity 0.01 0.26 0.26 0.35 0.18 0.09 Queue Length 95th (ft) 1 0 0 0 0 8 Control Delay (s) 9.9 0.0 0.0 0.0 0.0 18.1 Lane LOS A C Approach Delay (s) 0.1 0.0 18.1 Approach LOS C Intersection Summary Average Delay 0.3 Intersection Capacity Utilization 39.5% ICU Level of Service A Analysis Period (min) 15 Steel Lake Crest Parametrix, Inc. Concurrency File No.: 07-103903-00-CN City of Federal Way 9/10/07 Horizon With 2557: S 312 St & 28 Av S HCM Unsignalized Intersection Capacity Analysis --* --* -)v ' 4% t /W i Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations 4 4 41� 4T r Sign Control Stop Stop Stop Stop Volume (vph) 349 3 45 2 1 0 37 189 1 0 199 448 Peak Hour Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Hourly flow rate (vph) 349 3 45 2 1 0 37 189 1 0 199 448 Direction, Lane # EB 1 WB 1 NB 1 SIB 1 SIB 2 Volume Total (vph) 397 3 227 199 448 Volume Left (vph) 349 2 37 0 0 Volume Right (vph) 45 0 1 0 448 Hadj (s) 0.14 0.17 0.06 0.03 -0.67 Departure Headway (s) 6.1 7.3 6.3 6.3 5.6 Degree Utilization, x 0.67 0.01 0.40 0.35 0.69 Capacity (veh/h) 562 414 533 558 627 Control Delay (s) 20.8 10.3 13.3 11.3 18.8 Approach Delay (s) 20.8 10.3 13.3 16.5 Approach LOS C B B C Intersection Summary Delay 17.3 HCM Level of Service C Intersection Capacity Utilization 65.0% ICU Level of Service Analysis Period (min) 15 C Steel Lake Crest Concurrency File No.: 07-103903-00-CN City of Federal Way Parametrix, Inc. 9/10/07 2857: S 317 St & 28 Av S Horizon With HCM Unsignalized Intersection Capacity Analysis Movement EBL EBT WBT WBR SBL SBR Right Turn Channelized Volume (veh/h) 6 0 0 0 0 2 Peak Hour Factor 1.00 1.00 1.00 1.00 1.00 1.00 Hourly flow rate (vph) 6 0 0 0 0 2 Approach Volume (veh/h) 6 0 2 Crossing Volume (veh/h) 0 6 0 High Capacity (veh/h) 1385 1378 1385 High v/c (veh/h) 0.00 0.00 0.00 Low Capacity (veh/h) 1161 1155 1161 Low v/c (veh/h) 0.01 0.00 0.00 Intersection Summary Maximum v/c High 0.00 Maximum v/c Low 0.01 Intersection Capacity Utilization 15.0% ICU Level of Service A Steel Lake Crest Concurrency File No.: 07-103903-00-CN City of Federal Way Parametrix, Inc. 9/10/07 Horizon With 3053: S 320 St & 21 PI S HCM Unsignalized Intersection Capacity Analysis --I-.-,* -*- r�* 14/ Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations 11 +0 A +0 F if Sign Control Free Free Stop Stop Grade 5% 2% 0% 0% Volume (veh/h) 0 42 1 0 56 0 0 0 0 0 0 2 Peak Hour Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Hourly flow rate (vph) 0 42 1 0 56 0 0 0 0 0 0 2 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type Raised Raised Median storage veh) 0 0 Upstream signal (ft) 641 567 pX, platoon unblocked vC, conflicting volume 56 43 63 98 14 70 99 19 vC1, stage 1 conf vol 42 42 56 56 vC2, stage 2 conf vol 21 56 14 43 vCu, unblocked vol 56 43 63 98 14 70 99 19 tC, single (s) 4.1 4.1 7.5 6.5 6.9 7.5 6.5 6.9 tC, 2 stage (s) 6.5 5.5 6.5 5.5 tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 p0 queue free % 100 100 100 100 100 100 100 100 cM capacity (veh/h) 1547 1564 646 559 1062 639 559 1055 Direction, Lane # EB 1 EB 2 EB 3 EB 4 WB 1 WB 2 WB 3 WB 4 NB 1 SB 1 Volume Total 0 17 17 9 0 22 22 11 0 2 Volume Left 0 0 0 0 0 0 0 0 0 0 Volume Right 0 0 0 1 0 0 0 0 0 2 cSH 1700 1700 1700 1700 1700 1700 1700 1700 1700 1055 Volume to Capacity 0.00 0.01 0.01 0.01 0.00 0.01 0.01 0.01 0.00 0.00 Queue Length 95th (ft) 0 0 0 0 0 0 0 0 0 0 Control Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 8.4 Lane LOS A A Approach Delay (s) 0.0 0.0 0.0 8.4 Approach LOS A A Intersection Summary Average Delay 0.2 Intersection Capacity Utilization 15.0% ICU Level of Service A Analysis Period (min) 15 Steel Lake Crest Parametrix, Inc. Concurrency File No.: 07-103903-00-CN City of Federal Way 9/10/07 Horizon With 3566: S 328 St & Milita Rd S HCM Unsignalized Intersection Capacity Analysis -4\ t 4 Movement EBL EBR NBL NBT SBT SBR Lane Configurations t t Sign Control Stop Free Free Grade 0% 0% 0% Volume (veh/h) 0 0 0 1 1 0 Peak Hour Factor 1.00 1.00 1.00 1.00 1.00 1.00 Hourly flow rate (vph) 0 0 0 1 1 0 Pedestrians 10 10 10 Lane Width (ft) 12.0 12.0 12.0 Walking Speed (ft/s) 4.0 4.0 4.0 Percent Blockage 1 1 1 Right turn flare (veh) Median type None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 22 21 11 vC1, stage 1 conf Vol vC2, stage 2 conf Vol vCu, unblocked Vol 22 21 11 tC, single (s) 6.4 6.2 4.1 tC, 2 stage (s) tF (s) 3.5 3.3 2.2 p0 queue free % 100 100 100 cM capacity (veh/h) 978 1039 1595 Direction, Lane # EB 1 EB 2 NB 1 NB 2 SB 1 SIB 2 Volume Total 0 0 0 1 1 0 Volume Left 0 0 0 0 0 0 Volume Right 0 0 0 0 0 0 cSH 1700 1700 1700 1700 1700 1700 Volume to Capacity 0.00 0.00 0.00 0.00 0.00 0.00 Queue Length 95th (ft) 0 0 0 0 0 0 Control Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 Lane LOS A A Approach Delay (s) 0.0 0.0 0.0 Approach LOS A Intersection Summary Average Delay 0.0 Intersection Capacity Utilization 20.7% ICU Level of Service A Analysis Period (min) 15 Steel Lake Crest Parametrix, Inc. Concurrency File No.: 07-103903-00-CN City of Federal Way 9/10/07 Horizon With 3850: S 333 St & Pacific Hwy S HCM Unsignalized Intersection Capacity Analysis *-- t /P. "P. Movement WBL WBR NBT NBR SBL SBT Lane Configurations Sign Control Stop Free Free Grade -2% 2% -2% Volume (veh/h) 0 15 1635 9 0 2193 Peak Hour Factor 1.00 1.00 1.00 1.00 1.00 1.00 Hourly flow rate (vph) 0 15 1635 9 0 2193 Pedestrians 10 10 10 Lane Width (ft) 12.0 12.0 12.0 Walking Speed (ft/s) 4.0 4.0 4.0 Percent Blockage 1 1 1 Right turn flare (veh) Median type Raised Median storage veh) 1 Upstream signal (ft) 890 1110 pX, platoon unblocked 0.81 0.81 0.81 vC, conflicting volume 2390 570 1654 vC1, stage 1 conf vol 1650 vC2, stage 2 conf vol 741 vCu, unblocked vol 2249 4 1341 tC, single (s) 6.8 6.9 4.1 tC, 2 stage (s) 5.8 tF (s) 3.5 3.3 2.2 p0 queue free % 100 98 100 cM capacity (veh/h) 121 860 410 Direction, Lane # WB 1 NB 1 NB 2 NB 3 SB 1 SB 2 SB 3 SB 4 Volume Total 15 654 654 336 0 731 731 731 Volume Left 0 0 0 0 0 0 0 0 Volume Right 15 0 0 9 0 0 0 0 cSH 860 1700 1700 1700 1700 1700 1700 1700 Volume to Capacity 0.02 0.38 0.38 0.20 0.00 0.43 0.43 0.43 Queue Length 95th (ft) 1 0 0 0 0 0 0 0 Control Delay (s) 9.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Lane LOS A Approach Delay (s) 9.3 0.0 0.0 Approach LOS A Intersection Summary Average Delay 0.0 Intersection Capacity Utilization 56.9% ICU Level of Service B Analysis Period (min) 15 Steel Lake Crest Concurrency File No.: 07-103903-00-CN City of Federal Way Parametrix, Inc. 9/10/07 Horizon With 458: S Star Lake Rd & Military Rd S HCM Signalized Intersection Capacity Analysis %-* , VL.. Movement SEL SER NEL NET SWT SWR Lane Configurations Y + Ti. Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Grade (%) -2% -5% 1 % Total Lost time (s) 5.0 5.0 5.0 5.0 Lane Util. Factor 1.00 1.00 1.00 1.00 Frpb, ped/bikes 0.97 1.00 1.00 0.99 Flpb, ped/bikes 1.00 1.00 1.00 1.00 Frt 0.90 1.00 1.00 0.99 Fit Protected 0.99 0.95 1.00 1.00 Satd. Flow (prot) 1618 1814 1909 1811 Fit Permitted 0.99 0.15 1.00 1.00 Satd. Flow (perm) 1618 289 1909 1811 Volume (vph) 72 201 66 516 1008 125 Peak -hour factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Adj. Flow (vph) 72 201 66 516 1008 125 RTOR Reduction (vph) 90 0 0 0 3 0 Lane Group Flow (vph) 183 0 66 516 1130 0 Confl. Peds. (#/hr) 10 10 10 10 Bus Blockages (#/hr) 0 2 0 0 0 0 Turn Type Perm Protected Phases 4 2 6 Permitted Phases 2 Actuated Green, G (s) 16.6 93.4 93.4 93.4 Effective Green, g (s) 16.6 93.4 93.4 93.4 Actuated g/C Ratio 0.14 0.78 0.78 0.78 Clearance Time (s) 5.0 5.0 5.0 5.0 Vehicle Extension (s) 2.0 2.0 2.0 2.0 Lane Grp Cap (vph) 224 225 1486 1410 v/s Ratio Prot c0.11 0.27 c0.62 v/s Ratio Perm 0.23 v/c Ratio 0.82 0.29 0.35 0.80 Uniform Delay, di 50.2 3.8 4.0 7.8 Progression Factor 1.00 1.11 0.90 1.00 Incremental Delay, d2 19.3 2.9 0.6 4.9 Delay (s) 69.5 7.2 4.2 12.7 Level of Service E A A B Approach Delay (s) 69.5 4.6 12.7 Approach LOS E A B Intersection Summary HCM Average Control Delay 18.1 HCM Level of Service B HCM Volume to Capacity ratio 0.80 Actuated Cycle Length (s) 120.0 Sum of lost time (s) 10.0 Intersection Capacity Utilization 86.2% ICU Level of Service E Analysis Period (min) 15 c Critical Lane Group Steel Lake Crest Parametrix, Inc. Concurrency File No.: 07-103903-00-CN City of Federal Way 9/10/07 Horizon With 1050: S 288 St & Pacific Hwy S HCM Signalized Intersection Capacity Analysis Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations .9* 1 4 r A +tT A) W4 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Grade (%) 14% -7% -2% 2% Total Lost time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Lane Util. Factor 1.00 0.95 0.95 1.00 1.00 0.91 0.97 0.91 Frpb, ped/bikes 0.99 1.00 1.00 0.97 1.00 0.99 1.00 1.00 Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.96 1.00 1.00 0.85 1.00 0.96 1.00 1.00 Fit Protected 0.98 0.95 0.96 1.00 0.95 1.00 0.95 1.00 Satd. Flow (prot) 1629 1698 1756 1585 1787 4881 3399 4971 Fit Permitted 0.98 0.95 0.96 1.00 0.95 1.00 0.95 1.00 Satd. Flow (perm) 1629 1698 1756 1585 1787 4881 3399 4971 Volume (vph) 25 23 17 424 34 187 30 859 309 359 1548 36 Peak -hour factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj. Flow (vph) 25 23 17 424 34 187 30 859 309 359 1548 36 RTOR Reduction (vph) 0 13 0 0 0 156 0 38 0 0 1 0 Lane Group Flow (vph) 0 52 0 220 238 31 30 1130 0 359 1583 0 Confl. Peds. (#/hr) 10 10 10 10 10 10 10 10 Bus Blockages (#/hr) 2 0 6 6 0 2 0 2 0 0 6 0 Turn Type Split Split Perm Prot Prot Protected Phases 4 4 8 8 5 2 1 6 Permitted Phases 8 Actuated Green, G (s) 10.5 19.8 19.8 19.8 4.5 55.5 14.2 65.2 Effective Green, g (s) 9.5 19.8 19.8 19.8 5.0 56.0 14.7 65.7 Actuated g/C Ratio 0.08 0.17 0.17 0.17 0.04 0.47 0.12 0.55 Clearance Time (s) 4.0 5.0 5.0 5.0 5.5 5.5 5.5 5.5 Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lane Grp Cap (vph) 129 280 290 262 74 2278 416 2722 v/s Ratio Prot c0.03 0.13 c0.14 0.02 0.23 c0.11 c0.32 v/s Ratio Perm 0.02 v/c Ratio 0.40 0.79 0.82 0.12 0.41 0.50 0.86 0.58 Uniform Delay, d1 52.6 48.1 48.4 42.7 56.1 22.2 51.7 18.0 Progression Factor 1.00 0.95 0.96 1.89 1.00 1.00 0.95 0.91 Incremental Delay, d2 0.8 12.3 15.8 0.1 1.3 0.8 15.7 0.9 Delay (s) 53.3 58.2 62.0 80.5 57.4 23.0 64.8 17.2 Level of Service D E E F E C E B Approach Delay (s) 53.3 66.1 23.8 26.0 Approach LOS D E C C Intersection Summary HCM Average Control Delay 32.5 HCM Level of Service C HCM Volume to Capacity ratio 0.64 Actuated Cycle Length (s) 120.0 Sum of lost time (s) 15.0 Intersection Capacity Utilization 75.9% ICU Level of Service D Analysis Period (min) 15 c Critical Lane Group Steel Lake Crest Concurrency File No.: 07-103903-00-CN City of Federal Way Parametrix, Inc. 9/10/07 Horizon With 1056: S 288 St & Military Rd S HCM Signalized Intersection Capacity Analysis } 0. Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations +T 0 1 + F t r Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Grade (%) -5% 8% 3% -3% Total Lost time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Lane Util. Factor 1.00 0.95 1.00 0.95 1.00 1.00 1.00 1.00 1.00 1.00 Frpb, ped/bikes 1.00 0.98 1.00 0.99 1.00 1.00 0.97 1.00 1.00 0.97 Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 0.95 1.00 0.96 1.00 1.00 0.85 1.00 1.00 0.85 Fit Protected 0.95 1.00 0.95 1.00 0.95 1.00 1.00 0.95 1.00 1.00 Satd. Flow (prot) 1799 3350 1699 3239 1743 1820 1500 1782 1891 1556 Fit Permitted 0.95 1.00 0.95 1.00 0.95 1.00 1.00 0.95 1.00 1.00 Satd. Flow (perm) 1799 3350 1699 3239 1743 1820 1500 1782 1891 1556 Volume (vph) 118 244 140 274 375 131 150 346 154 320 651 201 Peak -hour factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj. Flow (vph) 118 244 140 274 375 131 150 346 154 320 651 201 RTOR Reduction (vph) 0 70 0 0 30 0 0 0 87 0 0 0 Lane Group Flow (vph) 118 314 0 274 476 0 150 346 67 320 651 201 Confl. Peds. (#/hr) 10 10 10 10 10 10 10 10 Bus Blockages (#/hr) 2 2 0 0 0 2 0 2 2 2 0 0 Turn Type Prot Prot Prot Perm Prot Perm Protected Phases 5 2 1 6 3 8 7 4 Permitted Phases 8 4 Actuated Green, G (s) 11.5 14.4 21.4 24.3 12.4 39.8 39.8 24.4 51.8 51.8 Effective Green, g (s) 11.5 14.4 21.4 24.3 12.4 39.8 39.8 24.4 51.8 51.8 Actuated g/C Ratio 0.10 0.12 0.18 0.20 0.10 0.33 0.33 0.20 0.43 0.43 Clearance Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lane Grp Cap (vph) 172 402 303 656 180 604 498 362 816 672 v/s Ratio Prot 0.07 0.09 c0.16 c0.15 0.09 0.19 c0.18 c0.34 v/s Ratio Perm 0.04 0.13 v/c Ratio 0.69 0.78 0.90 0.73 0.83 0.57 0.13 0.88 0.80 0.30 Uniform Delay, di 52.5 51.3 48.3 44.7 52.8 33.1 28.1 46.4 29.6 22.3 Progression Factor 0.87 0.94 1.00 1.00 0.94 0.66 0.50 0.93 0.90 0.89 Incremental Delay, d2 8.6 8.7 27.9 3.4 23.5 3.5 0.5 14.5 5.1 0.7 Delay (s) 54.1 57.1 76.2 48.1 73.1 25.3 14.6 57.9 31.8 20.5 Level of Service D E E D E C B E C C Approach Delay (s) 56.4 58.0 33.8 37.0 Approach LOS E E C D Intersection Summary HCM Average Control Delay 44.7 HCM Level of Service D HCM Volume to Capacity ratio 0.83 Actuated Cycle Length (s) 120.0 Sum of lost time (s) 15.0 Intersection Capacity Utilization 87.0% ICU Level of Service E Analysis Period (min) 15 c Critical Lane Group Steel Lake Crest Concurrency File No.: 07-103903-00-CN City of Federal Way Parametrix, Inc. 9/10/07 Horizon With 1651: S Dash Point Rd & Pacific Hwy S HCM Signalized Intersection Capacity Analysis * � I i A/ Movement EBL EBR NBL NBT SBU SBT SBR Lane Configurations r A +++ A +++ r Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 Grade (%) 0% 0% -1 % Total Lost time (s) 5.0 5.0 5.0 5.0 5.0 5.0 Lane Util. Factor 0.97 1.00 1.00 0.91 0.91 1.00 Frpb, ped/bikes 1.00 0.96 1.00 1.00 1.00 0.97 Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 0.85 1.00 1.00 1.00 0.85 Flt Protected 0.95 1.00 0.95 1.00 1.00 1.00 Satd. Flow (prot) 3419 1488 1770 5072 5070 1548 Flt Permitted 0.95 1.00 0.95 1.00 1.00 1.00 Satd. Flow (perm) 3419 1488 1770 5072 5070 1548 Volume (vph) 278 116 218 927 0 1365 926 Peak -hour factor, PH 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj. Flow (vph) 278 116 218 927 0 1365 926 RTOR Reduction (vph) 0 93 0 0 0 0 37 Lane Group Flow (vph) 278 23 218 927 0 1365 889 Confl. Peds. (#/hr) 10 10 10 10 10 Bus Blockages (#/hr) 2 6 0 2 0 6 0 Turn Type Perm Prot Prot pm+ov Protected Phases 8 5 2 1 6 8 Permitted Phases 8 6 Actuated Green, G (s) 26.3 26.3 19.1 98.2 74.1 100.4 Effective Green, g (s) 26.3 26.3 19.1 98.7 74.6 100.9 Actuated g/C Ratio 0.19 0.19 0.14 0.73 0.55 0.75 Clearance Time (s) 5.0 5.0 5.0 5.5 5.5 5.0 Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 Lane Grp Cap (vph) 666 290 250 3708 2802 1214 v/s Ratio Prot 0.08 c0.12 0.18 0.27 c0.14 v/s Ratio Perm 0.02 0.43 v/c Ratio 0.42 0.08 0.87 0.25 0.49 0.73 Uniform Delay, d1 47.6 44.4 56.8 6.0 18.5 9.5 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 0.2 0.0 25.9 0.2 0.6 2.0 Delay (s) 47.8 44.5 82.7 6.1 19.1 11.5 Level of Service D D F A B B Approach Delay (s) 46.8 20.7 16.0 Approach LOS D C B Intersection Summary HCM Average Control Delay 20.6 HCM Level of Service C HCM Volume to Capacity ratio 0.75 Actuated Cycle Length (s) 135.0 Sum of lost time (s) 10.0 Intersection Capacity Utilization 78.8% ICU Level of Service D Analysis Period (min) 15 c Critical Lane Group Steel Lake Crest Parametrix, Inc. Concurrency File No.: 07-103903-00-CN City of Federal Way 9/10/07 Horizon With 2051 : S 304 St & Pacific Hwy S HCM Signalized Intersection Capacity Analysis -.4 4--- 4-- 4\ t / ► 4 -V --* 'r Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations a' r 41� N tO N tO Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Grade (%) -4% 5% -1 % 2% Total Lost time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Lane Util. Factor 1.00 1.00 1.00 1.00 0.91 1.00 0.91 Frpb, ped/bikes 1.00 0.97 0.99 1.00 0.99 1.00 1.00 Flpb, ped/bikes 1.00 1.00 0.99 1.00 1.00 1.00 1.00 Frt 1.00 0.85 0.97 I.00 0.98 1.00 0.99 Fit Protected 0.98 1.00 0.97 0.95 1.00 0.95 1.00 Satd. Flow (prot) 1859 1532 1689 1778 4973 1752 4954 Fit Permitted 0.84 1.00 0.78 0.95 1.00 0.95 1.00 Satd. Flow (perm) 1595 1532 1350 1778 4973 1752 4954 Volume (vph) 26 42 38 171 54 59 43 1085 134 54 1486 58 Peak -hour factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj. Flow (vph) 26 42 38 171 54 59 43 1085 134 54 1486 58 RTOR Reduction (vph) 0 0 29 0 9 0 0 9 0 0 3 0 Lane Group Flow (vph) 0 68 9 0 275 0 43 1210 0 54 1541 0 Confl. Peds. (#/hr) 10 10 10 10 10 10 10 10 Bus Blockages (#/hr) 2 0 6 6 0 2 0 2 0 0 6 0 Turn Type Perm Perm Perm Prot Prot Protected Phases 4 8 5 2 1 6 Permitted Phases 4 4 8 Actuated Green, G (s) 29.2 29.2 29.2 12.0 69.7 7.1 64.8 Effective Green, g (s) 28.2 28.2 28.2 12.0 69.7 7.1 64.8 Actuated g/C Ratio 0.23 0.23 0.23 0.10 0.58 0.06 0.54 Clearance Time (s) 4.0 4.0 4.0 5.0 5.0 5.0 5.0 Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lane Grp Cap (vph) 375 360 317 178 2888 104 2675 v/s Ratio Prot 0.02 c0.24 0.03 c0.31 v/s Ratio Perm 0.04 0.01 c0.20 v/c Ratio 0.18 0.02 0.87 0.24 0.42 0.52 0.58 Uniform Delay, d1 36.7 35.3 44.1 49.8 13.9 54.8 18.4 Progression Factor 1.00 1.00 1.00 0.52 0.19 1.00 1.00 Incremental Delay, d2 0.1 0.0 20.6 0.2 0.4 1.8 0.9 Delay (s) 36.8 35.3 64.7 26.0 3.1 56.6 19.3 Level of Service D D E C A E B Approach Delay (s) 36.2 64.7 3.9 20.6 Approach LOS D E A C Intersection Summa HCM Average Control Delay 18.5 HCM Level of Service B HCM Volume to Capacity ratio 0.62 Actuated Cycle Length (s) 120.0 Sum of lost time (s) 10.0 Intersection Capacity Utilization 76.0% ICU Level of Service D Analysis Period (min) 15 c Critical Lane Group Steel Lake Crest Concurrency File No.: 07-103903-00-CN City of Federal Way Parametrix, Inc. 9/10/07 2057: S 304 St & 28 Av S Horizon With HCM Signalized Intersection Capacity Analysis Movement EBT EBR WBL WBT NBL NBR Lane Configurations 1� + I ? Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Grade (%) 6% -2% 4% Total Lost time (s) 5.0 5.0 5.0 5.0 5.0 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 Frpb, ped/bikes 0.98 1.00 1.00 1.00 0.93 Flpb, ped/bikes 1.00 0.96 1.00 1.00 1.00 Frt 0.96 1.00 1.00 1.00 0.85 Fit Protected 1.00 0.95 1.00 0.95 1.00 Satd. Flow (prot) 1691 1711 1881 1734 1438 Fit Permitted 1.00 0.64 1.00 0.95 1.00 Satd. Flow (perm) 1691 1160 1881 1734 1438 Volume (vph) 124 56 544 194 65 418 Peak -hour factor, PH 1.00 1.00 1.00 1.00 1.00 1.00 Adj. Flow (vph) 124 56 544 194 65 418 RTOR Reduction (vph) 13 0 0 0 0 306 Lane Group Flow (vph) 167 0 544 194 65 112 Confl. Peds. (#/€7r) 10 10 10 10 Turn Type Perm Perm Protected Phases 4 8 2 Permitted Phases 8 2 Actuated Green, G (s) 77.9 77.9 77.9 32.1 32.1 Effective Green, g (s) 77.9 77.9 77.9 32.1 32.1 Actuated g/C Ratio 0.65 0.65 0.65 0.27 0.27 Clearance Time (s) 5.0 5.0 5.0 5.0 5.0 Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 Lane Grp Cap (vph) 1098 753 1221 464 385 v/s Ratio Prot 0.10 0.10 0.04 v/s Ratio Perm c0.47 c0.08 v/c Ratio 0.15 0.72 0.16 0.14 0.29 Uniform Delay, di 8.2 13.9 8.2 33.4 34.9 Progression Factor 1.18 0.48 0.53 1.00 1.00 Incremental Delay, d2 0.0 2.5 0.0 0.6 1.9 Delay (s) 9.7 9.2 4.4 34.1 36.8 Level of Service A A A C D Approach Delay (s) 9.7 7.9 36.4 Approach LOS A A D Intersection Summary HCM Average Control Delay 18.0 HCM Level of Service B HCM Volume to Capacity ratio 0.60 Actuated Cycle Length (s) 120.0 Sum of lost time (s) 10.0 Intersection Capacity Utilization 62.1% ICU Level of Service B Analysis Period (min) 15 c Critical Lane Group Steel Lake Crest Concurrency File No.: 07-103903-00-CN City of Federal Way Parametrix, Inc. 9/10/07 Horizon With 2058: S 304 St & Military Rd S HCM Signalized Intersection Capacity Analysis Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations '* 44 1 T+ '� + r Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Grade (%) -1% 4% 5% -4% Total Lost time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frpb, ped/bikes 1.00 0.93 1.00 1.00 1.00 1.00 1.00 0.95 Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 0.96 1.00 1.00 Frt 1.00 0.85 1.00 1.00 1.00 1.00 1.00 0.85 Fit Protected 0.95 1.00 0.95 0.95 1.00 0.95 1.00 1.00 Satd. Flow (prot) 1778 1476 1734 1725 1816 1737 1900 1535 Fit Permitted 0.95 1.00 0.95 0.36 1.00 0.60 1.00 1.00 Satd. Flow (perm) 1778 1476 1734 656 1816 1091 1900 1535 Volume (vph) 355 2 382 1 0 0 313 263 0 1 404 499 Peak -hour factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj. Flow (vph) 355 2 382 1 0 0 313 263 0 1 404 499 RTOR Reduction (vph) 0 297 0 0 0 0 0 0 0 0 0 157 Lane Group Flow (vph) 355 87 0 0 1 0 313 263 0 1 404 342 Confl. Peds, (#/hr) 10 10 10 10 10 10 10 10 Turn Type Split Split pm+pt Perm pm+ov Protected Phases 4 4 8 8 5 2 6 4 Permitted Phases 2 6 6 Actuated Green, G (s) 27.2 27.2 3.2 76.1 76.1 55.2 55.2 82.4 Effective Green, g (s) 26.7 26.7 2.2 76.1 76.1 55.2 55.2 81.9 Actuated g/C Ratio 0.22 0.22 0.02 0.63 0.63 0.46 0.46 0.68 Clearance Time (s) 4.5 4.5 4.0 5.0 5.0 5.0 5.0 4.5 Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lane Grp Cap (vph) 396 328 32 558 1152 502 874 1112 v/s Ratio Prot c0.20 0.06 c0.00 c0.07 0.14 0.21 0.07 v/s Ratio Perm c0.28 0.00 0.15 v/c Ratio 0.90 0.27 0.03 0.56 0.23 0.00 0.46 0.31 Uniform Delay, di 45.3 38.5 57.9 12.0 9.4 17.5 22.2 7.7 Progression Factor 1.01 1.10 1.00 1.23 0.60 0.66 0.70 0.71 Incremental Delay, d2 20.7 0.1 0.1 0.5 0.3 0.0 1.1 0.0 Delay (s) 66.5 42.5 58.0 15.3 5.9 11.6 16.8 5.5 Level of Service E D E B A B B A Approach Delay (s) 54.1 58.0 11.0 10.5 Approach LOS D E B B Intersection Summary HCM Average Control Delay 25.2 HCM Level of Service C HCM Volume to Capacity ratio 0.63 Actuated Cycle Length (s) 120.0 Sum of lost time (s) 15.0 Intersection Capacity Utilization 75.9% ICU Level of Service D Analysis Period (min) 15 c Critical Lane Group Steel Lake Crest Concurrency File No.: 07-103903-00-CN City of Federal Way Parametrix, Inc. 9/10/07 2546: S 312 St & 8 Av S Horizon With HCM Signalized Intersection Capacity Analysis Movement EBT EBR WBL WBT NBL NBR Lane Configurations 1� t Y Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Grade (%) 3% 0% 0% Total Lost time (s) 5.0 5.0 5.0 5.0 Lane Util. Factor 1.00 1.00 1.00 1.00 Frpb, ped/bikes 1.00 1.00 1.00 0.98 Flpb, ped/bikes 1.00 0.98 1.00 1.00 Frt 0.99 1.00 1.00 0.94 Fit Protected 1.00 0.95 1.00 0.97 Satd. Flow (prot) 1820 1741 1863 1674 Fit Permitted 1.00 0.40 1.00 0.97 Satd. Flow (perm) 1820 732 1863 1674 Volume (vph) 605 25 53 842 61 47 Peak -hour factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Adj. Flow (vph) 605 25 53 842 61 47 RTOR Reduction (vph) 1 0 0 0 27 0 Lane Group Flow (vph) 629 0 53 842 81 0 Confl. Peds. (#/hr) 10 10 10 10 Turn Type Perm Protected Phases 14 8 2 Permitted Phases 8 Actuated Green, G (s) 101.7 87.8 87.8 10.3 Effective Green, g (s) 100.7 87.8 87.8 9.3 Actuated g/C Ratio 0.84 0.73 0.73 0.08 Clearance Time (s) 5.0 5.0 4.0 Vehicle Extension (s) 2.0 2.0 2.0 Lane Grp Cap (vph) 1527 536 1363 130 v/s Ratio Prot c0.35 c0.45 c0.05 v/s Ratio Perm 0.07 v/c Ratio 0.41 0.10 0.62 0.62 Uniform Delay, d1 2.4 4.7 7.9 53.7 Progression Factor 0.07 0.27 0.47 1.16 Incremental Delay, d2 0.1 0.3 2.0 5.3 Delay (s) 0.2 1.6 5.7 67.3 Level of Service A A A E Approach Delay (s) 0.2 5.5 67.3 Approach LOS A A E Intersection Summary HCM Average Control Delay 7.5 HCM Level of Service A HCM Volume to Capacity ratio 0.58 Actuated Cycle Length (s) 120.0 Sum of lost time (s) 10.0 Intersection Capacity Utilization 60.3% ICU Level of Service B Analysis Period (min) 15 c Critical Lane Group Steel Lake Crest Parametrix, Inc. Concurrency File No.: 07-103903-00-CN City of Federal Way 9/10/07 Horizon With 2549: S 312 St & 14 AV S HCM Signalized Intersection Capacity Analysis k' 4\ t /". \0� 4 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations +T* +T+ 4 4 r Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Lane Util. Factor 1.00 0.95 1.00 0.95 1.00 1.00 1.00 Frpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Flpb, ped/bikes 1.00 1.00 0.99 1.00 1.00 1.00 1.00 Frt 1.00 1.00 1.00 0.99 0.98 1.00 0.85 Fit Protected 0.95 1.00 0.95 1.00 0.97 0.96 1.00 Satd. Flow (prot) 1766 3522 1746 3504 1756 1788 1583 Fit Permitted 0.29 1.00 0.40 1.00 0.97 0.96 1.00 Satd. Flow (perm) 547 3522 733 3504 1756 1788 1583 Volume (vph) 68 650 16 30 764 40 37 10 9 37 7 109 Peak -hour factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj. Flow (vph) 68 650 16 30 764 40 37 10 9 37 7 109 RTOR Reduction (vph) 0 1 0 0 2 0 0 6 0 0 0 102 Lane Group Flow (vph) 68 665 0 30 802 0 0 50 0 0 44 7 Confl. Peds. (ff/hr) 10 10 10 10 10 10 10 10 Turn Type pm+pt Perm Split Split Prot Protected Phases 7 4 8 5 5 6 6 6 Permitted Phases 4 8 Actuated Green, G (s) 88.9 88.9 78.3 78.3 8.7 7.4 7.4 Effective Green, g (s) 88.9 88.9 78.3 78.3 8.7 7.4 7.4 Actuated g/C Ratio 0.74 0.74 0.65 0.65 0.07 0.06 0.06 Clearance Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lane Grp Cap (vph) 462 2609 478 2286 127 110 98 v/s Ratio Prot 0.01 c0.19 c0.23 c0.03 c0.02 0.00 v/s Ratio Perm 0.10 0.04 v/c Ratio 0.15 0.25 0.06 0.35 0.39 0.40 0.07 Uniform Delay, di 5.0 5.0 7.6 9.4 53.1 54.2 53.1 Progression Factor 1.46 1.60 0.60 0.51 1.00 1.00 1.00 Incremental Delay, d2 0.1 0.2 0.2 0.3 0.7 0.9 0.1 Delay (s) 7.3 8.2 4.7 5.1 53.8 55.0 53.2 Level of Service A A A A D E D Approach Delay (s) 8.1 5.1 53.8 53.7 Approach LOS A A D D Intersection Summary HCM Average Control Delay 12.0 HCM Level of Service B HCM Volume to Capacity ratio 0.36 Actuated Cycle Length (s) 120.0 Sum of lost time (s) 20.0 Intersection Capacity Utilization 52.2% ICU Level of Service A Analysis Period (min) 15 c Critical Lane Group Steel Lake Crest Concurrency File No.: 07-103903-00-CN City of Federal Way Parametrix, Inc. 9/10/07 Horizon With 2550: S 312 St & Pacific Hwy S HCM Signalized Intersection Capacity Analysis Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations +T+ 0 N ++T N W if Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Grade (%) 1% 0% 0% 0% Total Lost time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Lane Util. Factor 1.00 0.95 1.00 0.95 1.00 0.91 1.00 0.91 1.00 Frpb, ped/bikes 1.00 0.99 1.00 1.00 1.00 1.00 1.00 1.00 0.97 Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 0.97 1.00 0.98 1.00 0.98 1.00 1.00 0.85 Fit Protected 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00 1.00 Satd. Flow (prot) 1747 3374 1741 3417 1741 4966 1755 5058 1517 Fit Permitted 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00 1.00 Satd. Flow (perm) 1747 3374 1741 3417 1741 4966 1755 5058 1517 Volume (vph) 250 359 100 148 432 77 330 801 100 167 1061 272 Peak -hour factor, PH F 1.00 1.00 1.00 1.00 1.00 t .00 1.00 1.00 1.00 1.00 1.00 1.00 Adj. Flow (vph) 250 359 100 148 432 77 330 801 100 167 1061 272 RTOR Reduction (vph) 0 22 0 0 13 0 0 12 0 0 0 62 Lane Group Flow (vph) 250 437 0 148 496 0 330 889 0 167 1061 210 Confl. Peds. (#/hr) 10 10 10 10 10 10 10 10 Bus Blockages (#/hr) 2 2 4 4 4 2 4 2 2 2 4 4 Turn Type Prot Prot Prot Prot pm+ov Protected Phases 7 4 3 8 5 2 1 6 7 Permitted Phases 6 Actuated Green, G (s) 19.3 26.7 13.5 20.9 25.0 42.8 19.0 36.8 56.1 Effective Green, g (s) 18.3 25.7 12.5 19.9 25.0 42.8 19.0 36.8 55.1 Actuated g/C Ratio 0.15 0.21 0.10 0.17 0.21 0.36 0.16 0.31 0.46 Clearance Time (s) 4.0 4.0 4.0 4.0 5.0 5.0 5.0 5.0 4.0 Vehicle Extension s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lane Grp Cap (vph) 266 723 181 567 363 1771 278 1551 760 v/s Ratio Prot c0.14 0.13 0.08 c0.15 c0.19 0.18 0.10 c0.21 0.04 v/s Ratio Perm 0.10 v/c Ratio 0.94 0.60 0.82 0.88 0.91 0.50 0.60 0.68 0.28 Uniform Delay, d1 50.3 42.6 52.6 48.8 46.4 30.2 47.0 36.5 20.1 Progression Factor 1.04 0.67 1.04 0.79 0.64 0.62 0.90 0.86 0.16 Incremental Delay, d2 37.8 1.0 22.6 13.5 22.8 0.9 2.2 2.2 0.1 Delay (s) 90.1 29.5 77.4 51.9 52.3 19.8 44.3 33.7 3.2 Level of Service F C E D D B D C A Approach Delay (s) 50.9 57.6 28.5 29.3 Approach LOS D E C C Intersection Summary HCM Average Control Delay 37.3 HCM Level of Service D HCM Volume to Capacity ratio 0.83 Actuated Cycle Length (s) 120.0 Sum of lost time (s) 20.0 Intersection Capacity Utilization 85.4% ICU Level of Service E Analysis Period (min) 15 c Critical Lane Group Steel Lake Crest Concurrency File No.: 07-103903-00-CN City of Federal Way Parametrix, Inc. 9/10/07 Horizon With 2552: S 312 St & 20 Av S HCM Signalized Intersection Capacity Analysis � � 'r � � 4\ i Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations I +T 0 *T it + Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Grade (%) 5% -4% -1% 0% Total Lost time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Lane Util. Factor 1.00 0.95 1.00 0.95 1.00 1.00 1.00 Frpb, ped/bikes 1.00 0.99 1.00 1.00 1.00 0.97 1.00 Flpb, ped/bikes 0.97 1.00 0.99 1.00 0.99 1.00 1.00 Frt 1.00 0.96 1.00 0.99 1.00 0.85 0.99 Flt Protected 0.95 1.00 0.95 1.00 0.96 1.00 0.98 Satd. Flow (prot) 1678 3250 1784 3547 1776 1527 1801 Flt Permitted 0.48 1.00 0.43 1.00 0.70 1.00 0.74 Satd. Flow (perm) 848 3250 813 3547 1296 1527 1368 Volume (vph) 9 394 161 152 438 28 170 45 148 38 52 5 Peak -hour factor, PH 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj. Flow (vph) 9 394 161 152 438 28 170 45 148 38 52 5 RTOR Reduction (vph) 0 22 0 0 2 0 0 0 115 0 2 0 Lane Group Flow (vph) 9 533 0 152 464 0 0 215 33 0 93 0 Confl. Peds. (#/hr) 10 10 10 10 10 10 10 10 Bus Blockages (#/hr) 0 2 0 0 2 0 2 0 2 2 0 2 Turn Type Perm Perm Perm Perm Perm Protected Phases 6 2 4 8 Permitted Phases 6 2 4 4 8 Actuated Green, G (s) 83.5 83.5 83.5 83.5 27.5 27.5 27.5 Effective Green, g (s) 83.5 83.5 83.5 83.5 26.5 26.5 26.5 Actuated g/C Ratio 0.70 0.70 0.70 0.70 0.22 0.22 0.22 Clearance Time (s) 5.0 5.0 5.0 5.0 4.0 4.0 4.0 Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lane Grp Cap (vph) 590 2261 566 2468 286 337 302 v/s Ratio Prot 0.16 0.13 v/s Ratio Perm 0.01 c0.19 c0.17 0.02 0.07 v/c Ratio 0.02 0.24 0.27 0.19 0.75 0.10 0.31 Uniform Delay, d1 5.6 6.6 6.8 6.4 43.7 37.2 39.1 Progression Factor 0.66 0.56 0.80 0.75 0.80 0.73 1.00 Incremental Delay, d2 0.0 0.2 1.1 0.2 8.5 0.0 0.2 Delay (s) 3.8 3.9 6.5 5.0 43.6 27.4 39.3 Level of Service A A A A D C D Approach Delay (s) 3.9 5.3 37.0 39.3 Approach LOS A A D D Intersection Summary HCM Average Control Delay 13.8 HCM Level of Service B HCM Volume to Capacity ratio 0.38 Actuated Cycle Length (s) 120.0 Sum of lost time (s) 10.0 Intersection Capacity Utilization 55.7% ICU Level of Service B Analysis Period (min) 15 c Critical Lane Group Steel Lake Crest Parametrix, Inc. Concurrency File No.: 07-103903-00-CN City of Federal Way 9/10/07 2554: S 312 St & 23 Av S Horizon With HCM Signalized Intersection Capacity Analysis Movement EBT EBR WBL WBT NBL NBR Lane Configurations + I + r Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Grade (%) -8% 8% 0% Total Lost time (s) 5.0 5.0 5.0 5.0 5.0 5.0 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frpb, ped/bikes 1.00 0.96 1.00 1.00 1.00 0.95 Flpb, ped/bikes 1.00 1.00 1.00 1.00 0.98 1.00 Frt 1.00 0.85 1.00 1.00 1.00 0.85 Flt Protected 1.00 1.00 0.95 1.00 0.95 1.00 Satd. Flow (prot) 1937 1575 1685 1774 1722 1503 Flt Permitted 1.00 1.00 0.95 1.00 0.95 1.00 Satd. Flow (perm) 1937 1575 1685 1774 1722 1503 Volume (vph) 438 271 101 477 317 80 Peak -hour factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 Adj. Flow (vph) 438 271 101 477 317 80 RTOR Reduction (vph) 0 147 0 0 0 53 Lane Group Flow (vph) 438 124 101 477 317 27 Confl. Peds. (#/hr) 10 10 10 10 Bus Blockages (#/hr) 0 2 2 2 2 0 Turn Type Perm Prot custom Protected Phases 6 5 2 Permitted Phases 6 4 4 Actuated Green, G (s) 54.7 54.7 11.3 70.0 41.0 41.0 Effective Green, g (s) 54.7 54.7 10.3 70.0 40.0 40.0 Actuated g/C Ratio 0.46 0.46 0.09 0.58 0.33 0.33 Clearance Time (s) 5.0 5.0 4.0 5.0 4.0 4.0 Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 Lane Grp Cap (vph) 883 718 145 1035 574 501 v/s Ratio Prot c0.23 c0.06 0.27 v/s Ratio Perm 0.08 c0.18 0.02 v/c Ratio 0.50 0.17 0.70 0.46 0.55 0.05 Uniform Delay, d1 23.0 19.3 53.3 14.2 32.7 27.1 Progression Factor 0.86 0.62 1.00 1.00 0.82 0.43 Incremental Delay, d2 2.0 0.5 11.1 1.5 3.8 0.2 Delay (s) 21.7 12.4 64.5 15.7 30.7 11.9 Level of Service C B E B C B Approach Delay (s) 18.1 24.2 26.9 Approach LOS B C C Intersection Summary HCM Average Control Delay 22.3 HCM Level of Service C HCM Volume to Capacity ratio 0.54 Actuated Cycle Length (s) 120.0 Sum of lost time (s) 15.0 Intersection Capacity Utilization 58.7% ICU Level of Service B Analysis Period (min) 15 c Critical Lane Group Steel Lake Crest Parametrix, Inc. Concurrency File No.: 07-103903-00-CN City of Federal Way 9/10/07 Horizon With 2750: S 316 St & Pacific HM S HCM Signalized Intersection Capacity Analysis * Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations T+ T N W. N ++I Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Grade (%) -2% 0% 2% -2% Total Lost time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 0.91 1.00 0.91 Frpb, ped/bikes 1.00 0.99 1.00 0.98 1.00 0.99 1.00 1.00 Flpb, ped/bikes 0.99 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 0.92 1.00 0.91 1.00 0.98 1.00 0.99 Fit Protected 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00 Satd. Flow (prot) 1761 1707 1739 1677 1752 4883 1787 5052 Fit Permitted 0.60 1.00 0.23 1.00 0.95 1.00 0.95 1.00 Satd. Flow (perm) 1110 1707 414 1677 1752 4883 1787 5052 Volume (vph) 107 87 99 207 84 112 167 1127 193 107 1292 70 Peak -hour factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj. Flow (vph) 107 87 99 207 84 112 167 1127 193 107 1292 70 RTOR Reduction (vph) 0 39 0 0 46 0 0 15 0 0 4 0 Lane Group Flow (vph) 107 147 0 207 150 0 167 1305 0 107 1358 0 Confl. Peds. (#/hr) 10 10 10 10 10 10 10 10 Bus Blockages (#/hr) 2 0 4 4 0 2 0 2 0 0 4 0 Turn Type pm+pt pm+pt Prot Prot Protected Phases 7 4 3 8 5 2 1 6 Permitted Phases 4 8 Actuated Green, G (s) 23.3 14.9 33.7 21.3 22.0 63.1 9.2 50.3 Effective Green, g (s) 21.3 13.9 32.7 20.3 22.0 63.1 9.2 50.3 Actuated g/C Ratio 0.18 0.12 0.27 0.17 0.18 0.53 0.08 0.42 Clearance Time (s) 4.0 4.0 4.0 4.0 5.0 5.0 5.0 5.0 Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lane Grp Cap (vph) 237 198 265 284 321 2568 137 2118 v/s Ratio Prot 0.03 0.09 c0.09 0.09 0.10 c0.27 0.06 c0.27 v/s Ratio Perm 0.05 c0.12 v/c Ratio 0.45 0.74 0.78 0.53 0.52 0.51 0.78 0.64 Uniform Delay, di 43.2 51.3 36.8 45.5 44.2 18.4 54.4 27.7 Progression Factor 1.00 1.00 0.76 0.73 0.59 0.33 1.20 0.35 Incremental Delay, d2 0.5 12.3 12.7 0.8 0.4 0.4 18.6 1.2 Delay (s) 43.7 63.7 40.6 33.9 26.7 6.4 83.6 10.8 Level of Service D E D C C A F B Approach Delay (s) 56.4 37.3 8.7 16.1 Approach LOS E D A B Intersection Summary HCM Average Control Delay 18.7 HCM Level of Service B HCM Volume to Capacity ratio 0.62 Actuated Cycle Length (s) 120.0 Sum of lost time (s) 10.0 Intersection Capacity Utilization 77.9% ICU Level of Service D Analysis Period (min) 15 c Critical Lane Group Steel Lake Crest Concurrency File No.: 07-103903-00-CN City of Federal Way Parametrix, Inc. 9/10/07 Horizon With 2855: S 317 St & 23 Av S HCM Signalized Intersection Capacity Analysis Movement EBL EBT EBR WBL WBT WBR SEL SET SER NWL NWT NWR Lane Configurations +4 1 T +T + r Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Grade (%) 0% -3% 0% -1 % Total Lost time (s) 5.0 5.0 5.0 5.0 5.0 5.0 Lane Util. Factor 1.00 1.00 1.00 0.95 1.00 1.00 Frpb, ped/bikes 1.00 0.96 1.00 1.00 1.00 0.95 Flpb, ped/bikes 0.97 1.00 0.99 1.00 1.00 1.00 Frt 1.00 0.85 1.00 1.00 1.00 0.85 Flt Protected 0.95 1.00 0.95 1.00 1.00 1.00 Satd. Flow (prot) 1739 1536 1747 3539 1872 1519 Flt Permitted 0.76 1.00 0.48 1.00 1.00 1.00 Satd. Flow (perm) 1386 1536 887 3539 1872 1519 Volume (vph) 0 0 0 137 0 64 58 606 0 0 456 128 Peak -hour factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj. Flow (vph) 0 0 0 137 0 64 58 606 0 0 456 128 RTOR Reduction (vph) 0 0 0 0 56 0 0 0 0 0 0 26 Lane Group Flow (vph) 0 0 0 137 8 0 58 606 0 0 456 102 Confl. Peds. (#/hr) 10 10 10 10 Turn Type Perm Perm Perm Perm Perm Protected Phases 4 8 2 6 Permitted Phases 4 8 2 6 6 Actuated Green, G (s) 14.8 14.8 96.2 96.2 95.7 95.7 Effective Green, g (s) 14.8 14.8 95.2 95.2 95.2 95.2 Actuated g/C Ratio 0.12 0.12 0.79 0.79 0.79 0.79 Clearance Time (s) 5.0 5.0 4.0 4.0 4.5 4.5 Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 Lane Grp Cap (vph) 171 189 704 2808 1485 1205 v/s Ratio Prot 0.01 0.17 c0.24 v/s Ratio Perm c0.10 0.07 0.07 v/c Ratio 0.80 0.04 0.08 0.22 0.31 0.08 Uniform Delay, d1 51.2 46.4 2.7 3.1 3.4 2.7 Progression Factor 1.00 1.00 1.18 1.24 1.09 1.31 Incremental Delay, d2 21.8 0.0 0.2 0.2 0.3 0.1 Delay (s) 73.0 46.4 3.4 4.0 4.0 3.7 Level of Service E D A A A A Approach Delay (s) 0.0 64.5 3.9 4.0 Approach LOS A E A A Intersection Summary HCM Average Control Delay 12.3 HCM Level of Service B HCM Volume to Capacity ratio 0.37 Actuated Cycle Length (s) 120.0 Sum of lost time (s) 10.0 Intersection Capacity Utilization 48.7% ICU Level of Service A Analysis Period (min) 15 c Critical Lane Group Steel Lake Crest Concurrency File No.: 07-103903-00-CN City of Federal Way Parametrix, Inc. 9/10/07 Horizon With 3050: S 320 St & Pacific Hwy S HCM Signalized Intersection Capacity Analysis --ih. 'r *-- 4-- 4\ t /0 i Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations M ++T# A) +++ r Zill tti� Al ftf F Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Grade (%) -6% 0% 2% -2% Total Lost time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Lane Util. Factor 0.97 0.91 0.97 0.91 1.00 0.97 0.91 0.97 0.91 1.00 Frpb, ped/bikes 1.00 1.00 1.00 1.00 0.98 1.00 0.99 1.00 1.00 0.98 Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 0.99 1.00 1.00 0.85 1.00 0.97 1.00 1.00 0.85 Flt Protected 0.95 1.00 0.95 1.00 1.00 0.95 1.00 0.95 1.00 1.00 Satd. Flow (prot) 3522 5119 3433 5045 1536 3358 4831 3426 5136 1522 Flt Permitted 0.95 1.00 0.95 1.00 1.00 0.95 1.00 0.95 1.00 1.00 Satd. Flow (perm) 3522 5119 3433 5045 1536 3358 4831 3426 5136 1522 Volume (vph) 460 897 83 377 1024 296 237 840 236 335 890 325 Peak -hour factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj. Flow (vph) 460 897 83 377 1024 296 237 840 236 335 890 325 RTOR Reduction (vph) 0 8 0 0 0 172 0 43 0 0 0 232 Lane Group Flow (vph) 460 972 0 377 1024 124 237 1033 0 335 890 93 Confl. Peds. (#/hr) 10 10 10 10 10 10 10 10 Bus Blockages (#/hr) 2 6 0 0 6 2 6 2 6 6 0 6 Turn Type Prot Prot Perm Prot Prot Perm Protected Phases 7 4 3 8 5 2 1 6 Permitted Phases 8 6 Actuated Green, G (s) 20.0 42.2 14.7 36.9 36.9 12.2 28.3 14.8 30.9 30.9 Effective Green, g (s) 20.0 42.2 14.7 36.9 36.9 12.2 28.3 14.8 30.9 30.9 Actuated g/C Ratio 0.17 0.35 0.12 0.31 0.31 0.10 0.24 0.12 0.26 0.26 Clearance Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lane Grp Cap (vph) 587 1800 v/s Ratio Prot c0.13 0.19 v/s Ratio Perm v/c Ratio 0.78 Uniform Delay, di 47.9 Progression Factor 0.68 Incremental Delay, d2 4.3 Delay (s) 36.8 Level of Service D Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group 421 1551 472 341 1139 423 1323 392 c0.11 c0.20 0.07 c0.21 c0.10 0.17 0.08 0.06 0.54 0.90 0.66 0.26 0.70 0.91 0.79 0.67 0.24 31.1 51.9 36.1 31.3 52.1 44.6 51.1 40.0 35.2 0.58 0.81 0.62 0.43 0.66 0.55 0.58 0.48 0.68 0.8 16.4 1.7 1.0 3.1 6.8 7.1 0.8 0.1 18.9 58.4 24.1 14.6 37.6 31.4 36.9 20.2 24.1 B E C B D C D C C 24.6 30.0 32.5 24.6 C C C C 27.9 HCM Level of Service C 0.79 120.0 Sum of lost time (s) 20.0 90.3% ICU Level of Service E 15 Steel Lake Crest Concurrency File No.: 07-103903-00-CN City of Federal Way Parametrix, Inc. 9/10/07 Horizon With 3052: S 320 St & 20 Av S HCM Signalized Intersection Capacity Analysis --* -. 'r4--- *--4\ r /A. 4 4/ Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations M t" T+ M tt'+ I 1� y1i 1a Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Grade (%) -3% 2% -1% -3% Total Lost time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Lane Util. Factor 0.97 0.91 0.97 0.91 1.00 1.00 1.00 1.00 Frpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 0.99 1.00 0.98 Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 0.99 1.00 0.99 1.00 0.93 1.00 0.90 Fit Protected 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00 Satd. Flow (prot) 3485 5067 3399 4898 1718 1711 1747 1678 Fit Permitted 0.95 1.00 0.95 1.00 0.28 1.00 0.35 1.00 Satd. Flow (perm) 3485 5067 3399 4898 499 1711 640 1678 Volume (vph) 243 1066 66 50 1438 145 151 84 81 191 88 160 Peak -hour factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj. Flow (vph) 243 1066 66 50 1438 145 151 84 81 191 88 160 RTOR Reduction (vph) 0 4 0 0 8 0 0 33 0 0 62 0 Lane Group Flow (vph) 243 1128 0 50 1575 0 151 132 0 191 186 0 Confl. Peds. (#/hr) 10 10 10 10 10 10 10 10 Bus Blockages (#/hr) 0 6 0 0 8 0 8 0 6 6 0 8 Turn Type Prot Prot pm+pt pm+pt Protected Phases 5 2 1 6 7 4 3 8 Permitted Phases 4 8 Actuated Green, G (s) 12.1 67.9 5.2 61.0 25.8 15.0 30.0 17.1 Effective Green, g (s) 12.1 67.9 5.2 61.0 24.8 14.5 29.0 16.6 Actuated g/C Ratio 0.10 0.57 0.04 0.51 0.21 0.12 0.24 0.14 Clearance Time (s) 5.0 5.0 5.0 5.0 4.5 4.5 4.5 4.5 Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lane Grp Cap (vph) 351 2867 147 2490 208 207 269 232 v/s Ratio Prot c0.07 0.22 0.01 c0.32 0.06 0.08 c0.07 c0.11 v/s Ratio Perm 0.09 0.10 v/c Ratio 0.69 0.39 0.34 0.63 0.73 0.64 0.71 0.80 Uniform Delay, d1 52.2 14.5 55.7 21.4 41.8 50.3 39.0 50.1 Progression Factor 0.77 0.87 0.99 1.01 1.00 1.00 0.92 0.94 Incremental Delay, d2 3.5 0.3 0.5 1.2 10.2 4.7 6.5 15.5 Delay (s) 43.8 13.0 55.7 22.9 52.0 55.0 42.5 62.8 Level of Service D B E C D D D E Approach Delay (s) Approach LOS Intersection Summary 18.5 B 23.9 53.5 54.0 C D D HCM Average Control Delay 27.9 HCM Level of Service C HCM Volume to Capacity ratio 0.66 Actuated Cycle Length (s) 120.0 Sum of lost time (s) 15.0 Intersection Capacity Utilization 79.3% ICU Level of Service D Analysis Period (min) 15 c Critical Lane Group Steel Lake Crest Concurrency File No.: 07-103903-00-CN City of Federal Way Parametrix, Inc. 9/10/07 Horizon With 3055: S 320 St & 23 Av S HCM Signalized Intersection Capacity Analysis ---t 4--- 4-- 4\ t 1* 1 4/ Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations A) ttT+ tO I t F Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Grade (%) 5% -5% 1% 0% Total Lost time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Lane Util. Factor 0.97 0.91 0.97 0.91 1.00 1.00 1.00 0.97 1.00 Frpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 0.99 1.00 0.99 Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 1.00 1.00 0.98 1.00 1.00 0.85 1.00 0.96 Fit Protected 0.95 1.00 0.95 1.00 0.95 1.00 1.00 0.95 1.00 Satd. Flow (prot) 3334 4824 3519 5026 1704 1839 1456 3323 1771 Fit Permitted 0.95 1.00 0.95 1.00 0.95 1.00 1.00 0.95 1.00 Satd. Flow (perm) 3334 4824 3519 5026 1704 1839 1456 3323 1771 Volume (vph) 116 1026 34 389 1557 256 116 257 457 501 218 86 Peak -hour factor, PH 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj. Flow (vph) 116 1026 34 389 1557 256 116 257 457 501 218 86 RTOR Reduction (vph) 0 3 0 0 17 0 0 0 6 0 12 0 Lane Group Flow (vph) 116 1057 0 389 1796 0 116 257 451 501 292 0 Confl. Peds. (#/hr) 10 10 10 10 10 10 10 10 Bus Blockages (#,qir) 2 16 0 0 8 2 8 2 16 16 0 8 Turn Type Prot Prot Prot pm+ov Prot Protected Phases 7 4 3 8 5 2 3 1 6 Permitted Phases 2 Actuated Green, G (s) 10.0 41.5 19.0 50.5 11.9 20.5 39.5 20.0 28.6 Effective Green, g (s) 10.0 41.5 19.0 50.5 11.4 20.0 39.0 19.5 28.1 Actuated g/C Ratio 0.08 0.35 0.16 0.42 0.10 0.17 0.32 0.16 0.23 Clearance Time (s) 5.0 5.0 5.0 5.0 4.5 4.5 5.0 4.5 4.5 Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lane Grp Cap (vph) 278 1668 557 2115 162 307 534 540 415 v/s Ratio Prot 0.03 0.22 0.11 c0.36 0.07 0.14 c0.13 c0.15 0.16 v/s Ratio Perm 0.18 v/c Ratio 0.42 0.63 0.70 0.85 0.72 0.84 0.84 0.93 0.70 Uniform Delay, di 52.2 32.9 47.8 31.3 52.7 48.4 37.7 49.6 42.1 Progression Factor 1.01 1.00 0.73 0.42 1.00 1.00 1.00 0.85 0.80 Incremental Delay, d2 0.4 1.8 2.0 3.0 11.8 17.0 11.2 21.4 4.2 Delay (s) 52.9 34.7 36.9 16.1 64.5 65.4 48.9 63.4 38.2 Level of Service D C D B E E D E D Approach Delay (s) 36.5 19.8 56.2 53.8 Approach LOS D B E D Intersection Summary HCM Average Control Delay 35.2 HCM Level of Service D HCM Volume to Capacity ratio 0.84 Actuated Cycle Length (s) 120.0 Sum of lost time (s) 10.0 Intersection Capacity Utilization 87.4% ICU Level of Service E Analysis Period (min) 15 c Critical Lane Group Steel Lake Crest Concurrency File No.: 07-103903-00-CN City of Federal Way Parametrix, Inc. 9/10/07 Horizon With 3350: S 324 St & Pacific Hwy S HCM Signalized Intersection Capacity Analysis --I --t ~ t 4\ T /' 1 1 A/ --► Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations + r '+ Zii tO A tO Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Grade (%) -1 % 1 % 0% 0% Total Lost time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Lane Util. Factor 1.00 1.00 1.00 0.97 1.00 1.00 0.91 1.00 0.91 Frpb, ped/bikes 1.00 1.00 0.97 1.00 1.00 1.00 0.99 1.00 1.00 Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 1.00 0.85 1.00 0.98 1.00 0.98 1.00 0.99 Fit Protected 0.95 1.00 1.00 0.95 1.00 0.95 1.00 0.95 1.00 Satd. Flow (prot) 1778 1812 1500 3361 1786 1755 4934 1713 4943 Fit Permitted 0.95 1.00 1.00 0.95 1.00 0.95 1.00 0.95 1.00 Satd. Flow (perm) 1778 1812 1500 3361 1786 1755 4934 1713 4943 Volume (vph) 196 207 208 328 251 49 267 1187 234 184 1131 122 Peak -hour factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj. Flow (vph) 196 207 208 328 251 49 267 1187 234 184 1131 122 RTOR Reduction (vph) 0 0 169 0 6 0 0 21 0 0 9 0 Lane Group Flow (vph) 196 207 39 328 294 0 267 1400 0 184 1244 0 Confl. Peds. (#/hr) 10 10 10 10 10 10 10 10 Bus Blockages (#/hr) 0 8 8 8 2 0 2 0 8 8 8 2 Turn Type Prot Perm Prot Prot Prot Protected Phases 7 4 3 8 5 2 1 6 Permitted Phases 4 Actuated Green, G (s) 15.0 22.9 22.9 15.4 23.3 24.0 46.9 15.8 38.7 Effective Green, g (s) 14.5 22.4 22.4 14.9 22.8 24.0 46.9 15.8 38.7 Actuated g/C Ratio 0.12 0.19 0.19 0.12 0.19 0.20 0.39 0.13 0.32 Clearance Time (s) 4.5 4.5 4.5 4.5 4.5 5.0 5.0 5.0 5.0 Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lane Grp Cap (vph) 215 338 280 417 339 351 1928 226 1594 v/s Ratio Prot c0.11 0.11 0.10 c0.16 0.15 c0.28 0.11 c0.25 v/s Ratio Perm 0.03 v/c Ratio 0.91 0.61 0.14 0.79 0.87 0.76 0.73 0.81 0.78 Uniform Delay, d1 52.1 44.8 40.7 51.0 47.1 45.3 31.1 50.7 36.8 Progression Factor 0.64 0.58 0.45 1.00 1.00 0.72 0.61 0.79 0.46 Incremental Delay, d2 34.5 2.1 0.1 8.7 19.4 8.0 2.3 14.2 2.8 Delay (s) 68.0 28.1 18.6 59.8 66.5 40.4 21.2 54.3 19.8 Level of Service E C B E E D C D B Approach Delay (s) 37.7 63.0 24.3 24.2 Approach LOS D E C C Intersection Summary HCM Average Control Delay 31.7 HCM Level of Service C HCM Volume to Capacity ratio 0.78 Actuated Cycle Length (s) 120.0 Sum of lost time (s) 15.0 Intersection Capacity Utilization 84.8% ICU Level of Service E Analysis Period (min) 15 c Critical Lane Group Steel Lake Crest Concurrency File No.: 07-103903-00-CN City of Federal Way Parametrix, Inc. 9/10/07 Horizon With 3650: S 330 St & Pacific Hwy S HCM Signalized Intersection Capacity Analysis Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations T+ ?". A +0 A +0 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Grade (%) -4% 0% 2% -2% Total Lost time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 0.91 1.00 0.91 Frpb, ped/bikes 1.00 0.98 1.00 0.98 1.00 1.00 1.00 1.00 Flpb, ped/bikes 0.99 1.00 0.99 1.00 1.00 1.00 1.00 1.00 Frt 1.00 0.88 1.00 0.87 1.00 0.99 1.00 1.00 Fit Protected 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00 Satd. Flow (prot) 1737 1628 1689 1573 1752 4952 1787 5067 Fit Permitted 0.72 1.00 0.73 1.00 0.95 1.00 0.95 1.00 Satd. Flow (perm) 1314 1628 1292 1573 1752 4952 1787 5067 Volume (vph) 72 8 38 22 6 53 138 1232 51 202 1541 21 Peak -hour factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj. Flow (vph) 72 8 38 22 6 53 138 1232 51 202 1541 21 RTOR Reduction (vph) 0 35 0 0 49 0 0 3 0 0 1 0 Lane Group Flow (vph) 72 11 0 22 10 0 138 1280 0 202 1561 0 Confl. Peds. (#/hr) 10 10 10 10 10 10 10 10 Bus Blockages (#/hr) 6 0 8 8 0 6 0 6 0 0 8 0 Turn Type Perm Perm Prot Prot Protected Phases 4 8 5 2 1 6 Permitted Phases 4 8 Actuated Green, G (s) 11.0 11.0 11.0 11.0 12.9 65.0 30.0 82.1 Effective Green, g (s) 10.0 10.0 10.0 10.0 12.9 65.0 30.0 82.1 Actuated g/C Ratio 0.08 0.08 0.08 0.08 0.11 0.54 0.25 0.68 Clearance Time (s) 4.0 4.0 4.0 4.0 5.0 5.0 5.0 5.0 Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lane Grp Cap (vph) 110 136 108 131 188 2682 447 3467 v/s Ratio Prot 0.01 0.01 c0.08 c0.26 0.11 c0.31 v/s Ratio Perm c0.05 0.02 v/c Ratio 0.65 0.08 0.20 0.08 0.73 0.48 0.45 0.45 Uniform Delay, d1 53.3 50.8 51.3 50.8 51.9 17.0 38.0 8.7 Progression Factor 1.00 1.00 1.00 1.00 0.99 1.00 0.56 0.34 Incremental Delay, d2 10.2 0.1 0.3 0.1 12.0 0.6 0.2 0.3 Delay (s) 63.5 50.9 51.6 50.8 63.3 17.6 21.5 3.2 Level of Service E D D D E B C A Approach Delay (s) 58.6 51.1 22.0 5.3 Approach LOS E D C A Intersection Summary HCM Average Control Delay 15.3 HCM Level of Service B HCM Volume to Capacity ratio 0.49 Actuated Cycle Length (s) 120.0 Sum of lost time (s) 10.0 Intersection Capacity Utilization 63.7% ICU Level of Service B Analysis Period (min) 15 c Critical Lane Group Steel Lake Crest Concurrency File No.: 07-103903-00-CN City of Federal Way Parametrix, Inc. 9/10/07 Horizon With 4050: S 336 St & Pacific Hwy S HCM Signalized Intersection Capacity Analysis --I, � 4- � 4\ I i Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations + r I +T Avii W. A +++ if Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Grade (%) 1 % 1 % 3% -3% Total Lost time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Lane Util. Factor 1.00 1.00 1.00 1.00 0.95 0.97 0.91 1.00 0.91 1.00 Frpb, ped/bikes 1.00 1.00 0.98 1.00 0.99 1.00 1.00 1.00 1.00 0.98 Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 1.00 0.85 1.00 0.95 1.00 0.98 1.00 1.00 0.85 Flt Protected 0.95 1.00 1.00 0.95 1.00 0.95 1.00 0.95 1.00 1.00 Satd. Flow (prot) 1718 1853 1502 1717 3290 3368 4872 1796 5120 1557 Flt Permitted 0.16 1.00 1.00 0.19 1.00 0.95 1.00 0.95 1.00 1.00 Satd. Flow (perm) 296 1853 1502 345 3290 3368 4872 1796 5120 1557 Volume (vph) 269 428 402 191 395 223 269 1089 131 156 1309 265 Peak -hour factor, PHF 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj. Flow (vph) 269 428 402 191 395 223 269 1089 131 156 1309 265 RTOR Reduction (vph) 0 0 210 0 71 0 0 11 0 0 0 68 Lane Group Flow (vph) 269 428 192 191 547 0 269 1209 0 156 1309 197 Confl. Peds. (#/hr) 10 10 10 10 10 10 10 10 Bus Blockages (#/hr) 6 0 6 6 2 6 2 6 0 0 6 2 Turn Type pm+pt Perm pm+pt Prot Prot pm+ov Protected Phases 7 4 3 8 5 2 1 6 7 Permitted Phases 4 4 8 6 Actuated Green, G (s) 48.9 32.7 32.7 39.7 28.1 14.0 42.9 12.8 41.7 57.9 Effective Green, g (s) 48.9 32.7 32.7 39.7 28.1 14.0 42.9 12.8 41.7 57.9 Actuated g/C Ratio 0.41 0.27 0.27 0.33 0.23 0.12 0.36 0.11 0.35 0.48 Clearance Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lane Grp Cap (vph) 313 505 409 247 770 393 1742 192 1779 751 v/s Ratio Prot c0.12 0.23 0.07 0.17 0.08 c0.25 0.09 c0.26 0.04 v/s Ratio Perm c0.23 0.13 0.18 0.09 v/c Ratio 0.86 0.85 0.47 0.77 0.71 0.68 0.69 0.81 0.74 0.26 Uniform Delay, d1 27.5 41.3 36.4 31.9 42.2 50.9 32.9 52.4 34.3 18.4 Progression Factor 0.95 0.94 1.05 0.57 0.69 1.00 1.00 1.02 1.02 0.96 Incremental Delay, d2 17.5 10.7 0.3 7.2 1.4 3.9 2.3 21.3 2.8 0.1 Delay (s) 43.7 49.5 38.4 25.5 30.4 54.8 35.2 74.7 37.6 17.7 Level of Service D D D C C D D E D B Approach Delay (s) 44.0 29.2 38.8 37.9 Approach LOS D C D D Intersection Summary HCM Average Control Delay 38.1 HCM Level of Service D HCM Volume to Capacity ratio 0.79 Actuated Cycle Length (s) 120.0 Sum of lost time (s) 15.0 Intersection Capacity Utilization 86.1 % ICU Level of Service E Analysis Period (min) 15 c Critical Lane Group Steel Lake Crest Concurrency File No.: 07-103903-00-CN City of Federal Way Parametrix, Inc. Appendix C ■ Pro-rata Share Calculations Steel Lake Crest Plat (07-103903-CN) Transportation Concurrency Analysis City of Federal Way Page 20 10/23/07 N a m e a N r m tl. 0 i() 40II Omi n N � Cml i° N V N � O i7 r F9 £9 fA f9 fA f9 FA M fA W !9 f9 L O LV t7 I� N C 3r d � S r O Ol C o, a` 3 G 'J c C �a p .. IY O YO] O m O pOp d pqpq •CR Y C'Z m Y] N n O < ((V� m N V N O, A N N trl T N � d I� � O m ;z F- s o oFp CY .. y E w m ° m U o E' E E - m m z a �N N m z m 3 ro N N E c - ¢ o E n N y - `L E m �N s 3 E a U Z 3 m ro c E m o m E = x m iZ S m m Fur t m¢ W m m— .� y Ul ° N ° 7 0 O¢ 7 2 C N N m �i m 3 O c ac N N c O m m W m m W L Z « a a J u a O a m a a d a a a a « « a s a a m a a a c� 3 A v a' 3 U m ¢ _ O < � r N a = m m M H 3 o U a c y m � N m m In h m a m a v m In m tq L m m cc ¢ m N Q ¢ m c c a d aQ _ m m a .. rA N lu) m n_a i in NLN¢a: m U U o fn N U! ul N m N fn N m N V1 Vl tD fn N //1 7] m a dI �l N Pl V N n m OI N C � m O1 � N N N s 3 9 3 3 3 9 ¢o a' ol r n N H H a N N N N N H M N N N H H N N H H N N N H N H N N N N N N M N a N N N a m r < N V cq 4 o o ~ 14 CN U H N N N H N N N w N N e ; o w i N N O O O C O O 6 E - n � o E CC YYff �y O p� p� N mm $3 3 j 6 O Lq [[VV ppJJ NN �bp a o < � 4 is U = w a _ N U E 12 0 $ m 2 m - _ N N - s 2 N mw ¢ y L w W 65 12 3 3 y w m E E w ` m O cE E o aft w y zy m ao f ¢ Q n ul 3 3 w y= o o w N y'3 c om w w $ w w n w J= 3 U Q A m w w"> 3 w ca.� r3n ° m=a w c o > s w H N vi 3 i m w m w 3 a w w m 19 w= m m a o a m¢¢¢ n a' n n n n c m w N` Q 3 3 A 3¢ a¢¢¢ w w w iv m Q � .Q N w y U _ N o w � m � w va w w H an d w w'm 0 V U V tm/1 V¢1 V¢i ¢ m ¢ N N w N N a N [� w oa a r m o N a v N N N N N N N N N p H N N p NOO H H N C N 11pp N N N N N N N N NNy N N N tNV tN1 oH1 a r 0 r 6 6 N 6 O O O O ^ N N c — � N O a a z N 3 N N 2 — E 2 N — - 19 y 3 In 3 2 s '3 _ d y m g g 3 N y N Is m qq•qq ¢ �gN3� a m L• y N N gym'+ c� - N N 2 cc N . � m n p} N N N N N e a 3 o iacl yak 2 w m m uygi m m o g �o W � o y 1p� o N == vt c n y55 �j ¢ V¢] 3 N ��{ W pip y� 6 w 3 �2 i � 3 (3R 23/] N f3A L4 N N H 6 Q 2 3 N N a N N y N m _D b n NN N N p N S N N N N f!! N N y 5 N N ¢ N 5 N 3 U m.m N N m O N N N m m f/J N � fq V1 Vl N a n �