Loading...
19-103025GEORGE GERG P. E. vn-ELZTR c1-UKAI�TECFr- �TICAL 12701 111 th Ave E Puye p, Wa 98374 (253) 241-333'At GEOTECHNICAL REPORT May 3 0, 2019 Client Aleksander Adzhigirey 32822 5th Ave SW Federal Way, WA Adress th 30523 28 Ave SW Federal Way, WA 98023 Parcel # 416660-0600 I Subject: Geotechnical report, as defined by The City of Federal Way Ordinance "Article II" Critical Areas", Division 4, Geologically Hazardous Areas". The site is Lot 4, Block 6, Lakota Addition, located at 30523 28th Ave SW, Federal Way, WA. It is off Dash th Point Road and 28 Ave SW, Federal Way, King County, WA. It is in NW 1/4 of section 12, Township 21N, Range 08E, W.M., King County, WA. Parcel # 4.16660-0600 Prepared by: George Gergis, RE RECEIVED JUN 21 2019 C W r 0 0 CITY OF FEDERAL WAY COMMUHn YOEVELOpMENi SHEET INDEX Sheet 1-14 Sheet 12 Sheet 14 Sheet A Sheet 15, 16 and 17 Sheet B Sheet C Sheet D Adzhigirey Geo Report Index May 2019 General Report Construction Recommendations To The House Development Test Pits Site Plan Web Soil Survey Reasonable Land Use Plan by J.S. Jones And Associates Inc Septic System Design by Westside Septic Design LLC Proposed French Drain trench Adzhigirey Geo Page 1 May 2019 GEORGE GERGIS, P.E 12701 1111th Ave E Puyallup, WA 98374 (253) 241-3334 May 30, 2019 Sergey Adzhigirey ch 32822 5 Ave SW Federal Way, WA 98023 Subject: Geotechnical report, as defined by The City of Federal Way Ordinance "Article II" Critical Areas", Division 4, Geologically Hazardous Areas". The site is Lot 4, Block 6, Lakota Addition, located at 30523 28I' Ave SW, Federal th Way, WA. It is off Dash Point Road and 28 Ave SW, Federal Way, King County, WA. It is in NW 1/4 of section 12, Township 21N, Range 08E, W.M., King County, WA, Parcel # 416660-0600. Revised, amended report. Dear Mr. and Mrs. Adzhigirey: At your request we have carried out the necessary investigations to complete the above report in compliance of the scope of work required by The City of Federal Way. The following letter conveys our opinions, findings and conclusions. (A) PURPOSE OF REPORT This report is a revised and amended report from the original prepared on 2016. Changes and modifications made necessitated the preparation of this report. The changes provided to us are as follow: 1- Mostly changes to the on -site sewage system (septic system). These were due to recommendations by the wetland reviewer/consultant that are related to develop and construct within the wetland buffer. 2- The consultant presented some requirements to reduce the impact on the wetland buffer. These were to easterly move the system in order to preserve some trees and other wetland components. Adzhigirey Geo Page 2 May 2019 3- The "Final revised septic", approved on 06/09/2019, was provided to us. 4- Also final " Reasonable Use Plan" prepared by J.S. Jones and Associates, dated 05/14/2019 was provided to us. This report was prepared according to these final Septic and Reasonable Land use reports. (B) SITE LOCATION The property under discussion is a strip of land located off the east side of Dash Point Road and the west side of 28th Ave SW. At that location both Dash Point Road and 28th Ave S are directed in the north -south direction slightly to the northwest. Shortly to the north of the plat site, Dash Point road changes direction to the south west, while 28 cnAve SW continues north but turns to 30 thAve S. The site generally is located about one mile south of Puget Sound in The City of Federal Way area, King County, WA. At that location, The Dash Point Road was found to be paved and developed. The 28 th Ave South is presently an access to this and other properties. As stated in the above paragraph, the site is located directly east of Dash Point Road, however, the access to the property is proposed to be utilizing a direct driveway that enters the site from its east side street which is 28 th Ave SW near the north propertyline of the side. (C) SITE TOPOGRAPHY AND DESCRIPTION This subject site has never been previously developed and is almost presently remains in its original natural condition. The site generally contains slopes that may be considered medium to relatively steep. During the site investigation, minor disturbance was found near the 28`h Ave SW Street. This however did not affect the site topography or the remains in the natural condition, with medium dense to dense vegetation. During the site visits, field work and exploration, it was found that adjacent sites, to the north and east of the subject lot, have been developed as single family residence lots. The immediate lots of the same plat to the south of the subject lot remain undeveloped. The subject site is almost a trapezoidal shaped parcel of land. The west rear leg spans about 1 OTfeet total length with 35'feet straight line and the remaining very flat curve. It runs in the Adzhigirey Geo Page 33 May 2019 north-west direction along Dash Point Road. Almost in the same direction, the east side is 101'feet long broken line, along The 28 cnAve South. The north is 478'feet and the south side is about 450'feet, both extend in the east -west direction. As previously stated, the property contains medium to steep slopes. The site is at its highest uh elevation at the east side front of 28 Ave South. From there the ground slopes down westerly to the west and southwest toward Dash Point Road. From the top east area, for about ten feet, the ground slopes with 40% grade to the west. That is reduced to 15% in the next 40'feet. It then increases to an average of 27% for the next 200'feet.. From there till the west the slopes continues to flatten to about 7% in the west direction. However, from the main street, Dash Point up to the property, the slopes are about 65%, for about 15'feet only. In total, the site covers an area of about one acre. Please refer to figure 1, attached to this report. Presently, the drainage of the site is a natural surface drainage that runs westerly from the upper areas in the east, and toward Dash Point. Due to the relatively flatter slopes of the site west area of the site and the dense vegetation, it appears that most of the runoff is contained on site. Originally and based on maps provided to us by the owner, Mr. Adzhigirey, it was found that parts of the property were professionally designated as wetlands. A full wetland report was completed and the result is stated in a later section. (D) FIELD INVESTIGATION Original investigation including the subsurface was made during the month of October 2015. During which the writer visited the site and carried out a visual examination of the surface features, slope conditions and vegetation. Two test pits were examined. Test pits allow to investigate and to assess the subsurface conditions. The location of these pits is posted on Figure 1 and their description is as per the attached soil logs sheet. Recent site visit was made and no changes were verified in the topography, the surface or any new slides or major erosion. (E) GENERAL SITE SOILS For this site, test pits were determined to be sufficient for this investigation for several reasons. The type of soils expected on site was Indianola Loamy fine sand 0-15% or more. The verified soil is evaluated as matching these soils mostly in the east area of the site areas. These do not present danger of deep landslide due to the relatively denser substratum. Adzhigirey Geo Page 4 May 2019 In addition, the slopes although relatively steep, they did not reach the limits of angle of rest. No weaker layers are located at depth or top, which would result in any type of landslide. There was no seepage or major mottling observed during the investigation in the Indianola. As per "The United Stated Agriculture Department, USDA" and "The Natural Resources Conservation Service, NRCS" , The Soil Survey maps show the eastern area of the site is Indianola Soils, while the remaining to the west is Alderwood soils. The seepage in The Alderwood is contained in small area with dense substratum. No depressions or tension cracks, which confirm the above considerations. Please refer to a later section "Soils Characteristics" discussing the soils components and effects in detail. Therefore, in our opinion, the test pits were adequate and sufficient and there were no technical or economical reasons to justified the need of deep soils boring. Also the proposed construction is located in the eastern area of the site where the slopes are moderate. (F) FINDINGS As mentioned earlier, the site generally, over most of its steep areas, was found to be covered with medium dense to relatively dense vegetation covering. The vegetations were mix of some mature, mid age and young trees, with dense overgrowth of berries, salal and other types. At the time of the visit, and except for a small contained area, the site surface generally was found to be dry and appears to be relatively well drained, with no signs or evidenced of ground water seepage. In the subject parcel, no signs of previous ground movement, as would be evidenced by scarps, toppled or leaning trees, could be found on site. Our observations are detailed in the "seismic hazard" and slope stability and landslide hazard" sections at the end of this report. The parcel appears to be stable and we know of no historical landslide events in the immediate area of the lot. The steep slopes were closely examined and appear to be stable. (G) WETLAND As previously stated, original based maps provided to us by the owner, Mr. Adzhigirey, shown that parts of the property were designated as wetlands. Adzhigirey Geo Page 5 May 2019 Complete wetland report was made to specifically assess the areas designated as wetland and their buffers. The original report dated August 21, 2015 is made by "J. S. Jones and Associates, Inc" of Issaquah. Attached was a Reasonable Land Use Plan. Subsequently, This was revised multiple times on 11/22/16, 12/28/16, 12/31/18 to mostly addressing comments related to wetlands. Final Reasonable Land Use plan was dated 05/14/19 by J.S. Jones and Associates As per the wetland codes, the report clearly bordered the wetland areas and the associated buffers that must be set aside from construction activities. Based on the maps and the proposed site plan: a) The house will be to the east near the north PL to avoid the wetlands. b) The on -site septic system will be about 125'feet to its west c) The Civil Grading and Drainage Plans were prepared by Mr. Glen Code, P.E. of Development Engineering PLLC dated 09/23/15. It recommends a 8'x27'x2' infiltration trench that will be located just SW of the new house, about 70'feet from the 28t' Ave SW. These all are as per the final Reasonable Land Use plans dated 05/14/19, stated and mentioned above. Please see, attached is copy of this plan showing the details of the wetland, the buffers and the locations of each of the mentioned items. This front setback will allow the house to be away from the front slopes coming down to the construction ground elevation from the street level. This area contains steep slopes (I) CONCLUSIONS AND RECOMMENDATIONS 1. Discussion of Development As mentioned earlier, the property under discussion has never been developed. It is proposed for the construction of a single family residence. This report has been prepared to address the proposed development. The access to this site will be through a direct driveway directing west - east from The 28 Ave SW As proposed, no major ground modifications are expected and we see no need for any change to the site existing topography. The new structure proposed in the northeast area of the site, near th 28 Ave South. This front setback will allow the house to be away from the front relatively steeper slopes coming down from the street level. Please refer to a later section addressing the difference in elevation between the street and the construction ground level. This will be discussed to address the driveway and any surface water from the street and the slopes itself. Adzhigirey Geo Page 6 May 2019 2. Soils Characteristics The King County Soil Survey describes the soils of the site, as "InC, Indianola Loamy Fine sand, 4 to 15%". The Soils Conservation Service, states that other types such as Alderwood, Neilton and Everett may be contained with these soils. Based on the examination, in the development proposed site area, we found that generally the soils contain a large amount of medium to coarse sand, which confirms with the Indianola soils. The western area contained soils that are of type that may be considered Alderwood-Kitsap soils. As per The Soil Conservation Services, The Indianola soils are a well drained soils having rapid permeability in all of its layers. The substratum is a relatively soils that are fine to coarse sand. To the west, the Alderwood soils however are less permeable due to the very dense substratum layer which results in seasonal seepage and light to medium mottling. The slow permeability and denser deep soils may cause perching that may occur atop during heavy wet periods. During our investigation we observed seepage to the depth of about 3.50'feet. For The Indianola, the surface runoff is medium and the erosion hazard is moderate to severe, for the steep sloped areas. It may be considered similar for The Alderwood-Kitsap. Our exploration have exposed a fine to coarse sand with silt below eight inches depth soils in a medium dense condition up to about 60"inches. At that depth the soils become slightly denser. Very light scattered mottling has been found at the top 42inches layer. In our opinion, the site subsurface investigation reveals that the site soils generally conforms to the above type described in The KCSS and the NRCS in the soils type and sometimes in gradual condition from type to another but in steeper slopes. Please refer to the attached figure 2, for the soils type description. The site soils have adequate bearing capacity to support structural loads. All types of existing soils are well accepted as fill especially the wet season. During these dry periods they may be used provided that they are free of topsoil, debris and rock fragments larger than 6 inches. However, if the moisture in the soil exceeded the optimum moisture, as defined by ASTM D- 1557-91, it will become impossible to reach 95% compaction of the maximum dry density of the soils, as defined by the same test. Therefore the use of these soils in the rainy season or periods is acceptable, if compaction is made to reach 95%. Otherwise structural fill may be needed, see table 1 for specification. Generally, during wet weather construction, material with more than 6 percent fines will not be easily workable. Adzhigirey Geo Page 7 May 2019 For the soils described as medium dense, a bearing capacity of 1000 psf may be used in the foundation design with an adequate factor of safety. A one- third increase in allowable bearing capacity may be utilized for the short term loads such as the case in the wind or seismic loads. 3- Wetlands Please refer to the "wetland" section in page #4. The section describes the basis for the house proposed location in the site eastern section. The attached plans show the wetland limits and the area allowed to construct. 4- Landslide Hazard Generally, Landslide Hazard Area are these area with slope of 40% or more and with a vertical relief of ten or more feet. Also designated as Landslide Hazard Areas are those with over 15%, containing hillsides intersecting geologic contacts with a relatively permeable sediment overlaying a relatively impermeable sediment or bedrock combined with spring groundwater seepage. Similarly are the areas which have a severe limitation for building site development because of slope conditions, according to the Soil Conservation Service. None of these conditions apply to the development area. The eastern slopes do not reach steep slopes or the vertical relief. All of the remaining of the lot is under 30%% and down to about 8% ground slopes. We have found no signs of erosion, or slides and is the site is stable. The mottling and seepage observed in the pits is a sign of seasonal perching, the top less denser layer, about 40"inch deep, is relatively silty soft to medium dense and no construction is proposed in this area. The development is in the sandy soils and the foundation will be recommended to be at the medium dense layer. The small eastern area of the site contains slopes were that it is stable and development may proceed as proposed considering the recommendations of this report. 5- Erosion Hazard Erosion Hazard areas are usually defined as those areas classified having moderate to severe, severe or very severe erosion potential by the Soil Conservation services. Considering the sloped area as InC, that soil has a medium erosion hazard as per The Soil Conservation service. A small area in the midsection reaches about 30% slopes and may be considered as erosion hazard area. This however is not proposed for any development and remains in its natural condition. It is well vegetated and requires no special care during and post construction. Adzhigirey Geo Page 8 May 2019 All other areas of the site are not considered erosion hazard. Please refer to the temporary and permanent erosion sections of this report. 6- Temporary and Permanent Erosion Measures Generally, the soils erosion hazard depends and its components and slopes. Because of the relatively large amount of fines in the Indianola and Kitsap soils, it is relatively susceptible to erosion when cuts, exposed surfaces exist, especially with wet weather. Long periods of water exposure will cause erosion when the slopes reach about 30%. Therefore, we do not recommend exposure of cuts for long times in wet or windy periods. Our recommendations in this regard will follow and must be considered carefully to protect the site stability. The site topography as exist does appear to necessitate medium cuts during the installation of the structure foundation over the sloped ground. These cuts will be made to accommodate the construction of the utilities, the drainage system, if any, and the foundation. All the exposed temporary or permanent cuts must be protected by maintaining certain slope and protect its surface from erosion, especially during wet periods. The side slopes of the temporary cuts may be maintained at 1H:1.5V for The Kitsap, assuming short period of exposure in the wet season, not to exceed few days. If open for longer periods, in the wet season, we recommend that side cuts be flattened to 1 H: IV or to be shored, if over 4.50'feet. The contractor is responsible to comply with the cuts state and federal regulations, beyond the requirements of this report. Retaining structures may be required when developing this site, as proposed in the future by the owner. When needed, the following values may be used for that design: Active lateral earth pressure 35pcf, Non restricted walls. Active lateral earth pressure 45pcf, restricted walls Passive lateral earth pressure 250pcf against native or well compacted Coefficient of friction 0.32 Factor of safety of 1.5 is already considered for the coefficient of friction. Areas downslope and surrounding any construction excavation should be protected from any sedimented runoff by the use of silt fences (see the attached detail) or by covering the dirt piles with plastic. Similarly, the concentrated runoff from upslope or surrounding areas should be prevented from entering any construction excavation area by diverting the flow. Adzhigirey Geo Page 8 May 2019 All other areas of the site are not considered erosion hazard. Please refer to the temporary and permanent erosion sections of this report. 6- Temporary and Permanent Erosion Measures Generally, the soils erosion hazard depends and its components and slopes. Because of the relatively large amount of fines in the Indianola and Kitsap soils, it is relatively susceptible to erosion when cuts, exposed surfaces exist, especially with wet weather. Long periods of water exposure Kill cause erosion when the slopes reach about 30%. Therefore, we do not recommend exposure of cuts for long times in wet or windy periods. Our recommendations in this regard will follow and must be considered carefully to protect the site stability. The site topography as exist does appear to necessitate medium cuts during the installation of the structure foundation over the sloped ground. These cuts will be made to accommodate the construction of the utilities, the drainage system, if any, and the foundation. All the exposed temporary or permanent cuts must be protected by maintaining certain slope and protect its surface from erosion, especially during wet periods. The side slopes of the temporary cuts may be maintained at 1 H:1.5V for The Kitsap; assuming short period of exposure in the wet season, not to exceed few days. If open for longer periods, in the wet season, we recommend that side cuts be flattened to 1H:1V or to be shored, if over 4.50'feet. The contractor is responsible to comply with the cuts state and federal regulations, beyond the requirements of this report. Retaining structures may be required when developing this site, as proposed in the future by the owner. When needed, the following values may be used for that design: Active lateral earth pressure 35pef, Non restricted walls. Active lateral earth pressure 45pcf, restricted walls Passive lateral earth pressure 250pcf against native or well compacted Coefficient of friction 0.32 Factor of safety of 1.5 is already considered for the coefficient of friction. Areas downslope and surrounding any construction excavation should be protected from any sedimented runoff by the use of silt fences (see the attached detail) or by covering the dirt piles with plastic. Similarly, the concentrated runoff from upslope or surrounding areas should be prevented from entering any construction excavation area by diverting the flow. Adzhigirey Geo Page 9 May 2019 All the excavated materials must be piled, stored and covered suitably until reused or to be exported. This to be done in such a way not to spill onto slope faces, burying the vegetation in the surrounding or downslope areas. Therefore protection of the lower areas to be undertaken by the use of silt fences or covering of the dirt piles at minimum. 7- Site Drainage and Ground Water The site soils have a rapid permeability in its upper layers and slower at depth. We do not expect major variation due to the development, as proposed when the development is considering an adequate value and system. For this type of soils a 1.50 In/Hr permeability may be used for the Indianola, and is acceptable for the design of the any drainage system of the lot, if needed. If needed, a site infiltration system should be a minimum of 25'feet from the top of the steep slopes that are 30% or more. In such case there will be no changes or negative effect regarding the site slopes. The above ara a h recommendations, from our original re ort we found to be complied with in "The final Reasonable Land Use" provided and attached plans. Therefore, even if infiltration is to be used, the generated runoff from the new developed impervious area is to have negligent effect on the site area considering: 1- The Indianola is a well draining soils. 2- Comply with top of slope setback 3- Temporary and permanent erosion measure is considered. 4- Utilizing an adequate permeability factors. The final drainage system details are beyond the scope of this report. 8- Proposed permanent cuts & fill Temporary cuts were discussed under the previous section " Temporary Erosion Measures". Permanent cuts may be needed, depending on the development. If utilized, it should not exceed 2H:1 V. All permanent slopes must be as soon as possible protected at their faces by seeding with grass or a suitable ground covering shrubs. If room does not allow for that approach, a steeper slopes of 1H:6V may be used and protected with rockeries. Those structures will require permits if their heights exceed 4.0'feet, and must be engineered. Design and construction must comply with the rockery Association, The City of Federal Way and other approved engineering methods. Other retaining structures may be used to Adzhigirey Geo Page 10 May 2019 provide larger spaces and required to be engineered when over 4.0'feet in height. Permanent fill, if needed, should be also kept at 2H:1 V as a maximum finish slopes. Fill should be compacted as mentioned earlier to 95% compaction. Fill should not be placed over grounds with slopes exceeding 4H:1 V, unless tiered, designed and inspected, and as soon as possible vegetated. No runoff is permitted in the east and north setbacks without being controlled. These areas to be well vegetated as detailed later. See the recommendation in Section (I). 9- Foundations and structures All the foundations must rest on the native ground or compacted soil, both verified and inspected to 1000psf with the minimum depth requirements. All the foundations may be conventional spread foundation system. Footing drains are required for this site. For the foundation, or as required in the retaining structures, the drain shall consist of 11/2" washed gravel or rock with a 4"inch PVC perforated pipe embedded in. These lines shall then be directed to the drainage system or to a daylight location 0.50'feet below and 5.00'feet away from the foundation level, with a splash block. The rock must be wrapped with filter fabric. The footing drain lines must not be connected with the roof drain lines for a distance of 5.0'feet minimum. We estimate the postconstruction settlement of the structures where supported on the medium dense, 2000psf, soils to range from 1/4"inch on native. Maximum differential settlement of the structures should be less than 3/8"inch, measured along 25'feet of continuous wall footing, or between adjacent comparably loaded isolated footings. All the ground surrounding the structure must be sloped away from the foundation with a 2% slopes at minimum or 1 % if concrete or paved slabs. 10- Site vegetation removal As usual, the construction activities on this site appear to require some removal of the existing vegetation or ground growth to the east for the driveway and house areas, in preparation for the development. All areas, post construction, adjacent to the structure and the top of the slopes, that were affected by the development, require professional landscaping installation prior to the final occupancy. Adzhigirey Geo Page 11 May 2019 Utilizing a deep rooted, less maintenance requirements, full year green type of plants are recommended. Please refer to the Construction Recommendation as er Section for the recommendation to professionally vegetate the front eastern slopes 11- Seismic hazard Seismic Hazard areas are usually defined as areas which possess either an Alluvial surficial geologic unit and/or recessional outwash overlain by Barneston, Everett, Neilton, Pilchuck or Spannaway soils as per The SCS description. The Kitsap or Indianola are slow drained soils in most of its layers and with deeper and denser substratum. Those soils are not of a type nor in a condition, which is prone to the phenomenon of liquefaction. This occurs as a result of rapid horizontal accelerations during which a rearrangement of the soil particle may cause a build-up in pore pressure and as this increases the shear resistance decreases to a possible temporary total loss of shear strength. This causes the soil to behave as liquid allowing major settlements. However, this is only possible with soils of very uniform grain'size distribution in loose condition, which is not the case of this site. In addition, There is no historical evidence of earthquake- induced slides in this area. 12- Slope Stability and Landslide Hazard We believe that the danger of any landslide on this property caused by natural reasons, such as seismic events, is unlikely. The investigation has shown a stable slope in an undisturbed condition. We have noticed no tension cracks over or at the top of the slopes. Also no signs of depressions, scarps or others defect were seen. No signs of previous ground movements or major erosion were observed, such as leaning trees or old escarpments. This confirms that no dormant, active or stabilized slides exist. The steep slopes are relatively at about the critical grade slope and the degree of rest for these type of soils. Surface erosion to these slopes may occur if affected by the construction. Therefore, these slopes should permanently remain protected by complying with the buffer and a setback and by being maintained permanently vegetated professionally. In addition, the denser condition of the soils and the amount of the slopes with denser depth which presents a landslides resistant soils. Adzhigirey Geo Page 12 May 2019 13- Setbacks and buffers The following to be maintained as critical buffer areas or setback areas: 1) No area of the site is required to be maintained as buffer zone except as set by the wetland report. 2) An 8 feet foundation setback from the face of the slopes to be maintained. As proposed in the Reasonable Land Use plan, this is in compliance. 3) When complying with the- wetland report as per the attached proposed house location, provides adequate setbacks for the needed slope stability. 4) Comply with the recommendations stated in Page #7 regarding the front eastern slopes. Please see the attached detail regarding the runoff routing and () CONSTRUCTION RECOMMENDATION TO THE HOUSE DEVDLOPMENT The front entry slopes have the following effects: 1- The driveway will run from the street level down to the house construction ground level. This is about seven to eight feet of elevation difference. The following is recommended for the construction and placement: (a) The driveway edges and sides may be sloped or retained by retaining walls. Please refer to the specific section #5 "Temporary and Permanent Erosion Measures". The section recommended both conditions of whether sloped sides or retaining wall. 2- These front slopes from the street level to the house foundation level may result in generating some runoff to the house foundation level. This report recommends to route and contains this flow. This may be accomplished by a combination of the following: (a) Install berm at the top to route the flow from the street from entering the site. (b) Install a French drain of 24" wide x30'.. dee'p fitted with a 4"perforated pipe,.at the toe of the slopes. In order to prevent affecting the foundation place the trench 10'feet away to the east of the foundation. The bottom of the trench is to be lower than the footing bottom. Add a berm atop f the trench. See the trench location and detail on the attached sheet. (c) Professionally vegetate the slopes to prevent erosion. Adzhigirey Geo Page 13 May 2019 CONCLUSION The development, as proposed, will have a minor effect on the site erosion, stability and drainage. When the recommendations of the drainage, setback, erosion sections are complied with, any negative effects will be minimum to negligent. In conclusion, we believe based on the above, that the site should not experience landslides as long as protected from erosion, drainage problems and the new development maintains enough setbacks with adequate foundations. LIMITATIONS The information, recommendations and conclusions presented herein have been prepared using generally accepted geologic and engineering practices and techniques in use in the date the field investigation was conducted. This report is limited to identifying possible geologic hazards as defined by The City of Federal Way Code mentioned above. This report is limited to the stated purpose for the identified property and should not be applied to any surrounding properties. We make no warranty either expressed or implied with respect to any geologic conditions which can vary between sites and within any one site. If conditions are encountered which appear to differ from those described in this report, we should be notified immediately so that we may review, and either verify or modify our opinions. This report is for the information of the client only. Its reproduction or transmittal to a third party, except in full, is prohibited without the permission of the writer. We would like to thank you for the opportunity to be in your assistance in this report. Should you have any questions regarding the content of this letter, please contact George Gergis at (253) 241-3334. -1'-, } I „ Sincerely, Georg G , P.E. f GEORGE GERGIS 12701 111th Ave E Puyallup,WA 98374 LOG OF TEST PITS Depth below Soil Group Description Test pit #1 0.00'-0.07' SM Dark brown grayish silty 0.07'-4.20' 4.20'-5.50' Test pit #2 0.00'-0.05' 0.05'-3.70' 3.70'-4.70' Test pit #3 0.00'-0.05' 0.05'-3.70' Page 14 Adzhigirey Geo May 2019 with some gravel. Dry to moist SM Soft to Medium dense brown to grayish at depth grayish. Silty fine to medium sand. No mottling. No seepage. SM Grayish coarse sand with silt. Medium dense to dense. No Mottling or seepage. Moist. SM Dark brown silty with some gravel. Dry to moist. SM Soft. dark brown silty fine sand. No Mottling. seepage. Denser at 40"inches SM Dense dark brown silty fine sand. No Mottling. No seaapage SM Dark brown silty with some gravel. Dry to moist. SM Soft to med dense. dark brown silty fine sand. Light mottling at 36" 1 ,u � I iii iat)DOI�� r� tit [yK4DUFr4ti 41 G£}i7U1[34+5 30420 qx I8f3f30D�v!)1 3134'44 1 310427 Ea1�".3�'UOE00 j 4 98Ge•006B7 i 30444 416e5005ft 5 �Da 0) r. 4•iSf~t�(10800 i M Y 5 f 5 'S 41 M800605 l •'s -' S S s 41 coma 70 •; � � �o(�a1 + 4106600000 S 4� l t s� 41f"0610 i - txzta���,tsr 29bZ 1 NO3 1. S ti TE: Lalrtehxven Weer and Behar Sewer Certiticute OfAVallablllty � DmIrkt neithur warrant# nor guarartttaa Parcel A168800{300 thr. xcouracy of zany faviiify intufmalian a tou aa(; provided. Nollity Inftiflow. and pond)itolse aro 9Oblsaitof191ditariflortlart- RtfiT 412i2049 erA 4166600600 swr.dorx (roan Update 12/28/18) Page 2 of 2. Z a a MOM 0990M 09UM 06BL4Zf, I FIR OEMM Ozgtm 01OLM oLS W m M m Z 3 'o ZN m � �a o m to a m o � 32 0 z x " +T a o � C. C pp3 0 0 � Z 7 Z,C7 M.TT ZZ .M I G1 N W 07+ — 0 0 c `o C a n, E (ap W m-Ei° a� 3 y Emw w o Q W'a� E w m T I W a G r43 C m C Wp a E c� G.��O= O D 8 io E 0 p W W E m za c o ai cn W Vl p EEyc p) Ew O tl' t0C,C/1 E 7 ❑) C W �r m N W C m W E = 8 to W LCL W a QoO U 3:15d � c � cov DO 'omE AE WQ Da) OJo C Co j fl] dOW :E 7 to nE,3 vt ` - wCup,erm g oE O o m'aN 30 .0 CL (n W a G N D W W o { 3 $ m a E 0 O C1 d D y a 7� N d W@ E C W .0 N 2(7 m .WO o U 'D W Q W W C _ av no _y N y c co 7 J Q' y Q C y 2?Q 0 C Y> . N F m C .0W W z E >� m aie (a.2 m W r-2 rnm id m- W` c`a rn m E a�•c ° o'cp D C W N W m !� Q❑ w 'C •C an Qm FCp 7 +W �l �m CD W Co N E �I O •O C Ego p p at m cJ L' `� j N W t'n m C O Ec wIt m Z' 01 D' W C m pp pp a�9,' = 'l ava O W <- �N o0 GS pE m $ y a E W�U F- into cn - F- w16 a a LL 0m U) a N T C -6 (n ID bm N fn fA > U fCL /J VJ O n � 7 w C 1 Y I O T c U) ui a _`-, a co a E T m n v w _ Qm a a N a m m O a 3 n a N N _ p L = O ° m 5 y m N Coo > 0 > S m C N d COO d a mm 0 46 0 0 N N O y N O d sl a cnIn s� o x b 1D m a 8 8 t 2 3_ a C � � T z o C b r � s d � � U 1 ❑ N O 2 nnpU feu 2014 Vested Wet[ Boundary & 100-foot Buffer z9 466.34' 1 APLE 12 . APLE r, 28 nd WALD AR 0APLE AHOCK PLE 1 M-0 - 26 LOT 3 Fencing with Sinage r� /// 1 O N m � O tJ 4AA-25,'T A-23 2 MAPL 19 �� A-17 A-18 89 j LE 1 1 Wetly S gn s / -12 21 CEDARI A-13 \ /A-14 S89'S3_; 466.34' 1 LOT 5 55'-6" - — 20.6' olzhigirey Property Line �� EDGE OF ' ASPHAL I Septic Supplyline 1� ?2' Of �m 5 iss 1 N Pif O 5/T01 r p o WMAPLE �UTURE N A TAKE �,-. . � T.B.R. 20'M \ Split Rail 15' APLE Silt Fence —1 'MAPLE � 2ON , c 2 4" E ' � WetLand Sign llrHE L❑C of Iltratio -6 enches St7tine 7 Spl �-- ''E . 27'AL R�- r � / f� 1 J N 0 RET. '4 y� f rJ 'f of t 2 f Q -z_ ['- 1 1 L6 Q r -vy� ,� D Q / n i O N n h] O REC61V < a v, JUN 21 2019 � UN�Ik.6, M �p NN N] 25% SLOPE rya ss' DW51GN CONTROL POINT in \� ELEVATION = 133.32 fiM . 1 �2' OF 2` 5� q0 PVC TIGHTLINE \ �v \ t• _� _ \ 5L6 _ _ -� _ O PIT O SIfO C10 = `-'''•.' :::: f:: ((}} _ £••:"S'r::{. :3r:?]: Ell I FUTURE ATU�ANKL?E \ - I m PROPO5ED Tn C/ 4 B`kDROOM \ \ RI \ SINGL " FAMILY \ 4 / •• �I I i .14i 8' 110 \ ` lINFIL 570-GPDON-SITE �_ 1 I \(RATIOf TRENCH 1 T WETLAND Af�EA / �,• ON -SITE -� j 1 IDE51 NED BY Pt / I ✓ WETLAND AREA I 1 \ 1 1 1 I t INS RE51DENTIAL r2SWAGE 5TRENGTH MRAMETEF, EASTGATE. SEPTIC TANK EPPLUENT P N E(MG1LTl&l,.EtqVlR0NMENTAL ) HEALTH BOD5 130-230 CBOD5 APPROXIMATELY 108-191 T55 49-150 NORTH .re 0 $ G 10-25 SOIL LOG TAKEN 10/05/ 13 BY KEITH PELZEL 5L I 00-02' DUFF 02-25' ROOTED BROWN MEDIUM SAND 25-GO' BROWN MEDIUM SAND 5L 2 00-02' DUFF 02-30' ROOTED BROWN MEDIUM SAND 25-GO' GREY MEDIUM SAND 5L 3 00-02' DUFF 02-24' ROOTED BROWN MEDIUM SAND 24-48' BROWN MEDIUM SAND MOTTLING Q 34' MAXIMUM DAILY FLOW = 570-GALLOI,15 PER DAY OPERATIONAL CAPACITY = 360-GALLON5 PER DAY Traverse PC 5L 4 00-04" DUFF 04-25" ROOTED BROWN MEDIUM SAND 25-54" BROWN MEDIUM SAND 5L 5 00-04' DUFF 04-24P ROOTED BROWN MEDIUM SAND 24-G4" BROWN MEDIUM SAND 5L G 00-04' DUFF 04-22' ROOTED BROWN MEDIUM SAND 22-G2' BROWN MEDIUM SAND 30 S 15 IIOTA SURVEY. SfTE FEATURES,TOPOORAPHY• ELBVATf'ONS 8 Boa HLWiiiSARE BASED OH ASSUMED OAT VIA FRONDED BY THE OY!#QR 3CO1137TY ftECOROS BARE IHTEf-7p£4 gNLY FQR THE APPROYAL4GOHSTRi1CTIOH CONSTRUCTION OF THE SEFM SYSTEU DESIGN. WESTSIOE SEPTIC OEWW RECOMMENDS THAT A LICENSED ARVEYOR• IPLSIALWAYS SE USED TO SET CORNERS• 65TABU5H LOT UKS S DETERMINE ELEVAVOm LOT UNES IDEOTOWES rSIDE SEPTIC BY OWNER. WESTSIDE ASSUMES NO M011 TY FOR LOT LINE DIME HSiONS OR ACCURAI SITE ADDRESS 30523 28TH AVENUES SEPTIC SYSTEM DESIGN PLAN PARCEL NUMBER 41 GGGO-0000 LOT NUM5ER 4 or L KOTA A%DD BLOCr, 6 -- WESTSIDE CLIENT 20G.790.291 I 32022 5THZAVE SW- i, SEPTIC DESIGN LLC . FEDERAL WAY, WA. 98023 r KEITH PELZEL 253.208 OWNER SERGEY ADZI-IIGIREY - 20G.790.291 I KERFIQaWE5T51DE5EFE5EPiIC.COtv1 32022 5TI1 AVE SW BRIAN POTUCEK FEDERAL WAY, WA. 95023 253,732.3792 — ---_---�_-- BRIANOa WEN51DEM111C.COM DATE 02-07-1 9 PAGE 2 OF 3 PO BOX 731069• PUYALWF. WA, 98373 S 1 l&) c 1 �u�Xylirv- f .34' � SIi LCi 5C_H_ 4-D_ T _VC r-H-1 �iC_ Tir- 1 I m P!� O SIiO FUTURE �i71 iF►t,;§§ _ 8 MAPLE pal�i. f Split RQR 15`MAPLE Skt Fence --1�•�iaFL � __ � 20;�; _ 24' We -tin A S un . WHE LUC z= -4 • Infit trai,o Tr efiches Sp+t sil-t f . 1�'�•4F�LE 27'AL UtR GEORGE GERGIS, P. E. cnM,s'1-x orECHrrtcAI,. -90 12701 1111h Ave E �����e� cJ �] 9 g 3 NWWup, Wa 98374 v Jr a•] o Fr-an.c.� D fv0 (253) 241-3334 A� E-cs� Are o\ Ndr�s -j f ;Z.IA Y x -�5 Ois _5�a�c�7rn ff,, --- Loj --rT- f) `2 Ft �� p' . . T50 0M l,owt.( 4 - 75�cr--=�m Aloe - ' str L)3 _ �� op .3 j,, Vrox, n1o�C �nberO�v�S o� �a� �t Q�i,� ,�• �G bern - 1 8 'A r � ■ � •� `JY 6 rs ��a�l