03-102778-UPCITY OF CITY HALL AN%1Z,,Federal Way Feder 1 st Way South • Box 9718 Federal Way, WA 98063-9-9718 •r— (253) 661-4000 www. cityoffederalway.. com Mr. Mark Anderson September 12, 2003 JPC Architects 355 110`h Avenue NE Fa" L E Bellevue, WA 98004 Re: File No: 03-102778-00-UP; USE PROCESS II APPROVAL Evergreen Bank; 1300 South 3201h Street, Federal Way Dear Mr. Anderson: The City has completed an administrative review of the proposed application to install a drive-thru Automated Transaction Machine (ATM) along the east fagade of the Evergreen Bank, 1300 South 320`h Street. The project also involves creating a drive-thru ATM lane in the area of seven existing parking stalls, and installing a landscaping island to provide separation between the ATM stacking lane and the adjacent drive aisle. The City hereby issues Process II approval based on the enclosed Findings and Conclusions for File No. 03-102 778-00- UP. The effective date of the decision is September 15, 2003. Pursuant to Federal Way City Code (FWCC) Section 22-368, this decision may be appealed in the form of a letter delivered to the Department of Community Development Services (33530 First Way South, PO Box 9718, Federal Way, WA 98063- 9718) by September 29, 2003 by any person who submitted comments or receives a copy of this decision. An appeal letter must contain a clear reference to the matter being appealed and a statement of the factual findings and conclusions of the Director of Community Development Services disputed by their person filing the appeal, and must include the appeal fee of $126. The Federal Way Hearing Examiner will hear any appeal of this Process II decision. Please be advised that since you are the only party of record for this application, you may waive your right to appeal. The City must receive this waiver in writing. Waiver of the right to appeal does not effect the issuance date. Therefore, if you choose to waive your right to appeal, you could begin work on the proposal on September 15, 2003, provided you have obtained the necessary building permit. This decision does not constitute building permit approval and does not waive compliance with future City of Federal Way codes, policies, and standards relating to this development. A building permit is required for this project. If you have any questions, please call Associate Planner Jane Gamble at 253- 661-4120. Thank you for your participation in the City of Federal Way Land Use permitting process. Sincerely,, '4� � rwt- Kathy McClung, Director Department of Community Development Services enc: Findings and Conclusions for File No. 03-102778-00-UP Site Plan c: Jane Gamble, Associate Planner Doc, I.D. 24460 CITY OF Federal lay FINDINGS AND CONCLUSIONS File No. 03-102778-00-UP Evergreen Bank Drive-Thru ATM 1300 South 320' Street, Federal Way 1. Project Description — The project consists of the installation of a drive-thru Automated Transaction Machine (ATM) along the east facade of the Evergreen Bank. The project also involves creating a drive-thru ATM lane in the area of seven existing parking stalls, and installing a landscaping island to provide separation between the ATM stacking lane and the adjacent drive aisle. 2. Zoning — Zoning for the subject site is City Center -Frame (CC-F). This zoning district permits retail uses pursuant to Federal Way City Code (FWCC) Section 22-804. The project is subject to Process II, Site Plan Review, as it does not meet the land use process exemptions under FWCC Sections 22-32 and 22-32.2. 3. Nonconformance — FWCC Section 22-334 establishes under what circumstances an existing nonconforming structure must be brought into conformance. The value of the proposed ATM drive-thru and required landscape island is $15,000. According to King County Assessor's information, the value of the existing improvement is $332,000. No nonconformance threshold is triggered by the proposed redevelopment. 4. Community Design Guidelines — Projects processed under site plan review are subject to the provisions of FWCC Chapter 22, Article XIX, "Community Design Guidelines." However, in cases of remodeling of existing developments, only those guidelines that are, "...reasonably related and applicable to the area of expansion or remodeling" (FWCC Section 22-1632) are applied to the project. In that the applicant is installing a drive-thru ATM lane, the requirements of FWCC Section 22-1634(g)(2) apply to the project. This code section stipulates that when a drive-thru window and stacking lanes are permitted along facades of buildings that face a right-of-way, they shall be visually screened from such street by Type III landscaping that will physically separate the stacking lane from the drive aisle. The submitted site and landscape plans show this required landscape island. Queuing Analysis — The applicant has provided a queuing analysis prepared by the Transpo Group, August 28, 2003. Based on this analysis, the proposed drive-thru ATM is anticipated to operate effectively without impacting parking or South 320`h Street operations. However, the applicant (Evergreen Bank) shall relocate stacking lanes should the ATM drive-thru compromise South 32e Street operations. 6. Parking — The building in which the Evergreen Bank is located is 6,993 square feet in area. The bank is 2,160 square feet in area. The other tenant, an office use, is 4,833 square feet in area. Pursuant to FWCC Section 22-804, one parking stall per 300 square feet of gross floor area is required for office and retail uses in the CC-F zone. As such, the total parking requirement for the subject property is 24 parking stalls.' The existing number of parking stalls on the site is 35; the proposed total number of parking stalls is 28, which satisfies minimum parking stall requirements. 7. Accessible Parking — The applicant has provided an accessible stall along the south facade of the building, pursuant to Building Division requirements. 8. Pursuant to FWCC Section 22-394(b), and the forgoing findings, the proposal is found to be consistent with the Federal Way Comprehensive Plan•, all applicable provisions of the FWCC; and with the public health, safety, and welfare. 9. Final construction drawings will be reviewed for compliance with specific regulations and other applicable City requirements. A building permit is required for this project. These findings shall not waive compliance with future City of Federal Way codes, policies, and standards relating to this development. Prepared by: Jane Gamble, Associate Planner Date: September 11, 2003 1 Pursuant to FWCC Section 22-1379, if the formula for determining the minimum number of parking spaces results in a fraction, that fraction will be rounded up to the next higher whole number. Evergreen Bank Drive-Thru ATM File #03-102778-00-UP / nog. I.D. 24462 Findings and Conclusions Page 2 1 JPC ARCHITECTS September 19, 2003 Kathy McClung, Director Department of Community Development Services City of Federal Way 33530 First Way South PO Box 9718 Federal Way, WA 98063-9718 "&uN �,,, y SEp 902 '�Q ""V6N7- Re. File No.: 03-102778-00-UP; Use Process II Approval EvergreenBank; 1300 South 320t' Street, Federal Way Dear Ms. McClung: We are in receipt of the City's Process II approval letter dated September 12, 2003 in regards to the site related improvements for the new drive through ATM for the subject project., We would like, at this time, to waive the right to appeal this decision. We appreciate your approval of this work and if you have any further questions or comments, please do not hesitate to contact me. Sincerely, JP Archi s, P LC Dennis L. ieni, Architect Partner CC: City of Federal Way: Jane Gamble Pemco Financial Services: Judith Moratti JMS Construction: Jonathan Slikas JPC Architects: Mark Anderson 355 110th Ave NE- Suite 100 Bellevue, WA 98004 tel [425]641-9200 fax [4251637-8200 www.jpcarchitects.com 4 JPC ARCHITECTS July 8, 2003 Ms. Deb Barker City of Federal Way City Hall 33530 1 st Way South Federal Way, WA 98063-9718 Re: Permit Submittal per RESPONSE TO INQUIRY (file 903-102156-00-AD) Evergreen Bank; 1300 South 320th Street, Federal Way, WA Ms. Barker, Thank -you for your above referenced response, received June 13th, 2003, addressed to my colleague Jennifer Dowrey. Please find below an itemized response to the FWCC standards you referenced in your letter. 1. Relocated stalls are now proposed at rear of site and thus screened from the 320th Street right-of-way. 2. No lawns proposed. 3. See site and parking analysis on A1.1 4. See site and parking analysis on A1.1 5. Type III landscaping provided, see A1.1. 6. We believe that the proposed design complies with 22-804, note 5. If you have any questions or comments, feel free to contact me at 425-641-9200. Thank you. Sincere, Mark Anderson 355 110th Ave NE - Suite 100 Bellevue, WA 98004 tel [425] 641-9200 fax [425] 637-8200 www.jpcarchitects.com Ll � V — 3u� . � )003 LEASE AGREEMENT G1iY OF VFI)E�P'l' A THIS LEASE made this 7th day of A 1, 2003 by and between (Names and Addresses): Caribou Land & Cattle Corn any (hereinafter called Lessor), and Ever$reenBank (hereinafter called Lessee): WITNESSETH: 1. PREMISES: Lessor does hereby lease to lessee, those certain premises commonly known as 1300 South 320'' Street Federal Way, Washington being situated upon land described in Exhibit "A" attached hereto, consisting of approximately 2680 square feet, as shown on Exhibit `B" attached hereto, (hereinafter called "premises"). 2. TERM: The term of this Lease shall be for 5 years commencing upon Lessee opening for business, but in no event later than the 1st day of July, 2003 and shall terminate on the 30`h day of June, 2008. Should the Lessee not be in material default herein, the Lessee will have the option to extend said Lease for an additional 5-year term under the same terms and conditions contained herein by giving Lessor written notice 120 days prior to the expiration of the initial term. 3. RENT: Lessee covenants and agrees to pay Lessor, at the offices of Lessor, PO Box 862 Ellensburg, WA 98926-1168 or to such other party or at such other place as Lessor may hereafter designate, monthly rent in the amount of Four Thousand Eight Hundred Dollars ($4,800.00), in advance, on the first day of each month of the lease term. Lessor hereby acknowledges receipt of Four Thousand Eight Hundred Dollars ($4,800.00), for the first month's rent. If Lessee is in possession of the premises for a portion of a month, the monthly rent shall be prorated for the number of days of Lessee's possession during that month. The above base monthly rental rate shall be adjusted annually in the following manner: The monthly rental rate shall be adjusted at each yearly anniversary date by using the revised Consumer price Index (CPI) for All urban Consumers as published by the United States Department of Labor for the Seattle -Everett Metropolitan area. The indexes used shall be those published for the anniversary date. The percentage of change from the earlier index to the later index shall be multiplied by the rent rate at the beginning of each lease year and the result added to that beginning rate to arrive at the adjusted rate which will apply to each of the twelve months of the succeeding lease year, except in no event shall rent rate be less than the original monthly rate. Should the components of the CPI change or be discontinued after inception of this lease, Lessor shall notify Lessee of a substitute index which in the Lessor's opinion approximates the result of the CPI and such index shall be utilized for subsequent adjustments. 4. UTILITIES AND FEES: Lessee agrees to pay all charges for light, heat, water, sewage, garbage, drainage, and all other utilities to the premises during the full term of this lease. All other items including all license fees and other governmental Page 1 of 10 pages hrm:leaseEB-Caribou STATE OF WASHINGTON, ss: COUNTY OF ' On this `��� day of April, 2003 before me personvy appeared ()&, a to me known to be x of Caribou Land & Cattle Company, the corporation that executed the within and foregoing instrument, and acknowledged said instrument to be the free and voluntary act and deed of said corporation, for the uses and purposes therein mentioned, and on oath stated that he was authorized to execute said instrument and that the seal affixed, if any, if the corporate seal of said corporation. IN WITNES�3ERE•r,have hereunto set my hand affixed my official seal the day and year 1�:�NO7ARYJ. ='.'• PU BL\G r not name ' A5Y,,1��, Notary ublic in and for e State of rr�` r•'�lfilil������' My appointme expires '1-(,2 - 01 STATE OF WASHINGTON, ) ss: COUNTY OF ���^ x ) On this ?"�- day of April, 2003 before me personally appeared 0 fT a- 7� tome known to be Pre 5idz*-f CC� of EvergreenBank, the corporation that executed the within and foregoing instrument, and acknowledged said instnunent to be the free and voluntary act and deed of said corporation, for the uses and purposes therein mentioned, and on oath stated that he was authorized to execute said instrument and that the seal affixed, if any, if the corporate seal of said corporation. IN WITNESS WHEREOF I ha�`Ptp�to set my hand affixed my official seal the day and year first above writt� �►¢ �h AtA A e rk L in and for the State of 71�-- appointment expires U Page 7 of 10 pages hrm:leaseEB-Caribou STATE OF WASHINGTON, ss: COUNTY OF ' On this `��� day of April, 2003 before me personvy. appeared Q tL. Q, Q to me known to be k of Caribou Land &: Cattle Company, the corporation that executed the within and foregoing instrument, and acknowledged said instrument to be the free and voluntary act and deed of said corporation, for the uses and purposes therein mentioned, and on oath stated that he was authorized to execute said instrument and that the seal affixed, if any, if the corporate! seal of said corporation. IN WITNES ��EREQF/j�have hereunto set my hand affixed my official seal the day and year fi.'. N101 R Y V . N� ` pU8 Qrnmnt:name '; �� '•••••M••• �� �w`� Not ublic in and for a State of �Y V17 I rWtAs� My appointmekk expires `-1-Lg - STATE OF WASHINGTON, ss: COUNTY OF A�147,) On this 7" day of April, 2003 before me personally appeared 6.0 • - I� to me known to be Ae side --I Clf a of EvergreenBank, the corporation that executed the within and foregoing instrument, and acknowledged said instrument to be the free and voluntary act and deed of said corporation, for the uses and purposes therein mentioned, and on oath stated that he was authorized to execute said instrument and that the seal affixed, if any, if the corporate seal of said corporation. IN WITNESS WHEREOF I l�:o set my hand affixed my official seal the day and year first above writt ....,, �•g r ' � VIOTARV V. 2L ri�ne h►+ e rtc L W<9bb" 'iublic in and for the State of appointment expires rl Page 7 of 10 pages hrm:leaseEB-Caribou STATE OF WASHINGTON ) ) ss. County of Kittitas ) On this nNay of Ail A I , 2003, before me the undersigned, a Notary Public in and for the State ot Washington, duly commissioned and sworn, personally appeared DERALD MARTIN and MARGARET MARTIN, husband and wife, to me known to be the individuals described in and who executed the foregoing instrument, and acknowledged to me that she signed the same as their free and voluntary act and deed, for the uses and purposes therein mentioned. WITNESS my hand and official seal hereunto affixed the day of 2003. �����i��u�►►►►rrrrz A R K� ���� atary Pu i in and for the State of �`[r,Gyox ExP;R•S �'�.�� Washington residing at Ellensburg. ARy z s My appointment expires 9 -Lp-% (- Cj 't Pii�`,Z04a• ��r�1'J '•. JZ1L f .•'�.��`�� JUN-26-2003 15:09--,PEMCO Real Estate CITY OF RECE Federal Way JUJ n A ?nv CITY 01­ - - - L l02�7�� APPLICATION NO(S) � � %W, v 206 628 4620 P.02 MASTER LAND USE APPLICATION-,'! DerARTWKT OF CaMHQMITV DEVrtopMtVrSScn%r CM 33530 First Wry 5outir;! "4; PO Box 9,71 [ �; Federal Wry WA 99053-97I d , 2S3-661-4000; Fax 253-661�9:: W ' Date Project NameN Property Address/I.ocatiort —t -z-ock- Parcel Number(s) "4 ; Project Description -J' ti= • .h r I)rpc of permit Required X 7M1 Annexation A PP Irtcwt . Binding Site Plan'' Boundary Line Adjustment N•arae: • 'y•' Comp PIaOlRezone Address:� C �i� , �E I�+l}S�" " Land Surface Modification Lot Line Elimination Czty/statc:SF�'CYI.,E Pp %pY "7Zg zip: I$1il-•0te Preappli"t C n Conferonce, Phone•', p(a _ _¢2Z _Iq0 (a Process I (Direecor s Appranl) Process A (Bice Plan Review) Fax: 42-aco Email:s Y��-` _"{�©� Process III (Project Approval)Sigeature: • � is Process IV (Ncaring Examiner's Decision) _ •,�_ ; `, Process V (Quasi,Iudicisl Rezone} Process VI f Agent (if different than Appliearo) I,I h �� v>z? SEPA w/Projeer Name: LPL S£PA Only Address: 3�ff5 110t-2 A jSy k)e t I l_vJ-;ZE lva Shoreline: Variance/Conditional Use Ciry)SMver, Short Subdivisioi3 Zip: abft'-J y Subdivision Phone: at R;5 - CoLt L-X�2oo Variance: Commerciaf/R esidenriai Fax: �z.5 � (03'7- Bzrav ' �+ Email: vv p,4r_,, 3ece dJ6('L�►,"LJk-S,Gal/Yt Required Information re: C oniug Desiputionr r'omptrhensive Plan Designation�JhjY Name.GARJ. o�� t tic,& Value of Exiaing lmpravetnepts s: I?0 �r� gt�,k]�S,JIWA Value ofProposed Improvements Ld Uniform Building Code (UBQ) `� `i I �t� $R`i- nt cupancy Typc �`�.�Consrrucdon Type e: '� Oulletin #0D; — Unrat 3.2003 Page 1 eF J kM landouts — RevisedlMtaver Land Use Ap p licurdli, TOTAL P.02 z'd 6EE9-Z96(60S) utquew aua0 e10:11 E0 So Inc CITY OF FEDERAL WAY DEPARTMENT OF COMMUNITY DEVELOPMENT SERVICES DEVELOPMENT REVIEW COMMITTEE TRANSMITTAL DATE: July 16, 2003 TO: Jim Femling, Development Services Manager Mary Kate Martin, Building Official Mary Young, Lakehaven Utility District Greg Brozek, Federal Way Fire Department FROM: Jane Gamble FOR DRC MTG. ON: Completeness: July 24, 2003 FILE NUMBER(s): 03-102778-00-UP RELATED FILE NOS.: None PROJECT NAME: EVERGREEN BANK PROJECT ADDRESS: 1300 S 320TH ST ZONING DISTRICT: CC-F PROJECT DESCRIPTION: USE PROCESS II - Review for proposal to install a drive -up ATM machine with associated relocation of parking and landscaping. LAND USE PERMITS: UPII PROJECT CONTACT: JPC ARCHITECTS MARK ANDERSON 355 110TH AVE NE 425.641.9200 (Work) MATERIALS SUBMITTED: Preliminary drawings i AGENDA OF: ATTN: SUBJECT: COMMENTS: Water: LAIEHAVEN UTILITY DISTRICT 316271st Avenue South ♦ P. O. Box 4249 ♦ Federal Way, WA 98063 COMMUNITY DEVELOPMENT TECHNICAL REVIEW COMMITTEE July 24, 2003 Ms. Jane Gamble Associate Planner Agenda Item No. 3 - Evergreen Bank 03-102778-00-UP Owner may wish to secure an irrigation meter for the property to avoid sewer service charges for such water use. Sewer: Any modification of the existing side sewer will require a side sewer permit. Owner will be required to complete a Sewer Use Survey (SUS); with pretreatment requirements, if any, to be determined upon review of said SUS. General: For any new extension or connection, the District will research prior facilities charges paid, if any, and evaluate the proposed project for the existence of any credits for the Capital Facilities Charges or any amounts due, based on water consumption records, for increased usage of the water and/or sewer systems beyond the level covered by previous payments. Capital Facilities Charges shall be assessed and collected for any increased use above that which may have been previously paid, including increases attributable to usage associated with existing service. Date: Mary E. oun$ U - CJ Develo merit Services Supervisor Direct Line: (253) 946-5400 FAX: (253) 529-4081 E-mail: myoung@lakehaven.org 4 J PC ARCHITECTS TRANSMITTAL To: Company: Address: City/State: Zip: Phone: Jane Gamble City of Federal Way City Hall 33530 1st Way South Federal Way, WA 98063-9718 253-661-4103 RECEIVED BY COMMUNITY DEVELOPMENT DEPARTMENT We are sending you the following: Submittal Attached J U L 2 2 2003 For Your: Review and Comment Action Required: As Indicated Delivery: USPS Ms. Gamble, Date: Project Name: Project No: Regarding: July21, 2003 EvergreenBank ATM 03-100-0158 Amendment to Submittal #03-102778-00-up six copies RESUBMIT TED J U L 2 2 2003 After submitting for the above referenced permit, our client pointed out that we have mis-labeled the size of the pre -fabricated ATM enclosure and that leaving transom glazing above an ATM is not desirable. I assume that this has something to do with criminal activity. I spoke with Ms. Deb Barker on Friday. She originally responded to our inquiry and provided the Document Checklist. In our phone call Ms. Barker indicated that you would be responsible for coordinating the review of the project and that if I got the revision to you by Tuesday, it should be possible for me to slip this revision in prior to department review. Please find attached that revision. Thank -you for your time and effort in review of our submittal. Sincerely, Mark Anderson JPC ARCHITECTS, PLLC Cc: Dennis Dieni, JPC Architects Judith Moratti, Pemco Insurance Jonathon Slikas, JMS Construction 355 110th Ave NE - Suite 100 Bellevue, WA 98004 tel [425] 641-9200 fax [425] 637-8200 www.jpcarchitects.com Transmit (Jane Gamble - zceyergreenban rig DOG Page 1 TECHNICAL REVIEW COMMERCIAL Agenda Date: July 24, 2003 Subject: Evergreen Bank/03-102778-UP/J. Gamble To: Development Review Committee From: Greg Brozek — Federal Way Fire Department FIRE APPARATUS ACCESS ROADS Fire apparatus access roads shall be provided when any portion of the facility or any portion of an exterior wall of the first story of the building is located more than 150 feet from fire apparatus. access as measured by an approved route around the exterior of the building or facility. Plans for fire apparatus access roads shall be submitted to the fire department for review and approval prior to construction. Fire apparatus access roads: 1) Shall have an unobstructed width of not less than 20 feet and an unobstructed vertical clearance of not less than 13 feet 6 inches. 2) Shall be designed and maintained to support the imposed load of a 30 ton fire apparatus and shall be provided with a surface so as to provide all-weather driving capabilities. 3) Shall be not less than a 20 foot inside turning radius and not less than a 40 foot outside turning radius. 4) With a dead-end in excess of 150 feet in length shall be provided with a cul-de- sac or Fire Department approved alternative at the dead end. All such cul-de- sacs shall be not less than 80 feet in diameter. 5) Gradient shall not exceed 12 percent. [K.C.F.D. #39 Administrative Policy Guideline No. 1006] Designated fire lanes may be required for emergency access. This may be done during the plans check or after the facility is in operation. When required, approved signs or other approved notices shall be provided and Jane Ga'm5le - zcevergreenbankdrn .DOC Page 2 � maintained for fire apparatus access roads to identify such roads and prohibit the obstruction by parking and other obstructions. ADDITIONAL COMMENTS The width of the existing driveway on the west side of the building does not meet the above requirements. Additionally, the turning radius at the northwest corner of the building does not meet those re uirements. The three existing diagonal parking spaces on the south side of the sub'ect site next to the east driveway) should be eliminated to provide the required width and turning radius for Fire Department access. THESE COMMENTS ARE VALID FOR 180 DAYS FROM REVIEW AND ONLY FOR THE PLANS REVIEWED. Greg Brozek — Assistant Fire Marshal 316171 Avenue South Federal Way, WA 98003 Phone 253-946-7241 Fax 253-529-7206 2 CITY of Federal Way DATE: August 6, 2003 TO: Jane Gamble, Associate Planner FROM: Sarady Long SUBJECT: EVERGREEN BANK - (03-102778-00-UP) 1300 S 320TH ST MEMORANDUM Public Works Department I have reviewed the information provided on 7/16/03. The project is complete, however the following information shall be included in the next submittal for staff review: 1. A queuing analysis perform by a professional engineer registered in Washington shall be submitted for the proposed drive-thru to ensure that traffic will not block the drive aisle or back up onto S 320'h St. 2. Parking spaces next to S 320`h St. should be removed to provide adequate driveway aisle for traffic circulation. 3. The two existing driveways should be consolidated. L:\CSDC\DOCS\SAVE\21982336019.DOC CITY OF ,..A Federal 7:W August 1, 2003 Mr. Mark Anderson JPC Architects 355 110`" Avenue NE Bellevue, WA 98004 CITY HALL W33530 a`� 1st Way South • PO Box 9718 Federal Way, WA 98063-9718 (253) 661-4000 www.cityoffederalway.com Re: File No: 03-102778-00-UP; REQUEST FOR ADDITIONAL INFORMATION Evergreen Bank; 1300 South 3201h Street, Federal Way Dear Mr. Anderson: On July 8, 2003, the City of Federal Way's Department of Community Development Services received your application to install a drive-thru Automated Transaction Machine (ATM) at the Evergreen Bank, 1300 South 320`h Street. The site is zoned City Center Frame (CC-F), Pursuant to Federal Wary City Code (FWCC) Section 22-804, retail uses are permitted in this zone. Nonconformance Issue The City has determined that your application is not considered an expansion of gross floor area,' nor does it exceed any of the other nonconformance thresholds identified in FWCC Section 22-334. As such, the applicant is not required to bring the existing improvements (i.e., landscaping and parking) into compliance with current code requirements; however, all newimprovements must be constructed to current code standards Drive-Thru Landscape Screening Pursuant to FWCC Section 22-1634(g)(a), the drive-thru ATM is required to be screened with Type III landscaping, which consists of a mixture of evergreen and deciduous trees, interspersed with large shrubs (a minimum of 24 inches in height) and groundcover. The landscaping indicated on the submitted site plan does not meet this requirement. Furthermore, the landscape island must be a minimum of six feet in width, pursuant to FWCC Section 22-1567(c) (enclosed). Please revise accordingly. Parking The submitted site plan shows 30 parking stalls, two of which are parallel to the ATM landscape island. The parking requirement for retail uses in the CC-F zone is one stall for every 300 feet of gross floor area. According to King County Assessor's data, the structure is 6,993 square feet in area; the parking requirement is thus a minimum of 24 stalls. The site plan also shows the rear (northern) parking row as being modified with landscape islands at either end. While this modification is not a requirement for your 1 The FWCC defines gross floor area as the total square footage of all floors in a structure as measured from either the interior surface of each exterior wall of the structure or, if the structure does not have walls, from each outer edge of the roof. Certain exterior areas may also constitute gross floor area. Mr. Mark Anderson Page 2 August 1, 2003 application, if you chose to install parking lot landscape islands they must meet code specifications, which is Type IV landscaping, consisting of trees, planted with supporting shrubs and groundcover (see FWCC Section 22-1565[d][2]). Please either remove the proposed landscape islands in this area, or indicate the required Type IV landscaping in this area. The proposed parallel parking stalls shown along the eastern edge of the required ATM landscape island are not permitted, in that a minimum drive -aisle width must be maintained for fire access around the building (see the enclosed July 24, 2003, memorandum from Greg Brozek, Federal Way Fire Department). Please revise the site plan accordingly. Site Plan Discrepancies Based on staff inspection, the submitted site plan appears to inaccurately locate the existing landscape island at the eastern edge of the southern parking row. This landscape island is in fact further to the east than is shown on the site plan. Please revise the site plan to correctly indicate the location of this landscape island. If you choose to relocate this landscape island to the position shown on the site plan, please be advised that it would be required to be brought up to current code requirements (i.e., planted with Type IV landscaping as described in FWCC Section 22-1565[d][2], enclosed, and expanded to a minimum width of six feet). Accessible Parking Please see the enclosed memorandum from the Building Division concerning accessible parking. Although the site plan does not show any accessible parking, staff site inspection revealed that there is one accessible stall at the eastern end of the southern parking row. Pursuant to Building Division requirements, a second accessible stall must be provided. At least one of the two required accessible stalls must be van accessible (that is, with an eight -foot wide access aisle located to the right of the van accessible parking stall). Please refer to the enclosed handout entitled, Accessible Parking for additional information. Please also refer to the enclosed July 23, 2003, memorandum from Ann Dower, Engineering Plans Reviewer, for additional requested information. Upon receipt of the referenced revisions, the City will continue its review of your project. If you have any questions, please feel free to call me at 253.661.4120. Sincerely, Jane Gamble Associate Planner enclosures c: Scott Sproul, Plans Examiner Ann Dower, Engineering Plans Reviewer File k03-102778-00-UP Doe, ID. 24026 Mr. Mark Anderson Page 2 August 1, 2003 application, if you chose to install parking lot landscape islands they must meet code specifications, which is Type IV landscaping, consisting of trees, planted with supporting shrubs and groundcover (see FWCC Section 22-1565[d][2]). Please either remove the proposed landscape islands in this area, or indicate the required Type IV landscaping in this area. The proposed parallel parking stalls shown along the eastern edge of the required ATM landscape island are not permitted, in that a minimum drive -aisle width must be maintained for fire access around the building (see the enclosed July 24, 2003, memorandum from Greg Brozek, Federal Way Fire Department). Please revise the site plan accordingly. Site Plan Discrepancies Based on staff inspection, the submitted site plan appears to inaccurately locate the existing landscape island at the eastern edge of the southern parking row. This landscape island is in fact further to the east than is shown on the site plan. Please revise the site plan to correctly indicate the location of this landscape island. If you choose to relocate this landscape island to the position shown on the site plan, please be advised that it would be required to be brought up to current code requirements (i.e., planted with Type IV landscaping as described in FWCC Section 22-1565[d][2], enclosed, and expanded to a minimum width of six feet). Accessible Parking Please see the enclosed memorandum from the Building Division concerning accessible parking. Although the site plan does not show any accessible parking, staff site inspection revealed that there is one accessible stall at the eastern end of the southern parking row. Pursuant to Building Division requirements, a second accessible stall must be provided. At least one of the two required accessible stalls must be van accessible (that is, with an eight -foot wide access aisle located to the right of the van accessible parking stall). Please refer to the enclosed handout entitled, Accessible Parking for additional information. Please also refer to the enclosed July 23, 2003, memorandum from Ann Dower, Engineering Plans Reviewer, for additional requested information. Upon receipt of the referenced revisions, the City will continue its review of your project. If you have any questions, please feel free to call me at 253.661.4120. Sincerely, 4&,'A&e- - Jane Gamble Associate Planner enclosures c: Scott Sproul, Plans Examiner Ann Dower, Engineering Plans Reviewer File 903-102778-00-UP Doc. I.D. 24026 CITY OF CITY HALL Federal Islay Feder 1 st Way South • Box 9718 Federal Way, WA 98063-9-9718 (253)661-4000 www.cityoffederalway.com August 1, 2003 Mr. Mark Anderson Ft JPC Architects 355 110 Avenue NE Bellevue, WA 98004 Re: File No: 03-102778-00-UP; REQUEST FOR ADDITIONAL INFORMATION Evergreen Bank; 1300 South 3201h Street, Federal Way Dear Mr. Anderson: On July 8, 2003, the City of Federal Way's Department of Community Development Services received your application to install a drive-thru Automated Transaction Machine (ATM) at the Evergreen Bank, 1300 South 320"' Street. The site is zoned City Center Frame (CC-F). Pursuant to Federal Way City Code (FWCC) Section 22-804, retail uses are permitted in this zone. Nonconformance Issue The City has determined that your application is not considered an expansion of gross floor area, nor does it exceed any of the other nonconformance thresholds identified in FWCC Section 22-334. As such, the applicant is not required to bring the existing improvements (i.e., landscaping and parking) into compliance with current code requirements; however, all new improvements must be constructed to current code standards Drive-Thru Landscape Screening Pursuant to FWCC Section 22-1634(g)(a), the drive-thru ATM is required to be screened with Type III landscaping, which consists of a mixture of evergreen and deciduous trees, interspersed with large shrubs (a minimum of 24 inches in height) and groundcover. The landscaping indicated on the submitted site plan does not meet this requirement. Furthermore, the landscape island must be a minimum of six feet in width, pursuant to FWCC Section 22-1567(c) (enclosed). Please revise accordingly. Parking The submitted site plan shows 30 parking stalls, two of which are parallel to the ATM landscape island. The parking requirement for retail uses in the CC-F zone is one stall for every 300 feet of gross floor area. According to King County Assessor's data, the structure is 6,993 square feet in area; the parking requirement is thus a minimum of 24 stalls. The site plan also shows the rear (northern) parking row as being modified with landscape islands at either end. While this modification is not a requirement for your 1 The FWCC defines gross floor area as the total square footage of all floors in a structure as measured from either the interior surface of each exterior wall of the structure or, if the structure does not have walls, from each outer edge of the roof. Certain exterior areas may also constitute gross floor area. ,,ACITY OF ,.,,,Federal Way DATE: 7/23/03 TO: Jane Gamble FROM: Ann Dower SUBJECT: EVERGREEN BANK - (03-102778-00-UP) 1300 S 320TH ST; Completeness Review MEMORANDUM Public Works Department The information provided on 7/08/03 has been reviewed. It is complete, however the following information must be included in the next submittal: 1. Show existing catch basins and storm water conveyance pipes. If any are to be rerouted due to this construction, please show the size, type, and location of all proposed pipe and structures, 2. Show all other existing utilities. 3. Please verify the location and width of the east driveway, and the location of the planter island north of that driveway. In the field, there is a handicapped -accessible parking stall west of the planter, and the planter island is located further east. The locations of the planter and driveway are important in determining cueing for the drive -through. 4. Please show the top of the slope along the east property line. 5. Please show any existing or proposed easements, 6. Please indicate how much impervious area is proposed. R.. SU B M I TT E D AUG 2 8 MS 0 3 —10A-1-27^— Dennis Dieni, JPC Tasha Atchison, P.E. Judith Moratti, Evergreen Bank Evergreen Bank Vehicle Queuing Analysis The Transpv Group August 28, 2003 03246.00 1%ECEIVED AUG 2 8 2003 This memorandum summarizes the queuing analysis completed for the proposed drive -up ATM at the Federal Way Evergreen Bank branch. The maximum vehicle queue length was determined and compared to the available on -site storage space. Based on this analysis, the drive -up ATM is anticipated to operate effectively without impacting parking or S 32Uh Street operations. Project Description The project site is located at 1300 S 32U" Street, in Federal Way, Washington. The bank is to be 2,160 sf, with an attached drive -through lane for access to one drive - up ATM. This analysis was focused on the queuing impacts of the ATM only. The project is currently under construction. Drive —up ATM Operations The proposed drive -up ATM is the first of its kind for Evergreen Bank Based on information from Evergreen Bank representatives, the peak number of customers anticipated to use the ATM would be 4 to 5 vehicles per hour. During non -peak hours, the ATM is estimated to be used by approximately 2 vehicles per hour. Also, the typical transaction takes about 3 minutes. According to TnkMakingCharacteri w of D ze-InBanking Facilities, published in the November 1992 ITE Journal, the peak hours of a drive -up ATM typically occur between 9:00 am to 4:00 pm. This is consistent with the anticipated use at the Federal Way Evergreen Bank branch. Assuming an average rate of 5 vehicles per peak hour, and 2 vehicles per non -peak hour, daily use equates to 69 trips per day, or 2,070 trips per month. Based on a survey of six other local banks, similar in customer base and nature to the proposed Evergreen Bank and that have drive -up ATM facilities, the average number of ATM transactions per month ranged from 440 to 2,200. The calculated 2,070 trips per month at Evergreen Bank are consistent with use at other local banks within Western Washington. The Transpo Group page 1 The Transpo Group Queue Analysis A queuing analysis was conducted based on the peak hour volume of 5 vehicles per hour. In order to account for the variation in vehicle arrival, the average queue length and the 95" percentile vehicle queue length was calculated. The 95" percentile is usually considered the maximum queue length and represents the queue that is greater than 95 percent of all possible queue lengths. The Poisson Arrival Distribution curve was used to calculate the 95" percentile queue. Based on the arrival rate of 5 vehicles per hour and the service rate of 3 minutes per vehicle, the average queue is anticipated to be one vehicle and the 95rh percentile queue was determined to be 2 car lengths, or approximately 40 feet. The calculation worksheets are provided in Attachment A. Based on the current site plan, the proposed drive -through lane can accommodate the expected maximum queue length of 40 feet. The drive -through lane has approximately 90 feet of storage between the ATM machine and the parking lot drive aisle. Therefore, the queues generated by the ATM du u peak times are not expected to impact parking operations or extend back to S 320 Street. Attachment A — Queue Length Calculations M:\03\03246 Evergreen Bank\Draft Repon.doc ri!` .•��. It The Transpo Group page 2 Approach volume (vph): Length of red interval (sec): Number of lanes: Number of vehicles arriving during the red interval (N) Attachment A QUEUE LENGTH PROBABILITY 5 180 1 Prob. of Queue Arrivals Length >= N (ft) Average arrival rate = Prob. of Factorial N Arrivals 0 100.0% 0 1 0.7788 1 22.1 % 20 1 0.1947 2 2.6% 40 2 0.02434 3 0.2% 60 6 0.00203 4 0.0% 80 24 0.00013 0.25 FIN. TE L,F- (N) CONC. CURB SEE SITE PLAN - JPC ARCHITECTS 355 110th Ave NE - Suite 100 Bellevue, WA 93004 to I [425] 641-9200, fax [425] 637-8200 ATM 6485 REGISTERED �i rAtRCMITECT 1/2" EXTERIOR GRADE PLYVOOD (PAINT TO MATCH BUILDING), OVER SECURITY MESH, TACK WELDED TO 6" 20 GA. STUDS ON 24" O.C., FINISHED WITH G11B ON INTERIOR. PROVIDE R-19 BATT INSUL IN WALL AND FLASH aER SMACNA STANDARDS._ -/-- REMOVE STORE —FRONT GLASS. MULLIONS AND WALL AS REQUIRED FOR PRE —FABRICATED UNIT. LOCATION OF DRIVE —UP ATM AND NIGHT DROP WITH R X 1"X84" ; ENCLOS OT S. SEE 2/A1.1 FOR EXAMPLE INSTALLATION. 1' 3' 5' JUL 2 2 201P, EVERGREEN BANK - ATM ELEV. JPC PROJ MGR: DD JPC PROJ NO.: 03-100-0158 ANN KUSKA DERR REVISION: STATE OF WASHINGTON BUILDING: 2003, JPC ARCHITECTS PLLC 07-21-03 1 I (E) (E) APPI I E3 T"N"'E E T lommk%l 40% ATH t�uUTH 3zu SCALE: iz 5 20 10, AN wwwwowwwww" ft moll I'm ww S cal e* mllft'l p N111110,11 oil ill wall I 1 11 0 IN 111,11 IN Now m A' VlClNmkftlTqYwm MAP---_ ROJ�CT _�v E M all wMeFel 0 I:qao, CARIBOU LAND & CATTLE COMPANY PO BOX 862 ELLENSBURG, WA 98926-1168 CONTACT PERSON: GENE MARTIN (509) 899-1413 TEN AN T PEMCO FINANCIAL SERVICES — EVERGREENBANK 325 EASTLAKE AVENUE EAST P.O. BOX 778 SEATTLE, WA 98111 (206) 628 7906 CONTACT PERSON: JUDITH A. MORATTI ARCHITECT JPC ARCHITECTS, PLLC 355 110TH AVENUE NE BELLEVUE, WA 98004 (425) 641-9200 CONTACT PERSON: DENNIS DIENI BEN ERAL CON TRACTOR JMS CONSTRUCTION 8575 WILLOWS ROAD REDMOND, WA 98052 (425) 883-0241 CONTACT PERSON: JONATHAN SLIKAS MA&I" Immukh, mmmftk lh Fi A X.�]F E I uff Nowwwom"El Scole: 1/4"=11-0" Rl EXAM Ov'�6 L�E guo"'k Rl VEown 1 AT PF, A I Iwo to low 16 *A too '10 ro yy Alk w lab low ign, Team,,., , i IWINWIWKW� IT, 661) WITH AT ION 'VAN ACCESSIBLE DI PPPONG SIGN''(R7— IS LOCAT PO DISABLE K SIGN R7-801A) BELOW TO POST IN CONCRETE — SMOOTH FLUSH FINISH. TOP OF S.�111111 TO BE AT 51-6" SEE NOTE 14 FOR FOR SPECIFICATIONSt UNO. ------- PLANT DECIDUOUS TREE AT THIS LOCATION. TREE —TO 9E A 9 W RT7 CALIPER. PROVIDE 16" WIDE WHITE "PAVING' STRIPING AT 32*1 O.C. SAWCUT EXISTING ASPHALT CONCRETE FULL DEPTH AT EDGE WHERE NEW AC IS TO BE PROVIDED. NEW AC TO BE PROVIDED AT STALLS MARKE D BY 2ACCESSIBLE$ PARKING Approvals SIGN,, AT STRIPING BETWEEN SAID STALLS, AND AS TAPERED AWAY (5% MAX. SLOPE) TO MATCH EXISTING ASPHALT. PROVIDE NEW AC PER NOTE 1. FINISH LEV EL AT CURB T BE NO LOWER THAN. 5*' BELOW SIDEWALK AT AFORE MENTIONED STALLS. RE�STRIPE ANY STRIPING REMOVED BY TAPERING OF AC. MAINTAIN DRAINAGE TO EXISTING CATCH BASINS. PROVIDE CONCRETE WHEELSTOP AT THIS LOCATION. SEE 3/Al.1 SIM. IN WHITE 'PAVING' STRIPINGs WITH BLUE 'PAVING" STRIPING BACKGROUND$ PAINT INTERNATIONAL SYMBOL OF ACCESS AT THIS LOCATION. MINIMUM SIZE TO BE 42*p X 42"O'll, low 0 Vol A alk A A EEf3GREEN TREE (TOTAL 2) Ma INCENSE CEDAR CALOCEDRUS DECURRENS EXTERIOR GRADE PLYWOOD (PAINT TO MATCH BUILDING)s OVER SECURITY MESH$ TACK WELDED TO 620 GA. STUDS ON 24" O.C., FINISHED WITH GWB ON ®! INTERIOR. PROVIDE R-19 BATT INSUL IN WALL AND FLASH PER Mum-_.- SMACNA STANDARDS.., bib! too NIGHT DROP 00 —CONCRE7E VERTICAL CURB v-WITH REINFORCING. PROVIDE ............rr (2) CONT. #4 STEEL _ _ 7 3/EINFOkCING BARS. NOTE: PROVIDE WHITE "PAVING" PAINT. COMBINE ARROWS WHERE SHOWN COMBINED. NOT TO SCALE wnm""AFFljo"4k OT TO SCALE Na Date Descriptlon 04-30-03 SPACE PLAN 06-05-03 PERMIT SET 06-16-03 PRICING SET 06-30-03 ATM PERMIT /1\ 07-21-03 PERMIT REVISION 08-11-03 PERMIT REVISION yj STATE 0 Ke' pl an', Sheet Title blTE PLAN/ hAti �LEVATI Sheet No. 2003, jpC Architects, PLLC blTE PLAN/ hAti �LEVATI Sheet No. 2003, jpC Architects, PLLC (J z U r m E A G R A P One S A 1pw# AAft S kw� NOWNWAMN" w9ft Am* mwft AVOM%N' a a Am* U-2 8 m AT . I I E tame 355 110th Ave NE ';"'.,,§uite 100 Bellevue, WA 98004"',\,. tel 14251641-9200, fa)t 44251637-8200 3U'O South 3Z'Oth U a Federal Way, WA- No. Date Descripbon 04-30-03 SPACE PLAN 06-05-03 PERMIT SET 06-16-03 PRICING SET 06-30-03 ATM PERMIT 07-21-03 PERMIT REVISION 08-11-03 PERMIT REVISION N KUSKA DE STATE OF WASHIN Sheet Titlb''�111 S E P Sheet N'0': m 01% A @ 2003v JPC Architactso PLLC a 1.1 m 7 aM 1A 0 Alf -------- ---- ---rf - r. t. yy ro ZZZ ri W41 R. 3. f. ............. ...... . ..... IR ............ a. Loi �7y"qp lr4,�-lof w 71Rk 4w, .yr e';'7 o 70T 7- �WK • y. lK a. Ire Ai s. Yk YMAW 01 x. 'If ............ JEW VW v .1 7-1 71 ---------- SEMI 77 7777 7-7 ----------- e"f"