10-103563-ADCITY OF CITY HALL FILE Federal Way 33325 8th Avenue South Mailing Address: PO Box 9718 Federal Way, WA 98063-9718 (253) 835-7000 www.cityoffederalway.com August 26, 2010 Ed Abbott Abbott Heys Architect 1221 2nd Avenue, Suite 300 Seattle, WA 98101 RE: FILE #10-103563-00-AD; HAMPTON INN MODIFICATION REQUEST Dear Mr. Abbott: This letter approves two separate requests to modify approved site plan and project details for Hampton lim based on letters submitted on August 17, and August 18, 2010. Process III Project Approval for the new hotel building was granted on August 8, 20081 and the building permit was issued on July 31, 2009? Parking Lot Modification In a letter dated August 17, 2010, the applicant's engineer submitted a request to modify an interior parking lot landscaping island at the northeast corner of the hotel building to create a new compact parking stall. According to the letter, 136 square feet of landscaping would be eliminated with the new parking stall. This amount of landscaping was added to a landscape island at the southeast corner of the site, so there is no decrease in the amount of interior parking lot landscaping required for this project. The letter further notes that turning radii in the parking lot have been met with a 30-foot inside and a 50-foot outside radius as originally approved. The number of parking stalls approved under the August 6, 2008, land use decision is maintained with the modification request, and the amount of compact parking stalls is consistent with Federal Way Revised Code (FWRC) compact standards for the City Center Code zoning district. Garbage and Recycling Enclosure Modification In a letter dated August 18, 2010, the applicant requested a change to the materials of the garbage and recycling enclosure. Proposed is a CMU enclosure with gates made of Trex — a composite wood product. There is no change to the location and dimensions of the enclosure. The proposed material change maintains the look of the hotel building and meets City Center Code design guideline standards. With the approved modification request, there are no changes to site access points, easements, utilities, or impacts to sensitive areas, significant trees, or the environment. Compliance with Community Design Guideline standards is maintained. Pursuant to Federal Way Revised Code (FWRC) 19.15.090(2), "Subsequent Modification," the modification request does not constitute a change in use and is determined to have no substantial changes to the impacts on the neighborhood or the City as a result of the change. ' File #07-105269-UP 2 File #07-106838-MF Aub st 26, 2010 Page 2 Please contact Deb Barker, Senior Planner, at 253-835-2642 if you have any questions about this letter. Sincerely, A, r't� Greg Fewins, Director Community Development Services enc: Proposed parking stall addition dated 8/17/10 prepared by Pacific Engineering Design LLC Proposed garbage and recycling enclosure material changes dated 8/18/10 Abbott Heys and Associates, Inc. c: Mr. Koong Cho, Royal Hospitality, Inc., 8255 154t' Ave SE, Newcastle, WA 98059 Greg A. Diener, P.E., Pacific Engineering Design, LLC, via e-mail: greg@paceng.com Deb Barker, Senior Planner Scott Sproul, Assistant Building Official Joseph Szpek, Building Inspector 10-I03563 Doc, I.D. 55415 1 �' 1 t I 42 26. Oy — — — — f—R=30' \ APPROVED- PU% �,.W IF\Ij C� tatty c , �crn. - %0 7Q - E3 DEiio 1 ald 1. -_ 20 0 10 20 40 GRAPHIC SCALE SCALE: 1" = 20' W n 1 m M HAWrON INN Pacific ta,�.s s3rM AME. S.. A#�7 SUITEB �q - PAFKM Engineering M +'� w" g�'� DRAWN Iva.: asoas AT NE COMM Design, LLC � �� - m DRAWN BY. JF '�' ISSUE HATE: 8/17/2010 �p Civil Engineering and PACM PAGE 1 0F f Planning Consultants 0 00 L E APPROV.- F City old Federd V faa Dept. rs rl-r-41 frOl- . ..r Perna 5 '" By—..� 8 r. �T- 18'-0" - [GATE OP EFuG rn RtC41 HARpS NO. 183 HASP WILCOx I , I I / I I I I i I I I I I I 3- x 2" x 114" I I I ANGLE FRAME [LCANE BOLTS L 1�xfi�5 AW TEXTURED C iiFi I30ARpS Sp ACEQ 1/4" 4" LONG PIPE SLEEVES A A T, ATTACH TO ANGLE WITH SET IN CONC: FOR (2) CADIUM PLATED BOLTS PER BOARD CANE BOLTS GATE ELEVATION AT TRASH ENCLOSURE -•.......................................................................__. DRAWING NAME: _. G* DeAMINC7 5GALE- N ��✓ 5K NUMBER: 040610-RE-1,1 DATE: 5115110 SCALE: 3/8" 1'-0" APCHITEC7 EOwARL3 E. Am= STAT£ OF WASHINGTO{ 1 CEDAR FENCE 6' X:8" STL. POST TOP OF CONCRETE SLAB 121 2nd Ave f Sure 300 Seallle, WA ABBOTT HEYS =1( AND ASSOCIATES INC `h59?SG 7-10 architecture • interior design • planning 2xd NAILER 0 TOP, BO'T. E MID PONT G'XG' STEE_ COST. PAINTED PAINTED CMU RaCHARD WILCOX NO. BB-434 HINGE TOP, SOT. E MID PONT N.."7CH CE AR.A BOARD TO QE :EVE HINGES 24 NAILER BETWE=N -ORZ. 1411LERB 6 POST E GATE FRAME ALL 00POSED EDGcS O= a,3C — WOOJ AND STEEL: IS TO BE PAINTED TOP, BOTTOM AND ALL EDGcS. DRAWM6 NAME Gate Plan DRAI611146 SCALP: 3" = 1'-0" 5K NUMBEPto SK OW510-EA 1.1 ,DOB NUMBER: 0903 DATE &/15/10 1221 2nd Ave Sude 300 Seattle, WA 98101 phn: 206.2E WASH SLOPE 1/27 8' G.M.U. BOND BEAM W/ (2) # 4'S CONT. — PROVIDE HO21Z. DUR- A-WALL REINF. EVERY COURSE --� #69 V 48' O.C. FULL HEIGHT OF WALL 1/2" PREMOLDED JOINT FILLER --- 6" CONC. SLAB - #4'9 (V W O.C. :0WARD E. ABBOTT— ATE OF WASHI IGTON EXTERIOR $ INTERIOR CMU FINISH SPECIFICATION TO STO SYSTEM STO- POWERWALL STUCCO ON MASONRY MATCH BUILDING 19T FLOOR EXTERIOR (1) #4 HORIZ. CONT. -- BxSx16 SMOOTH FACE C.M.U.'s REINF CELLS GRADE 1 #6 DOWELS V 48' O.C. SECTION V CMU WALL Scale 1/2' = 1' - O" 0903-101 CMU Wca TRASH ENCLOSURE ................................... 7RA/`IiNG NA. tiIE: ................ ..-................ .tom .�.. ��. . _ �: s', `t`� _ -•----------- ........ ._._...__............................................................... r_ .- .._. I221 Znd Av= � DR�VYING SGr,—)=: `X L� � y ;eo 951G1 5K NQNIGER. 040c10-RE-1 1 ABBOTT HEYS ,ANL) .55GG''NTE_ INC F BYTE. arch110C111f0 InIBlIOf :lC'S1gfl planning 11 r STATE OF (Cii 7+i t tJ'd' � 30'-0w S 22 I 6' CONCRETE SLAB W/ 94 BARS AT WCONCRETE Ia@ W/ 04 BARS AT �12'acEA.WAv r t a �17ocEAV0 r_ ASPHALT PAVING 4" a� v N i llryyy � sA SLOPE B' 0 STEEL PIPE PATNTI;D. REF DiL SGA2 SLOPED RIDdE LINE N rE SI RA HENCLOSURETOACCflMODArE RECYCLING AEDDIREMENTSAND LOCAL ❑ROINANCES AND CODES TRASH ENCLOSURE v4^ = V4, -•---•---- �LI...... DRAYVIN6 N,4>r1► 'A DRAYMN5 5GAL5: 3< NUM3ER. 040610-RE-1 1 E: �5.115 /10 _r• Seale,_ �;� ABBOTT HEYS ANDASSuDATES INC IF--:� I archlleclure • Interior design • planning I DEPARTMENT OF CommuN'rrV DEVELOPMENT SERVICES 33325 8th Avenue South CITY OF - ry-gyp PO Box 9719 Federal Way WA 98063-9718 Federal Way 253 835-2C,07; Fax 253-835-2609 RESUBMITTAL INFORMATION This completed form MUST accompany all resubmittals "Please note.' Additional or revised plans or documents for an salve project will not be accepted unless accompanied by th/s completed form. Mailed resubmitta/s that do not include this form or that do not contain the correct number of copies will be resumed or discarded. You are encouraged to submit all items in person and to contact the Permit Counter prior to submitting ifyou are not sure about the number of copies required. " ANY CHANGES TO DRAWINGS MUST BE CLOUDED. Project Number. Project Name: Project Address: I I — Project Contact: kV Phone: RESUBMITTED ITEMS: # of Copies "' Detailed Description of Item Always submit the some number of copse§ as required foryour initial application." Resubmittal Requested by: Letter Dated: 66-1/e 1 /O t `aff !r- OFFICE USE ONLY RESUB P Distribution Date: By. Dept/Div Name # Descri tion Building Planning PW Fire Other Bulletin #129 — April 21, 2009 Page 1 of 1 k:\HandoutsResubmittal Intonation Deb Barker From: Ed Abbott [ed@aha-arch.com] Sent: Wednesday, August 18, 2010 2:01 PM To: Deb Barker; Hunter Rogers Cc: Koong Cho; Fred Smith; Alex Jansen Subject: Re: Garbage and Recycling enclosure - Hampton Inn Attachments: 0903trashenclo.pdf Deb, Trash Enclosure drawings for your review and approval as requested with City of Federal Way Resubmittal Information form.. Best, Ed Ed Abbott AIA Architect Abbott Heys & Associates Inc. 1224 2nd Ave., Suite 300 Seattle, WA. 98101 206.285.1224 x 102 206.285.9366 FAX ed@aha-arch.com On 8/18/10 9:06 AM, "Deb Barker"<Deb.Barker@cityoffederalway.com> wrote: Alex - Per my e-mail from yesterday, I am still waiting to receive a formal revision to the garbage and recycling enclosure and gates from Ed Abbott. I need receive this drawing and completed resubmittal information form before I come out to inspect the io6th parldng stall. Regards Deb Barker, Senior Planner City of Federal Way 33325 8th Avenue South, PO Box 9718 Federal Way, WA 98063-9718 253-835-2642 (p) 253-835-2609 (f) deb. barkeitei tyoffe de ralway . com From: Alex Jansen [ma ilto:aiansenC]jarlsenconstructioncam_pany.com] Sent: Wednesday, August 18, 2010 8:49 AM To: Deb Barker Cc: koongc:(@comcast.net; 'Fred Smith' Subject: Assignment of Funds Request - Hampton Inn Deb. Please see the attached letter regarding assignment of funds and the garbage enclosure gate. Please let me know if you require anything additional. Thanks. Alex Jansen President Jansen Construction Company 418 Beavercreek Rd, Suite 104 Oregon City, OR 97045 Phone (503) 607-1700 Fax (503) 607-1701