08-103631ECEH ED
JUL 31 2008 .
Federal way PERMIT -
33.3258'�.4CE:��L"E FEDERAPP',j:CATION
FGDEVL R-WA Y. lvi 5)8083.9718
2�3 895.2G0:• FaA ?i3 8:15 2609 CDS
71'IS' Y1[t "" G'+C 11Y1 ! .:7J1`I
-Lk-10-3l3L
Sit- MF 0 ME EL PL DE EN FP
The following is required information - an incomplete application will not be accepted. Please print legibly (in ink) or type.
PROPERTY1 • •
SITEADDRESS 31720 Gateway Blvd S, Federal Way, 98003 SUITE/UNIT #
ASSESSOR'S TAX/PARCEL # 0 9 2 1 0 1 - 9 1 8 5 LOT SIZE (sj) ' 10 2, 212 sq:
0921049035 2.256 acres
LEGAL DESCRIPTION (e.g. Acme Estates, Lot]) Spec if ically parcel 5&8 of KC LLA recording
#870S120940 inclusive in Krngit-h.cp—wpag,to, 4vudy1egNdescnpf-v County, Washington.
PROJECT•• •
TYPE OF PERMIT N BUILDING ❑ PLUMBING ❑ MECHANICAL
❑ DEMOLITION ❑ ELECTRICAL ❑ ENGINEERING ❑ FIRE PREVENTION SYSTEM
PROJECT DESCRIPTION (Provide detailed description of [.Lark included on this permit only)
Perform clearing and grading operations to achieve a subgrade elevation to
support hotel and perimeter parking (4,860 cy cut and 1,190 cy of fill)
(Clearing an7 Grading permit
PROJECT NAME (Narne Of Business or Owner Last Name)
PROPERTY
OWNER
CONTRACTOR
APPLICANT
PROJECT
CONTACT
LENDER
EXISTING USE
Hampton Inn & Suites
PEOPLE INFORMATION
NAME
Royal Hospitality, LLC
PRIMARY PHONE
(253)318 _0090
MAILING ADDRESS
Cny. STATE. ZIP
E-MAIL ADDRESS
8255 154th Ave SE
Newcastle, WA 98059
koongc@comcast.net
COMPANI" NAME
Wright Dev_West Coast LLC
APPLICANT NAME
Bob Wright
OFFICE PHONE
(503)484 - 1103
NUXIL[NG ADDRESS
2333 NW Vaughn St
CITY. STATE. ZIP 9 7 21 0
Portland/ OR
CIhV ELL PiF
) _
CF[Y OF FEDERAL WAY BUSINESS LICENSE NUMBER
EXPIRATION DATE
FAX NUI%TBF.R
( 503) 484 - 1119
CONTRACTOR'S REGISTRATION NUMBER
EXPIRATION DATE
E-KAILADORMS
WRIGHDW929BZ
01/09/2010
bob@bobwrightdev.com
CONTPANY" NANIF
Pacific Engineering Design, LLC
APPLICANT NAME
Darrin Sanford
OFFICE PHONE
(206) 431 _7970
�y�(l,[y(4Aj2DR�S$ rd Ave S , Ste 10 0
Se at t1e , WA 98188
CELL PHONE -
RELATIONSHIP TO PROJECT
Civil Engineer
FAX NUMBER
(206) 388 - 1648
❑ Architect ❑ Tenant ❑ Agent X Other
NAIAI PRIMARY PHONE E-MAIL ADDRESS
Pacific Engineering Design Darrin Sanford (206 ) 431 _ 7970 dsanford@paeeng.eom
Per RCW 19.27.095:
Lender information is required ifproject value exceeds $5,000
MAILING ADDRESS
CnY, STATE. ZIP PHONE
EXISTING ASSESSED/APPRAISED VALUE $
PROPOSED USE
VALUE OF PROPOSED WORK $
SPRINKLERED BUILDING? ❑ YES ❑ NO FIRE SUPPRESSION SYSTEM PROPOSED/REQUIRED? ❑ YES ❑ NO
WATER SERVICE PROVIDER ❑ LAKEHAVEN ❑ HIGHLINE ❑ TACOMA ❑ PRIVATE (WELL)
SEWER SERVICE PROVIDER 0 LAKEHAVEN ❑ HIGHLINE 0 PRIVATE (SEPTIC)
THIS CARD IS TO REMAIN ON -SITE
CIr,rOF Community Deveiopn,<,�nt Inspection Record
Federal Way IVR INSPECTION REQUEST PHONE # (253) 835-3050
PERMIT #: 08-103631-00-CO
Owner:
Address: 31720 GATEWAY BLVD S
FEDERAL WAY, WA 98003
This card is part of your required inspection documents. Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE T141 C'A RD.
Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please
schedule inspections as appropriate. Work must not
be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection
sequence. On -going inspections
are logged on the back of this card.
❑ Footings/Setback (4110)
❑
Foundation Wall (4115)
❑
Drainage/Downspout (4040)
Approved to place concrete
Approved to place concrete
Approved to backfill
By Date
By
Date
By
Date
❑
❑
❑ Re -steel (4215)
Slab/Concrete Floor (4255)
Underfloor Framing (4285)
Approved to place concrete or grout
Approved to place concrete
. Approved to sheath floor
By Date
By
Date
By
Date
❑
❑
❑ Floor Sheathing (4105)
Shear Walls (4245)
Roof Sheathing (4220)
Approved to install flooring
Approved to install siding
Approved to install roofing
By Date
By
Date
By
Date
❑ Fire/Draft Stops (4095)
Approved
By Date
NOTE: Prior to scheduling a Framing (4120)
inspection; Electrical, Plumbing & Mechanical
Rough -in and Fire/Draft Stop inspections must be
signed -off and approved. IBC 109.3.4/UBC 108.5.4
❑ Framing (4120)
Approved to insulate
By Date
❑
Insulation (4150)
❑ Gypsum Wallboard Nailing (4130)
❑
Suspended Ceiling Grid (4265)
Approved to install wallboard
Approved to install mud & tape
Approved to drop tile
By
Date
By Date
By
Date
I
❑
Final - Fire Department (4060)
❑ Final - Planning (4070)
❑
Final - Public Works (4080)
Approved
Approved
Approved
By
Date
By Date
By
Date
❑ Final - Building (4050)
Approved
B Date / ?
For inspector
❑ Rough Electrical
Approved
By Date
reference only
❑ FINAL - Electrical
Approved
By Date
City of Federal Way
Community Development Services
P.O. Box 9718
Federal Way. WA 98063-9718
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: HAMPTON INN & SUITES
Project Address: 31720 GATEWAY BLVD S
c
-,uilding - Commercial
Permit #: 08-103631-00-CO
Inspection Request Line: (253) 835-3050
Parcel Number: 092104 9185
Project Description: Clearing and grading operations to achieve a subgrade elevation to support new hotel and
perimeter parking. (4,860cy cut and 1,190cy fill)
Owner
Applicant
Contractor
Lender
ROYAL HOSPITALITY LLC
PACIFIC ENGINEERING DESIGN
JANSEN CONSTRUCTION CO OF
PI BANK
8255 154TH AVE SE
LLC
WASH
1 155 N 130TH RD
NEWCASTLE WA 98059
15445 53RD AVE S
JANSECC93408 (9/28/09)
SEATTLE WA 98133
SEATTLE WA 98188
418 BEAVERCREEK RD SUITE 104
OREGON CITY OR 97045
Census Category: 999 - Unknown
Includes:
# 1
#2
#3
#4
Occupancy Class:
Construction Type:
Occu anc Load:
Floor Area (sq. ft.)
0
0
0
0
y - Additional Permit Information:,'; '„+
Mechanical to be Included?........ ............................. No Number of Stories........................... ...............1
Permit for Building Shell Only? .............................No Plumbing to be Included? ....................................... No
Special Inspection(s) Required?.............................Yes New / Additional Sq. Feet - Total............:::........... 0
No Fixtures Associated With This Permit!! -.:.-,% �"i';ti
CONDITIONS:
THIS PERMIT IS FOR CLEARING, GRADING AND TEMPORARY EROSION CONTROL ONLY.
NO OTHER OTHER SITE WORK IS PERMITTED.
PERMIT EXPIRES Tuesday, October 13, 2009
Permit Issued on Monday, October 13, 2008
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and the City
/o�f_Federal Way.
Owner or agent: Date:
City of Federal Way
Community Development Services
P.O Box 9718
Federal Way, WA 98063-9718
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: HAMPTON INN & SUITES
Project Address: 31720 GATEWAY BLVD S
wilding - Commercial
Permit #: 08-103631-00-CO
Inspection Request Line: (253) 835-30.50
Parcel Number: 092104 9185
Project Description: Clearing and grading operations to achieve a subgrade elevation to support new hotel and
perimeter parking. (4,860cy cut and 1,190cy fill)
Owner
Applicant
Contractor
Lender
ROYAL HOSPITALITY LLC
PACIFIC ENGINEERING DESIGN
WRIGHT DEVELOPMENT WEST
ROYAL HOSPITALITY LLC
5255 154TH AVE SE
LLC
COAST LLC
5255 154TH AVE SE
NEWCASTLE WA 98059
15445 53RD AVE S
WRIGHDW929BZ (01/09/2010)
NEWCASTLE WA 98059
SEATTLE WA 98188
2333 NW VAUGHN ST
PORTLAND OR 97210
Census Category: 999 - Unknown
Includes:
# 1
#2
#3
#4
Occupancy Class:
Construction Type:
Occupancy Load:
Floor Area (sq. ft.)
0
0
0
0
Additional Permit Information
Mechanical to be Included? ................................... No Number of Stories......................
Permit for Building Shell Only? .............................No Plumbing to be Included? ....................................... No
Special Inspection(s) Required?.............................Yes New / Additional Sq. Feet - Total.......................... 0
No Fixtures Associated With This Permit ll
CONDITIONS:
THIS PERMIT IS FOR CLEARING, GRADING AND TEMPORARY EROSION CONTROL ONLY.
NO OTHER OTHER SITE WORK IS PERMITTED.
PERMIT EXPIRES Saturday, April 11, 2009
Permit Issued on Monday, October 13, 2008
1 hereby certify thqih e above information is correct and that the construction on the above described property and
the occupancy the use will be in accordance with the laws, rules and regulations of the State of Washington
and the City of Federal Way.
Owner or agent: �C �~ Date: