17-106091-PCr^�
CITY OF
A. Federal
Mr. Wayne Nelson
Encompass Engineering
165 NE Juniper Street, Suite 201
Issaquah, WA 98027
xvnelsengeric ; passes -net
caDenQencompasses.net
Way
FILE,
Re: File #17-106091-00-PC, PREAPPLICATION CONFERENCE SUMMARY
Kislyak Short. Plat, 34402 24th Place SW, Federal Way
Dear Mr. Nelsen:
CITY HALL
33325 8th Avenue South
Federal Way, WA 98003-6325
(253) 835-7000
www. cityoffederalway.. com
Jim Ferrell, Mayor
January 30, 2018
Thank you for participating in the preapplication conference with the City of Federal Way's Development
Review Committee (DRC) held January 11, 2018 . We hope that the information discussed at that meeting
was helpful in understanding the general requirements for your project as submitted.
This letter summarizes comments given to you at the meeting by the members of the DRC. The members
who reviewed your project and provided comments include staff from the City's Planning and Building
Divisions and Public Works Department, and representatives from Lakehaven Utility District and South King
Fire and Rescue. Some sections of the Federal Way Revised Code (FWRC) and relevant information handouts
are enclosed with this letter. Please be advised, this letter does not represent all applicable codes. In preparing
your formal application, please refer to the complete FWRC and other relevant codes for all additional
requirements that may apply to your project. The complete Federal Way City Code (FWCC) can be found on-
line at: h=://www.codepublishing.cgm:m IWA/Fe
The key contact for your project is Jim Harris (253-835-2652, or jim.harris@,tityoffederalwacom). For
specific technical questions about your project, please contact the appropriate DRC representative as listed
below. Otherwise, any general questions about the preapplication and permitting process can be referred to
your key contact.
PROJECT DESCRIPTION
Subdivision of one lot into seven residential lots; plus a storm drainage tract, public right -of way
improvements, and associated improvements.
MAJOR ISSUES
Outlined below is a summary of the major issues of your project based on the plans and information
submitted for preapplication review. These issues can change due to modifications and revisions in the plans.
These major issues only represent comments that the DRC consider most significant to your project and do
not include the majority of the comments provided. The major issues section is only provided as a means to
highlight critical requirements or issues. Please be sure to read the entire department comments made in the
next section of this letter.
Mr. Wayne Nelsen
Page 2of14
January 30, 2018
• Planning Division
o All residential subdivisions are required to provide open space in the amount of 15 percent of the
gross land area of the subdivision site per FWRC 18.55.060(2). All or some of the open space
requirement may be satisfied by a fee -in -lieu payment.
• Public Works Development Services Division
Major Issues — Stormwater
The preliminary plan has been submitted on the wrong vertical datum. The City of Federal Way's
standard datum is NGVD 29.
2. Water Quality Treatment will be Enhanced Basic in accordance with the 2016 King County Surface
Water De ign Manual (KCSWDM) and the City of Federal Way Addendum to the 2016 KCSWDM.
3. Due to a downstream constriction the developer will be required to provide Level 3 Flow Control, or
to correct the downstream constriction as part of this development.
Major Issues — Street
1. Preliminary assessment of required mitigation for cutting into 22nd Place SW for water, sewer, and
other utilities would be for grind and overlay of 22nd Place SW from the end of road to SW 344th Street.
• Public Works Traffic Division
■ Tranortation Concurrency Management (FWY�RC 19.90) — A transportation concurrency permit with the
application fee of ,$'1,620.00 is required for the proposed project.
■ Traffic Impact Fees (FWRC 19.91) — Traffic impact fees are required for single-family residential
dwelling units.
• Frontage Improvements (FWRC 19.135.040) — Construct street frontage improvements and dedicate
right-of-way along the north property line; extending SW 344th Place.
■ Access Management (FW IRC 19,135.260) — The development shall meet access management standards.
• Block Perimeter (FWRC 18.55.010 & FWYIRC 19.135.251) — The development shall meet block
perimeter requirements of 1,320 feet for non -motorized access, and 2,640 feet for streets.
R Intersection Sight Distance - Submit intersection sight distance analysis consistent with AASHTO standard.
DEPARTMENT COMMENTS
Outlined below are the comments made by the representatives of each department present at the preapplication
conference. Each section should be read thoroughly. If you have questions, please contact the representative
listed for that section.
File #17-106091-00-PC Doc ID: 77066
M
Mr. Wayne Nelsen
Page 3 of 14
January 30, 2018
COMMUNITY DEVELOPMENT — PLANNING DIVISION (Jim Harris, 253-835-2652,
'im.harris ci offederalwa .coin
1. Comprehensive Plan and Zoning De ignation — The city's comprehensive plan designation for the subject
property is Single -Family Residential — High Density. The property is currently zoned Single -Family
Residential (RS) 7.2.
Note that any area established as an ingress/egress easement, flagpole, access panhandle, or access tract
for each property must be deducted from the underlying parcel lot size per FWRC 19.05.120, definition
of "Lot Area." Please include this "net" lot area on the lot closure calculations and short plat document.
2. Short Plat Process — Pursuant to FWRC 18.30.010, short plat applications are administratively processed
through the Department of Community Development. The administrative review process requires that
the Director of Community Development issue a decision on the short subdivision request and confirm
conformance with FWRC 18.30.110(2). Public notice of the complete short plat proposal is required per
FWRC 18.30.080, and a 15-day public comment period is provided. However, no public hearing will be
required unless an appeal is filed.
If the director issues an approval of the short plat, the approval typically includes and requires
construction of associated infrastructure improvements. As required by the city's Public Works
Department, all infrastructure improvements must be designed, reviewed, and constructed prior to
recording the short plat.
Prior to construction of short plat improvements, engineering approval must be granted by the Public
Works Department. Please see Development Services Manager Cole Elliot's comments below for specific
information regarding engineering requirements.
A master land use application and short plat handout are enclosed; relevant code sections can be accessed
at: www.code u lishino,.com/WA/FedemLWay.
3. State Environmental Policy Act (SEPA) —The proposal is SEPA exempt.
4. Public Notice —The city will prepare and the applicant will post, a notice board or boards on the subject
property. Copies of the Notice of Application will also be posted at the city's designated public notice
areas and published in the Federal lay Mirror. One set of public mailing envelopes must be submitted
with the application. A handout regarding how to obtain mailing labels is enclosed.
5. Critical Areas There are no mapped or known critical areas within 200 feet of the site.
6. 5itz�le Family Residential Regulations — Existing and future residences must conform to the following bulk
and dimensional requirements of FWRC 19.200.010, "Detached Dwelling Units": front yard — 20 feet;
side yard — 5 feet; and rear yard — 5 feet.
Please refer to FWRC 19.05.160, `Properly Line" definition for the flag lot setbacks illustration to see how
the building setbacks should be applied.
File #17-106091-00-PC Doc ID: 77066
Mr. Wayne Nelsen
Page 4of14
January 30, 2018
Orivawey
for Lot 71
Access
Easemtnl
for Lot 1
........ , aye_.. _. _.._ _
r�
'
Lot 2 i
i
r
1
; i Lot 1
s•arr
Or
Lot 2
Driveway Not an arterial
for trot 2 or principal collector
Flag Lot Setbacks
Lot 2
Lot 9
N
i__..••--------
Driveway for Lot 2 Arterial or
and Access Easement-principal
for Lot 1
Lot 3
zW
Driveway ;
for Lot 3 Lot 2
and Access
Easement ,. .r�-------
for Lat 2
Lot 1 ti
� . zo•
Not an arterial
or principal collector
1= = Front Yard
S = Side Yard
R = Rear Yard
Lot coverage for residential uses is limited to 60 percent and includes all impervious surfaces, such as
driveways, walkways, patios, and roof overhangs. Maximum height of structures is 30 feet above average
building elevation.
Driveway and/or parking pad in a required front yard may not exceed 20 feet in width (except as
specified in FWRC 19.130.240[1][b]), and may not be closer than five feet to any side property line.
The existing deck on proposed Lot No 1 must be at least five feet from any future property line.
File #17-106091-00-PC Doc ID: 77066
Mr. Wayne Nelsen
Page 5 of 14
January 30, 2018
7, Private Access Design — A handout drawing 3-2CC is enclosed that shows the required width for shared two
lot access. The handout is from the Public Works Development Services Manual.
8. Open Space All residential subdivisions are required to provide open space in the amount of 15 percent of
the gross land area of the subdivision site per FWRC 18.55.060(2). All or some of the open space
requirements may be satisfied by a fee -in -lieu payment at the discretion of the Parks Director, after
consideration of the city's overall park plan, quality, location, and service area of the open space that
would otherwise be provided with the project. If the fee -in -lieu option is chosen, a written request to the
Parks Director is required. A copy of this request is a required as a component of the short plat
application. Open space fees shall be paid prior to recording the short plat. Refer to FWRC 19.100.070,
"Timing of Fee Payments."
9. Landscaping Around Pond — A minimum width of three to five feet of landscaping strip for pond screening
is required between the pond and roadway per FWRC 19.115.050.
10. Tree Retention/Replacement— The city's tree standards require each development/redevelopment to
maintain a tree unit density. The minimum tree density requirements for RS zones are 25 tree units per
acre. A tree retention plan prepared by a certified arborist, or a certified landscape architect, detailing how
the subject property will meet tree unit density requirements shall be submitted with the short subdivision
application. Items required to be included in the plan are itemized in FWRC 19.120.040(2)(a) through (e).
The table below identifies tree unit values for retained and replacement trees.
FWRC 19.120.130-2 — Tree Unit Credits
Retained Trees
Tree Unit Credit
Existing Tree 1" to 6" d.b.h.
1.0
Existing Tree > 6" to 12" d.b.h.
1.5
Existing Tree > 12" to 18" d.b.h.
2.0
Existing Tree > 18" to 24" d.b.h.
2.5
Existing Tree > 24" d.b.h.
3.0
Replacement Trees
Replacement Tree - Small (Mature canopy area < 450 SF)
.50
Replacement Tree - Medium (Mature canopy area 450 to 1,250 SF)
1.0
Replacement Tree - Large (Mature canopy area > 1,250 SF)
1.5
11. Clearing & Grading— A clearing and grading plan addressing items listed in FWRC 19.120.040(1)(a)
through 0) is required with a short subdivision application. Prior to beginning clearing and grading
activities, all trees/vegetation that are to be preserved within and adjacent to the construction area shall
be clearly marked and protected per guidelines prescribed within FWRC 19.120.160.
File #17-106091-00-PC Doc ID: 77066
Mr. Wayne Nelsen
Page 6 of 14
January 30, 2018
12. De ign Criteria and Improvements — Short plats are subject to the subdivision design and improvements
criteria set forth in FWRC Chapters 18.55 and 18.60, respectively. It is the responsibility of the applicant
to identify how the proposed short subdivision meets applicable design and improvements criteria and is
therefore, entitled to the land division.
13. Sewage Disposal— The applicant must provide documentation that each lot in the subdivision will either
connect to the sanitary sewer system, or provide an on -site septic system. Wherever feasible, all lots in the
short plat shall be connected to sanitary sewer system; see comments from the Lakehaven Water & Sewer
District, below. A sewer availability certificate from the Lakehaven Water & Sewer District must be
provided with the short plat application if sanitary sewer is to be used.
If connection to the sanitary sewer system is not feasible, on -site sewage disposal may be utilized. The
design and construction of the septic system must be approved by the Public Health -Seattle & King
County. Provide a copy of the Health Department Subdivision Pre -Application Report. If on -site septic
systems are provided, prior to short plat recording, the applicant must obtain the Public Health -Seattle &
King County signature on the short plat document and provide a copy of their signed Application for
Final Subdivision.
14. Water— A water availability certificate from Lakehaven Water & Sewer District must be provided with the
short plat application.
15. School Access Analysis —Pursuant to FWRC 18.55.070, pedestrian and bicycle access should be provided
for established or planned safe school routes, bikeways, trails, transit stops, and general circulation. Please
provide an analysis of access routes for schools serving this proposed short plat. Contact Jennifer
Wojciechowski with Federal Way Public Schools at 253-945-2071, or j_wojcieCa &ms.or% for information
about the school access analysis requirements and assignment information.
16. School Impact Fees —School impact fees are due at the time of building permit for new dwelling units. This
fee amount is subject to change as determined annually by the Federal Way School District. Please check
with the Permit Center, as mentioned below, for up-to-date fees.
17. Administrative Fees— Please contact the Permit Center at permitcenter citvoffederalNvay.com, or 253-835-
2607, for current short subdivision review fees. The applicant will also be responsible for transportation
concurrency, engineering review (EN), and King County recording fees.
18. Approval Duration — Short plat approval expires five years from the date of approval, per FWRC
18.30.260. Engineering plans must be approved, improvements constructed, and the plat must be
recorded within the five-year time period. Pursuant to FWRC 18.05.090, no less than 60 days prior to the
lapse of approval, the applicant may request a two-year time extension for the plat approval.
19. Recording — The applicant will record the short plat with the King County Division of Records and Elections
following final approval of the short plat document, completion of infrastructure, and Public Works
Department approval of as -built plans. Prior to recording the short plat, water and sewer completion letters
must be provided to the city and all surveying and monumentation must be complete. In addition, all other
required improvements must be substantially completed as determined by the departments of Community
Development and Public Works. The open space fee -in -lieu must be paid in full prior to recording.
File #17-106091-00-PC Doc ID: 77066
Nir. Wayne Nelsen
Page 7 of 14
January 30, 2018
PUBLIC WORKS — DEVELOPMENT SERVICES DIVISION (Cole Elliott, P.E., 253-835-2730,
cole.elliot e citp deralway.com )
Land Use Issues — Stormwater
Surface water runoff control and water quality treatment will be required per the 2016 King County Surface
Water Design Manual (KCSWDM) and the City of Federal Way Addendum to the manual. This project
meets the requirements for a Full Drainage Review. At the time of land use site plan preliminary short
plat submittal, a preliminary Technical Information Report (TIR), addressing the relevance of the project
to the nine core and five special requirements of the KCSWDM will be required. A Level 1 downstream
analysis shall also be provided in the preliminary TIR. The city addendum can be found at the following
website: -,v%vw.citvoffederalwa .com node 1467.
2. The project lies within an area with an identified flow control restriction downstream; thus, the applicant
must design the flow control facility to meet this performance criterion, level 3 flow control. In addition
to flow control facilities, Best Management Practices (BMP's) are required as outlined in the KCSWDM.
The project also lies within an Enhanced Basic Water Quality Area. Water quality treatment shall be
designed to meet the treatment criteria of the Enhanced Basic Water Quality Menu.
3. If infiltration is proposed, soil logs prepared by a licensed geotechnical engineer, or septic designer, must
be provided to verify infiltration suitability.
4. Detention and water quality facilities for short plats outside the City Center Core must be above ground
(i.e. open pond). For short plats, the detention and water quality facilities shall be within a separate tract
that will be owned and maintained by the owners of the platted lots. Underground facilities are allowed
only with approval from the City of Federal Way Public Works Department.
5. Show the proposed location and dimensions of the detention and water quality facilities on the
preliminary plans.
6. If more than one acre will be disturbed during construction, a National Pollutant Discharge Elimination
System (NPDES) construction stormwater permit may be required. Information regarding this permit
can be obtained from the Washington State Department of Ecology at 360-407-6048, or
http: / /www. ecy.wa. gov/ programs /wq/ s tormwater/ cons truction/index.html.
Right -of -Way Improvements
1. See the Traffic Division comments from Senior Traffic Engineer Erik Preston for traffic related items.
2. If dedication of additional right-of-way is required to install street frontage improvements, the dedication
shall be conveyed to the city through a statutory warranty deed. The dedicated area must have clear title
prior to recording.
3. Preliminary assessment of required mitigation for cutting into 22nd Place SW for water, sewer, and other
utilities would be for grind and overlay of 22nd Place SW, from the end of road to SW 344t), Street.
4. All stormwater treatment and detention requirements outlined above may apply to any improvements
within the public right-of-way.
FAe #17-106091-00-PC Doc ID: 77066
IVIr. Wayne Nelsen
Page 8 of 14
January 30, 2018
FWRC 19.135.280 requires that driveways serving residential uses may not be located closer than 25 feet
to any street intersection. Lots and intersections within new subdivisions or short plats must be designed
to meet this standard.
EN Permit Issues
1. Engineered plans are required for clearing, grading, road construction, and utility work. Plans must be
reviewed and approved by the city. Short plats are charged $1,669 for the first 12 hours of review.
Additional review time is charged at $139 per hour. A final TIR shall be prepared for the project and
submitted with the engineering plans. Both the TIR and the plans will require the signature/seal of a
professional engineer registered/licensed in the State of Washington.
2. In addition to engineering approval, short plats and subdivisions are required to obtain a separate permit
for grading. Details and fees may be obtained from the Building Division.
3. The Federal Way Public Works Development Standards Manual (including standard detail drawings, standard
notes, and engineering checklists) is available to assist the applicant's engineer in preparing the plans and
TIR on the city's website at: «nvw.cit;roffederalway.com/node/1467.
4. Bonding is required for all street improvements and temporary erosion and sediment control measures
associated with the project. The bond amount shall be 120 percent of the estimated costs of the
improvements. An administrative fee deposit will need to accompany the bond to cover any possible
legal fees in the event the bond must be called. Upon completion of the installation of the improvements,
and final approval of the Public Works Inspector, the bond will be reduced to 30 percent of the original
amount and held for a two-year maintenance period.
5. The developer will be responsible for the maintenance of all storm drainage facilities (including the
detention and water quality facilities) and street systems during the two-year maintenance period. During
that time, the Public Works Inspector will make periodic visits to the site to ensure the developer's
compliance with the maintenance requirements. Upon satisfactory completion of the two-year
maintenance period, the remainder of the bond will be released. Maintenance for public roads and
subdivision drainage facilities then become the responsibility of the city. Maintenance for private roads
and drainage facilities, including short plats, remain the responsibility of the individual property owners.
6. When topographic survey information is shown on the plans, the vertical datum block shall include the
phrase "DATUM: N.G.V.D.-29" or "DATUM: K.C.A.S.," on all sheets where vertical elevations are
called out.
7. Drawings submitted for plan review shall be printed on 24" x 36" or 22" x 34" paper. Site plans shall be
drawn at a scale of 1" = 20', or larger. Architectural scales are not permitted on engineering plans.
8. Provide cut and fill quantities on the clearing and grading plan.
9. Temporary Erosion and Sediment Control (TESC) measures, per Appendix D of the 2016 KCSWDM,
must be shown on the engineering plans.
10. The site plan shall show the location of any existing and proposed utilities in the areas affected by
construction.
File #17-106091-00-PC Doc ID: 77066
Mr. Wayne Nelsen
Page 9 of 14
January 30, 2018
PUBLIC WORKS — TRAFFIC DIVISION (Erik, Preston, PE, 253-835-2744,
erik. rest n ci offederalwa .c m)
Transportation Concurrency Analysis (FWRC 19.90)
1. Based on the submitted materials for six new single-family residential lots, the Institute of Transportation
Engineers JTE) Trip Generation - 8th Edition, land use code 210 (Single -Family Detached Housing), the
proposed project is estimated to generate approximately six new weekday PM peak hour trips.
Alternatively, the applicant may submit a site specific trip generation study for the proposed development.
2. A concurrency permit is required for this development project. The PW Traffic Division will perform a
concurrency analysis to determine if adequate roadway capacity exists during the weekday PM peak
period to accommodate the proposed development. Please note that supplemental transportation analysis
and concurrency mitigation may be required if the proposed project creates an impact not anticipated in
the six -year Transportation Improvement Plan (TIP).
3. The estimated fee for the concurrency permit application is $1,620.00 (1 — 10 trips). This fee is an
estimate and based on the materials submitted for the preapplication meeting. The concurrency applicant
fee must be paid in full at the time the concurrency permit application is submitted with the land use
application. The fee may change based on the new weekday PM peak hour trips as identified in the
concurrency trip generation. The applicant has the option of having an independent traffic engineer
prepare the concurrency analysis consistent with city procedures; however, the fee remains the same.
Transportation Impact Fees (TIF) (FWRC 19.91)
Based on the submitted materials for six new single family lots, the estimate total traffic impact fee is
,$''23,948.37. The actual fee will be assessed and collected from the applicant when the building permit is
issued, using the fee schedule then in effect (FWRC 19.100.070 3[c]). At any time prior to building permit
issuance, the applicant may request to defer to final building inspection the payment of a transportation
impact fee for a single-family residential dwelling unit (FWRC 19.100.075). If this option is selected, a
covenant prepared by the city to enforce payment of the deferred fees will be recorded at the applicant's
expense. Refer to defer payment of impact fee code for process.
Street Frontage Improvements (FWRC 19.135)
The applicant/owner would be expected to construct street improvements consistent with the planned
roadway cross -sections as shown in Map III-4 in Chapter III of the Federal Way Comprehensive Plan
(FWCP) and Capital Improvement Program (CIP) shown as Table III-10 (FWRC 19.135.040). Based on
the materials submitted, staff conducted a limited analysis to determine the required street improvements.
The applicant is expected to construct improvements on the following street to the city's planned
roadway cross -sections:
The east -west street shall be Type a ' W ' local street, consisting of a 28-foot street with curb
and gutter, 4-foot planter strips with street trees, 5-foot sidewalks, and street lights in a 52-
foot right-of-way for a full width street. A 36-foot right-of-way dedication and 3/4-street
improvements, that include a minimum pavement width of 24 feet (14' to centerline + 10',
per FWRC 19.135.040[1D, are required as measured from the street centerline, OR far side
edge of travel way.
File #17-106091-00-PC Doc ID: 77066
Mr. Wayne Nelsen
Page 10 of 14
January 30, 2018
2. The applicant may be required to dedicate additional right-of-way to accommodate roadway tapers, or a
property corner radius, especially from lot 7.
3. The applicant may make a written request to the Public Works Director to modify, defer, or waive the
required street improvements (FWRC 19.135.070). Information about a right-of-way modification
request is available through the Public Works Development Services Division. The modification request
has a nominal review fee currently at $'298 ($278.00 plus $20 recording fee).
4. Tapers and transitions beyond the project frontage may be required as deemed necessary for safety
purposes, taper rate shall be WS^2/60, or as directed by the Public Works Director.
Access Management (FWRC 19.135)
1. Access management standards are based on roadway safety and capacity requirements. FWRC 19.135.280
provides access standards for streets based on planned roadway cross -sections. Please note that access
classifications are per Drawing 3-1A in the Public Works Development Standards.
2. Driveways that serve only a residential use may not be located closer than 25 feet to any street
intersection or driveway. Separation distances shall be measured from centerline to centerline of
roadways and driveways.
3. More information is required regarding the subject parcel's access rights, and those of future subdivided
lots to SW 344f Place, which is a private road in a tract.
4. If shared access for Lots 1 and 2 is desired, access could be shared in a 20-foot easement or private tract
with a 16-foot pavement width per Dwg. No. 3-2CC.
Design Criteria (FWRC 18.55)
1. Block perimeters shall be no longer than 1,320 feet for non -motorized trips, and 2,640 feet for streets
(FWRC 18.55.010 and FWCP Policy TP4.2). Therefore, an east/west connection along the north side of
the property would be required.
2. All lots shall be accessed by a public street right-of-way (FWRC 18.55.020). In certain cases, lots may be
accessed by an ingress/egress and utilities easement or alley subject to the requirements established in the
City of Federal Way Public Works Development Standards. Residential lots should not have access onto
arterial streets.
3. Traffic calming devices, such as speed humps, traffic circles, chicanes, etc. should be incorporated in the
residential street design and may be required to control speed and any potential cut -through traffic.
Miscellaneous Safety Related Comments
1. Driveways serving a single family dwelling unit abutting two streets should be at least 25 feet from the
beginning of the street radius.
File #17-106091-00-PC Doc ID: 77066
Mr. Wayne Nelsen
Page 11 of 14
January 30, 2018
COMMUNITY DEVELOPMENT — BUILDING DIVISION (Peter Lawrence, 253-835-2621,
Peter.Lawrence ci ❑ffederalwa .com)
No comments provided on the short plat preapplication.
LAKEHAVEN WATER & SEWER DISTRICT (Brian Asbury, 253-946-5407, BAshuty@lakehay�n_.or )
Water
A Water Certificate of Availability issued separately by Lakehaven may be required to be submitted with any
land use and/or building permit applications (check with land use agency for requirement). The certificate is
valid for one year from date of issuance. If a certificate is needed, allow one to two working days to issue for
typical processing. The 2018 cost for a Water Certificate of Availability is $60.00.
Hydraulic model results (FF #331, copy enclosed) indicate that Lakehaven's standard maximum allowable
system liquid velocity of 10 ft/s, at no less than 20 psi, is exceeded at a fire flow rate above 1,500 GPM.
This flow figure depicts the calculated performance of the water distribution system under high demand
conditions. Fire flow rates greater than available in the existing distribution system may be accommodated
through water distribution system improvements. Please contact Lakehaven for further detail.
A Lakehaven Developer Extension (DE) Agreement will be required to construct new water distribution
system facilities for the proposed development, including extend -to -far -edges) in accordance with long-
standing Lakehaven policy. Additional detail and/or design requirements can be obtained from Lakehaven by
completing and submitting a separate application to Lakehaven for either a Developer Pre -Design Meeting,
or a DE Agreement. Lakehaven encourages owners/developers/applicants to apply for Lakehaven processes
separately to Lakehaven, and sufficiently early in the pre-design/planning phase to avoid delays in overall
project development.
• Lakehaven has no record of a formal easement that covers Lakehaven's water system facilities on the adjacent
property (parcel 894720TRCT, private roads 246, Place SW & SW 344th Place). Execution of a formal
easement will required, for the (minimum) area of the new point -of -connection to existing water system
facilities in 24t" Place SW. If associated with a Developer Extension Agreement the applicant/ developer shall
have prepared and submitted to Lakehaven the appropriate legal description(s) and graphical depiction(s) of
the proposed easement area(s). Lakehaven will review the descriptions and depictions and, when approved,
prepare and transmit the easement documents to the applicant/developer for formal execution.
• The site has one existing water service connection (WtrSvc 19231, W x 3/a" meter).
• The associated DE Agreement must achieve a point of either substantial completion or acceptance, as
deteaYruned by Lakehaven, prior to activating any new domestic or irrigation water service connections,
• Based on the proposal submitted, preliminary estimated Lakehaven water service connection fees, charges,
and/or deposits (2018 schedule) will be as follows. Actual connection charges will be detem nzed upon
submittal of service connection application(s) to Lakehaven. A developer latecomer charge is assessable
against the property for water facilities previously constructed that provide direct benefit to the property.
File #17-106091-00-PC Doc 1D: 77066
Mr. Wayne Nelsen
Page 12of14
January 30, 2018
This latecomer charge expires March 11, 2028. If a DE Agreement is required, latecomer charges are due
prior to and as a condition of scheduling the Lakehaven DE preconstruction meeting. Connection charges
are separate from any DE fees, charges, and/or deposits and are due at the time of application for service. All
Lakehaven fees, charges, and deposits are typically reviewed and adjusted (if necessary) annually, and are
subject to change without notice.
'+ Water Meter Installation, 1" preliminary size: $490.00 charge per meter. Actual size TBD by Lakehaven
based on UPC plumbing fixture count.
■ Capital Facilities Charge(s)-Water: $3,707.00 per Equivalent Residential Unit (ERU). Water system
capacity credits are available for this property from system capacity charges previously assessed, paid
directly to Lakehaven, and/or credited to the property for 2.00 ERU. Please contact Lakehaven for
further detail.
■ Latecomer Charge (Eagle Manor, estimated): $7,241.15. This amount is currently estimated, and should
be finalized in early 2018.
Sewer
• A Sewer Certificate of Availability issued separately by Lakehaven may be required to be submitted with any
land use and/or building permit applications (check with land use agency for requirement). The certificate is
valid for one year from date of issuance. If a certificate is needed, allow one to two working days to issue for
typical processing. The 2018 cost for a Sewer Certificate of Availability is $60.00.
• A Lakehaven Developer Extension (DE) Agreement will be required to construct new sanitary sewer system
facilities necessary for the proposed development, including extend-to-far-edge(s) in accordance with long-
standing Lakehaven policy. Additional detail and/or design requirements can be obtained from Lakehaven by
completing and submitting a separate application to Lakehaven for either a Developer Pre -Design Meeting,
or a Developer Extension Agreement. Lakehaven encourages owners/developers/applicants to apply for
Lakehaven processes separately to Lakehaven, and sufficiently early in the pre-design/planning phase to
avoid delays in overall project development.
• The site does not have an existing sewer service connection.
■ The associated DE Agreement must achieve a point of either substantial completion or acceptance, as
determined by Lakehaven prior to activating any new sewer service connections.
Based on the proposal submitted, preliminary estimated Lakehaven sewer service connection fees, charges,
and/or deposits (2018 schedule) will be as follows. Actual connection charges will be determined upon
submittal of service connection application(s) to Lakehaven. A developer latecomer charge is assessable
against the property for sewer facilities previously constructed that provide direct benefit to the property.
This latecomer charge expires March 11, 2028. If a DE Agreement is required, latecomer charges are due
prior to and as a condition of scheduling the Lakehaven DE preconstruction meeting. Connection charges
are separate from any DE fees, charges, and/or deposits and are due at the time of application for service. All
Lakehaven fees, charges, and deposits are typically reviewed and adjusted (if necessary) annually, and are
subject to change without notice.
File #17-106091-00-PC Doc 1D: 77066
Mr. Wayne Nelsen
Page 13 of 14
January 30, 2018
in Sewer Service Connection Permit: $280.00 fee per lot.
■ Capital Facilities Charge(s)-Sewer: $3,509.00 per Equivalent Residential Unit (ERU).
■ Latecomer Charge (Eagle Manor, estimated): V 7,240.72. This amount is currently estimated, and should
be finalized in early 2018.
General
■ All Lakehaven Development Engineering related application forms, and associated standards
information, can be accessed at Lakehaven's Development Engineering web pages:
h ttp: / /wvAv.lakehav en. org /204/ D evelol2mcn t-1 :ng n ge ring.
• All comments herein are valid for one year and are based on the proposal(s) submitted and Lakehaven's
current regulations and policies. Any change to either the development proposal(s), or Lakehaven's
regulations and policies may affect the above comments accordingly.
SOUTH KING FIRE AND RESCUE (Chris Cahan, 253-946-7243, chris.caliaula southkingfire.org)
Water Supply
Fire Flow
A Cer'tificaie of WaterAvailability shall be requested from the water district and provided at the time of building
permit application.
Fire Hydrants
The existing fire hydrants on SW 344th Place will be sufficient for this project.
Fire hydrants shall be in service prior to and during the time of construction.
Emergency Access
Fire apparatus access roads shall comply with all r-eguirernents of Fire Access Policy 10.006:
h=-./1southkingfu-c.=/Documr-ntCenterZI-lome/ Vie«yrJ24.
Fire apparatus access roads shall be installed and made serviceable prior to and during the time of construction.
Fire Sprinkler System
The need for an NFPA 13D fire sprinkler system will be determined at the time of building permit submission.
CLOSING
This letter reflects the information provided at the preapplication meeting and is intended to assist you in
preparing plans and materials for formal application. We hope you found the comments useful to your project.
We have made every effort to identify major issues to eliminate surprises during the city's review of the formal
application. The completion of the preapplication process in the content of this letter does not vest any future
project application. Comments in this letter are only valid for one year as per FWRC 19.40.070(4).
File #17-106091-00-PC Doc ID: 77066
Mr. Wayne Nelsen
Page 14 of 14
January 30, 2018
As you know, this is a preliminary review only and does not take the place of the full review that will follow
submission of a formal application. Comments provided in this letter are based on preapplication materials
submitted.
Modifications and revisions to the project as presented for this preapplication may influence and modify
information regarding development requirements outlined above. In addition to this preapplication letter,
please examine the complete FWRC and other relevant codes carefully. Requirements that are found in the
codes that are not addressed in this letter are still required for your project.
If you have questions about an individual comment, please contact the appropriate department representative
noted above. Any general questions can be directed towards the key project contact, Jim Harris, at 253-835-
2652, or iiin.harris@citvoffederalway.coin . We look forward to working with you.
Sincerely,
un Harris
Senior Planner
enc: Master Land Use Application
Short Plat Handout
Mailing Label Handout
Meeting Sign in Sheet
Street Cross Section W
PW Drawing 3-2CC
Lakehaven Hydraulic Model Flow Estimate
Lakehaven Water Map
c: Cole Elliot, Development Services Manager
Erik Preston, Senior Traffic Engineer
Brian Asbury, Lakehaven Water & Sewer
Chris Cahan, South King Fire & Rescue
Pile #17-106091-00-PC Doc ID: 77066
Jim Harris
From: ECY RE SEPA HELP <sepahelp@ECY.WA.GOV>
Sent: Friday, January 26, 2018 12:15 PM
To: Jim Harris
Subject: RE: Exemption question assistance
Hello Jim,
This is a tricky issue because the short plat exemption is a type of agency decision (land -use decision) and can
be interpreted to only apply to the scope of that land -use decision. My advice is that if, under your land -use
authority, the short plat decision includes the approval of the road expansion, then the entire proposal can be
considered exempt under 800(6). However, if these are two separate "agency actions" that are interdependent,
then the entire proposal is not exempt from SEPA due to the applicability of WAC 197-11-305 (if part of a
proposal is not exempt then SEPA review is required on the entire proposal).
I hope that helps clarify a bit, sorry it is a bit of a gray area.
Thank you,
Annie Szvetecz
SEPA Policy Lead
Washington Department of Ecology
annie. s zyetecz era? a cy.wa.Zo_v
From: Jim Harris [mailto:Jim.Harris@cityoffederalway.com]
Sent: Thursday, January 25, 2018 8:32 AM
To: ECY RE SEPA HELP <sepahelP@ECY.WA.GOV>
Subject: Exemption question assistance
SEPA Staff:
I am in the preliminary stage of reviewing an 8 lot short plat that would include construction of a new right of way and
two lanes of new roadway.
Per WAC 197-1-800 (6) (d) the short plat land use decision is exempt from SEPA review (it is not on lands covered by
water)
However, the action of dedicating new Right of way and constructing a new 2 lane public roadway is not exempt as it
does not meet any of the exemptions in WAC 197-11-800(2)(d)
So, my question is: Does this proposal require SEPA review due to the non-exempt new roadway improvements?
Any assistance you can provide is appreciated.
Jim Harris
Senior Planner
Fedemi Way
33325 8th Avenue South
Federal Way, WA 98003-6325
Phone:253/835-2652 Fax: 253/835-2609
www.cit ofederalwa .corn
Office Hours Mon - Thur, 8:00 AM — 4:30 PM or by appointment
Lakehauen
2421039115
2400
C 8"AC
"AC
2421039005
34249
"AC a
8"
Q
ii as 8947200060 8947200070 8947200080 8947200090 8947200100
= 34406 2319 2311 2303 2223 4
Ex. Co
T947200010Ex.
Hydr� nt DI 8 DI8"PVC
8947200110
vc 19231 4" Meter 34402 a
14121011
2125
1412101 0
2131
9574800014
34435
9574800015
6" AC 9574800010 11 G" AC
SW 346TH ST
01147002 2217
114700180 2231
2323 11470019 11470021 11470023 40
11470025 11470027
231 22303 2225 2211 11470026 2131
114700200
2309 2203
NOTE: Lakehaven Water and Sewer
District neither warrants nor guarantees
the accuracy of any facility information
provided. Facility locations and conditions
are subject to field verification.
Kislyak Short Plat
17-106091-00-PC
0 100 200
Feet 1/12/2018 1
Ex. 8" Mai
(Acti ve)
2421039005
34249
Ex. 8" Ma
SW 344THST (Active)
8947200130
1 2 3
5
[[
Tract B
New H
drant
z
720
Q }
.f
Ne 8":Main
ew 4" Main
( ctive)
(Active ,
6
NoijYe amplete
; ;Not YetCom�)e
CO
7
u
i
1
12 11 10
9
NOTE: Lakehaven Water and
District neither weriants nor gus
the accuracy of any facility infc
provided. Faciffty locations and co
are subject tofield verification.
8
9574800014
34435
9574800015
Water Certificate of Availability N
Parcel (original) 8947200120 - Eagle Manor
a W log
Feel 12/5/2016 BIA
696 LLC wtr Eagle Manor 8947200120.docx (10/18/16) Page 2 of 2
Lakeh aven Water and Sewer District
Hydraulic Model Fire Flow Estimate
Request/Reporting Form
Requested By:
Eagle Manor
Date:
11/29/16
Location to be Modeled: 21xx SW 344`i' Pl (APN 8947200120)
Lakehaven V4 Section Grid:
F/12
intersection:
SW 344 PI & 22" d Ave SW —180 ft East
Add. Description:
See attached map
Pressure Zone: 538
Results By:
John Bow1nm4v
Date:
12/15/16
Model Run No.:
Master Water System Model 2007.net
FF #331
Condition
Pressure (psi)
Flow (gpm)
Static
53
0
Fire Flow
20
2400
NOTES:
Lakehaven's adopted level of service goals for fire flow rates are 1000 gpm within single
family residential areas (including duplexes) and 2500 gpm for multi -family, commercial,
industrial areas.
Model results depict the theoretical performance of the water system under high demand
conditions and are not guaranteed to represent actual system performance. A design
professional should be consulted for site specific design purposes.
The calculated fire flow capacity in the above table is based on a currently available residual
system pressure of 20 psi at the location modeled. The model indicates that Lakehaven's
standard maximum allowable velocity of 10 ft/s is exceeded at a fire flow rate above 1500
gpm. Fire flow capacities greater than 1500 gpm may be accommodated through water
system improvements.
121516FF 331 - Eagle Manor (Form Rev. 12/6/13)
CITY OF FEDERAL WAY ~ 1
DEVELOPMENT REVIEW COMMITTEE (DRC)
Preapplication Conference Sign -In Sheet
17-106091-PC, Kislyak Short Plat Pre -Application Conference
January 11, 2018
NAME
WITH
PHONE & EMAIL
Im rc s
l
25-3 �'3� -�
�,� .
c
_H
_
c� a es, vac
Ll e.
��► �,r � v��-s
sus � �3s - a ":3 0
L))�.Ak
n
�2-s ,-93s-Q7yy
19Rc 5Sy F--
L- etjAv&j wk
5;aue vcS .
253 - *6 -.SSF0
7—x
Of
s .
VS
Af
410
-.e 'j�►'iLT" :�}a^i_ .±. i�;' 1 'M - '; -:�P; •. � �. ,.�' �� •.w d•i ", _ JRo+'• � -
.-low # u
lWW
ty
. s:- t••• r;= 1 -mot• ,r - ?4'1 �`-' _-¢ `�_.-�.. - _ ,-� - - /'
MAY
-49
>•._•�_V'S iy'i. :�` �� ,T���j�"t:� ��Y��' fY- � �� 'rt .ram. ,1 W�
qu{lf�4'''.+
No
1 . !L . s 1�L•- ! t t
10 4�1
•46
r.�
��__,��'��� r-,��'' �� r''•
r/—r� � -fir -+" 4" +•�. ..�s - 1 _ •] }��"��� 'M�5 '' -
�?' iG , _ _'`1� c - Y. W - •i L7.. r` - •—,'�� rmill
lit
ne It.
:ram il,e ' "�. L-k• r'• f' r y
OL.
_,•,:.fir-} Yr � • �.. '"'�„�.. .`�d
10
jig 4P.—
r,
� _lam M �rr k - �� 1"i:i • h.r..M
CITY OF FEDERAL WAY
COMMUNITY DEVELOPMENT DEPARTMENT
DEVELOPMENT REVIEW COMMITTEE TRANSMITTAL
DATE: 12/26/17
TO: Cole Elliott, Development Services Manager
Peter Lawrence, Plans Examiner
Rick Perez, City Traffic Engineer
Brian Asbury, Lakehaven Water & Sewer District
Chris Cahan, South King Fire & Rescue
FROM: Jim Harris 253 835-2652
jim.harris@cityoffederalway.com
FOR DRC MTG. ON: January 4, 2018- Internal
January 11, 2018, 9:00 AM - with applicant
FILE NUMBER(s): 17-106091-00-PC
RELATED FILE NOS.: None
PROJECT NAME: KISLYAK SHORT PLAT
PROJECT ADDRESS: 34402 24TH PL SW
ZONING DISTRICT: RS 7.2
PROJECT DESCRIPTION: Subdivision of one lot into six residential lots.
LAND USE PERMITS: TBD
PROJECT CONTACT:
WAYNE NELSEN
MATERIALS SUBMITTED: Preliminary Short Plat Map by Encompass Engineering
CITY OF
Federal Way
APPLICATION NO(s)
1 _� -ID
MASTER LAND USE APPLICATION
RECEIVED
��r" r�D DEPARTMENT OF COMMUNITY DEVELOPMENT
CI 33325 81hAvenue South
Federal Way, WA 98003-6325
DEC 253-835-2607; Fax 253-835-2609
�% % u .ca offederahwaveom
CrN aF FEDF-RAL WAY
, �OMMUNTIY c)EVELOPMErrr
17 f - PC
oJ&
Project Name Kislyak Short Plat
Property Address/Location 34402 - 24th Place SW
Parcel Number(s) 894720-0110
Project Description
PT.F.ASF PRTNT
Date 12 2,1
Subdivide one tax parcel into 6 single family residential lots.
Type of Permit Required
Annexation
Binding Site Plan
Boundary Line Adjustment
Comp Plan/Rezone
Land Surface Modification
Lot Line Elimination
X Preapplication Conference
Process I (Director's Approval)
Process II (Site Plan Review)
Process III (Project Approval)
Process IV (Hearing Examiner's Decision)
Process V (Quasi -Judicial Rezone)
Process VI
SEPA w/Project
SEPA Only
Shoreline: Variance/Conditional Use
Short Subdivision
Subdivision
Variance: Commercial/Residential
Required Information
R5-7.2 Zoning Designation
SF -HD Comprehensive Plan Designation
Value of Existing Improvements
Value of Proposed Improvements
International Building Code (IBC):
_Occupancy Type
Construction Type
Applicant
Name: Petr Kislyak
Address: 6608 12th St. E.
City/State: Fife, WA
Zip: 98424
Phone: 253-332-9765
Fax:
Email: pkislyak@gmail.com
Signature:
Agent (if different than Applicant)
Name: Wayne Nelsen / Encompass Engineering & Surveying
Address: 165 NE Juniper St., Suite 201
City/State: Issaquah, WA
Zip: 98027
Phone: 425-392-0250
Fax:
Email: wnels a@encompasses.net
Signature: 0 fIld _
Owner Same as applicant
Name:
Address:
City/State:
Zip:
Phone:
Fax:
Email:
Signature:
Bulletin #003 —January 1, 2011 Page I of 1 k:\Handouts\Master Land Use Application