Loading...
23-104760City ofFederal Way Community Development Dept. 33325 8[h Ave S Federal Way, WA 98003 fs� E Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: TRAHAN Project Address: 818 SW 363RD PL Electrical Permit #:23-104760-00-EL Inspection Request Line: (253) 835-3050 Parcel Number: 779645 0280 Project Description: rewire on the top floor of the house after a fire keeping the exact same layout Owner Applicant Contractor ANTHONY TRAHAN LUIS NUNEZLN ELECTRICAL LLC LN ELECTRICAL LLC 818 SW 363RD PL 901 SUNSET BLVD NE APT D215 LNELEEL773K2(5/22/25) FEDERAL WAY WA 98023 RENTON WA 98056 901 SUNSET BLVD NE UNIT D215 RENTON WA 98056 USA Additional Permit Information Is this an Online or O.T.C. application? .................. Yes Electrical Fixtures Alt. Serv./Feeder: 0 to 200 aml 2 PERMIT EXPIRES Saturday, 23 March, 2024 Permit Issued on Monday, September 25, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of W shin tan and the City of Federal Way. Owner or agent: late: rt"'I_�Jotjl cIVr or Federal Way THIS CARD IS TO ON -SITE Construction Inspection Record INSPECTION REQUESTS: (253) 835-3050 Scheduled inspections ruay be failed if dus card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read leR to right. top to bottom). Please schedule inspections as appropriate. Work nttrst not be co-.: eyed until it is approved. Check ,with your inspector if You are unsure about any of the inspections or the inspection sequence- On -going inspections are logged on the back of this card - ELECTRICAL El LIFER Ground (4295) ❑ Ditch cover (4030) ❑ Slab/Concrete Floor (4255) Approved Approved Approved to place concrete By Date By Date By Date ❑ Pool Bonding (4195) ❑ Temporary Power (4275) ❑ Senice (4235) Approved Approved Approved By Date By Date By Date ❑ FeederslSub-panels (4045) ❑ Rough Electrical (4225) ❑ Ceiling Cover (4020) Approved pproved/fQ Approved BS- Date B� /J Date / / G4JI i BS Date 0 Final - Electrical (4055) Approved Bv Z Date MECHANICAL ❑ -Mechanical Rough -in (4165) ❑ Gas Piping (4125) ❑ Final --Mechanical (.1065) Approved Approved to release test Approved By Date By Date By Date PLUMBING 0 Plumbing Groundwork (4190) 0 Rough Plumbing (4230) 0 Final - Plumbing (4075) Approved to cover Approved Approved By Date By- Date BY Date