23-104916City of Federal Way
Community Development Dept
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: SIMA
Project Address: 30649 11TH AVE S
�=1L
Project Description: Roughing plumbing 2 half bath
Plumbing
Permit #:23-104916-00-PL
Inspection Request Line: (253) 835-3050
Parcel Number: 091900 0150
Owner
Applicant
Contractor
MENGISTU & SAMRAWIT SIMA
REDIAT SAHLEEMERALD CITY
EMERALD CITY PLUMBING & SEWER
30649 1 ITH AVE S
PLUMBING AND SEWER LLC
EMERACP782DC (4/19/24)
FEDERAL WAY WA 98003
11238 S RENTON AVE
11238 RENTON AVE S
SEATTLE WA 98178
SEATTLE WA 98178
Sinks
Plumbing Fixtures
2 Water Closets
2
PERMIT EXPIRES Monday, 8 April, 2024
Permit Issued on Wednesday, October 11, 2023
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
�WNshT ton and the Ci of Federal Way.
Date: Owner or agent: ..T
'F\,' A_PA,
CITY of
Federal Way
THIS CARD IS TO REALJUN ON -SITE
Construction Inspection Record
INSPECTION REQUESTS: (2_53) 335-30:50
Scheduled inspections nl.'i': be %sled if this crud is not ou-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right. top to bottom) Please schedule inspections as appropriate Work un:st not be covered until it is approved. Check -xith your inspector
u are unsure about anv of the inspections of the lIISpeCilOn sequence. On-?OLrl? inspections are longed on the back of tivs card_
ELECTRICAL
❑
IJTFER Ground (429-3)
❑
Ditch corer (4030)
❑
SlabiConcrete Floor (4255)
Approved
Approved
Approved to place concrete
By
Date
By
Date
By
Date
❑
Pool Bonding (4195)
❑
Temporary- Power (4275)
❑
Senzce (4235)
Approved
Approved
Approved
By
Date
By
Date
BS
Date
❑
Feeders/Sub-panels (4045)
❑
Rough Electrical (4225)
❑
Ceiling Corer (4020)
Approved
Approved
Approved
Bti-
Date
By
Date
Bj
Date
Final - Electrical (4055)
Approved
By
Date
MECHANICAL
❑
-Mechanical Rough -in (4165)
❑
Gas Piping (4125)
❑
Final - Mechanical (4065)
Approved
Approved to release test
Approved
BS
Date
By
Date
By
Date
PLUMBING
Q Plumbing Groundwork (4190) 0 Rough Plumbing (4230) 11E] Final - Plumbing (4075)
Approved to cover Approved Approved
By Date 11 BY A,,) Date 1 � I � /z3 By 1 � Date 1 Z l%%