Loading...
23-104916City of Federal Way Community Development Dept 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: SIMA Project Address: 30649 11TH AVE S �=1L Project Description: Roughing plumbing 2 half bath Plumbing Permit #:23-104916-00-PL Inspection Request Line: (253) 835-3050 Parcel Number: 091900 0150 Owner Applicant Contractor MENGISTU & SAMRAWIT SIMA REDIAT SAHLEEMERALD CITY EMERALD CITY PLUMBING & SEWER 30649 1 ITH AVE S PLUMBING AND SEWER LLC EMERACP782DC (4/19/24) FEDERAL WAY WA 98003 11238 S RENTON AVE 11238 RENTON AVE S SEATTLE WA 98178 SEATTLE WA 98178 Sinks Plumbing Fixtures 2 Water Closets 2 PERMIT EXPIRES Monday, 8 April, 2024 Permit Issued on Wednesday, October 11, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of �WNshT ton and the Ci of Federal Way. Date: Owner or agent: ..T 'F\,' A_PA, CITY of Federal Way THIS CARD IS TO REALJUN ON -SITE Construction Inspection Record INSPECTION REQUESTS: (2_53) 335-30:50 Scheduled inspections nl.'i': be %sled if this crud is not ou-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right. top to bottom) Please schedule inspections as appropriate Work un:st not be covered until it is approved. Check -xith your inspector u are unsure about anv of the inspections of the lIISpeCilOn sequence. On-?OLrl? inspections are longed on the back of tivs card_ ELECTRICAL ❑ IJTFER Ground (429-3) ❑ Ditch corer (4030) ❑ SlabiConcrete Floor (4255) Approved Approved Approved to place concrete By Date By Date By Date ❑ Pool Bonding (4195) ❑ Temporary- Power (4275) ❑ Senzce (4235) Approved Approved Approved By Date By Date BS Date ❑ Feeders/Sub-panels (4045) ❑ Rough Electrical (4225) ❑ Ceiling Corer (4020) Approved Approved Approved Bti- Date By Date Bj Date Final - Electrical (4055) Approved By Date MECHANICAL ❑ -Mechanical Rough -in (4165) ❑ Gas Piping (4125) ❑ Final - Mechanical (4065) Approved Approved to release test Approved BS Date By Date By Date PLUMBING Q Plumbing Groundwork (4190) 0 Rough Plumbing (4230) 11E] Final - Plumbing (4075) Approved to cover Approved Approved By Date 11 BY A,,) Date 1 � I � /z3 By 1 � Date 1 Z l%%