Loading...
23-102522City of Federal Way FILE Community Development Dept. 33325 8th Ave S ; Federal Way, WA 98063 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: EJIOGU Project Address: 30156 16TH AVE SW Project Description: NEW 200AMP U/G SERVICE. SF 4432 Electrical Permit #:23-102522-00-EL Inspection Request Line: (253) 835-3050 Parcel Number: 515320 0395 Owner Applicant Contractor JOYCE EJIOGU MERIDIAN CENTER ELECTRIC MERIDIAN CENTER ELECTRIC INC (01) 920 280TH ST 11109 66TH AVE E MERIDCE318SG (2/28/25) DES MOINES WA 98198 PUYALLUP WA 98373 11109 66TH AVE E PUYALLUP WA 98373 Additional Permit Information a Is this an Online or O.T.C. application? ................. Yes New Service: Residential Electrical fixtures PERMIT EXPIRES Wednesday, 8 November, 2023 Permit Issued on Friday, May 12, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of hn�d h Ci �edera! Way. Owner or agent: Date: calr of = Federal Way THIS CARD IS TO REALM\ ON -SITE Construction Inspection Record INSPECTION REQI-E-'T : (253) S35 i0,50 Scheduled inspections nix., be failed if Lhis card is not on -site. DO -NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right. top to bottom). Please schedule inspections as appropriate_ Rork must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this cud. ELECTRICAL ❑ UFER Ground (429-5) ❑ Ditch cover (4030) ❑ Slab/Concrete Floor (42-55) Approved Approved - Approved to place concrete By Date By Date By Date 0 Pool Bonding (4193) ❑ Temporary Power (4275) Q Service (4235) Approved Approved Approved [By Date Bv Date B} Date ❑ ❑ Feeders/Sub-panels (404-) Rough Electrical (4225) 0 Ceiling Cover (4020) By Approved Approved Approved Date B� Date (P�Ol/ By Date Ell Final - Electrical (4055) Approved B}' elrl Date - y MECHANICAL ❑ Mechanical Rough -in (4165) El Gas Piping (4125) Q Final - -Mechanical (4063) Approved Approved to Ielease tat Approved By Date By Date By Date PLUMBING 0 Plumbing Groundwork (4190) 0 Rough Plumbing (4230) ❑ Final -Plumbing (4075) Approved to cover Approved Approved By Date By Date By Date