23-102522City of Federal Way
FILE
Community Development Dept.
33325 8th Ave S ;
Federal Way, WA 98063
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: EJIOGU
Project Address: 30156 16TH AVE SW
Project Description: NEW 200AMP U/G SERVICE. SF 4432
Electrical
Permit #:23-102522-00-EL
Inspection Request Line: (253) 835-3050
Parcel Number: 515320 0395
Owner
Applicant
Contractor
JOYCE EJIOGU
MERIDIAN CENTER ELECTRIC
MERIDIAN CENTER ELECTRIC INC (01)
920 280TH ST
11109 66TH AVE E
MERIDCE318SG (2/28/25)
DES MOINES WA 98198
PUYALLUP WA 98373
11109 66TH AVE E
PUYALLUP WA 98373
Additional Permit Information
a
Is this an Online or O.T.C. application? ................. Yes
New Service: Residential
Electrical fixtures
PERMIT EXPIRES Wednesday, 8 November, 2023
Permit Issued on Friday, May 12, 2023
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
hn�d h Ci �edera! Way.
Owner or agent: Date:
calr of =
Federal Way
THIS CARD IS TO REALM\ ON -SITE
Construction Inspection Record
INSPECTION REQI-E-'T : (253) S35 i0,50
Scheduled inspections nix., be failed if Lhis card is not on -site. DO -NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right. top to bottom). Please schedule inspections as appropriate_ Rork must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this cud.
ELECTRICAL
❑ UFER Ground (429-5)
❑ Ditch cover (4030)
❑ Slab/Concrete Floor (42-55)
Approved
Approved -
Approved to place concrete
By Date
By Date
By Date
0 Pool Bonding (4193) ❑ Temporary Power (4275) Q Service (4235)
Approved Approved Approved
[By
Date
Bv Date
B} Date
❑
❑
Feeders/Sub-panels (404-)
Rough Electrical (4225)
0
Ceiling Cover (4020)
By
Approved
Approved
Approved
Date
B� Date (P�Ol/
By
Date
Ell
Final - Electrical (4055)
Approved
B}'
elrl Date - y
MECHANICAL
❑
Mechanical Rough -in (4165)
El Gas Piping (4125)
Q
Final - -Mechanical (4063)
Approved
Approved to Ielease tat
Approved
By
Date
By Date
By
Date
PLUMBING
0
Plumbing Groundwork (4190)
0 Rough Plumbing (4230)
❑
Final -Plumbing (4075)
Approved to cover
Approved
Approved
By
Date
By Date
By
Date