Loading...
06-105803CITY of � Federal December 12, 2006 Ms. Brenda Fodge Stanton Development, LLC PO Box 2307 Kirkland, WA 98083 CITY HALL Wa 33325 8th Avenue South Y Mailing Address: PO Box 9718 Federal Way, WA 98063-9718 (253) 835-7000 www.cityoffederalway.com Re: File #06-105803-00-PC, PREAPPLICATION CONFERENCE SUMMARY Steel Lake Cottages, 20xx South 3041h Street, Federal Way Dear Ms. Fodge: Thank you for participating in the preapplication conference with the City of Federal Way's Development Review Committee (DRC) held November 30, 2006. We hope that the information discussed at that meeting was helpful in understanding the general requirements for your project as submitted. This letter summarizes comments given to you at the meeting by the members of the DRC. The members who reviewed your project and provided comments include staff from the City's Planning and Building Divisions and Public Works Department, and representatives from Lakehaven Utility District and South King Fire and Rescue. Some sections of the Federal Way City Code (FWCC) and relevant information handouts are enclosed with this letter. Please be advised, this letter does not represent all applicable codes. In preparing your formal application, please refer to the complete FWCC and other relevant codes for all additional requirements that may apply to your project. The.key contact for your project is Isaac Conlen (253-835-2643, or isaac.conlen@cityoffederalway.com). For specific technical questions about your project, please contact the appropriate DRC representative as listed below. Otherwise, any general questions about the preapplication and permitting process can be referred to your key contact. PROJECT DESCRIPTION Applicant proposes a condominium style cottage housing development consisting of 10 cottages and six Compact Single -Family (CSF) dwelling units, detached and attached garages, surface parking spaces, a community building, internal roadway system, and central green spaces and pathways. The project site is constrained by wetland and buffer, stream buffer, steep sloped portions, and Shoreline Master Program (SMP) jurisdiction. This proposal is subject to the selection criteria of ordinance #06-533, and must satisfy those criteria in order to proceed to formal application submittal. MAJOR ISSUES Outlined below is a summary of the major issues of your project based on the plans and information submitted for preapplication review. These issues can change due to modifications and revisions in the plans. These major issues only represent comments that the DRC consider most significant to your project File #06-105803-00-PC - Doc ID 38814 Ms. Brenda Fodge Page 2 December 12, 2006 and do not include the majority of the comments provided. The major issues scction is only provided as a means to highlight critical requirements or issues. Please be sure to read the entire department comments made in the next section of this letter. ■ Planning Division 1. City wetland maps show category I wetlands and associated 200-foot buffers on the west and southeast portions of the site. 2. City critical areas maps show a major stream (Redondo Creek) just west of the subject property. A-100-foot stream setback encroaches onto the western portion of the site. 3. City critical areas maps identify portions of the site that meet or may meet the definition of geologically hazardous area. 4. The portion of the site within 200-feet of the Ordinary High Water Mark (OHWM) of Steel Lake is within SMP jurisdiction. A shoreline substantial development pennit is required. Additionally, certain setbacks and development regulations apply. • Public Works Development Services Division Detention and water quality facilities for private commercial developments outside the City Cenfer Core must be above ground (i.e. open pond.). Underground facilities are allowed only with approval from the City of Federal Way Stormwater Management Division. Several items related to the lot status will need to be clarified prior to issuing any building permits. The items are: potential lot line elimination, a boundary survey, and prescriptive easements across the property. More detail about each is listed below. • Public Works Traffic Division 1. A Concurrency Application is required for the weekday PM peak hour. The estimated fee for this application is $1,448.00. The concurrency permit process will determine if any additional traffic analysis and/or traffic mitigation fees apply to the project. Please see the enclosed concurrency handout. 2. The FWCC requires street frontage improvements and right-of-way dedication along South 304"' Street. 3. A limited site access study prepared by an engineer licensed in the state of Washington is required. The study shall include sight distance analysis at the proposed driveway along South 300 Street. Four final copies of the analysis must be stamped and submitted to the City. 4. Current code requirements for internal roads are a major issue; please see those requirements in the detailed comments. File k06-105803-00-PC Doc 1D 38814 Ms. Brenda Fodge Page 3 December 12, 2006 DEPARTMENT COMMENTS Outlined below are the comments made by the representatives of each department present at the preapplication conference. Each section should be read thoroughly. If you have questions, please contact the representative listed for that section. PLANNING DIVISION (Isaac Conlen, 253-835-2643, issac.conlen ci offederal►vay.com Overall, the project appears to be very consistent with the intent of the Cottage Housing ordinance and would appear to be a positive addition to the community. Critical areas and their buffers, however, seem to place significant limitations on the site. The proposed site plan can not be approved without modification to comply with the critical area provisions of FWCC Chapter 22, Article XIV. Zoning Chart and Use Classification — The subject property is zoned RS 5.0. A Cottage Housing Development (CHD) is a permitted use in the RS 5.0 zone. Land Use Review Process — CHDs require a two-phase review process. Following the preapplication meeting, the applicant will submit a selection phase submittal, including the items noted in the enclosed CHD handout. This submittal is due by January 1, 2007. No fees are required with this application. The applicant, in conjunction with staff, will hold a community meeting to gather input from neighbors. Input from this meeting may then be incorporated into the site plan and resubmitted. Staff will evaluate the application on a competitive basis with any other CHD applications submitted by the deadline. Up to two CHDs may be selected to continue to the second review phase. If selected, this project will require approval of a Use Process IV application with State Environmental Policy Act (SEPA) review. Because portions of the project are within SMP jurisdiction, a shoreline substantial development permit is also required. Use Process IV is a quasi- judicial review process with a decision issued by the city's hearing examiner following a public hearing (see enclosed informational handout). The examiner will also issue a decision on the substantial development permit. SEPA — The proposal requires review under the State Environmental Policy Act (SEPA), pursuant to the Washington Administrative Code (WAC) 197-11-800, "Categorical Exemptions," because there are more than four units. Also, since a portion of your development would be within a critical area or related buffer, it requires SEPA review. A SEPA checklist and handout are enclosed. 4. Land Use Review Fees — The following land use fees would be applicable at the time of the second review phase: Use Process IV: Shoreline Substantial Development Permit: SEPA: Lot Line Elimination: Third Party Environmental Review: $3,510.00 $2,430 - $12,505 (depending on value of improvements) $843.50 $15 8.00 Cost recovery basis Fees cited are as of December 2006. Fees are scheduled to increase by 3.8% at the start of the year. File 406-105803-00-PC Doc ID 38814 Ms. Brenda Fodge Page 4 December 12, 2006 Critical Areas — According to city maps, the site is constrained by geologically hazardous areas, streams, and wetlands (see FWCC Chapter 22, Article XIV, "Critical Areas," enclosed). Provisions of the above noted critical areas applicable to your proposed site plan are noted below. a. Wetlands — City maps show category I wetlands along the west and southeast portions of the site. Your analysis indicates category II wetlands on -site. The application should include a wetland report prepared by a professional wetland scientist, which includes a wetland survey and evaluation of the wetland category (FWCC 22-1356). Category I wetlands require a 200- foot buffer and category II wetlands require a 100-foot buffer. The submitted site plan shows a 50-foot buffer with several minor intrusions closer than that and an even smaller buffer in the area of the detached garage for units 12 and 13 (although the comment was made that the shoreline in this area does not meet the definition of wetland area). Your wetland evaluation will be critical in determining the buildable portion of the site. We will utilize the services of our third party wetland consultant to help with review of this project, so this should be accounted for in budgeting considerations. FWCC 22-1359 (enclosed for reference) contains provisions to allow structures or improvements within regulated wetland buffers subject to certain criteria. Note, the maximum reduction is 50 percent of the standard wetland buffer. If it is determined that the wetland is in fact a category II, a 50-foot buffer is the absolute minimum that can be approved, and then only if such reduction is clearly shown to be consistent with the criteria of FWCC 22-1359. b. Regulated Lakes — Steel Lake is a regulated lake pursuant to FWCC 22-1331 thru.1336. Structures and other improvements may not be located within 25-feet of the Ordinary High Water Mark (OHWM) of the lake. Minor intrusions such as paths and seating may be permitted subject to certain criteria. Wetland buffers (see above) and shoreline setbacks (see below) appear to impose larger setback requirements, which would supersede the 25-foot lake setback requirement. C. Streams —The site. plan shows Redondo Creek just off -site to the west. Redondo Creek is considered a major stream with a 100-foot setback requirement, which is shown on the site plan. Improvements are generally shown outside of the creek setback with the exception of a small portion of the detention vault, a pathway, and the proposed community building. Intrusions into the stream setback may be permitted if the applicant can clearly demonstrate the provisions of FWCC 22-1312 have been met. Different standards apply for `minor intrusions,' such as the pathway, and `other intrusions,' such as structures, driveways, etc. d. Geologically Hazardous Areas _ City maps indicate that a portion of the site is considered an erosion hazard area. Based on the topography depicted on the submitted site plan, it appears that portions of the site may also meet the definition of landslide hazard area and/or steep slope hazard as well (see enclosed definitions). A geotechnical report prepared by a qualified professional will be required with formal Process IV submittal. This report should identify and map portions of the site meeting the definitions for the various types of geologically hazardous areas. Pursuant to FWCC 22-1286(b), development activities may not occur within 25 feet of a geologically hazardous area unless no reasonable alternative exists, and then only if the activities will not create increased slide or erosion hazards. Your geotechnical report will need to demonstrate consistency with FWCC 22-1286(b). File 406-105803-00-PC Doc ID 38814 Ms. Brenda Fodge Page 5 December 12, 2006 Subsection (g)(4) of the CHD article states that siting of dwelling units and open space in areas exceeding 15 percent slope is not encouraged. The majority of the site is sloped at greater than 15 percent. The city's concern is related to the amount of grading and retaining wall construction needed to make development of steeper sloped areas feasible. Tiered development supported by retaining walls and rockeries is not desired. This issue should be addressed in your selection phase submittal. A conceptual grading plan and for cross-section drawing may be needed to evaluate this issue. 6. Shoreline Master Program Jurisdiction — Steel Lake is regulated under the city's SMP. Portions of the site within 200 feet of the OHWM fall Under SMP jurisdiction. Additionally, any wetlands associated with the water body are considered shorelines subject to the provisions of the SMP. This would include the wetlands on the subject property. As noted above, a shoreline substantial development permit is required. The subject property is in the Urban shoreline environment. The provisions of FWCC 18-165 are applicable. Residential structures shall maintain a 50-foot setback from the OHWM, or_a setback as established by the stringline method (FWCC 22-18-165[d][31), or the minimum buffer required for any associated critical areas if greater than the shoreline setback. The stringline method establishes a setback as measured along a line that connects the most waterward point of structures on the lots on either side of the subject property. If the stringline method of calculating setback results in a building setback of less than 30 :feet, the setback shall be 30 feet. Based on discussion at the preapplication meeting, it appears that either the stringline or the 30-foot default setback may be applicable (although further analysis of wetland/stream buffers is necessary to make this determination). Please clearly identify the location of the OHWM on the site plan. Structures on adjacent lots and their distance from OHWM must be depicted as well. Residential accessory structures less than 150 feet and less than eight feet in height may be located within the setback area. 7. CHD Requirements — Relevant CHD provisions from FWCC Chapter 22, Article XII are noted below. a. Calculation of Units — Up to twice the number of dwelling units permitted by the underlying density may be permitted in a CHD. Calculation of permitted units is based on analysis of a pro -forma site plan showing the number of traditional single-family dwelling units that could be built on the site. With your selection phase submittal, please include a pro -forma site plan depicting lots, internal streets, open space, and adequately sized stormwater facilities. The site plan is intended to be conceptual, but must include adequate detail to confirm the feasibility of the concept based on FWCC requirements. To develop 16 cottage/CSF units as proposed, the pro -forma site plan must indicate that the site would yield at least eight single family units/lots. Treatment of wetland buffers will be critical in evaluating the pro -forma site plan. Preferably, the pro -forma plan will not require significant buffer reductions/intrusions. If the plan depends upon wetland buffer reductions, we will need to discuss a method for analyzing the feasibility of such reductions. b. Two of the 16 total dwelling units must be affordable in order to achieve a maximum of 16 units as proposed. Affordable cottages shall be sold at a price which is affordable to a two person (three -person for CSF units) family making 80 percent or less of King County median income, as published in King County's Benchmark report or equivalent publication from the Doc ID 38814 File N06-105803-00-PC Ms. Brenda Fodge Page 6 December 12, 2006 U.S. Department of Housing and Urban Development (HUD). The most recently published benchmark report (2004) indicates a sale price of $177,700 (for cottages). This dollar amount has likely increased since that time. The sale price will be calculated at the time the units go on the market. Affordable units are intended to remain affordable for a period of 15 years. The developer will be required to record a title covenant regarding initial sales price and affordability. The developer/builder is responsible for marketing affordable units to families meeting eligibility requirements (less than 80 percent of median income). Affordable units must have a similar appearance and use similar exterior materials as market rate units, and must be dispersed throughout the project rather than clustered in one area. C. Compact Single Family Units — CSF units may not exceed 35 percent of total units. The site plan indicates 6 of 16 units will be CSF, which satisfies the 35 percent standard. d. Unit Size — Cottages are limited to 1,100 square feet and CSF units are limited to 1,300 square feet. e. ' Common Open Space — Five hundred square feet of common open space is required per unit. The site plan indicates more than twice that is proposed. The conceptual -landscaping plan shows quality planting throughout the site. Please also show any improvements within the common open space if proposed. Private Open Space — Four hundred square feet of private open space is required per unit. The site plan indicates more than twice that is proposed. The detail shows attractive improvements in these areas, including landscaping and short fencing. g. Design Standards — Dwelling units are intended to have a roof pitch of 6:12 or steeper, although dormers and other architectural features may be allowed with a pitch of not less than 4:12 (up to 35 percent of total roof area). The submitted elevations appear to satisfy this requirement. It would be helpful to show roof pitches on the elevation drawings. If a plan has a lot of shallow pitch features, we may need to see a roof plan that shows the pitch of the various components. Subsection (h)(2) states that each unit abutting a public right-of-way shall have a front porch and entry oriented to the right-of-way. Units 1 and 2 abut South 304`h Street and appear to have front porches oriented in that direction. If the eventual design includes sidewalks along the frontage of 304"', these units should incorporate walkways that connect the entries to the sidewalk. It may be desirable to showcase these units as the entryway and most visible component of the project from offsite. The two -car garage directly north of unit 2 appears to partially screen that unit from view to some extent. You may want to consider reconfiguring this portion of the site. Most of the units that abut the internal road appear to orient to the road as well, which is desirable. Subsection (h)(3) calls for units to have a porch and entry oriented towards the common open space. Most appear to do so, although it is not clear that this is the case with units 2, 7, 10, 14, and 15. Please address this issue in your selection phase submittal. File #06-105803-00-PC Doc I D 38814 Ms. Brenda Fodge Page 7 December 12, 2006 Most of the design standards address dwelling unit design. Issues such as roof pitch, porch size, and calculation of square footage should be addressed with building permit submittal. Submittal drawings should highlight these issues to benefit and expedite the plan review process. h. Parking — Thirty parking stalls are required. The site plan indicates that 32 spaces are provided. The site plan appears to be consistent with other parking provisions as well. i. Setbacks, Height, Lot Coverage — The site plan appears to satisfy these requirements for the most part. It does not appear that the units meet a 15-foot front yard setback from the internal street. This setback dimension may be modified pursuant to the modification section of the article. Also, the detached garages north of unit 2 and near units 12 and 16 do not meet the separation requirement of six feet. j. Selection Criteria — In addition to compliance with the above noted provisions and others of Article XII, the applicant must demonstrate that the project satisfies the selection criteria of ordinance 06-533. The selection criteria should be addressed in a cover memo or narrative along with other significant code issues. 8. Community Building — A community building up to 2,000 square feet is permitted in a CHD. You propose a community building on the foundation of a previously existing building in the southeast, part of the site. This area of the site is heavily constrained due to wetland buffer and shoreline. setback requirements (although it was stated that the wetland may not extend to this area). Based on. the materials submitted for the preapplication meeting, it does not appear that the proposed building meets setback and buffer requirements. The existing foundation does not `grandfather' this footprint, so a structure in this location must comply with current code requirements. 9. Landscaping — The conceptual landscaping plan looks good. FWCC 22-1568 requires retention of 25 percent of significant trees (defined as a healthy tree 12 inches in diameter or 37 inches in circumference measured at 4.5 feet above ground, excluding Poplar, Big Leaf Maple, Red Alder, and Cottonwoods). A detailed tree survey will be required with your formal submittal if the project is selected to move forward. 10. Condominiums — Prior to recording a condominium agreement, staff will need to review the agreement to see that adequate provisions are made to address subsection (m) regarding maintenance of common areas. Note, the city does not have code requirements regarding condominium development, other than the requirements for maintenance as indicated above. The condominium agreement will be recorded with King County. PUBLIC WORKS DEVELOPMENT SERVICES DIVISION (Sean R. Wells, P.E., 253-835-2731, se an.wells (4 city offe d er a lw a ),. eo m) Land Use Issues — Stormwater Surface water runoff control and water quality treatment will be required per the 1998 King County Surface Water Design Manual (KCSWDM) and the City of Federal Way Addendum to the 1998 KCSWDM. This project meets the requirements for a Full Drainage Review. At the time of land use Doc ID 38814 File 406-105803-00-PC Ms. Brenda Fodge Page 8 December 12, 2006 site plan submittal, a preliminary Technical Information Report (TIR), addressing the relevance of the project to the eight core and five special requirements of the KCSWDM will be required. A Level 1 downstream analysis shall also be provided in the preliminary TIR. The city has 1" = 100', five-foot contour planimetric maps that may be used for basin analysis. 2. The project lies within a Level 1 flow control area, thus the applicant must design the flow control facility to meet this performance criteria. The project also lies within a Basic Water Quality Area. Water quality treatment shall be designed to meet the treatment criteria of the Basic Water Quality Menu. If infiltration is proposed, soil logs prepared by a licensed geotechnical engineer or septic designer must be provided to verify infiltration suitability. 4. Detention and water quality facilities for private commercial developments outside the City Center Core must be above ground (i.e. open pond.). Underground facilities are allowed only with approval from the City of Federal Way Stormwater Management Division. 5. Show the proposed location and dimensions of the detention and water quality facilities on the preliminary plans. 6. If more than one acre will be disturbed during construction, a National Pollutant Discharge .: Elimination System (NPDES) permit may be required. Information regarding this permit can be obtained form the Washington State Department of Ecology at www.ecy.wa.goy/pro,,ranxs/sea/ ac/index.html, or by calling 360-407-6437. 7. If work is to be done below the ordinary high water mark, a Hydraulic Project Approval (HPA) permit may be required. Information regarding this permit can be obtained from the Washington Department of Fish and Wildlife at www.wa.g_qv/wdfw.`hah/_h1?gl)age/hhn, or by calling the office of Regulator Assistance at 360-407-7037. Land Use Issues — Property 1. There appears to be underlying parcels to this property. A Lot Line Elimination (LLE) approval may be required. 2. There is a, "30' rd drawn from mosaic" shown on the King County Assessor Map across this property site. The property deed has a restriction about an unrecorded easement for the road as shown on the assessor's map. This might be a title -clouding issue and needs to be resolved. 3. The existing legal description defines the western property line as the, "...centerline of the existing slough and drainage ditch." A land survey was conducted and recorded in 2001 (recording number 20010130900005, Vol. 143/Pg 012), which shows the, "thread of ditch not located," and "edge of water on 1/23/01." The "edge of water" line differs significantly with the King County Assessor's Map. This undetermined location could affect the property calculations significantly. A detailed land survey may be required. File #66-105803-00-PC Doc 1 D 38814 Ms. Brenda Fodge Page 9 December 12, 2006 Right -of -Way Improvements 1. See the Traffic Division comments from Senior Traffic Engineer Maryanne Zukowski for traffic related items. 2. Based on available records and the submitted materials, it appears that this proposal meets the 25 percent threshold criteria for requiring street frontage improvements as identified in FWCC 22-1473. The applicant/owner may submit an MAI appraisal for the subject property, or King County Assessor's records may be used. The Development Services Division will evaluate this data to determine if the project actually meets the city's 25 percent threshold for requiring street frontage improvements. 3. If dedication of additional right-of-way is required to install street frontage improvements, the dedication shall be conveyed to the city through a statutory warranty deed. The dedicated area must have clear title prior to recording. 4. All stormwater treatment and detention requirements outlined above will be applied to new impervious area within the public right-of-way. 5. FWCC 22-1543 requires that driveways serving residential uses may not be located closer than 25 feet to any street intersection. Lots and intersections within new subdivisions or short plats must be designed to meet this standard. Building (or El) Permit Issues Engineered plans are required for clearing, grading, road construction, and utility work. Plans must be reviewed and approved by the city. Engineering review fees are $730.00 for the first 12 hours of review and $61 per hour for additional review time. A final TIR shall be prepared for the project and submitted with the engineering plans. Both the TIR and the plans will require the signaturelseal of a professional engineer registered/licensed in the State of Washington. Please note that these fees will increase after January 1, 2007. 2. The Federal Way Development Standards Manual (including standard detail drawings, standard notes, and engineering checklists) is available on the city's website at www,ci . affederalwa .corn to assist the applicant's engineer in preparing the plans and TIR. 3. The applicant shall provide a geotechnical report that addresses design pavement thickness for the roadways. 4. Bonding is required for all improvements associated with the project. The bond amount shall be 120 percent of the estimated costs of the improvements. An administrative fee deposit will need to accompany the bond to cover any possible legal fees in the event the bond must be called. Upon completion of the installation of the improvements, and final approval of the Public Works Inspector, the bond will be reduced to 30 percent of the original amount and held for a two-year maintenance period. Doc ID 38914 File H06-105803-00-PC Ms. Brenda Fodge Page 10 December 12, 2006 5. The developer will be responsible for the maintenance of all storm drainage facilities (including the detention and water quality facilities) and street systems during the two-year maintenance period. During that time, the Public Works Inspector will make periodic visits to the site to ensure the developer's compliance with the maintenance requirements. Upon satisfactory completion of the two-year maintenance period, the remainder of the bond will be released. Maintenance for public roads and subdivision drainage facilities then become the responsibility of the city. Maintenance for private roads and drainage facilities, including short plats, remain the responsibility of the individual property owners. 6. When topographic survey information is shown on the plans, the vertical datum block shall include the phrase "DATUM: N.G.V.D.-29" or "DATUM: K.C.A.S.," on all sheets where vertical elevations are called out. Drawings submitted for plan review shall be printed on 24" x 36" or 22" x 34" paper. All final approved drawings shall be drafted/plotted on 24" x 36" or 22" x 34" mylar sheet with permanent black ink. Site plans shall be drawn at a scale of 1" = 20', or larger. Architectural scales are not permitted on engineering plans. Provide cut and fill quantities on the clearing and grading plan. Erosion control measures, per Appendix D, 1998 KCSWDM-, must be shown on the engineering plans. 9. The site plan shall show the location of any existing and proposed utilities in the areas affected by construction. PUBLIC WORKS TRAFFIC DIVISION (Maryanne Zukowski, PE, 253-835-2742, nia anne.zuko►vski a cit •offederalway.com Transportation Impact Analysis The city has adopted new policies for traffic analysis and mitigation requirements effective January 1, 2007. A concurrency hand out explaining the new policies is attached. 2. A Concurrency Application is required for the weekday PM peak hour. The estimated fee for this application is $1,448.00. The applicant would be expected to contribute pro-rata shares toward Transportation Improvement Plan (TIP) projects impacted by one or more peak hour trips. A limited site access study prepared by an engineer licensed in the state of Washington is required, regardless of the timing of the application. The study shall include sight distance analysis at the proposed driveway along South 304`h Street. Four final copies of the analysis must be stamped and submitted to the city. Staff has expressed some concerns that to improve sight distance, engineering improvements may be required. Street Frontage Improvements 1) Per FWCC 22-1474, the applicant/owner would be expected to construct street improvements consistent with the planned roadway cross -sections as shown in Map I1I-6 of the Fed&al Way File 906-105803-00-PC Dot 1D 38814 Ms. Brenda Fodge Page 11 December 12, 2006 Comprehensive Plan (FWCP) and Capital Improvement Program (CIP) shown as Table III-19. Based on the materials submitted, staff conducted a limited analysis to determine the required street improvements in meeting the FWCC. Based on the analysis and FWCC, the applicant would be expected to construct improvements on the following streets to the city's planned roadway cross - sections: • South 3040' Street is planned as a Type "M" street, consisting of a 36-foot street with two 12- foot lanes, two eight -foot sidewalks, two six-foot planter strips, and one 12-foot center lane in a 70-foot right-of-way. Assuming a symmetrical cross section, five-foot right-of-way dedication and half street improvements are required and should be measured from the street centerline. • Internal road way access to more than four lots shall be a Type "W" street consisting of a 28- foot street with two five-foot sidewalks, two four -foot planter strips, in 52 feet of right-of-way. • Internal roadway access to four or less lots shall be a Type "Y" steer consisting of a 24-foot street with two five-foot sidewalks and utility strip. ■ A 106-foot diameter cul-de-sac is required; modification to this requirement may be made through the South King Fire and Rescue. 2) Per FWCC 22-1477, the applicant may make a written request to the Public Works Director to modify, defer, or waive the required street improvements. Information about a right-of-way modification requests are available through the assigned planner. Such requests have a set review fee. PUBLIC WORKS - SOLID WASTE AND RECYCLING DIVISION (Rob Van Orsow, 253-835-2770, robe cityofederaiway.coni Solid Waste & Recycling Design'Considerations Solid waste and recycling design considerations include: Adequate space allocation for interior and exterior collection containers. The following exterior trash enclosure parameters will accommodate most solid waste and recycling needs: clear interior dimensions measuring 10 feet deep by 18 feet across, with a single two -door swinging gate spanning across the front of the enclosure. When the gate is opened, no structure or hardware is allowed above grade across the enclosure opening. Gate pins/holes are preferred in positions for closed gates and holding gates open for service access. • User access to interior waste and recycling storage areas/containers, and to exterior containers screened by enclosure(s). Unobstructed, safe enclosure ingress and egress for service vehicles, directly in line with enclosure openings. • Landscaping, setbacks and screening requirements (based on FWCC 22-1564[d] & [e]). File H06-105803-00-PC Doc ID 38814 Ms. Brenda Fodge Page 12 December 12, 2006 Note that larger -scale commercial or multi -family developments may see long-term savings from the use of on -site solid waste compaction equipment. This equipment may require larger enclosures, defined overhead clearance, and consideration of power utility access and drainage management. Help with many design parameters related to service access is available via the city's contracted solid waste services provider, Waste Management. Contact Senior Route Manager John Davis at 206.786.4530 (cell). BUILDING DIVISION (Scott Sproul, 253-835-2633, scott.sproulQa cltvoffederalway.com) International Building Code (IBC), 2003 edition Washington State Amendments WAC 51-40* International Mechanical Code (IMC), 2003 edition Washington State Amendments WAC 51-42* Uniform Plumbing Code (UPC), 2003 edition Washington State Amendments WAC 51-46 & WAC 51-47* . International Fire Code (IFC) 2003 Washington State Amendments* National Electric Code (NEC), 2005 edition Accessibility Code ICC/ANSI Al 17.1-2003 Washington State Energy Code WAC 51-11* Washington State Ventilation and Indoor Air Quality Code WAC 51-13* *Current state amendments are dated. July 1, 2004. ** As of January 1, 2002, the state amendments now require arc -fault interrupters for 15-20 amp branch circuits serving sleeping rooms in dwelling units (R-1's). Wind/Seismic: Basic wind speed 8585 Mph, Exposure_, 25# Snow load, Seismic Zone D-1 A complete building permit application and commercial checklist. (Additional copies of application and checklists may be obtained on our web site at w-wA,-cityoffederalway.com.) Submit two sets of drawings and specifications. Specifications shall include: n/a -Soils report, x Structural calculations, x Energy calculations, _ Ventilation calculations. Note: A Washington State Registered architect's stamp is required for additions/alterations (new or existing) of 4,000 gross floor area or greater, unless specifically listed as an "exempt" structure per the Revised Code of Washington (RCW). File P06-105803-00-PC Doc ID 38814 Ms. Brenda Fodge Page 13 December 12, 2006 Submit n/a copies with King County Health Department approval stamp for all projects that include food service facilities, septic systems, or other elements within the project that require health department approval. Energy code compliance worksheets are required to be completed and included with your permit application. A wet stamp and signature is required on all sheets of plans and on the cover page of any calculations submitted. Federal Way reviews plans on a first in first out basis; however, there are some small projects with inconsequential review requirements that may be reviewed out of order. Review Timing The first comment letter can be expected within two to four weeks of submittal date. Re -check of plans will occur in one to three weeks after re -submittal. Revised or resubmitted plans shall be provided in the same format, size, and amount as the originally submitted plans. Revised/resubmitted drawings shall indicate by means of clouding or written response, what changes have been made from the original drawings. Plans for all involved departments will be forwarded from Community Development Services. Federal Way has an expedited review process. Information is available at our front counter. Other Permits & Inspections Separate permits may be required for electrical, mechanical, plumbing, fire suppression systems, and signs. Applicants may apply for separate permits at any time prior to commencement of construction. When required, special inspections shall be performed by WABO approved agencies or by agencies approved by the building official prior to permit issuance. Construction must be approved by all reviewing departments prior to final building division inspection. All concerned departments (planning, public works, electrical, fire) must sign off before the Building Division can final the structure for occupancy. Building final must be approved prior to the, issuance of a Certificate of Occupancy. The City of Federal Way does not issue temporary Certificate of Occupancies. All construction projects may be required to have a pre -construction conference. If a pre -con meeting is required, all subs, the general or representative, the architect or representative, the engineer or representative, electrical contractor, and any other interested party, should attend this meeting. Meetings will occur at the Building Division and will be scheduled by the inspector of record for the project. Site -Specific Requirements Building permit required for each structure. Since some of the garages are detached, they will require a separate building permit. Fire resistive requirements shall be per IRC 302.1 File N06-105803-00-PC Doc ID 38814 Ms. Brenda Fodge Page 14 December 12, 2006 The information provided above is based on limited plans and information. The comments provided are not intended to be a complete plan review and further comments are possible at time of building permit plan review. LAKEHAVEN UTILITY DISTRICT (Brian Asbury, 253-946-5407, basbur lakehaven.or ) Water A developer extension agreement will be required to extend and/or construct mainline water distribution facilities to serve the site. Preliminary review comments provided by South King Fire & Rescue indicate two new hydrants will be required onsite. Due to the lack of feasible opportunities to create a `looped' water distribution system, a new main extending from South 304"' Street into the property will be required to be 12-inch diameter pipe from the point of connection to the first hydrant tee/lateral. Provisions for construction of 12-inch diameter pipe must be addressed in the project's SEPA checklist, pursuant to SEPA requirements. To date, the owner/applicant has not submitted either a Pre -Application, Pre -Design, or Developer Extension Agreement application to Lakehaven (application copies enclosed). Lakehaven emphasizes that owner/applicant should apply separately to Lakehaven for the one of the above processes early in the pre-design/planning phase, to avoid delays in the overall development process. Further detail and/or design guidance and requirements regarding water distribution and/or sanitary sewer facilities will be provided only after the owner/applicant has submitted the appropriate application to Lakehaven. Sewer A side sewer permit will be required for each new connection to the sanitary sewer system, in accordance with standards defined in Lakehaven's current `Fees and Charges Resolution.' Minimum slope for gravity side/building sewers is two percent. If area proximate to either the existing eight -inch AC sewer forcemain, or parallel eight -inch (AC?) gravity main (both mains currently out -of -service) is proposed to be disturbed (i.e., building over top of existing lines, etc.). The developer will be required to submit a written request to Lakehaven to have Lakehaven remove and dispose of, in accordance with pollution control regulations, all out -of - service AC sewer pipe on the property. General Charges -payable -in -lieu -of -extension, and/or latecomer and/or earlycomer charges maybe are assessable against the property for facilities either previously constructed or to be constructed that provide direct benefit to the property. Please contact Lakehaven for further detail by obtaining apd submitting a separate application for a pre -design meeting or a developer extension agreement (enclosed). Lakehaven's Capital Facilities Charges are calculated on the basis of Equivalent Residential Units (ERU). Residential equivalency for single-family use is calculated as 1.0 ERU per unit. Lakehaven's 2006 Capital Facilities Charges are $3,196/ERU for water and $2,768/ERU for sewer. File N06-105803-00-PC Doc ID 39814 Ms. Brenda Fodge Page 15 December 12, 2006 Credit maybe available for this property from connection charges previously assessed for water and/or for sewer. Please contact Lakehaven for further detail by obtaining submitting a separate application for a pre -design meeting or a developer extension agreement (enclosed). All comments herein are valid for one year and are based on the proposal(s) submitted and Lakehaven's current regulations and policies. Any change to either the development proposal(s) or Lakehaven's regulations and policies may affect the above comments accordingly. SOUTH KING FIRE AND REscUE (Chris Ingham, 253-946-7244, ehris.inaliaxt)�southkim fire.or Water Supplies for Fire Protection At least two on -site hydrants will be required. Fire hydrants shall be in service PRIOR to and during construction. A Certificate of Water Availability shall be provided at the time of formal application indicating the fire flow available at the site. Fire hydrants shall be- spaced 600 feet or less apart. Every building shall have a fire hydrant within 300 ft. All measurements shall be made as vehicular travel distance. Fire Apparatus Access Roadway The access road shall be provided with a cul-de-sac. If a cul-de-sac cannot be provided then all structures shall be protected with an approved automatic fire sprinkler system. The tee turnaround will be required to be a minimum of 20 feet in width. Designated fire lanes shall be required for emergency access. Fire apparatus access roads shall be installed and made serviceable PRIOR to and during the time of construction. Fire apparatus access roads: 1) Shall have an unobstructed width of not less than 20 feet and an unobstructed vertical clearance of not less than 13 feet 6 inches. 2) Shall be designed and maintained to support the imposed load of a 25-ton fire apparatus and shall be provided with a surface so as to provide all-weather driving capabilities. 3) Shall be not less than a 20-foot inside turning radius and not less than a 40-foot outside turning radius. 4) With a dead-end in excess of 150 feet in length shall be provided with a cul-de-sac at the dead end. All such cul-de-sacs shall be not less than 80 feet in diameter. File N06-105803-00-PC Doc ID 38814 Ms. Brenda Fodge Page 16 December 12, 2006 5) Gradient shall not exceed 15 percent. EXCEPTION: When buildings are completely protected with an approved automatic fire sprinkler system, these provisions may be modified by the chief. CLOSING This letter reflects the information provided at the preapplication meeting and is intended to assist you in preparing plans and materials for formal application. We hope you found the comments useful to your project. We have made every effort to identify major issues to eliminate surprises during the city's review of the formal application. The completion of the preapplication process in the content of this letter does not vest any future project application. Comments in this letter are only valid for one year as per FWCC 22-1657. As you know, this is a preliminary review only and does not take the place of the full review that will follow submission of a formal application. Comments provided in this letter are based on preapplication materials submitted. Modifications and revisions to the project as presented for this preapplication may influence,and modify information regarding development requirements outlined above. In addition to this preappheation letter, please examine the complete FWCC and other relevant codes carefully. Requirements that are found in the codes that are not addressed in this letter are still required for your project. If you have questions about an individual comment, please contact the appropriate department representative noted above. Any general questions can be directed towards the key project contact, Isaac Conlen, at 253-835-2643. We look forward to working with you. Sincerel , Isaac Conlen Acting Senior Planner enc: Master Land Use Application Current Fee Schedule Substantial Development Permit Application Materials Lakehaven Application Forms Process IV Informational Handout FWCC Chapter 18, Article 3, Shorelines SEPA Checklist and Handout FWCC Chapter 22-1, Definitions CHD Handout FWCC Chapter 22, Article XIV, "Critical Areas" Concurrency Handout FWCC Chapter 22, Article XVII, "Landscaping" c: Sean Wells, Senior Engineering Plans Reviewer Maryanne Zukowski, Senior Traffic Engineer File 06-105803-00-PC Doc ID 38814 N90'00'00"E— I q 400M' RUSSELL F�50R 614�0\/E SITE 11 PLAN Architecture/Planning =4��—� 1932 First Avenue • Suite 1100 • Seattle, WA 98101 206.443.1181 • Fax 206.448.8908 CITY OF FEDERAL WAY COMMUNITY DEVELOPMENT REVIEW COMMITTEE SIGN -IN SHEET PRE -APPLICATION MEETING File No. 06-105803-PC Steel Lake Cottages November 30, 2006 (Name IDepartment/Organization (Number - ZCV3 = ���-Z r y ► �j -� 3 J -1�3 PIA.) S&ir V4 s 83S a731 Gtn itev ] 10 �pcwftpcvew Ora, Z�,-s-r ;�53_q _S7c7 6L� L u ork-S z� 5 $SS-21)1 ZS`3- r3S--z,6`F z 35 : 3 CR „ STUN Z66, S_Z� 1I2Z_ nUu J ' --- � CITY OF Federal November 14, 2006 Ms. Brenda Fodge Stanton Development, LLC PO Box 2307 Kirkland, WA 98083 CITY HALL 33325 8th Avenue South y Mailing Address: PO Box 9718 Federal Way, WA 98063-9718 (253) 835-7000 www.cityoffederalway.com Re: File #06-105803-00-PC; NOTICE OF PREAPPLICATION CONFERENCE Steel Lake Cottages; 20?? South 304`h Street, Federal Way Dear Ms. Fodge: The above -referenced proposal has been assigned to me as project planner. At this time, the application and preliminary site plan have been routed to the members of the Development Review Committee (DRQ. A conference with the project applicant and DRC has been scheduled as follows: Thursday, November 30, 2006 -- 9:00 a.m. Hylebos Conference Room City Hall, 2°" Floor 33325 Bch Avenue South Federal Way, WA 98003 We look forward to meeting with you. Let me know if you will have more than five people attending the preapplication conference so we can make arrangements for a larger room. This is the only notice sent out, so please coordinate directly with anyone else you would like to attend the meeting. Please call me at 253-835-2643 if you have any questions. Sincerel y) f� Isaac Conlen Acting Senior Planer Doc. I.D. 38795 CITY OF FEDERAL WAY DEPARTMENT OF COMMUNITY DEVELOPMENT SERVICES DEVELOPMENT REVIEW COMMITTEE TRANSMITTAL DATE: 11/9/06 TO: Will Appleton, Development Services Manager Scott Sproul, Assistant Building Official Brian Asbury, Lakehaven Utility District Chris Ingham, Federal Way Fire Department Geri Walker, Federal Way School District FROM: Isaac Conlen FOR DRC MTG. ON: 11/22/06 - Internal Completeness 11/30/06 - With applicant FILE NUMBER(s): 06-105803-00-PC RELATED FILE NOS.: None PROJECT NAME: STEEL LAKE COTTAGES PROJECT ADDRESS: XXXX S 304TH ST ZONING DISTRICT: RS 5.0 PROJECT DESCRIPTION: Proposal for 16 cottage and/or compact single-family homes and site development LAND USE PERMITS: Use Process IV, SEPA (This application will go thru an initial selection process. If selected to continue it will then be processed via UP IV.) PROJECT CONTACT: STANTON DEVELOPMENT, LLC BRENDA FODGE PO BOX 2307 4258275722 (Primary) MATERIALS SUBMITTED: Site Plan, landscaping plan, elevation and floor plans and design narrative _OAS RECEIVED mov 0 9 Z006 CITY ❑>_ SIT A Federal Way BUIL[� NG DEP� MASTER LAND USE APPLICATION DEPARTMENT OF COMMUNITY DEVELOPMENT SERVICES 33325 81h Avenue South PO Box 9718 Federal Way WA 98063-9718 253-835-2607;Fax 253-835-2609 www.cityoffederalway.com APPLICATION NO(S) 06 — �u `� ` W� Date i O Project Name L e5 Property Address/Location Parcel Number(s) CG Project Description PLEASE PRINT Type of Permit Required Annexation Binding Site Plan Boundary Line Adjustment Comp Plan/Rezone Land Surface Modification Lot Line Elimination Preapplication Conference Process I (Director—s Approval) Process II (Site Plan Review) Process III (Project Approval) Process IV (Hearing Examiner's Decision) Process V (Quasi -Judicial Rezone) Process VI SEPA w/Project SEPA Only Shoreline: Variance/Conditional Use Short Subdivision Subdivision Variance: Commercial./Residential Required Information 0 Zoning Designation iD—Comprehensive Plan Designation Value of Existing Improvements Value of Proposed Improvements International Building Code (IBC): Occupancy Type Construction Type wa Applicant Name: 5rurtcDeye l cvrrentlLLJC Address: P0. - 21�' City/State: Vkfy_[A r)4, UJA Zip: ' SM Phone: q_2-5. 2�25t , 61-r� Email42 r�3' '51:G Signature:7 , () AA ,. } Agent (if different than Name: c�irv, cis Address: City/State: Zip: Phone: Fax: Email: Signature: Owner Name: Sty r re a 5 U.�-eyXe Address: City/State: Zip: Phone: Fax: f J Email: 1 1 Signature: �L J _ r' A cantGci-•. �rev�cla Page 1 of 1 lC: anaouisuviaMIUL i a„u �,—. Vk • ---•- Bulletin #003 —August 18, 2004 g Core Design, Inc. CORE 14711 N. E. 2 9th Place, Suite 101 Bellevue, Washington 98007 DESIGN r l V . 425.885.7877 Fax425.885.7963 EDwww.coredesigninc.com November 8, 2006 ' iJ v 0 9 2006 Core No. 06100 tl7'f OF FEDEFAL WAY MUM 6EPT, City of Federal Way Department of Community Development Services 33325 8 h Avenue South Federal Way, Washington 98063 RE: STEEL LAKE COTTAGES — STRUCTURES To Whom It May Concern: The project site is located at approximately 1901 South 304th Street (Parcel No. 0921049012). The site is currently vacant, except for the foundation of a building that has been on site for more than 45 years. Raedeke Associates, Inc. has reviewed aerial photos back to 1961 to determine, approximately, when the building was erected. The site was cleared in 1961 and the building was erected in 1965. The photos have been included with this pre -application submittal. The current proposal is to construct a community structure on the existing foundation. The building would be used by residents for gatherings and meetings. The remainder of the site is vacant and will be developed with 16 single family detached cottages and detached garages. The site will also be developed with access roads and guest parking areas. If you have any questions or need additional information, do not hesitate contact me at (425) 885-7877. Sincerely, CORE DESIGN, INC. Lafe B. Hermansen Project Manager Enclosure(s) cc: Brenda Fodge, Stanton Properties ENGINEERING • PLANNING • SURVEYING STATEMENT OF DESIGN INTENT The purpose of the Cottage and Compact Single Family Housing Ordinance is to encourage the development of housing types that are responsive to changing household demographics. We embraced this goal in designing the Steel Lake Cottages, where residents will enjoy an alterative to the sprawling, automobile dominated subdivisions found throughout the Puget Sound region. Here you will find modestly scaled homes tucked into the landscape, organized around neighborhood greens and linked together by a pedestrian friendly circulation network. Reduced front yard setbacks strengthen the connection between the public realm and the private home. This proximity allows residents to have their eyes on the street, enhancing safety and fostering social interaction between neighbors. Streets lined with porches, entries and living spaces are not only visually more attractive but also create an inviting sense of enclosure for the street environment. Accessing garages from alleys and detaching garages continue the pattern of de- emphasizing the automobile. When garages are positioned to minimize their visual impact, the streetscape becomes more human in scale and shifts the focus to the positive, social aspects of the homes. Cottage housing communities also respond to other issues. The reduction of total development area enables the preservation of natural features. This is especially helpful on lots with difficult grading and large sensitive areas. Smaller homes mean shorter streets and utility lines, smaller detention facilities and generally less infrastructure. The resulting conservation of energy and resources is environmentally responsible. Small homes are also socially responsible, giving people with low and moderate mi comes choices not readily available in today's housing market. The home designs are based on a creative interpretation of traditional vernacular styles. Exterior finisher will include lap, shingle, and board and batten siding, traditional detailing and a palate of rich natural colors. NOV 0 9 Z006 CITY OF FEDERAL WAY' BUILDING DEPT. Prepared by Hackworth Group 8 November 2006 o CD > 0) N o -P, CD n s > D m 0c) (.C)< ��� e* co C c N CD -n Cn CD -P O CD �. co -U O C co 3 tt� 500 0 CD 0 0 b C� coro� 0P)wo co � K W O co +� O O c < CO r, � 4, W zm rn rn> r n EL CD, � v 1 CD 00 � 1 o 1 �II o w oC) �;Tj 0-.�NOW 1 CD v i o lot �Vo •II �' -Z v� 0� 00 I. Iv 0 00 V v CD tt Fri► C Mom+ • ISO CD C O CD C O CD r7l CD