Loading...
23-104809City of Federal Way FILF Community Development Dept. 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: MAHLEN Project Address: 34434 9TH AVE SW Project Description: Furnace change out Mechanical Permit #:23-104809-00-ME Inspection Request Line: (253) 835-3050 Parcel Number: 132171 0290 Owner Applicant Contractor JEANETTE MAHLEN DAVID HIRSTDEAR ELECTRIC INC DEAR SERVICES (GENERAL) 34434 9TH AVE SW 19309 68TH AVE S SUITE R-106 DEARSS*835D3 (3/23/25) FEDERAL WAY WA 98023 KENT WA 98032 26840 78TH AVE S KENT WA 98032 Additional Permit Information Mechanical Work Valuation?.................................. 9353 Is this an Online or O.T.C. application? .................. Yes Mechanical Fixtures Furnaces 1 PERMIT EXPIRES Tuesday, 26 March, 2024 Permit Issued on Thursday, September 28, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of ONtan In tit ft"f Federal Way - Owner or agent: date: cnr or 'A Federal Way THIS CARD IS TO REAL_ -I\ ON -SITE Construction Inspection Record INSPECTION REQL-ESTS: (2-53) 835-3050 Scheduled inspections luny be failed if ties crud is not on -site. DO NOT LOSE THIS CARD. L*ispections are listed as close to sequential order as possible (read left to right. top to bottom), Please schedule inspections as appropriate. Work urst not be covered until it is approved. Check with your inspector if ou are unsure about any of the inspections or the inspection sequence. 0,1-going inspections are lowed oil the back of this card. ELECTRICAL Q By LTER Ground (4295) Approved Date 0 By Ditch cover (4030) Approved Date Q By SIablConcrete Floor (42-55) Approved to place concrete Date 0 Pool Bonding (41945) 0 Temporary Pourer (4275) Service (4235) Approved Approved Approved Bv- Date By Date By Date 0 Feeders/Sub-panels (4043) Q Rough Electrical (4235+) 0 Ceiling Cover (4020) Approved Approved Approved By Date By Date By Date 0 Final - Electrical (4055) Approved Bv- Date MECHANICAL 0 Mechanical Rough -in (4165) 0 Gas Piping (4125)❑� Final - Mechanical (4065) Approved Approved to release test Approved By Date By Date By Date 1Z�Z7/Z3 PLUMBING 0 Plumbing Groundwork (4190) Q Rough Plumbing (4230) Q Final - Plumbing (4075) Approved to cover Approved Approved By Date By Date BY Date