Loading...
23-102955City of Federal Way Community Development Dept. 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 FILE Plumbing Permit #:23-102955-00-PL Inspection Request Line: (253) 835-3050 Project Name: MCGINNIS Project Address: 1024 S 286TH PL Parcel Number: 515296 0290 Project Description: Adding toilet, sink, bathtub, and shower to existing 3 inch sewer line Owner Applicant Contractor KELLY MCGINNINS ABRAHAM STARKSMetropolitan Builders VINNY BOY'S PLUMBING LLC 3818 SW DASH POINT RD Inc, (PLUMBING) FEDERAL WAY WA 98023 900 E SUITE 19-435 AVE MERIDIAN VINNYBP781CM (3/4/24 MILTON WA 98354 PO BOX 39658 LAKEWOOD WA 98496 Plumbing Fixtures Bathtubs 1 Laundry Washer Outlets 1 Lavatories 1 Other Plumbing Fixtures 1 Showers 1 Sinks 1 Water Closets 1 PERMIT EXPIRES Tucs� December, 2023 Permit Issu 'i�r day, June 8, 2023 I hereby certify that the above inform o 1 ect and that the construction o e described property and the occupancy and the use w� cordance with the laws, rules an a ions of the State of Waung on and the City of Federal Vey._ Owner or agent: t+1 Date: CITY OF - Federal Way THIS CARD IS TO RE\I_XI\ ON -SITE Construction Inspection Record INSPECTION REQUESTS: (253) 335-3050 Scheduled inspections ma-: be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right. top to bottom). Please schedule inspections as appropriate. Work uuist not be covered until it is approved_ Check with your inspector if you are unsure about an:- of the inspections or the inspection sequence- On -going inspections are logged on the back of this card - ELECTRICAL El BV UFER Ground (4295) Approved Date ❑ By Ditch cover (4030) Approved Date ❑ By SlablConcrete Floor (425a) Approved to place concrete Date ❑ Pool Bonding (4195) ❑ Temporary Power (4275) ❑ Sen-ice (4235) Approved Approved Approved By Date By Date By Date Feeders/Sub-panels (4045) ❑ Rough Electrical (4225) ❑ Ceiling Corer (4020) Approved Approved Approved By Date B-,• Date By Date Final - Electrical (4055) Approved By Date MECHANICAL Q Mechanical Rough -in (4165) ❑ Gas Piping (4125) ❑ Final -Mechanical (4065) Approved Approved to release test Approved - By Date By Date By Date PLUMBING 0 Plumbing Groundwork (4190) ❑ Rough Plumbing (4230) 0 Final - Plumbing (4075) Approved to cover Approved Approved By rj Date (*)1v1 L3 By Date By Date