23-102955City of Federal Way
Community Development Dept.
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
FILE
Plumbing
Permit #:23-102955-00-PL
Inspection Request Line: (253) 835-3050
Project Name: MCGINNIS
Project Address: 1024 S 286TH PL Parcel Number: 515296 0290
Project Description: Adding toilet, sink, bathtub, and shower to existing 3 inch sewer line
Owner
Applicant
Contractor
KELLY MCGINNINS
ABRAHAM STARKSMetropolitan Builders
VINNY BOY'S PLUMBING LLC
3818 SW DASH POINT RD
Inc,
(PLUMBING)
FEDERAL WAY WA 98023
900 E SUITE 19-435 AVE MERIDIAN
VINNYBP781CM (3/4/24
MILTON WA 98354
PO BOX 39658
LAKEWOOD WA 98496
Plumbing Fixtures
Bathtubs 1 Laundry Washer Outlets 1 Lavatories 1
Other Plumbing Fixtures 1 Showers 1 Sinks 1
Water Closets 1
PERMIT EXPIRES Tucs� December, 2023
Permit Issu 'i�r day, June 8, 2023
I hereby certify that the above inform o 1 ect and that the construction o e described property
and the occupancy and the use w� cordance with the laws, rules an a ions of the State of
Waung on and the City of Federal Vey._
Owner or agent:
t+1
Date:
CITY OF -
Federal Way
THIS CARD IS TO RE\I_XI\ ON -SITE
Construction Inspection Record
INSPECTION REQUESTS: (253) 335-3050
Scheduled inspections ma-: be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right. top to bottom). Please schedule inspections as appropriate. Work uuist not be covered until it is approved_ Check with your inspector if
you are unsure about an:- of the inspections or the inspection sequence- On -going inspections are logged on the back of this card -
ELECTRICAL
El
BV
UFER Ground (4295)
Approved
Date
❑
By
Ditch cover (4030)
Approved
Date
❑
By
SlablConcrete Floor (425a)
Approved to place concrete
Date
❑
Pool Bonding (4195)
❑
Temporary Power (4275)
❑
Sen-ice (4235)
Approved
Approved
Approved
By
Date
By
Date
By
Date
Feeders/Sub-panels (4045)
❑
Rough Electrical (4225)
❑
Ceiling Corer (4020)
Approved
Approved
Approved
By
Date
B-,•
Date
By
Date
Final - Electrical (4055)
Approved
By
Date
MECHANICAL
Q
Mechanical Rough -in (4165)
❑
Gas Piping (4125)
❑
Final -Mechanical (4065)
Approved
Approved to release test
Approved -
By
Date
By
Date
By
Date
PLUMBING
0 Plumbing Groundwork (4190) ❑ Rough Plumbing (4230) 0 Final - Plumbing (4075)
Approved to cover Approved Approved
By rj Date (*)1v1 L3 By Date By Date