23-101893Mechanical
City of Federal Way
Community Development Dept.
FILM
3
33325 Sth Ave S
-
Federal Way, WA 98003
�,...
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: QUAIL RUN PHASE I CONDOMINIUM Unit 6
Project Address: 3101 SW 319TH PL
Project Description: Relocation of the gas meter
Permit #:23-101893-00-ME
Inspection Request Line: (253) 835-3050
Parcel Number: 698000 0060
Owner
Applicant
Contractor
PATRICIA A BOATRIGHT
COREY ALEXANDERINFRASOURCE
INFRASOURCE SERVICES LLC
3101 SW 319TH PL UNIT 6-E
SERVICES LLC
INFRASL871C2 (2/22/25)
FEDERAL WAY WA
13330 STONE AVE N
14103 STEWART RD
98023
SEATTLE WA 98133
SUMNER WA 98390
Additional Permit Information
Mechanical Work Valuation?, ................................. 1000 Is this an Online or O.T.C. application?.................. Yes
a
Mecha res
Gas Piping I
PERMIT EKES Sunday, 8 Octob r,
\inf�
rmii ed on Tuesday, April 1 i
1 hereby certify that the aboation is correct and that the r, onsir on on the above described property
and the occupant and the use will be in accordance with t rules and regulations of the State of
Y g
- 4-V1
Washin ton and the City afINe rai Way.
Owner or agent: NDate:
� � r
C
crrr or
Federal Way
THIS CARD IS TO RE_%LAIN ON -SITE
Construction Inspection Record
INSPECTION REQUESTS: (253) 335-3050
Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS C kRD. Inspections are listed as close to sequential order as possible
(read left to right. top to bottom) Please schedule inspections as appropriate. Work must not be cowered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
ELECTRICAL
❑
UFER Ground (4295)
❑
Ditch cover (4030)
❑
Slab/Concrete Floor (4255)
Approved
Approved
Approved to place concrete
By
Date
By
Date
By
Date
0
Pool Bonding (4195)
❑
Temporary Poorer (4275)
❑
Service (4235)
Approved
Approved
Approved
By
Date
By
Date
By
Date
❑
Feeders/Sub-panels (4045)
❑
Rough Electrical (4225)
❑
Ceiling Corer (4020)
Approved
Approved
Approved
By
Date
By
Date
By
Date
❑
Final - Electrical (4055)
Approved
By
Date
MECHANICAL
❑
Mechanical Rough -in (4165)
❑
Gas Piping (4125)
❑
Final - Mechanical (4065)
Approved
Approved to release test
Approved
By
Date
By
Date L� (� 7J�
By
Date
z,•
PLUMBING
0
Plumbing Groundwork (4190)
0
Rough Plumbing (4230)
❑
Final - Plumbing (4075)
Approved to cover
Approved
Approved
By
Date
By
Date
By
Date