Loading...
22-105006City of Federal Way Community Development Dept. 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: BELMOR MHP SPACE 7 Project Address: 2101 S 324TH ST Project Description: Onsite demolition of manufactured home Demolition Permit #:22-105006-00-DE Inspection Request Line: (253) 835-3050 Parcel Number: 162104 9037 Owner Applicant Contractor BELMOR MOBILE HOME PARK LP BRE ICEAMERICAN ABATEMENT & AMERICAN ABATEMENT & DEMO 2101 S 324TH ST DEMO AMERIAD833CF (2/7/23) FEDERAL WAY WA 98003 2 AUBURN WAY 2 AUBURN WAY AUBURN WA 98002 AUBURN WA 98002 Additional Permit I orrr%*o PERMIT EXPI Sunday, 30 April, 202 Permit luued tohsday, November 1, 2Q2 I hereby certify that the above inform correct and that the construction o e above described property and the occupancy and the use will be in accordance with the fa les and regulations of the State of i n a City of Federa Owner or agent: %�.FDate: r at r THIS CARD IS TO REMAIN ON -SITE CITY OF 1— Construction Inspection Record Federal Way INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 22 105006 00 Address: 2101 S 324TH ST Space 007 Project: BELMOR MOBILE HOME PARK LP FEDERAL WAY WA 98003 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. ❑ SWM Precon Site Mtg (4400) Site Assessment (Erosion) (4365) 0 Interim Erosion Control (4370) Approved To be done PRIOR to breaking ground Approved By Date By Date By Date 0 Final Erosion Control (4375) Final - Building (4050) Approved Approved By Date By Date ❑ Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date RECEIVED OCT 2 7 2022 CITY OFFENRALWAY PERMIT APPLICATION CITY OF MMMUNiTY D'cVELOFME.W PERMIT CENTER + 33325 81h Avcnuc South + Federal Way, WA 98003-6325 Federal y 253.835-2607 + FAX 253-835-2609 + pernittcr,nrtrw -iyotfedcrahvay tom PERMIT NUMBER ` Q rr�yC)co 1 ,� TARGET DATE t } � I1134/2022 SITE ADDRESS f SUITE/UNIT 2101 S 314Ih SI 11 PROJECT VALUATION ZONING ASSESSOR'S TAX/PARCEL 6 111.000.00 9037 TYPE OF PERMIT ❑ BUILDING ❑ PLUMBING ❑ MECHANICAL M DEMOLITION d ENGINEERING ❑ FIRE PREVENTION NAME OF PROJECT 13chnorNIobilc I-IomePark#7 PROJECT DESCRIPTION Onshc domol[1io19 d manulaclured home Detailed desmption of work to be included on this permil only NAME PRIMARY PHONE }Into Knnh-o IP IS% 8311.2517 PROPERTY OWNER MAILING ADDRESS EMAIL 2101 S 321th S1 mtbolohaPhp,onn tom CITY STATE ZIP F[d[nl9Va7 p•,t 9M01 NAME PHONE Amrn Ab-m[nt and Demo 753 929 A:10 MAILING ADDRESS EMAIL I Auburn Wad '.'Ste 101 ohlupt>.L.,a tom CONTRACTOR CITY STATE ZIP FAX Aubu,n %VA 9AA62 2;1 929 6611 WA STATE CONTRACTOR'S LICENSE / EXPIRATION DATE USI A%IF.RIAnA33CF v' / 07 / 20!I A02.1177PA; NAME PRIMARY PHONE na l[N Amrnpn,lbnrmen and Demo 2t1929 A71P APPLICANT MAILINGA0DRE6S EMAIL 2 Anbutn WaI N'Ste 101 u0iur^a.J•wt rum CITY STATE ZIP FAX Anb.,n 1VA 9eoo' 2"919 861? NAME PRIMARY PHONE PROJECT CONTACT 11"let 233929.6710 (Tile individual to receive and MAILING ADDRESS EMAIL respond to all correspondence l Aubum WayN Ste 101 oh4e,e+Id.—tom concerning this application) CITY STATE ZIP FAX Auhu,n %VA 90001 254 929 ACTS PROJECT FINANCING NAME MnrnKonhl:rn 11• ED OWNER -FINANCED Whets value is S5,000 or more MAILING ADDRESS, CITY, STATE, ZIP PHONE tRVIV 192T.095I 2101.; 32411,54 1:[Jeta1 N'ay. WA 9An03 751'�i Q'2Sl I eerelfy under penalty of perjury that I am the property owner or authorised agent of the property owner. I certify that to the best of my knowledge, the Information submitted to support of this permit application Is true and Correct. I ccrft that I wits comply with ail applicable C(t9 of redcrat Way regulations pertaining to the work authorized by the Issuance of a permit. I understand that the issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal laws regulating con stru Otte n or On Won in On to I to ws. I f1irther agree to hold harm less the City of Federal Way as to any etoim line ludinp costs, expenses, and attorneys' jets incurred in the invest(gation and defense of such rialml, which moy be made by any person, InctuOtt ng the undersigned, and filed against the ctry, but an?y where such claim arises out of the reliance of the city, including its officers and employees, upon the accuracy of the information supplied to the cft as a part aft is appticatlon. SIGNATURE. J ^� DATE %O1��/ v� PRINT NAME Bulletin A100 —February 19, 2020 Page i or2 01lank ulslPcrmil Application 44k CITY OF Federal Way CU\I)Ili�l'1'1 DEVELUPMENr DEII.M011ENT 33325 81.4 vcnuc South Federal Way. WA 98003 253-835-2607: Fax 253-835.2609 .+�u ca.niicacralt.a..com DEMOLITION PERMIT REQUIREMENTS A demolition permit is required to remove any structure on a subject property. Demolition of separate structures may require separate permits. ❑ Address of Demolition: 2101 S 324th St Unit #7 Federal W2X, WA 98003 ❑ Prior to submitting a demolition permit, the following items must be signed by the respective agency or their approvals attached. Items not applicable to your project should be marked N/A. ❑ AcompletedConstructlon PermltAppllcatlon form is also required. 1. ASBESTOS ABATEMENT (Provide copy of Notice of Intent trorn Puget Sound Clean Air Agency S. ELECTRICITY and copy of inspection report by AHERA•certifted inspector) PSCAA Notification rr2022W138 (Puget Sound Energy(Ta[tama power) (City of Federal Way Building Official) 2. FUEL STORAGE TANKS 6. NATURAL GAS a Under grade tank(s) islare present o Above grade tank(s) are present a Tank(s) has been pumped or removed under South King Fire & Rescue (Puget Sound Energy) permit prsor to any dismantling or excavation (South King Fire and Rescue) 7. WATER - Public Source 3. SEPTIC SYSTEM DECOMISSIONING NIA (King County Environmental Services) 4. SANITARY SEWER (Lakehaven Water & Sewer District) NA (Lakehaven Water & Sewer District) S. WATER - Private Well NA (King County Environmental Services) ❑ Please Note: Erosion control measures must be in place d ring the demolition and through completion of the site clean-up. 4APPI1ca a-& Bullelin►122-April 8.2021 Page I of 1 01landoulsl13cmohuon Permit Rcquircinci s CC ,, rvur seeps Clean Ah Agency Notification Case #: 202205138 This page must be printed. A printout of the notification, all amendments to the notification, and the asbestos survey shall be available for inspection at all times at the asbestos project or demolition site (Reg III, 4.03(a)(6)). Fee Amount Paid $65.00 Credit Card Transaction S AQOASB83SD09 Transaction Date 10/25/22 Owner's Name Metro Northwest Phone (253) 838-0517 Project Street Address 2101 S 324TH ST unit r7 city Federal Way Zip 98003 Contact Person Aaron Borrero Phone (425) 698-7925 Mailing Address This project Includes a demolition. Demolition Start Date 11/14/22 Completion Date 11/21/22 Demolition will be completed by a demolition contractor Demo Contractor American Abatement and Demo Contractor lob # Contact Aaron Borrero Phone (253) 929-8730 Mailing Address 2 Auburn Way N, Suite 101 Auburn, WA 98002 (1) 1 certify that the information I have provided Is to the best of my knowledge true and accurate. (2) 1 understand that I must file an Amendment to this Notification If: The type of pro)ect has changed. The project types are asbestos and demolition. The quantity of friable asbestos 10 be removed meets a larger project category. The project'S start Or COMPIeVOS date has Changed. (3) I understand one Notification must be fled for each structure. The only exception is for a single-family residence that includes multiple ancillary structures, such as a detached garage or other outbuildings having the same street address. If there is no street address, I have used a building number. (4) I understand the Fees for this Notification are nonrefundable. Create Another Notification If you have questions, contact us at asbestos@pscleanairgov or 206.689.4055. AMERICAN ' ABATEMENT & DEMO CERTIFIED ASBESTOS RISK ASS ESSN-1ENT AND TESTING PROJECT NSA\1E: BELLtMORE• PARK UNIT 7 PROJECT LOCATION-:2 10 1 S. ,74"I S1" F1:I)1`.K:\L WAY, WA RATE SAMPLED: Monday. October 17, 2022 Dear Tyler flint American Abatement and Demo LLC appreciates the opportunity to be of service to you. If you have any questions regarding this report, please contact Aaron Borrero, AHERA Building Inspector. at 425-698-7925. AARON BORRERO AHERA BUILDING INSPECTOR CERTIFICATION NUMBER 182411 EXP. 9/10/2022 I AMERICAN � ABATEMENT &DEMO DEMOLITION ASBESTOS SURVEY On October 17, 2022, AHERA Building Inspector Aaron Borrero, of America: Abatement and Demo LLC, conducted a Good Faith Demolition inspection for suspected asbestos -containing materials, at the Bellmore Park 2101 South 324`h St Unit#7 Federal Way, WA, at the request of Tyler Flint with Bellmore Park. Accessible areas were visited, and samples were taken of building materials suspected to contain asbestos or lead. The asbestos samples were taken to Asbestos Northwest to be analyzed. Lead samples were taken to NVL Labs to be analyzed. The building in question was tested at 2101 South 324th St Unit#7 Federal Way, WA by AHERA Building Inspector, Aaron Borrero. The building in question was in good condition and structurally sound. Out of the 7 asbestos samples taken only 4 came back positive for asbestos. The second layer of roofing (samples 7-7 and 7-8, 1,200 SQ FT) had silver seal paint that was positive for (cluysotile 3%).The window caulking tested positive (5% chrysotile) there are 11 windows 150 Linear FT. PROCEDURES FOR ASBESTOS PROJECTS It shall be unlawful for any person to cause or allow any work on an asbestos project unless it is performed by persons trained and certified, in accordance with the standards established by the Washington State Departemnt of Labor and Industries, the Federal Occupational Safety & Health Administration (OSHA), or the United States Environmental Protection Agency (EPA) (whichever agency has jurisdiction) and whose certification is current. The certification requirment does not apply to asbestos projects conducted in an owner -occupied, single family residence performed by the resident owner of the dwelling. 2 110's AMERICAN ■ ABATEMENT &DEMO AHERA (Asbestos Hazard Emergency Response Act) regulation requires this inspection to include the indentification of Friable and Non -Friable ACM in: • Surfacing Materials, • Thermal Systems Insulation, and • Miscellaneous Materials: to delineate homogenous areas and to sample or "Presume" all materials locations. The number of samples required is specified in the AHERA Rue (40 CFR 763.86) as follows: Surfacing Materials (SW 3 samples per homogeneous area of less than 1000 sq. feet, ■ 5 samples for greater than 1000 but less than 5000 sq. feet, r 7 samples for greather than 5000 sq. feet Thermal System Insulation (TSI) o 3 samples from each homogeneous area that is not "Assumed" to be asbestos, • 1 sample per each patched area, and as determined by the inspector for tees, elbows, or valves. Suspected asbestos -containing materials within the structure were identified and classified as a surfacing material, Thermal System Insulation (TSn, or miscellaneous materials. Surfacing materials are those which are either spray applied or troweled -on for acoustical, decorative, or fireproofing purposes. TSI is insulation used to inhibit heat transfer or to prevent condensation on pipes, boilers, tanks, ducts and various other components. Miscellaneous materials include all other materials not included in the above categories such as floor tile, roofing felt, cementitous materials, wallboard systems and products such as caulking, mastics, and putties. AMERICAN ■ ABATEMENT &DEMO Field inspection, data collection, and report generations were performed according to the following Scope of Work: The survey was intended to identify possible asbestos -containing materials (ACM) on the interior and exterior of the building. The inspection covered only those areas, which were exposed and/or physically accessible to the inspector. Materials uncovered during the course of demolition, renovation, or maintenance activities that are not identified in this inspection report must be presumed to contain asbestos until PLM analysis proves that this material is not asbestos -containing. This inspection is not intended for, nor should be used as a design specification. The Asbestos in School Hazard Amendments and Reauthorization Act (ASHARA), effective November 20"', 1990, expanded accreditation requirements to apply to persons who work with asbestos in public and commercial buildings as well as schools. Specifically, ASHARA expanded the Toxic Substance Control Act (TSCA) Section 206 (a) (1) and (3) to require accreditation for any person who designs or conducts a response action with respect to friable ACM in a building. TSCA Section 207 provides for civil penalties of $5,000 for each day of a violation for not employing accredited individuals to design and conduct response actions. Sampling of suspected asbestos -containing materials was conducted as prescribed in 40 CFR 763.86. In the case of <1 % asbestos is found in a material, WISHA enforcement staff must assess that the basic asbestos work practice requirments as given in WAC 296-62-17712(2), particularly use of wet, non -aggressive methods and prompt clean up. Vaccuums used must be HEPA filtered. Worker training must include asbestos awareness and hands on training as given in WAC 296- 62-07722(5). Respiratory protection must be based on overall dust levels. A competent person must be assigned and trained under the requirments of WAC 296-62-07728. 4 AMERICAN � ABATEMENT &DEMO Sample Number 7-1 Description Asbestos Type Chrysotile Percent (if detected) 5 Window caulk o , AMERICAN � ABATEMENT &DEMO AMERICAN • � ABATEMENT &DEMO .4 t= 71% W-ma 7 AMERICAN • ■ : ABATEMENT &DEMO i Lu-� MLIL� V"�r- -. IV te"*,� AMERICAN ■ ABATEMENT &DEMO The intent of the asbestos survey is to comply with asbestos regulations required by the state of Washington and Puget Sound Clean Air Agency. Currently, the state of Washington requires a written "good faith inspection" for identification of asbestos -containing materials prior to any remodeling or demolition work. During demolition and construction work it is the responsibility of the owner and the contractor to make this survey document available to all concerned parties who may be handling the building materials. In demolitions, all asbestos is to be removed by an asbestos contractor. These agencies regulate asbestos in these counties (Washington State); Puget Sound Clean Air Agency (PSCAA) King, Kilsap, Snohomish Olympic Regional Clean Air Agency (ORCAA) Jefferson, C1allam, Mason, Thurston, Pacific, Grays Harbor Southwest Clean Air Agency (SWCAA) Lewis, Clark, Wahkiaktan, C oiv1i1Z, Skamania Yakima County Clean Air Authority (YCCAA) Yakima Northwest Air Pollution Authority (NAPA) Whatcom, Skagit, Island Douglas County Clean Air Commission, Douglas Grant County Clean Air Authority, Grant Tri Counties Air Pollution Control Authority, Benton, Walla Walla, Franklin Spokane County Air Pollution Control Authority (SCAPCA) Spokane Washington Department of Ecology (DOE) Stevens, Ferry, Okanogan, Saar Juan, Chelan, Kiltitas, Klickital, Columbia, Garfield, Asolin, Adams, Lincoln, Pend Oreille A fee must be paid, and the Notice of Intent filed, and be submitted prior to renovation or demolition of a building. There is a required waiting period after filing a notification before work can begin. (Mandatory 10 days for all demolition's) Calendar or working day wait is stipulated by each regulatory agency's policy. Further information regarding compliance may be obtained at our office. 0 o AMERICAN ■ ABATEMENT &DEMO It is unlawful for the owner or owner's agent to remove asbestos in excess of 10 linear feet or 48 square feet per year, per structure, unless the building is an owner -occupied, single family private residence. Washington State law requires asbestos that is left in place, be in good repair and maintained at regular intervals. Maintenance should be documented. In addition, PSCAA requires that a copy of the written asbestos survey be made available on -site for inspection by a PSCAA Control Officer during construction and demolition work. The survey is required to be performed in accordance with 40 CFR 763.86. These federal standards require inspections to be conducted by an EPA Accredited Building Inspector with analysis to be provided by an asbestos laboratory certified by the National Bureau Standards. The requirements are described in Article 1 and Article 4, of PSCAA's Asbestos Control Standards. All survey work was conducted in compliance with the above -mentioned standards. Asbestos -Containing material are required to be removed and disposed of in accordance with Washington State Regulations 296-155 WAC, Part S prior to any demolition, renovation, or remodeling that would disturb these materials. Washington State Department of Labor and Industries and PSCAA require that the abatement be performed using Certified Asbestos Abatement Workers under the direct on -site supervision of a Certified Asbestos Supervisor in accordance with 296-65 WAC. Also see 296-62 WAC, Part I-1General requirements for handling asbestos. Asbestos inspections are non -comprehensive by nature and our assessment is limited only those locations inspected and sampled. This survey was not designed to identify all potential concerns or eliminate all risk associated with abatement. No warranty, express or implies, is made with American Abatement and Demo, LLC. American Abatement and Demo LLC is not responsible for materials which require destructive means to access, or materials which are hidden from sight, those materials hidden behind walls, or materials which cannot be found with reasonable diligence. Extreme caution should be used during renovation or demolition to ensure that additional unidentified materials are not disturbed. In the event that additional materials are discovered, the material should be sampled by an EPA Accredited AHERA Building Inspector and analyzed to determine if it contains asbestos prior to disturbance. 10 AMERICAN ■ ABATEMENT &DEMO WRITTEN BY: AARON BORRERO AHERA BUILDING INSPECTOR CERTIFICATION NUMBER 182411 EXP. 09/10/2022 AMERICAN ABATEMENT AND DEMO, LLC Certificate of C17"0111p letf v t1 This is to certify that Aaron E. Borrero has satisfactorily completed 4 hours of online refresher training as an AHERA Building Inspector to comply with the training requirements of TSCA Title II, 40 CFR 763 (AHERA) EPA PrpridW M 1085 W4 %] C«1111f�iu Nurr�br+ ®� Sep M 7.a2 t r,9•n er V— r •w••• r.-.� �..n Era. Swig NiA lnafrueW Andr6Zwananhurg A,}fAnFKRKPC.Zl*1$14AA4W%o?t 100,Nt]V�Mk1 �lAMCirYAYM1Gipl�.�1 ]6L.µ tfif rlJlC.�.II�IIKCOf1 II /1-1k,, ASBESTOS, 1AdAv%.k' 30620 Pacific Hwy S. 4103. Federal Way. WA 98003 (253) 94 1-4343 TESTING NVLAP LAB CODE 200"3-0 Enclosed please find the analytical report for one or more samples submitted for analysis by Polarized Light Microscopy. The six types of asbestos fibers are chrysotile, amosite, crocidolite, tremolite, anthophyllite and actinolite. A sample which contains more than 1 % asbestos is considered positive and is defined by the EPA as an Asbestos Containing Material (ACM). The samples were analyzed in accordance with EPA method 600/R-93/1 16 and 600/M4-82-020 which has a detection limit of approximately 1%. The analyst used a stereomicroscope to visually inspect the sample to determine homogeneity and material descriptions. The sample was then viewed under a polarized light microscope to determine the presence and percentage ol' asbestos and non -asbestos fibers. After analysis is complete, all paperwork is filed together, and kept in a secure locked filing cabinet. Asbestos Northwest ensures that the files will not be tampered with at any time and will only be removed if the client requests reanalysis or a modification to the report. If you have any concerns or comments, contact us at feed back(u..asbestosnN .com or till out our survey at ashestosnw.com/survev I Thank you, (,,P,/ FO t�'4 -These results are only applicable to the samples enclosed with information provided by the client. This report may not be reproduced, except in full, without the approval of the laboratory. This report may not be used to claim product certification, approval. or endorsement by NVLAP. NIST, or any agency of the U.S. Government.- w ORgHWEST Asbestos NON Batch# 30620 Padfla HWy S. 9103. Federal Way, WA 98003 2 o 0- (253) 9414343 NVLAP Lab Code: 200993-0 Bulk Samples Chain of Custody (EPA 6001R-931116) Name: America Abatement & Demo is ce: � _ Address: 18855 SE Auburn Black Diamond RD Phone: 425-698-7925 .Auburn. WA 98092 Proiect Manager _Aaron Bgrrero --._- _ Project Locat.-..: -E-mail: Aaron(MAD WA.com Number of Samples: Tum:around-time: ; lAr,,A,- r r �P.J _ i11 i - . ■ r '~ IJ W,y,.I +M OR .I.i n awn .r s .. m m m m m m m Print Sign Company Date Time Sampled by: A/Afl ' f . Relinquished by: Delivered by: u `i Accepted by: Analyzed by: 0 ASBESTOS ��� NORTHWEST Asbestos Northwest, LLC 30620 Pacific Hwy S, #103, Federal Way, WA 98003 Ph: (253) 941-4343 Fax: (253) 941-4175 TESTINGa NVLAP LAB CODE 200993 U Batch Number: 202214290 PLM Analysis by EPA Method 600/M4-82-020 and 600/R-93/116 This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NISI, or any agency of the U.S. Government. Attn: Aaron Borrero Date Received: 10/17/2022 American Abatement and Demo Date Analyzed: 10/17/2022 18855 SE Auburn Black Diamond Rd Samples Received: 8 Auburn WA 98092 Samples Analyzed: 8 Location: 2101 S 324th St Unit #7 Federal Way, WA ,Client Sample Lab Sample Layer Description Matrix % Non -Asbestos % Asbestos Fibers ID ID Fibers and Type 1 Gray soft/elastic material Binder/filler 2% Cellulose, Glass fibers 5% Chrysotile 1 Gray soft/elastic material Binder/filler 2% Cellulose, Glass fibers 5% Chrysotile 7-3 1 Beige floral Patterned sheet VinyUbinder None Detected None Detected vinyl 2 Beige fibrous material with Filler, 75% Cellulose, None Detected mastic Mastic/binder Synthetic fibers 3 Pale yellow sheet vinyl with Vinyl/binder None Detected None Detected glitter 4 Green fibrous material with Filler, 75% Cellulose, None Detected mastic Mastic/binder Synthetic fibers 7-4 1 Beige floral Patterned sheet Vinyl/binder None Detected None Detected vinyl 2 Beige fibrous material with Filler, 75% Cellulose, None Detected mastic Mastic/binder Synthetic fibers Y12� Analyzed by: Cathy Butler( -� ?I1 " 1 Report Page 1 A S B E 5 T 0 5 lmwaa NORTHWEST TESTING Asbestos Northwest, LLC NVLAP LAB CODE 200993.9 30620 Pacific Hwy S, #103, Federal Way, WA 98003 Ph: (253) 941-4343 Fax: (253) 941-4175 Batch Number: 202214290 PLM Analysis by EPA Method 600/M4-82-020 and 600/R-93/116 This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST, or any agency of the U.S. Government. Attn: Aaron Borrero American Abatement and Demo 18855 SE Auburn Black Diamond Rd Auburn WA 98092 Location: 2101 S 324th St Unit #7 Federal Way, WA Date Received: 10/17/2022 Date Analyzed: 10/17/2022 Samples Received: 8 Samples Analyzed: 8 ,Client Sample Lab Sample Layer Description Matrix % Non -Asbestos % Asbestos Fibers 1D ID Fibers and Type 3 Pale yellow sheet vinyl with Vinyl/binder None Detected None Detected glitter 4 Green fibrous material with Filler, 75% Cellulose, None Detected mastic Mastic/binder Synthetic fibers 7-5 1 Pinkish beige sheet vinyl Vinyl/binder None Detected None Detected None Detected 2 Gray fibrous material with Filler, 75% Cellulose, mastic Mastic/binder Synthetic fibers 3 Gray brittle material Binder/filler 2% Cellulose, Talc None Detected None Detected 4 Beige sheet vinyl Vinyl/binder None Detected 5 Beige fibrous material with Filler, 75% Cellulose, None Detected mastic Masticibinder Synthetic fibers 6 Beige sheet vinyl Vinyl/binder None Detected None Detected Analyzed b : Cathy Butler 'qN 44�" Report Page 2 Y Y Y '' i ko NOR TRH W EaS T V�� +IL/�JjrJ�]� TESTING V Asbestos Northwest, LLC NVLAP LAB CODE 20O"3•0 30620 Pacific Hwy S, #103, Federal Way, WA 98003 Ph: (253) 941-4343 Fax: (253) 941-4175 Batch Number: 202214290 PLM Analysis by EPA Method 600/M4-82-020 and 600/R-93/116 This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST, or any agency of the U.S. Government. Attn: Aaron Borrero American Abatement and Demo 18855 SE Auburn Black Diamond Rd Auburn WA 98092 Location: 2101 S 324th St Unit #7 Federal Way, WA Date Received: 10/17/2022 Date Analyzed: 10/17/2022 Samples Received: 8 Samples Analyzed: 8 Client Sample Lab Sample Layer Description Matrix % Non -Asbestos % Asbestos Fibers ID ID Fibers and Type 7 Green fibrous material with Filler, 75% Cellulose, None Detected mastic Mastic/binder Synthetic fibers 7-7 1 Silver paint Paint/binder 1 % Cellulose 3% Chrysotile " 1 Pinkish beige sheet vinyl Vinyl binder None Detected None Detected None Detected 2 Gray fibrous material with Filler, 75% Cellulose, mastic Mastic/binder Synthetic fibers 2% Cellulose, Talc 3 Gray brittle material Binder/filler None Detected 4 Beige sheet vinyl Vinyl/binder None Detected None Detected 5 Beige fibrous material with Filler, 75% Cellulose, None Detected mastic Mastic/binder Synthetic fibers Beige sheet vinyl Vinyl/binder None Detected None Detected 6 Analyzed b : Cathy Butler RP '� ` Report Page 3 Y Y Y . ASBESTOS " NORTHWEST Asbestos Northwest, LLC 30620 Pacific Hwy S, #103, Federal Way, WA 98003 Ph: (253) 941-4343 Fax: (253) 941-4175 KV�P ° TESTING NVLAP LAB CODE 2DO993.0 Batch Number: 202214290 PLM Analysis by EPA Method 600/M4-82-020 and 600/R-93/116 This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST, or any agency of the U.S. Govemment. Attn: Aaron Borrero Date Received: 10/17/2022 American Abatement and Demo Date Analyzed: 10/17/2022 18855 SE Auburn Black Diamond Rd Samples Received: 8 Auburn WA 98092 Samples Analyzed: 8 Location: 2101 S 324th St Unit #7 Federal Way, WA Client Sample ID Lab Sample 1D Layer Description Matrix % Non -Asbestos % Asbestos Fibers Fibers and Type 7 Green fibrous material with Filler, 75% Cellulose, None Detected mastic Mastic/binder Synthetic fibers 7-8 1 Silver paint Paint/binder 1% Cellulose 3% Chrysotile Analyzed b : Cathy Butler "flI �/,�� Report Page 4 Y Y Y . r