Loading...
22-101529Mechanical MA City of Federal Way Community Development Dept. 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Or - Permit #:22-101529-00-ME Inspection Request Line: (253) 835-3050 Project Name: FRANCEWAR Project Address: 2152 S 286TH ST Parcel Number: 422210 0340 Project Description: inspect the gas tubing from the meter on the side of house Owner Applicant Contractor KEVIN FRANCEWAR LETTY FRANCEWAR OWNER 2152 S 286TH ST 2152 S 286TH ST OWNER FEDERAL WAY WA 98003-3321 FEDERAL WAY WA 98003 V. Additional Permit ation Mechanical Work Valuation? ............. 2000.00 Ihi, an Online or O.T.C. app ' Yes ecl i cal Fixtures Gas Piping 1 PERMIT EXPIRES Tuesday, 4 Oct r, 2022 P�ssued on Thursday, A , 2022 hereby certify that the above nforrrlation is correct and that nstruction on the above described property and the occupANUN , the use will be in accordance with laws, rules and regulations of the State of End -the C* of Federal Way.Owner or ag � Date: LA 0 THIS CARD IS TO REMAIN ON -SITE Ch Construction Inspection Record Federal Way INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 22 101529 00 Address: 2152 S 286TH ST Project: LETTY FRANCEWAR FEDERAL WAY WA 98003-3321 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. El Mechanical Rough -in (4165) fBy Gas Piping (4125) Final - Mechanical (4065) Approved Approved to release test Approved By Date A .� Date 41) 1211 a,By Date Rough Electrical El Final Electrical L1Right of Way Approved Approved Approved By Date By Date By Date