Loading...
22-101949City of Federal Way Community Development Dept. 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: STRUTHERS Project Address: 36906 17TH AVE S Building - Single Family Permit 9:22-101949-00-SF Inspection Request Line: (253) 835-3050 Project Description: BLUEBEAM - Addition of 3/4 bath in basement bonus room. Parcel Number: 721266 0600 Owner Applicant Contractor Lender DANIEL STRUTHERS DANIEL STRUTHERS OWNER IS CONTRACTOR OWNER IS LENDER 36906 17TH AVE S 36906 17TH AVE S FEDERAL WAY WA 98003 FEDERAL WAY WA 98003 Census Category: 434 - Residential alt adr-nohap umber of units Includes: # 1 #2 #3 #4 Occupancy Class: R-3 %b Construction Type: -I] pX - B Is Occupancy Load: Floor Area (sq. ft.) dditional Per InMechanical to Occupancy # I - Construction Type..... �............. Type V - g o be Included?..................................... Yes Plumbing Work Valuation?....... 9500 44 Mechanical Work Valuation? .................................. 500 Number of Stori 4 Is this an Online or O.T.C. application? .................. No ...................... Plumbing to de . Yes Occupancy #1 - Use........ ........................... Comprehensive ignation................... S igh-Density Zoning Designation......... idential Total Valuation: 10,000.00 CMechanical Fixtures Fans l Drains Water Closets Plumbing Fixtures 1 Showers 1 Sinks PERMIT EXPIRES Monday, 21 November, 2022 Permit Issued on Wednesday, May 25, 2022 Residence (1 or 2 family) RS 7.2 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: F Date: THIS CARD IS TO REMAIN ON -SITE `MYoF Construction Inspection Record Federal Way INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 22 101949 00 Address: 3690617TH AVE S Project: DANIEL STRUTHERS FEDERAL WAY WA 98003-7596 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. 0 Plumbing Groundwork (4190) Q Underfloor Framing (4285)❑ Floor Sheathing (4105) Approved to cover Approved to sheath floor Approved to install flooring By Date By Date By Date ® Shear Walls (4245) ® Roof Sheathing (4220) ® Rough Plumbing (4230) Approved to install siding Approved to install roofing Approved By Date By Date By Date Efl Mechanical Rough -in (4165) ® Gas Piping (4125) 0 Fire/Draft Stops (4095) Approved Approved to release test Approved By Date By Date By Date n; Prior to scheduling a FraminL109.340 I0 Framing4120 ( ) ❑ Insulation (4150) Electrical, Plumbing & Mechah-in and Fire/Draft Stop inspections gned- [L Approved to insulate Approved to install wallboard off and approved. IBC By Date By Date 12 Gypsum Wallboard Nailing (4130) R3 Final - Mechanical (4065) Final - Plumbing (4075) Approved to install mud & tape Approved Approved By Date By Date By Date Final - Building (4050) Approved By Date Rough Electrical ❑ Final Electrical Right of Way Approved Approved Approved By Date By Date By Date