22-101916City of Federal Way
Community Development Dept.
33325 8th Ave S
Federal Way, WA 98003
Ph: (253)835-2607 Fax: (253) 835-2609
Project Name: HARBORSTONE CREDIT UNION
Project Address: 1900 S COMMONS
i
Building - Commercial
Permit 9:22-101916-00-CO
Inspection Request Line: (253) 835-3050
Parcel Number: 762240 0010
Project Description: BLUEBEAM - Interior remodel of an existing retail space to a new credit union. Work
includes architectural and electrical, mechanical and plumbing are existing to remain. Provide
new storefront ATM.
Owner
Applicant
Contractor
Lender
MGP XI COMMONS FW LLC
MICHAEL HALLMICHAEL A
WARWICK CONSTRUCTION INC
OWN FR IS LENDER
425 CALIFORNIA ST
HALL ARCHITECT LLC
365 FM 1959 RD
SAN FRANCISCO CA 94104
600 N 4TH ST SUITE 404
HOUSTON TX 77034-5413
PHOENIX AZ 85004
Census Category: 434 - Residential altla Range in numbe of units
Includes:
#1
#
#4
Occupancy Class:
B
Construction Type:
Type H - B
Occupancy Load:
32.00 •
Floor Area (sq. ft.)
2,874.00 SL
w
Additional Permit Inforrron
Occupancy #1 - Area (Sq. Feet) .......................... 4 cc ,yyy #1 - Construction Type......................... Type II- B
Mechanical to be Included? ............. N I' ng Work Valuation?..................................... 0
Mechanical Work Valuatison?........ ..... 0 Number of Stories ................................................... 1
Is this an Online or O.T.C. application? .................. No Permit for Building Shell Only?.............................. No
Plumbing to be Included? .............. .................... No • Will Certificate of Occupancy be Issued?............... Yes
.
Occupancy #1 - Us ProfS$'
Comprehensive Plan Designation ........................... City Center Core
„ SeryZoning Designatio ...... ... CC-
............. ............
Total Valuation: 100, 0
No Fixturesociated With This Permit !l
PERMIT EXPIRES Sunday, 27 November, 2022
Permit Issued on Tuesday, May 31, 2022
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
h*gtorUMthe City of Federal Way.
Owner or agent: Date:
City of Federal Way
Certificate of occupancy
This Certificate issued pursuant to the requirements of Section 111 of the International Building Code or Section
R110 of the International Residential Code is certifying that at the time of issuance, this structure was in
compliance with the various ordinances of the City regulating building construction or use. This certificate is valid
ONLY when endorsed by City staff.
Tenant Name: HARBORSTONE CREDIT UNION
Address: 1900 S COMMONS Unit A
Permit # 22-101916-00-CO
Includes: # 1 #2 #3 #4
Occupancy Class: B
Construction -Type: Type II'_ B
Occupancy Load .I 32.00
Floor Area (sq. ft.p, 2,874.00
aW!,xer Name: MGP XIS COMMONS FW LLC
OwneirAddrarss: 425 CALIFOVLA ST,
SAN FPANCISCO qA 94104
Co .v"
,3•
Building Official '
Date
01
The priority focus in the review and inspection madq by the City prior to issuance of this Certificate was on those matters which
experience has shown most severely affect the heakhr and safety of the general public. Although the City has made as complete
a review and inspection as is reasonably possible (within budgetary time and person-4 limitations), the City neither guarantees
nor warrants to the ownerl occupant or to any other parson that this Certificate evidences,stricf cdtnpliance with each and every
ordinance or regulation of the City or the State of Washington affecting the construction or je of said structure or the land upon
which it is situated. Such compliance is the responsibility of the owner and / or occupant of the premises.
W
- kt
-r- 1
A�,
CITY OF
Federal Way
PERMIT #:
Project:
THIS CARD IS TO REMAIN ON -SITE
Construction Inspection Record
INSPECTION REQUESTS: (253) 835-3050
22 101916 00 Address: 1900 S COMMONS Unit A
MGP XI COMMONS FW LLC FEDERAL WAY WA 98003
Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
Site Assessment (Erosion) (4365)
Q
Footings/Setback (4110)
0
Re -steel (4215)
To be done PRIOR to breaking ground
Approved to place concrete
Approved to place concrete or grout
By
Date
By
Date
By
Date
®
Slab/Concrete Floor (4255)
5❑
Underfloor Framing (4285)
®
Floor Sheathing (4105)
Approved to place concrete
Approved to sheath floor
Approved to install flooring
By
Date
By
Date
By
Date
Q Fire/Draft Stops (4095)
® Interim Erosion Control (4370)EFire/Draft
duling a Framing inspection;
Approved
Approved
mbing & Mechanical Rough -in
Stop inspections must be signed -
By Date
By Date
approved. IBC 109.3.4
Q Framing (4120)
1n Insulation (4150)
tt Gypsum Wallboard Nailing (4130)
Approved to insula
Approved to install wallboard
Approved to install mud & tape
By 191,Date
By Date
By Date
1 z
Suspended Ceiling Grid (4265)
9 s
Final - S K F & R (4060)
14
Final -Planning
Approved to drop tile
Approved
Approved
By
Date
By
Date
By
Date
16Final Erosion Control (4375) Q
Approved
By Date By
Final - Building (4050)
Approved
Date
Rough Electrical
Final Electrical
❑
Right of Way
Approved
Approved
Approved
By
Date
By
Date
By
Date
Building Division
.
CITY �F 33325 Eighth Avenue South
Federal Wa Federal Way, Fax
98003-4�lk6325
y Phone 253-835-2607 Fax 253-35-609
CORRECTION NOTICE
IF YOU HAVE QUESTIONS CALL (253) 835- ��-
WHEN CORRECTIONS HAVE BEEN MADE, CALL (253) 835-3050 FOR RE -INSPECTION. SEE BACK OF CARD
FOR DETAILS. NOTE: ELECTRICAL CORRECTIONS ARE REQUIRED TO BE MADE WITHIN 15 DAYS.
116
DA E
10
INSPECTOR
DO NOT REMOVE THIS NOTICE
Page of