Loading...
23-101150Building - Single Family City crnlriva,. CommuPermit #:23-101150-00-SF niEyDcyclvclapmcm Dept 33335 811E Ave S Federal Way, WA 98003 _ Inspection Request Line: (253) 835-3050 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: THE WOODLANDS AT REDONDO CREEK LOT 54 Project Address: 30321 19TH AVE S Parcel Number: 952651 0540 Project Description: BLUEBEAM - Construction of a 2,785 square foot 2-story with basement single family residence, with a 67 square foot covered entry, 100 square foot covered patio, 140 square foot deck and an attached 373 square foot garage. Includes plumbing and mechanical. Owner Applicant Contractor Lender SSHI LLC DBA D R HORTON JESS BOSANCUD R HORTON D R HORTON OWNER IS LENDER 11241 SLATER AVE NE SUITE 12C 11241 SLATER AVE NE SUITE 120 11241 SLATER AVE NE SUITE 120 KIRKLAND WA 98033 KIRKLAND WA 98033 KIRKLAND WA 98033 Census Category: 101 - New Single Family House Includes: # 1 #2 #3 #4 Occupancy Class: R-3 Construction 'I' e: Tye V - B Occupancy Load: Floor Area (sq. R.) 2,785.00 0.00 Additional Permit Information New / Additional Sq. Feet - 1st Floor ..................... 903 New / Additional Sq. Feet - 2nd Floor.................... 1162 New / Additional Sq. Feet - 3rd Floor ..................... 0 Occupancy # 1 - Area (Sq. Feet) ...... .......... I .... I........ 2785 New / Additional Sq. Feet - Basement .................... 720 Basic Plan?.....,..................................................... No Occupancy #1 -Construction Type ......................... Type V - B New / Additional Sq. Feet - Deck........................... 140 New / Additional Sq. Feet - Garage ........................ 373 Mechanical to be Included? ............................. I....... Yes Plumbing Work Valuation? ..................................... 15000 Mechanical Work Valuation?.................................. 10000 Number of Stories ................................................... 2 New / Additional Sq. Feet - Other.,......................... 167 Plumbing,to be Included? .................... I .......... I........ Yes New / Additional Sq. Feet - Total .................. ....... .- 3465 Will Certificate of Occupancy be Issued? ............... Yes Occupancy #1 - Use ................................................ Residence (I or 2 family) Comprehensive Plan Designation ........................... SF - High -Density Zoning Designation................................................. RS 5.0 Residential Total Valuation: 487,227.59 Mechanical Fixtures Fans 7 Furnaces 1 Gas Piping I Gas Pipe Outlets 2 Plumbing Fixtures _ Bathtubs 2 Dishwashers 1 Laundry Washer Outlets I Lavatories 6 Showers 2 Sinks 1 Water Closets 4 Water Heaters 1 Hose Bibbs 2 PERMIT EXPIRES Monday, 13 November, 2023 Permit Issued on Wednesday, May 17, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of f1ttcEily of Federal Way. , Owner or agent. Date: City of Federal Way Certificate of Occupancy This Certificate issued pursuant to the requirements of Section 111 of the International Building Code or Section 11110 of the International Residential Code is certifying that at the time of issuance, this structure was in compliance with the various ordinances of the City regulating building construction or use. This certificate is valid ONLY when endorsed by City staff. Tenant Name: THE WOODLANDS AT REDONDO CREEK LOT Address: 30321 19TH AVE S Includes: # 1 #2 Occupancy Class: R-3 Construction Type: Type V - B Occupancy Load: 0.00 Floor Area (sq. ft.) 2,785.00 0.00 Owner Name: SSHI LLC DBA D R HORTON Owner Address: 11241 SLATER AVE NE SUITE 120 KIRKLAND WA 98033 Building Offs •ial #3 Permit # 23-101150-00-SF #4 L + G 5 (Z°24-- Date The priority focus in the review and inspection made by the City prior to issuance of this Certificate was on those matters which experience has shown most severely affect the health and safety of the general public. Although the City has made as complete a review and inspection as is reasonably possible (within budgetary time and personnel limitations), the City neither guarantees nor warrants to the owner I occupant or to any other person that this Certificate evidences strict compliance with each and every ordinance or regulation of the City or the State of Washington affecting the construction or use of said structure or the land upon which it is situated. Such compliance is the responsibility of the owner and I or occupant of the premises. r THIS CARD IS TO REMAIN ON -SITE . CITY OF �r Construction Inspection Record Federal Way INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 23 101150 00 Address: 30321 19TH AVE S Project: SSHI LLC dba D R HORTON FEDERAL WAY WA 98003 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. 0 SWM Precon Site Mtg (4400) El Site Assessment (Erosion) (4365) Footings/Setback (4110) Approved To be done PRIOR to breaking ground Approved to place concrete By Date By Date By a Date al f Z ® Foundation Wall (4115) Approved to place concrete By 0 Date Q Drainage/Downspout (4040) Approved to backfilI By y �.1 Date � ]..�1 ® Plumbing Groundwork Approved to cover c� By Date cJ 90) 0 Slab/Concrete Floor (4255) 0 Underfloor Framing (4285) 0 Floor Sheathing (4105) Approved to place concrete Approved to sheath floor Approved to install flooring By 1 Date -1 L2,3 By Datefj�" By /-1) Date Q Shear Walls (4245) Approved to install sidin By Date/ � li, 7 13 Mechanical Rough -in (4165) Approved By Date 's Interim Erosion Control (4370) Approved By Date Q Roof Sheathing (4220) Approved to install roofing By '1I 0 Date L '} 14 Gas Piping (4125) Approved to release test � By C Date Prior to scheduling a Framing inspection; Electrical, Plumbing & Mechanical Rough -in and Fire/Draft Stop inspections must be signed - off and approved.. IBC 109.3.4 1z By Rough Plumbing (4230) Approved Date 15 Fire/Draft Stops (4095) Approved By 61,J Date 18/,2 -7-, e 17 Framing (4120) Approved to insulate 1 o, 31 l By A-0 Date L3 18 Insulation (4150) 19 Gypsum Wallboard Nailing (4130) 2D Final Erosion Control (4375) Ato install wallboard Approved to install mud & tT�IZ5 Approved {{pproved By y6r J Date } i 3 Z3 By Date By Date 0 Final - Mechanical (4065) 22 Final - Plumbing (4075) 0 Final - Building (4050) Approved �14((V4- Approved Z4' W Approved By 11VUDate I 0'y4- By 1'V� Date By lyy� Date L(k oe- i S e w Off' ff r W V 11 A1J- "ftC 1iAe oV,_ ❑ Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date CITY OF Building Division � FederalWay33325 Eighth Avenue South Phone Federal Way, WA 98003-6325 835-2607 Fax 253-835-2609 CORRECTION NOTICE ADDRESS: '3a3Z1 1 qi" hire- S PERMIT#: Z'�>-1 n 1 IS-0 IF YOU HAVE QUESTIONS CALL Wax_ (253) 835-_ X(,zl WHEN CORRECTIONS HAVE BEEN MADE, CALL (253) 835-3050 FOR RE -INSPECTION. SEE BACK OF CARD FOR DETAILS. NOTE: ELECTRICAL CORRECTIONS ARE REQUIRED TO BE MADE WITHIN 15 DAYS. DATE INSPECTOR DO NOT REMOVE THIS NOTICE Page of CIT'-t OF Building Division 33325 tighth Avenue Sauth Federal Way F3-835-1 Way. x 98835-6325 Phone 253-835-25fl7 Fax 253-835-26Q9 CORRECTION NOTICE ADDRESS:2� �C1e �' PERMIT#: �°� IF YOU HAVE QUESTIONS CALL (253) 835- WHEN CORRECTIONS HAVE BEEN MADE, CALL (253) 83 -3050 FOR RE -INSPECTION. SEE BACK OF CARD FOR DETAILS. NOTE: ELECTRICAL CORRECTIONS ARE REQUIRED TO BE MADE WITHIN 15 DAYS. DA E INSPECTOR DO NOT REMOVE THIS NOTICE Page of