23-105237City of Federal Way
Community Development Dept.
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: KM SUMMIT
Project Address: 33301 9TH AVE S
Building - Commercial
Permit #:23-105237-00-CO
Inspection Request Line: (253) 835-3050
Parcel Number: 9265010130
Project Description: BLUEBEAM - Adding wall in existing office space. No plumbing or mechanical.
Owner
Applicant
Contractor
Lender
ALPHA PACIFIC LLC
HANK
METROPOLITAN CONTRACTING
TENANT IS LENDER
33801 1ST WAY S UNIT 311
PETERSONMETROPOLITAN
2454 OCCIDENTAL S SUITE 3B
FEDERAL WAY WA 98003
CONTRACTING
SEATTLE WA 98134
2454 OCCIDENTAL S SUITE 3B
SEATTLE WA 98134
Census Category: 437 - Commercial alt / add / conversion
Includes:
#1
#2
#3
#4
Occupancy Class:
Construction Type:
Occupancy Load:
Floor Area (sq. ft.)
0.00
Additional Permit Information
Mechanical to be Included? ..............................:...... No
Mechanical Work Valuation? .................................. 0
Is this an Online or O.T.C. application? .................. No
Plumbing to be Included? ................. I.- ................. . No
Plumbing Work Valuation? ..................................... 0
Number of Stories ....................... 2
Permit for Building Shell Only? .............................. No
PERMIT EXPIRES Sunday, 2 June, 2024
Permit Issued on Tuesday, December 5, 2023
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the City of Federal Way.
Owner or agent: Date:
T7 D
_�k
CITY OF
Federal Way
PERMIT #: 23 105237 00
THIS CARD IS TO REMAIN ON -SITE
Construction Inspection Record
INSPECTION REQUESTS: (253) 835-3050
Address: 33301 9TH AVE S Unit 120
Project: ALPHA PACIFIC LLC FEDERAL WAY WA 98003-2602
Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
❑�
Site Assessment (Erosion) (4365)
0
Footings/Setback (4110)
0
Re -steel (4215)
To be done PRIOR to breaking ground
Approved to place concrete
Approved to place concrete or grout
By
Date
By
Date
By
Date
Q
Slab/Concrete Floor (4255)
0
Underfloor Framing (4285)
Q
Floor Sheathing (4105)
Approved to place concrete
Approved to sheath floor
Approved to install flooring
By
Date
By
Date
By
Date
❑ Fire/Draft Stops (4095)
0 Interim Erosion Control (4370)
Prior to scheduling a Framing inspection;
Approved
Approved
Electrical, Plumbing & Mechanical Rough -in
and Fire/Draft Stop inspections must be signed -
By Date
By Date
off and approved. IBC 109.3.4
®
Framing (4120)
To
Insulation (4150)
S1
Gypsum Wallboard Nailing (4130)
Approved to insulate
Approved to install wallboard
Approved to install mud & tape
By
0 Date l
v
By
Date
By
Date f �%
92
Suspended Ceiling Grid (4265)
13
Final - S K F & R (4060)
14
Final - Planning
Approved to drop tile
Approved
Approved
By
Date
By
Date
By
Date
Final Erosion Control (4375) IlEg Final - Building (4050)
Approved Approved
By Date By _'Tl l Datel I i
Rough Electrical
Final Electrical
Right of Way
Approved
Approved
Approved
By
Date
By
Date
By
Date