Loading...
21-100274City of Federal Way Community Development Dept. 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 i Building - Commercial Permit #:21-100274-00-CO Inspection Request Line: (253) 835-3050 Project Name: LAKEHAVEN - ADMINISTRATION BUILDING Project Address: 31627 1ST AVE S Parcel Number: 072104 9017 Project Description: BLUEBEAM - Construction of a 41604 square foot, 2-story building, including associated sitework. Includes plumbing and mechanical. Owner Applicant Contractor Lender LAKEHAVEN WATER & SEWER MELENA STEWARTHELIX LYDIG CONSTRUCTION INC OWNER IS LENDER DISTRICT DESIGN GROUP 3180 139TH AVE SE 31627 1 ST AVE S 6021 12TH ST SUITE 201 BELLEVUE WA 98005 FEDERAL WAY WA 98003 TACOMA WA 98424 Census Category: 325 - New Public Works and Utilities Building Includes: # 1 42 #3 #4 Occupancy Class: B Construction Type: Type II - B Occupancy Load: 277.00 Floor Area (sq. ft.) 41,604.00 • - � w W •-ter-- - �...� Additional Permit Information New / Additional Sq. Feet - 1st Floor ..................... 20,802 New / Additional Sq. Feet - 3rd Floor ..................... 0 New / Additional Sq. Feet - Basement .................... 0 New / Additional Sq. Feet - Deck ........................... 0 Mechanical to be Included? ..................................... Yes Mechanical Work Valuation? .................................. 2091000 New / Additional Sq. Feet - Other ........................... 0 Permit for Building Shell Only?................. ............. No New / Additional Sq. Feet - Total ........................... 41604 Occupancy #1 -Use ................................................ Professional Services/Offices Zoning Designation .... ...................... :. RS 9.6 Total Valuation: 7,454,604.72 New / Additional Sq. Feet - 2nd Floor .................... 20,802 Occupancy 41 - Area (Sq. Feet)................... „-, 41604 Occupancy #1 -Construction Type ......................... Type II - B New / Additional Sq. Feet - Garage ................ ._....... 0 Plumbing Work Valuation? ....................... 1019000 Number of Stories ................................................... 2 Is this an Online or O.T.C. application? .............:.... No Plumbing to be Incltided?........................................ Yes Will Certificate of Occupancy be Issued? ............... Yes Comprehensive Plan Designation..-...................._ SF - High -Density Residential Mechanical Fixtures Air Handling Units 4 Ducting 1 Fans 1 Gas Piping I Hot Water Tanks 2 Plumbing Fixtures Dishwashers 3 Drains 22 Drinking Fountains 2 Laundry Washer Outlets 2 Lavatories 21 Rain Water Systems 1 Showers 7 Sinks 10 Urinals 3 Water Closets 18 Hose Bibbs 6 CONDITIONS: 1. Prior to any Temporary Certificate of Occupancy (TCO) and/or permanent Certificate of Occupancy (CO), all street improvements within 1st Ave S shall be completed, and the 10-feet of right of way (ROW) shall he dedicated to the Citv. 2. Prior to any Temporary Certificate of Occupancy (TCO) and/or permanent Certificate of Occupancy (CO), the 28-feet of right of way (ROW) for the 'future' 2nd Ave SW shall be dedicated to the City. 3. Prior to Construction, the applicant shall install protective silt fencing and orange construction fencing as detailed in the Restoration Plan prepared by Soundview Consultants, revised November 2020. This fencing shall be maintained serviceable throughout construction activity. 4. Prior to issuance of a CO, the buffer addition areas and/or restoration areas must be planted per the wetland buffer restoration actions recommended in the Restoration Plan prepared by Soundview Consultants, revised November 2020. 5. Prior to issuance of a CO, a split rail fence shall be placed along the defined outer wetland buffer boundary, with critical areas signage installed every 150 feet. 6. Prior to issuance of a CO, the established buffer shall be memorialized with a recorded "notice on title" or other protective means. 7. Following the completion of onsite wetland buffer planting activities, an implementation report shall be prepared and submitted to the city. 8. A five-year monitoring program shall be undertaken following the successful completion of the initial planting efforts to ensure the success of the buffer averaging planting plan. PERMIT EXPIRES Sunday, 16 January, 2022 Permit Issued on Tuesday, July 20, 2021 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: Date: City Of Federal Way Certificate of occupancy This Certificate issued pursuant to the requirements of Section 111 of the International Building Code or Section R110 of the International Residential Code is certifying that at the time of issuance, this structure was in compliance with the various ordinances of the City regulating building construction or use. This certificate is valid ONLY when endorsed by City staff. Tenant Name: LAKEHAVEN - ADMINISTRATION BUILDING Permit # 21-100274-00-CO Address: 31627 1ST AVE S Includes: #1 #2 #3 #4 Occupancy Class: B Construction Type: Type II - B Occupancy Load: 277.00 Floor Area (sq. ft.) 41,604.00 Owner Name: LAKEHAVEN WATER & SEWER DIS Owner Address: 31627 1ST AVE S ERA L WAY W 003 Building OVcial Date The �hnoty focus in the rav4l v and inspection made by the City prior to issuance of this Certificate was on those matters which expenence has shown most severely affect the health and safety of the general public. Although the City has made as complete a review and inspection as is reasonably possible (within budgetary time and personnel limitations), the City neither guarantees nor warrants to the owner/ occupant or to any other person that this Certificate evidences strict compliance with each and every ordinance or regulation of the City or the State of Washington affecting the construction or use of said structure or the land upon which it is situated. Such compliance is the responsibility of the owner and / or occupant of the premises. CITY OF Federal Way PERMIT #: Project• THIS CARD IS TO REMAIN ON -SITE Construction Inspection Record INSPECTION REQUESTS: (253) 835-3050 21 100274 00 Address: 31627 1ST AVE S LAKEHAVEN WATER & SEWER D_ FEDERAL WAY WA 98003-5201 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as passible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector i f you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card, M Footings/Setback (4110) Q • Foundation Wall (4115) ® Drainage/Downspout (4040) Approved to place concrete Approved to place concrete Approved to backfill By Date By Date By Date 0 Re -steel (4215) Plumbing Groundwork (4190) 0 Slab/Cohcrete Floor (4255) Approved to place concrete or grout Approved to cover Approved to place concrete 1 , By Date By, Date .. By . Date Q Undertlo.gr Fr$tttipg(4285)� ;,a. ; ® F(6or•Slrehthing•(4105) Shear Walls (4245) Approve ioesth floor �,e,, Appmved to install tloorirrg Approved to install siding By as#e •." ..1 • i By Date By Date 10 Roof Sheathing (4220) 1l Rough Plumbing (4230), 9z Mechanical Rough -in (4165) Approved to install roofing Approved 5 13 `zZ Approved i`Z7 "LZ By Date By A Date By A-rJ Date i3 Gas Piping (4125) Fire/Draft Stops (4095) Approved to release test Approved By Date By Date E duling a Framing inspection; mbing & Mechanical'Rough-in Stop inspections must be signed - approved. IBC 109.3.4 Framing (4120) 1s Insulation (4150) E] Gypsum Wallboard Nailing (4130) Approved to insulate Approved to install wallboard Approved to install mud f tap By Date By Date By hf``Date 98 Suspended Ceiling Grid (4265) , Final - S K F & R (4060) 20 Final - Planning Approved to drop the Approved Approved By 1 A14 Date 14 LA yL By Date By Date 21 Final - Public Works (4080) 22 Final - Mechanical (4065) Z3 Final - Plumbing (4075) Approved Approved Approved By Date By A,1 Date , �W Zl/ By Date 24 Final - Building (4050) Approved By Date 1 4-7/q EJ Rough Electrical El Final Electrical Right of Way Approved Approved I Approved By Date By Date By Date r ADDRESS: CITY OF Building Division 33325 Eighth Avenue South FederalWayFederal Way, x 93835-2609 Phone 253-835-2607 Fax 253-835-2609 CORRECTION NOTICE PERMIT#: ;?)- /X,2 7q I'n q , pw ►,�. P_�L}�,� ,� ra b0id, lab C. 40 (1 a L7d-?M /Voc Q. vcbm\ \; jw\ -e aA *i,^\ IF YOU HAVE QUESTIONS GALL eJ it (253) 835- 2639 WHEN CORRECTIONS HAVE BEEN MADE, CALL (253) 835-3050 FOR RE -INSPECTION. SEE BACK OF CARD FOR DETAILS. NOTE: ELECTRICAL CORRECTIONS ARE REQUIRED TO BE MADE WITHIN 15 DAYS. I26 )", - AN DA INSPECTOR CEO NOT REMOVE THIS NOTICE Page of � ADDRESS: CITY OF Building Division 33325 Eighth Avenue South Federal Wa Federal Way, Fax 98003-63,25 y Phone 253-835-2607 Fax 253-35-609 CORRECTION NOTICE PERMIT#: A--100 2 7 I _.+. i :.4 Yam► � ': L IF YOU HAVE QUESTIONS CALL (253) 835- WHEN CORRECTIONS HAVE BEEN MADE, CALL (253) 835-3050 FOR RE -INSPECTION. SEE BACK OF CARD FOR DETAILS. NOTE: ELECTRICAL CORRECTIONS ARE REQUIRED TO BE MADE WITHIN 15 DAYS. DAT14 INSPECTOR DO NOT REMOVE THIS NOTICE Page of CITY OF Building Division 33325 Eighth Avenue South Federal Wa Federal Way, Fax 98835-2609 y Phone 253-835-2607 Fax 253-35-609 CORRECTION NOTICE ADDRESS: 1 i }(j L, , _ !�! PERMIT#: 72,1-10027g1-co a-Ga '-� �C`2 1 y T- o Q lR f, I ►. � .r_�- �.�r� r r -871 IF YOU HAVE QUESTIONS CALL (253) 835- WHEN CORRECTIONS HAVE BEEN MADE, CALL (253) 835-3050 FOR RE -INSPECTION. SEE BACK OF CARD FOR DETAILS. NOTE: ELECTRICAL CORRECTIONS ARE REQUIRED TO BE MADE WITHIN 15 DAYS. _7 DATE DO NOT �\— _-� INSPECTOR REMOVEqHIS NOTICE Page of Andrew Norton From: Andrew Norton Sent: Thursday, January 26, 2023 2:05 PM To: 'Elliott Bosch' Subject: Correction notice 7-7 .3.. Lunchroom patio deck guardrail height to be 42" AFF �- 2:: Bathrooms 221,222 side wall grab bar'not 54" off inside cor r of wall 3. Grab rail shall terminate in a return style o a wall, a newe post, or the ground. Applies to the handrail on the entryway staircase on the lower level and a upper lev termination into the north side wall. 4. Emergency illumination is elec. rooms requi d to to on when a loss of power occurs S- In mud room area an exit sign is required ove th At door, as well as emergency illumination based on occupant load from adjacent space that will e ' through the mud room area. %6. Head protection required on main entryway+ tai landing to protect to a height of 6'6". If your intention is to use j/ furniture or other fixture type barriers, it all be ecured to the floor just as the bars are in the stairwells. 7. Provide SKFR finals and PW OK to TCO. Code sections have been omitted due to ti a constraints. If you have a specific question I am happy to provide the relevant code section to you at a later clatd. Andrew Norton Building Inspector/Plans Examin 253-835-2639 �t4 SxZ�zo�-1►1 � ©� I sl 1