Loading...
23-102996Electrical City of Federal Way • Community Developmen[Dept. FILE Permit #•23-102996-00-EL 33325 8th Ave S Federal Way, WA 98003 Inspection Request Line: (253) 835-3050 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: KING COUNTY AQUATIC CENTER Project Address: 650 SW CAMPUS DR Parcel Number: 192104 9051 Project Description: HVAC Controls - 2 New Controllers, 3 Power Extensions, 1 Room Sensor Owner Applicant Contractor KING COUNTY PARKS TANYA DIERCKSOUND ENERGY SOUND ENERGY SYSTEMS 201 S JACKSON ST UNIT 700 SYSTEMS (ELECTRICAL) SEATTLE WA 98104 3409 S 37TH ST 3409 SOUNDES136PG (2/14/24) TACOMA WA 98409 3409 37TH ST TACOMA WA 98409 Additional Permit Information Is this an Online or O.T.C. application? .................. Yes Electrical Fixtures Low Voltage - Other (Commel 6 PERMIT EXPIRES Tuesday, 5 December, 2023 Permit Issued on Thursday, June 8, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the itCity of Federal Way. Owner or agent: 01\1 I i 1 ■ i a: Date: ■ r---/ ry et I _4k CITY or Federal Way THIS CARD IS TO REM -AI\ O\-SITE Construction Inspection Record INSPECTION REQUESTS: (2_53) S3;-3050 Scheduled inspections nra-; be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right. top to bottom). Please schedule inspections as appropriate. Fork must not be covered until it is approved. Check with your inspector if you are unsure about any. of the inspections or the inspection sequence. On-eoi12 inspections are IoPQed on the back of this card. ELECTRICAL Q By LFER Ground (4295) Approved Date El By Ditch cover (4030) Approved Date Q By Slab/Concrete Floor (4255) Approved to place concrete Date ❑ Pool Bonding (4195) ❑ Temporary Power (4275) ❑ Service (4235) Approved Approved Approved BV Date By Date By Date ❑ Feeders/Sub-panels (4045) ❑ Rough Electrical (4225) 0 Ceiling Corer (4020) Approved Approved Approved By Date Bj• Date By Date Final - Electrical (40:5 By zczpproved Date / zLe"� MECHANICAL ❑ Mechanical Rough -in (4165) ❑ Gas Piping (4125) ❑ Final -Mechanical (4065) Approved Approved to release test Approved By Date BV Date By Date PLUMBING t❑ Plumbing Groundwork (4190) ❑ Rough Plumbing (4230) ❑ Final - Plumbing (4075) Approved to cover Approved Approved By Date By Date By Date