Loading...
23-104355City of Federal Way FILE Community Development Dept. 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: THE WOODLANDS AT REDONDO CREEK LOT 23 Project Address: 1940 S 301ST CT Project Description: NEW 200 AMP SFR; SQ FT 3158 Electrical Permit #:23-104355-00-EL Inspection Request Line: (253) 835-3050 Parcel Number: 952651 0230 Owner Applicant Contractor SSHI LLC DBA D R HORTON SHANNON CHELETTEPROVI DENT PROVIDENT ELECTRIC INC (01) 11241 SLATER AVE NE SUITE 120 ELECTRIC INC PROVIEl103C2 (2/22/24) KIRKLAND WA 98033 17615 SE 252ND ST' +=. PO BOX 7087 98 COVINGTON WA 042 ' COVINGTON WA 98042 Additional Permit Information Is this an Online or O.T.C. application? .................. Yes Electrical Fixtures New Service: Residential I PERMIT EXPIRES Saturday, 24 February, 2024 Permit Issued on Monday, August 28, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of WashingtC) on and the City of Federal Way. Owner or agent: NI Ini Date- �� J'f'JCJ / Glir OF 4P:& Federal Way THIS CARD IS TO RE]I_-I\ ON -SITE Construction Inspection Record INSPECTION REQUESTS: (253) 835-30:50 Scheduled inspections ma-, be failed if this crud is act on -site. DO NOT LOSE THIS C:kRD. Inspections are listed as close to sequential order as possible (read lei to right. top to bottom). Please schedule inspections as appropriate. G['ork mist not be co-:ered until it is approved. Check xith your inspector if you are unsure about any of the inspections or the inspection sequence. On -going im3pecftons are logged on the back of this card. ELECTRICAL Q L'FER Ground (4295) ❑ Ditch cover (4030) El SlablConcrete Floor (425- Approved Approved �y/�OV Approved to place concrete Bv Date By 60 Date / By Date Pool Bonding (4195) ❑ Temporary Power (4275) ❑ Service (4235) Approved Approved Approved By Date By Date By 0010� Date �_15� Q Feeders/Sab-panels (404-5) ❑ Rough Electrical (4225) ElCeiling Cover (4020) By Approved Date Bj Approved Date :approved By Date ❑ Final - Electrical (4055) Approved By Date MECHANICAL El -Mechanical Rough -in (4165) 0 Gas Piping (4125) El Final --lechanica.l (4065) Approved Approved to release test Approved By Date By Date By Date PLUMBING 0 Plumbing Groundwork (4190) 0 Rough Plumbing (4230) ❑ Final - Plumbing (4075) Approved to cover Approved Approved By Date By Date By Date