Loading...
23-104758City of Federal Way - Community Development Dept 33325 8th Ave S Federal Way, WA 98003 }1 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: HAMILTON Project Address: 36515 1ST PL SW Project Description: CIRCUIT FOR DUCTLESS HEAT PUMP Electrical Permit #:23-104758-00-EL Inspection Request Line: (253) 835-3050 Parcel Number: 113960 0120 Owner Applicant Contractor PATRICIA HAMILTON KAREN MATHENEYWASHINGTON WASHINGTON ENERGY SERVICES CO 36515 1ST PL SW ENERGY SERVICES CO (ELECTRICAL 01) FEDERAL WAY WA 98023-7381 3909 196TH ST SW WASHIES854NG (9/7/25) LYNNWOOD WA 98036 3909 196TH ST SW LYNNWOOD WA 98036 Additional Permit Information Is this an Online or O.T.C. application? .................. Yes Electrical Fixtures Circuits - Residential 1 PERMIT EXPIRES Saturday, 23 March, 2024 Permit Issued on Monday, September 25, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the usIe-:.will be in, accordance with the laws, rules and regulations of the State of W �� an1t C Federal Way. k Owner or agent: w.4t) Date. _4%_ urr or Federal Way THIS CARD IS TO RE_1LAIN ON -SITE Construction Inspection Record INSPECTION REQUESTS: (2-53) 835-30:50 Scheduled inspections nix, be failed if this card is not on -site. DO NOT LOSE THIS CARD. hispections are listed as close to sequential order as possible (read left to right. top to bottom). Please scLedtile inspections as appropriate. Work nrust not be co:-ered until it is approved. Check -.cith -your inspector if you are iwsure about an:, of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. ELECTRICAL tiFER Ground (4295) ❑ Ditch cover (4030) ❑ SlablCoucrete Floor (42-55) Approved Approved Approved to place concrete By Date B`- Date B-Y Date ❑► Pool Bonding (4195) ❑ Temporary Power (4275) ❑ Service (4235) Approved Approved Approved By Date By Date By Date ❑ Feedei-slSab-panels (4045) ❑ Rough Electrical (4225) ❑ Ceiling Corer (4020) Approved Approved Approved Date B- Date By Date ��Bv- El Final - Electrical (4055) Approved Bt- �{ MECHANICAL Mechanical Rough -in (4165) Q Gas Piping (4125) ❑ Final - Mechanical (4065) Approved Approved to release test Approved By Date By Date l3v Date PLUMBING Q Plumbing Groundwork (4190) ❑ Rough Plumbing (4230) 0 Final - Plumbing (4075) Approved to cover Approved Approved By Date l3v Date BY Date