Loading...
23-103303City of Federal Way Community Development Dept. 33325 8th Ave 5 Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 FILE Electrical Permit #:23-103303-00-EL Inspection Request Line: (253) 835-30'50 Project Name: 32020 PROFESSIONAL BUILDING Project Address: 32020 1ST AVE S \\ Parcel Number: 172104 9058 Project Description: Retrofit LEDs in Units 107,108,f1,0,I I I Owner Applicant Contractor 32020 PROFESSIONAL PLAZA LLC ]AN ROSANDERCUSTOM ELECTRICAL CUSTOM ELECTRICAL SERVICES LLC 9427 16TH DR W SERVICES LLC (01) EVERETT WA 98204 3716 AUBURN WAY N CUSTOES893J2 (4/22/25) AUBURN WA 98002 3802 AUBURN WAY N SUITE 307 AUBURN WA 98002 Additional Permit Information Is this an Online or O.T.C. application? .................. Yes Electrical Fixtures Circuits - Commercial 16 PERMIT EXPIRES Sunday, 24 December, 2023 Permit Issued on Tuesday, June 27, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: Date: _N� CITY or Federal Way THIS C_1RD IS TO REAWN ON -SITE Construction Inspection Record INSPECTION REQL-ESTS: (2_53) 535-3050 Scheduled inspections ntay be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right. top to bottom) Please schedule inspections as appropriate TWork nuut not be covered until it is approved. Check with your inspector if . you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. ELECTRICAL Q LTFER Ground (4295) E) Ditch cover (4030) 0 Slab/Concrete Floor (4255) Approved Approved Approved to place concrete By Date By Date By Date Q Pool Bonding (4195) Temporary Power (4275) 0 Seriice (4235) Approved Approved Approved By Date By Date By Date Q Feeders/Sub-panels (4045) Q Rough Electrical (4225) Q Ceiling Cover (4020) Approved Approved Approved By Date B-s• Date Bi- Date 0 Final - Electrical (4055) B} Approved A Date MECHANICAL El Mechanical Rough -in (4165) ❑j Gas Piping (4125) 0 Final - Mechanical (4065) Approved Approved to release test Approved Bv Date Bv Date By Date PLUMBING l Plumbing Groundwork (4190) Rough Plumbing (4230) Q Final - Plumbing (4075) Approved to cover Approved Approved By Date By Date By Date