23-105134City of Federal Way
Community Development DepC
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: SOUTH CAMPUS ESTATES LOT 7
Project Address: 427 SW 366TH ST
Project Description: 200 AMP UC NEW SFR
Electrical
Permit #:23-105134-00-EL
Inspection Request Line: (253) 835-3050
Parcel Number: 787965 0070
Owner
Applicant
Contractor
GEOFFREY SHERWINSOUTH CAMPUS
ERIN ORMANRICHARD C REED
RICHARD C REED ELECTRIC INC
DEVELOPMENT LLC
ELECTRIC INC
RICHACRO22KQ (5/18/24)
PO BOX 188
11012 CANYON RD E SUITE 8-958
PUYALLUP WA 98371
PUYALLUP WA 98375
11012 CANYON RD E SUITE 8958
PUYALLUP WA 98373
Is this an Online or O.T.C. application?........
New Service: Residential I
Additional Permit Information
Yes
Electrical Fixtures
PERMIT EXPIRES Saturday, 13 April, 2024
Permit Issued on Monday, October 16, 2023
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Was hin ton and the City of Federal Way.
Owner or agent: Date:
CITY Of
Federal Way
THIS CARD IS TO REAL -IN ON-SIIE
Construction Inspection Record
INSPECTION REQUESTS: (2-53) 835-3050
Scheduled inspectrous imy be failed if gins card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequent al order as possible
(read Left to rl?ht. top to bottom). Please schedule Lipectlons as appropriate?. Work 11rust not be covered until it is appr0,7ed_ Check xith your inspector if
Vou are unsure about an: of the 1Lipecrio11s or the inspection sequence. Can-?o1IL inspections are log zed on the back of illls card.
ELECTRICAL
❑
UFER Ground (4295)
❑
Ditch cover (4030)
❑
SlabiConcrete Floor (4255)
Approved
Approved
Approved to place concrete
By
Date
By
Date
By
Date
❑
Pool Bonding (4195)
❑
Temporary Power (4275)
❑
Service (4235)
Approved
Approved
Approved
�
By
Date
By
Date
By
Date a
❑
Feeders/Sub-panels (4045)
❑
Rough Electrical (4225)
❑
Ceiling Cover (4020)
Approved
Approved
Approved
B%-
Date
By�
Date/ p vg ✓-'Z/3
By
Date
❑
final - Electrical (4055)
Approved
By .
_ Date���
MECHANICAL
❑
-Mechanical Rough -in (4165)
❑
Gas Piping (4125)
❑
Final - -Mechanical (4065)
Approved
Approved to release test
Approved
Bi-
Date
By
Date
By
Date
PLUMBING
❑
Plumbing Groundwork (4190)
❑
Rough Plumbing (4230)
0
Final - Plumbing (4075)
Approved to cover
Approved
Approved
By
Date
By
Date
Date