22-103950-Plan Set-8-29-22GENERAL NOTES
1. INSTALLATION OF SOLAR PHOTOVOLTAIC SYSTEM SHALL BE IN ACCORDANCE WITH NEC ARTICLE
690, AND ALL OTHER APPLICABLE NEC CODES WHERE NOTED OR EXISTING
2. PROPER ACCESS AND WORKING CLEARANCE AROUND EXISTING AND PROPOSED ELECTRICAL
EQUIPMENT WILL COMPLY WITH NEC ARTICLE 110
3. ALL WIRES, INCLUDING THE GROUNDING ELECTRODE CONDUCTOR SHALL BE PROTECTED FROM
PHYSICAL DAMAGE IN ACCORDANCE WITH NEC ARTICLE 250
4. THE PV MODULES ARE CONSIDERED NON-COMBUSTIBLE; THIS SYSTEM IS UTILITY INTERACTIVE PER
UL 1741 AND DOES NOT INCLUDE STORAGE BATTERIES OR OTHER ALTERNATIVE STORAGE SOURCES
5. ALL DC WIRES SHALL BE SIZED ACCORDING TO [NEC 690.81
6. DC CONDUCTORS SHALL BE WITHIN PROTECTED RACEWAYS IN ACCORDANCE WITH [NEC 690.311
7. ALL SIGNAGE TO BE PLACED IN ACCORDANCE WITH LOCAL JURISDICTIONAL BUILDING CODE
PHOTOVOLTAIC
EQUIPMENT:
AC System Size: 8.924 kW AC
DC SYSTEM SIZE: 9.20 kW DC
(23) HANWHA Q.PEAK DUO L-G5.2 400 PV Modules
(23) ENPHASE IQ8PLUS-72-2-US (240V) Inverters
RACKING: NANOMOUNT - 48" O.C.
APPLICABLE GOVERNING CODES
2020 NEC
2018 IFC 2018 IECC
2018 IBC
2018 IEBC 2018 WSEC
2018 IRC
2018 IFGC 2018 UPC
20181MC
20181PMC
Signed 8/10/2022
SITE SPECIFICATIONS
OCCUPANCY: R-3
ZONING: RESIDENTIAL
0
Revolution Energy Systems Inc.
9981 West 190th St
Unit K Mokena IL 60448
T: 708-995-1643
SITE INFORMATION
CURTIS EVERS
36902 4TH AVE SW
FEDERAL WAY, WA 98023
AC System Size: 8.924 kW AC
DC System Size: 9.20 kW DC
Lat, 47.2704245
Long,-122.3399955
(23) HANWHA Q.PEAK DUO L-G5.2
PV Modules
(23) ENPHASE IQ8PLUS-72-2-US (240V)
Inverter(s)
12110:11[.Yi100110x►1:1:14VA
SHEET INDEX:
PV01 COVER PAGE
PV02 SITE PLAN
PV03 ROOF ATTACHMENTS
PV04 MOUNTING DETAIL
PV05 LINE DIAGRAM
PV06 ELECTRICAL CALCS
PV07 LABELS
PV08 PLACARD
PV09 SITE PHOTOS
DRAWN BY: HSI CAD
DATE:
8/10/2022
COVER 1\415A)1
CITY OF FEDERAL WAY
COMMUNITY DEVELOPMENT
22-103950
V)
LU
Q
2
F-
2018 IRC M2301.2.1
Roof- mounted solar thermal equipment shall not obstruct or interfere
with the operation of roof -mounted equipment, appliances, chimneys,
plumbing vents, roof hatches, smoke vents skylights and other roof
penetrations and opening. ( Clearance between a collector panel and
a plumbing vent terminal should be at least equal to the inside
diameter of the vent terminal. Roof -mounted solar panels must never
be installed over any fuel -fired appliance vent terminal.)
NEC 110.2, 110.3(A), 110.3(B) and 300.4
All wiring must be properly supported by devices or mechanical
means designed and listed for such use and wiring must be
permanently and completely held off of the roof surface
128'-1 "
1''12'-3
EQUIPMENT LEGEND:
UTILITY METER Ac VISAC IDISCONNNECTLE, LABELED ENV INVERTER SUB SUB PANEL
F-7 METER SOCKET
MSP MAIN SERVICE PANEL Pv (FOR UTILITY PV METER) F] COMBINER BOX R LOAD CENTER
CLOSE UP OF HOME
M P?
SD SERVICE DISCONNECT I PV MODULES
ARRAY DETAILS:
MOUNTING PLANE:
AZIMUTH:
TILT:
MP1
900
150
MP2
1800
150
M P3
2700
150
MP1
MP2
VISIBLE, LOCKAB
FIRE ACCESS PATHWAY (T TYP) LABELED AC DISCON
JB BAIT BATTERY(IES) JUNCTION BOX PROPERTY LINE
LOCATED WITHIN
OF UTILITY METE
L1:1141118
Revolution Energy Systems Inc.
9981 West 190th St
Unit K Mokena IL 60448
T: 708-995-1643
SITE INFORMATION
CURTIS EVERS
36902 4TH AVE SW
FEDERAL WAY, WA 98023
AC System Size: 8.924 kW AC
DC System Size: 9.20 kW DC
Lat, 47.2704245
Long,-122.3399955
(23) HANWHA Q.PEAK DUO L-G5.2
PV Modules
(23) ENPHASE IQ8PLUS-72-2-US (240V)
Inverter(s)
PUGET SOUND ENERGY
20111L63
at T 8#
� �NAL'VE
Signed 8/10/2022
LE, DRAWN BY: HSI CAD
N ECT DATE:
10, 8/10/2022
R SITE PLE
CITY OF FEDERAL WAY
COMMUNITY DEVELOPMENT
22-103950