Loading...
23-103578y City of Federal Way Community Development Dept. FILE 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: WALKER Project Address: 30319 13TH AVE S Project Description: Remove/replace electric water heater. Plumbing Permit #:23-103578-00-PL Inspection Request Line: (253) 835-3050 Parcel Number: 250160 0110 Owner Applicant Contractor FRANK WALKER JASON HANLEYBROWNFAST WATER FAST WATER HEATER CO (PLUMBING) 189 RIVER RD HEATER COMPANY FASTWWH79901 (10/1/23) WASHINGTON CROSSING PA 11715 NORTH CREEK PKWY S SUITE C-106 1715 NORTH CREEK PKWY S SUITE C-10 18977-1603 BOTHELL WA 98011 BOTHELL WA 98011 - - - - Plumbing Fixtures - - Water Heaters 1 PERMIT EXPIRES Tuesday, 9 January, 2024 Permit Issued on Thursday, July 13, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of ONOd he Federal Way. 9 Owner or agent: NE — Date: FINALED CITY or Federal Way THIS C'LRD IS TO RE_1LUN ON -SITE Construction Inspection Record I`SPECTION REQUESTS: (253) 535-3050 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE TBZS CARD. Inspections are listed as close to sequential order as possible (read left to right. top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence- On -going inspections are logged on the back of this cud. ELECTRICAL 0 UFER Ground (4295) ❑' Ditch corer (4030) ❑ Slab/Concrete Floor (4255) Approved Approved Approved to place concrete By Date By Date Bv- Date 0 Pool Bonding (4195) ❑ Temporary Power (4275) ❑ Service (4235) Approved Approved Approved By Date By Date By Date ❑ Feeders/Sub-panels (4045) 0 Rough Electrical (4225) ❑ Ceiling Corer (4020) Approved Approved Approved Bv- Date By Date By Date El Final - Electrical (4055) Approved By Date MECHANICAL Q Mechanical Rough -in (4165) ❑ Gas Piping (4125) ❑ -Final - Mechanical (4065) Approved Approved to release test Approved By Date By Date By Date PLUMBING 0 Plumbing Groundwork (4190) ❑ Rough Plumbing (4230) 3❑ Final - Plumbing (4075) Approved to cover Approved Approved By Date By Date 13Y ��� Date 12L46L