Loading...
22-105194-SF-Woodlands Lot 2 - Site Plan 11-11-22DATE: 10/07/22 PLAN: 5150-B-R 15352-02 EXISTING RETAINING WALLS N a 21x I O' TRENr H 5'KNTO STRUOTURE/ 5' MIN TO PROP LINE I 12'-II I/2 Nac5°4I'26 "W r— Q I ®ro Yo; a _® I I 12x12 \JJ ♦� SOIL v I STOCK \ PILE _----- 20' FRONT E3S5L_ SILT FENOE OR— STRAN WATTLE e=7°05'35 R=27a.00' L-54.42' — TRIDENT MAPLE STREET TREE FMMC211APFAFORATED PIPE=&WnION FORASNGIEFAMILY RESIDENCE RANDOM FILL 6 MIN 18" MIN FILTER FABRIC 6" PERFORATED PIPE 1_24" MIN. 1 z"-a' WASHED ROCK TRENCH X-SECTION NT5 SLOPE _ TO ROAD DRAINAGE SYSTEM 2' x10' LEVEL TRENCH w/ PERFORATED PIPE PLAN VIEW OF ROOF NT5 NOTF-5: ) EXTERIOR CONCRETE AREAS MAY VARY DUE TO SITE CONDITIONS 2) EROSION/SEDIMENT CONTROL MEASURES MUST BE FUNCTIONAL AND MAINTAINED THROUGHOUT 30'-011— PAD: 501.40 55'—q al 48 5' E3SSL d EASEMENT p Ile, �, I5.0a' w I ARMORED ONST ENTRANOE S 302nd STREET s Roof drain and footing drain shall connect to community site drainage line. NORTH 5) SOIL 57 ION 3) SOIL STOCK PILES TO BE COVERED SITE PLAN WITHIN 24 HOURS 4) YARD DRAINS TO BE TIGHTLINED TO STORM DRAINAGE SYSTEM ADDR555: I�i22 5. 302nd St. 5) ROOF 4 FOUNDATION DRAINS TO BE TIED TO STORM DRAINAGE SYSTEM PAROEL: C152651-0020 Per 2021 SWDM Appendix C2.11 A gravel filled trench must be at least 10-feet in length for every 5,000-SF of impervious surface. BUILDING COVERAGE & IMPERVIOUS SURFACE BLDG COVERAGE = 60% MAX ROOF: 1,623 SF DRIVEWAY/WALK: 403 SF PATIO: 132 SF TOTAL IMPERVIOUS AREA: 2,158 SF LOT AREA: 5,316 SF BLDG COVERAGE: 41 UfiILITY LE6,END W = WATER LINE/METER e_SD = STORM LINE/STUB S = SEWER LINE/STUB --------------------- = FOOTING DRAIN —<<—««--««—<<— = STORM TIGHTLINE SCALE: 1:20 D.R. HORTON THE WOODLf�NDS COMPLETED BY: YXL D RHORTON " (425)821-3400 ext. 5172 ylin@drhorton.com AT REDONDO CREEK LOT 'Z 1 1 241 SLATER AVENUE NE SUITE 200 KIRKLAND, WA 98033