23-101471r
City or Federal Way
Community Development Dept.
33325 Sth Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Building - Single Family
Permit #:23-101471-00-SF
Inspection Request Line: (253) 835-3050
Project Name: THE WOODLANDS AT REDONDO CREEK LOT 46
Project Address: 30215 19TH AVE S Parcel Number: 952651 0460
Project Description: BLUEBEAM - Construction of a 2,785 square foot 2-story with basement single family
residence, with a 67 square foot covered entry, 100 square foot covered patio, 140 square foot
deck and an attached 373 square foot garage. Includes plumbing and mechanical.
Owner
Applicant
Contractor
Lender
SSHI LLC DBA D R HORTON
JESS BOSANCUD R HORTON
D R HORTON
OWNER IS LENDER
11241 SLATER AVE NE SUITE 12C
11241 SLATER AVE NE SUITE 120
11241 SLATER AVE NE SUITE 120
KIRKLAND WA 98033
KIRKLAND WA 98033
KIRKLAND WA 98033
Census Category: 101 - New Single Family House
Includes:
#1
#2
#3
#4
Occupancy Class:
R-3
Construction Type:
Type V- B
Occupancy Load:
Floor Area (sq. ft.)
2,785.00
Additional Permit Information
New / Additional Sq. Feet - 1 st Floor.. ...................
903 New / Additional Sq. Feet - 2nd Floor......--............
1162
New / Additional Sq. Feet - 3rd Floor .....................
0 Occupancy # 1 - Area (Sq. Feet) ...... ..;.._......... ...._...
2785
New / Additional Sq. Feet - Basement ....................
720 Basic Plan?...........
No
Occupancy 41 - Construction Type .........................
Type V - B New / Additional Sq. Feet - Deck ...........................
140
New / Additional Sq. Feet - Garage ........................
373 Mechanical to be Included".......:.............
Yes
Plumbing Work Valuation? .....................................
15000 Mechanical Work Valuation?.....:............................
10000
Number or Stories..,........ .............. .... ......... 2 New / Additional Sq. Feet - Other.....___ ......... _..
167
Plumbing to be Included?...........................I..........:
Yes New / Additional Sq. Feet - Total...........................
3465
Will Certificate of Occupancy be Issued? ...............
Yes Occupancy 41 -Use ................................................
Residence (I or 2
family)
............................................
Comprehensive Plan Designation ............... SF - High -Density Zoning Designation........-.......
RS 5.0
Residential
Total Valuation: 487,227.59
Mechanical Fixtures
Fans
7 Furnaces 1 Gas Piping
1
Gas Pipe Outlets
2
Plumbing Fixtures
Bathtubs
2 Dishwashers 1 Laundry Washer Outlets
1
Lavatories
6 Showers 2 Sinks
1
Water Closets
4 Water Heaters 1 Hose Bibbs
2
CONDITIONS:
1. No part of the main structure
may extend into the required yard setback. Eaves, awnings and similar
elements of a structure that customarily extend beyond the exterior walls of a structure -may extend up to
18 inches into any required yard - compliance with FWRC 19.125.160.
PERMIT EXPIRES Monday, 29 January, 2024
Permit Issued on Wednesday, August 2, 2023
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the City of Federal Way.
Owner or agent: �' Date:
City of Federal Way
Certificate of occupancy
This Certificate issued pursuant to the requirements of Section 111 of the International Building Code or Section
R110 of the International Residential Code is certifying that at the time of issuance, this structure was in
compliance with the various ordinances of the City regulating building construction or use. This certificate is valid
ONLY when endorsed _by City staff.
Tenant Name: THE WOODLANDS AT REDONDO CREEK LOT
Address: 30215 19TH AVE S
Includes: 41 #2
Occupancy Class: R-3
Construction Type% Type V - B
Occupancy Load:
Floor Area (sq. ft.) 2,785.00
Owner Name: SSHI LLC DBA D R HORTON
Owner Address: 11241 SLATER AVE NE SUITE 120
KIRKLAND WA 98033
ma,e, 4-w-,tq
Building Official
#3
Permit # 23-101471-00-SF
#4
z ] ,t>I Z'DZ
Date
The priority focus in the review and inspection made by the City prior to issuance of this Certificate was on those matters which
experience has shown most severely affect the health and safety of the general public. Although the City has made as complete
a review and inspection as is reasonably possible (within budgetary time and personnel limitations), the City neither guarantees
nor warrants to the owner/occupant or to any other person that this Certificate evidences strict compliance with each and every
ordinance or regulation of the City or the State of Washington affecting the construction or use of said structure or the land upon
which it is situated. Such compliance is the responsibility of the owner and / or occupant of the premises.
9 �
THIS CARD IS TO REMAIN ON -SITE .
crrr OF Construction 'Inspection Record
Federal Way INSPECTION REQUESTS: (253) 835-3050
PERMIT #: 23 101471 00 Address: 30215 19TH AVE S
Project: SSHI LLC dba D R HORTON FEDERAL WAY WA 98003
Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
Q
SWM Precon Site Mtg (4400)
0
Site Assessment (Erosion) (4365)
0
Footings/Setback (4110)
Approved
To be done PRIOR to breaking ground
Approved to place concrete
By
Date
By
Date
By
Date
®
Foundation Wall (4115)
❑
Drainage/Downspout (4040)
0
Plumbing Groundwork (4190)
Approved to place concrete
Approved to backfill
Approved to cover
By
41j Date 11 i j
By
ri Iti Date 9 1 j
By
Date
❑ Slab/Concrete Floor (4255)
® Underfloor Framing (4285)
Q Floor Sheathing (4105)
Approved to place concrete
Approved to sheath floor
Approved to install hearing
By DateLV
By L /3 Date Ib 11
By Date 10 X Z
0
Shear Walls (4245)
El Roof Sheathing (4220)
'• z Rough Plumbing (4230)
By
Approved to install siding
Date IOUy
By
Approved to install roofing
tj Date !o `j 15
By
Approved tl
Date
33
Mechanical Rough -in (4165)
Gas Piping (4125)
95
Fire/Draft Stops (4095)
Approved
Approved to release test
Approved
By
^ Date l 1
By
(3 Date t t11&3
By
Jtpj Date
Ib Interim Erosion Control (4370) Prior to scheduling a Framing inspection; i7 Framing (4120)
e
Electrical, Plumbing & Mechanical Rough -in
Approved Approved to insulate
and Fire/Draft Stop inspections must be signed -
.By Date off and approved. IBC 109.3.4 By Date 1 1 (t `Z 3
113 Insulation (4150)
19 Gypsum Wallboard Nailing (4130)
20 Final Erosion Control (4375)
Approved to install wallboard
Approved to install mud & tape
Approved
By V Date \lOW,
By Date (7444V3
By Date
21 Final - Mechanical (4065)
Q Final - Plumbing (4075)
23 Final - Building (4050)
Approved
Approved
1714—
y��A Approved
NLL
By Rk Date Z Ii��
By Date
By Date
V cvfe_ I l ✓1 c &if, - A-N
Rough Electrical
Final Electrical
❑
Right of Way
Approved
Approved
Approved
By
Date
By
Date
By
Date
OF
Z �4
Federal Way
4*
Building Division
33325 Eighth Avenue South
Federal W WA 98003-6325
Phone 253-835AM7 Fax 253-835-2609
CORRECTION NOUCE
1.wT+�
ADDRESS: 3o7-15 tymv Avg S PER 7_3- 1 o1411-O0
C Ptv L-VL G VALSSAIJ4 • G ke> u rJ� �ctv s £� Fes► l�—
` A Tr z "6or CIro L4-S pEG�
soyro
tJrJcc ELT$-cc.A N1
Z l.o vJ� 4�—
Ft-cxy ft TD t urT Zi SS
-ni l S W
r-" w`
w a-w-
3o-7 . l
t�IGK�T�S
S•v�J 7�-�F.f+-- l
t�tz�-�'f—��—
4�r
N E. ,r
4 ��
I�
IF YOU HAVE QUESTIONS CALL W (253) 835- Z&ZI
WHEN CORRECTIONS HAVE BEEN MADE, CALL (253) 835-3050 FOR RE -INSPECTION. SEE BACK OF CARD
FOR DETAILS. NOTE: ELECTRICAL CORRECTIONS ARE REQUIRED TO BE MADE WITHIN 15 DAYS.
z.* wk— —
DATE INSPECTOR
DO NOT REMOVE THIS NOTICE
Page of
Federal Way
Building Division
33325 Eighth Avenue South
Federal Way, WA 98003-6325
Phone 253-835-2607 Fax 253-835-2609
CORRECTION NOTICE
ADDRESS: �2I `J �� ��'1 �� S PERMIT#: Z�'� I O I G� � 1 - 00
IF YOU HAVE QUESTIONS CALL1�e" (253) 835-
\?"/;�', -�
WHEN CORRECTIONS HAVE BEEN MADE, CALL (253) 8 -3050 FOR RE -INSPECTION. SEE BA`CK OF CARD
FOR DETAILS. NOTE: ELECTRICAL CORRECTIONS ARE REQUIRED TO BE MADE WITHIN 15 DAYS.
:10
ATE INSPECTOR
DO NOT REMOVE THIS NOTICE
Page of _ _
Wesley Sterling Smith
From: Dw J Curtis
Sent: Thursday, May 25, 2023 7:13 AM
To: Brian Knittle; Wesley Sterling Smith
Subject: FW: SB30 vs SB40
See below
Sent from my Verizon, Samsung Galaxy smartphone
-------- Original message --------
From: charles@voelkereng.com
Date: 5/25/23 7:06 AM (GMT-08:00)
To: Dw J Curtis <DJCurtisl@drhorton.com>
Cc: Curtis J Peterson <CJPeterson @drho rton.com>
Subject: RE: SB30 vs SB40
[External]
Dw,
The returns should be on both sides, just like the S1330.
Cheers
Charlie
Charles Voelker, PE, SE
Voelker Engineering
193 N Shugart Flats Rd
Leavenworth, WA 98826
425-417-1122
From: Dw J Curtis
Sent: Tuesday, May 23, 2023 1:33 PM
To: Charles Voelker <charles@voelkereng.com> (charles@voelkereng.com) <charles@voelkereng.com>
Cc: Curtis J Peterson <CJPeterson @drhorton.com>
Subject: SB30 vs SB40
Charlie,
Do you see any issues with me extending detail 9 on the SB40 similar to the SB30? I would like to do the smaller footing
in the "returns" to the garage in the SB40 like the SB30 if possible.
SB30
1
m
FOUNDATION PLAN
U�A�x 11.4. - e-W
SB40
ry
0-0
t�i<9
�j
wo
C=
D—
tT
If you need more information I am always available and I look forward to your reply.
U-R-HORMN'
f�jJreJ•ic�-'F
Dw J Curtis
Construction Area Manager
D.R. HORTON
11241 Slater Avenue NE Suite 200, Kirkland, Wa 98033
o: 425 821 3400 m: 42S 6814801
America's #1 Home Builder Since 2002 1 D.R. Horton • Express • Emerald . Freedom
CAUTION: This email originated from outside of the organization. Do not click links or open attachments
unless you recognize the sender and know the content is safe.
CIT'1! OF - Building Division
33325 Eighth Avenue South
Federal Wa Federal Way, 98-6325
Phone 253-835-2607 Faxx 253-835835-2609
CORRECTION NOTICE
ADDRESS: l�Z J IAke'-,)- PERMIT#: ?� 1' f
IF YOU HAVE QUESTIONS CALL `Q (253) 835-
---W ?U �_
WHEN CORRECTIONS HAVE BEEN MADE; CALL (253) 83 �_050 FOR RE -INSPECTION. SEE BACK OF CARD
FOR DETAILS. NOTE: ELECTRICAL CORRECTIONS ARE REQUIRED TO BE MADE WITHIN 15 DAYS.
DATE INSPECTOR
DO NOT REMOVE THIS NOTICE
Page of