23-104766r
Electrical
City of Federal Way
Community Development Dept F%,
Permit #.23-104766-00-EL
33325 8th Ave 5 F I LFederal Way, WA 98003 Inspection Request Line: (253) 835-3050
Ph: (253) 835-2607 Fax: (253) 635-2609
Project Name: THE WOODLANDS AT REDONDO CREEK LOT 35
Project Address: 30015 19TH AVE S Parcel Number: 952651 0350
Project Description: NEW 200 AMP SFR; SQ FT 2932
Owner
Applicant
Contractor
SSHI LLC DBA D R HORTON
SHANNON CHELETTEPROVI DENT
PROVIDENT ELECTRIC INC (01)
11241 SLATER AVE NE SUITE 120
ELECTRIC INC
PROVIEI103C2 (2/22/24)
KIRKLAND WA 98033
17615 SE 252ND ST
PO BOX 7087
COVINGTON WA 98042
COVINGTON WA 98042
Additional Permit Information
Is this an Online or O.T.C. application? .................. Yes
Electrical Fixtures
New Service: Residential I
PERMIT EXPIRES Saturday, 23 March, 2024
Permit Issued on Monday, September 25, 2023
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
y s Ninlon and the City of Federal Way.
Owner or agent: Date.
CITY or
Federal Way
THIS CARD IS TO REMAIN O\-SITE
Construction Inspection Record
INSPECTION REQtT-STS: (2-53) 835-30-50
Scheduled inspections imv. be failed if this card is not on -sire. DO NOT LOSE TF1I5 C-A- D. Inspections are listed as close to sequential order as possible
tread left to righ(. top to hottnin) please schedule inspections as appropriate. lWork must not be co,:ered until it is appro, ed. Check ,.with your. IIlspector if
you are unsure about an of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
ELECTRICAL
❑ ❑
❑
tiFER Ground (4295)
Ditch cover (4030)
Slab/Concrete Floor (4233)
Approved
Approved
Approved to place concrete
By
Date
Bi
Date�v�,7 PW J
Bt
Date
❑
PaoI Bonding (4195)
❑
Temporary Power (4275)
❑
Service (423-5)
Approved
Approved
Approved
By
Date
By
Date
Bv
0� Date����^�
❑
Feeders/Sub-panels (4047
❑
Rough Electrical (422r+)
❑
Ceiling Cover (4020)
Approved
Approved
Approved
By
Date
By
�� Date/,Z—/ 07'
BS
Date
El
Final - Electrical (40,55)
ApprovedByDate
1-71�f_
MECHANICAL
0
Mechanical Rough -in (416)
❑
Gas Piping (4125)
❑
Final -Mechanical (4065)
Approved
Approved to release test
Approved
B-,-
Date
B,
Date
Bc
Date
PLUMBING
❑
Plumbing Groundwork (4190)
❑
Rough Plumbing (4230)
0
Final - Plumbing (4075)
Approved to cover
Approved
Approved
By
Date
By
Date
By
Date