Loading...
23-103170City of Federal Way FILE Community Development Dept, 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: FEDERAL WAY ESTATES Project Address: 31231 9TH AVE S Project Description: Alteration to interior of home for adding an ADU Electrical Permit #:23-103170-00-EL Inspection Request Line: (253) 835-3050 Parcel Number: 858220 0110 Owner Applicant Contractor FEDERAL WAY ESTATES LLC KEVIN ACHMANCDI Systems Inc C D I SYSTEMS INCORPORATED 31231 9TH AVE S 18701 MCGHEE DR E CDISYSI884NH (8/8/24 FEDERAL WAY WA 98003 BONNEY LAKE WA 98391 PO BOX 1981 MILTON WA 98354 Additional Permit Information Is this an Online or O.T.C. application? ... :.............. Yes Electrical Fixtures Circuits - Residential 8 PERMIT EXPIRES Sunday, 17 December, 2023 Permit Issued on Tuesday, June 20, 2023 I hereby certify that the above information is correct and that the construction on the above described_ property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of as ington and the City of Federal Way. Owner or agent: Date: rzw CITY of Federal Way THIS CAL", IS TO REALM-S ON -SITE Construction Inspection Record INSPECTION REQUESTS: (2-53) 835-30-50 Scheduled inspections ma-y be failed if this card is not on -site. DO \ OT LOSE TMS CARD. Inspections are listed as close to sequential order as possible (read left to right. top to bottom). Please schedule inspections as appropriate. Rork mist not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. ELECTRICAL Q tiFER Ground (4295) ❑ Ditch cover (4030) ❑ Slab/Concrete Floor (4255) Approved Approved Approved to place concrete By Date By Date By Date Q Pool Bonding (4195) ❑ Temporary Power (4275) 0 Service (4235) Approved Approved Approved By Date By Date By Date Q Feeders/Sub-panels (4045) ❑ Rough Electrical (4225) ❑4 Ceiling Corer (4020) Approved pZproved Approved B} Date '� BS Date�'',A&U BS Date 't] Final - Electrical (4055) By pprovcd Date MECHANICAL ❑1 Mechanical Rough -in (4165) ❑ Gas Piping (4125) ❑ Final -Mechanical (4065) Approved Approved to release test Approved By Date By Date By Date PLUMBING Q Plumbing Groundwork (4190) ❑ Rough Plumbing (4230) 0 Final - Plumbing (4075) Approved to cover Approwd Approved By Date By Date BY Date