24-100477-6 - Final 2024 TIP and Map_6-27-02-01-24!"#5
!"#5
18
509
509
167
161
509
509
!"#5
99
509
99
99
167
181
181
161
Star
NorthLake
TroutLake
FiveMileLake
Lake
Dollof Lake
LakeGeneva
MirrorLake
EasterLake LakeSteel
SW 320th StSW 320th St
S 304th St
SWDashPoin tR d
I - 5SW 356th St
I-5Hwy 18I - 5SW Camp
u
sDr
9thAvSH
o
yt
RdSWMarineViewDr
E
n
c
h
a
n
t
e
d
P
k
wy
Military RdPacificHwySMi
l
i
t
a
ry
R
d
M
a
ri
n
e
Vi
e
wD
r
Northshore Pkwy
S 288th St
R
e
d
o
ndoWyS MilitaryRdSStar
Lake R
d
S 272nd St
S 348th St I - 5E 11th StPort of Tacoma Rd 21st Av SWSW 312th S t
1st Av S1stAvS16th Av S28th Av SS 324th St
S 336th St
1st Av S49th Av SNorpointWyNESWD ashPtRd28th Av SS 312th St
S 320th St
Pacific Hwy S!!!!!!
35
!4
!1b
!!2
Puget Sound
CommencementBay
DumasBay
PovertyBay
7!!40
25
18
!!
37
12 !13
!!1a
!22
30 39a
6
15
3
!9
!23!16
!5
41b
8
41a
39b
!28!27
38 !42
36
!
44
45
This map is accompanied by no warranties, and is simply a graphic representation.
TransportationImprovementProgram
J:\complan\Transportation\tip_24_29.mxdCity of Federal Way
J:\complan\Transpo rtation \tip_2 4_29 .mxd
2024 - 2029
Original Map Date: March 2023
0 10.5
Miles
´
Legend
Intersection Improvements
City Center Access - Phase 1
City Center Access - Phase 2
Corridor Improvement
Non-Motorized Improvement
Overlay Improvement
* Project #'s 10, 11, 14, 17, 19, 20, 21, 24, 26, 29, 31, 32, 33, 34, & 43 are City Wide projects and are not called out on the map
Federal Way Transit Center
Map
ID**Location Description Previous Years 2023 2024 2025 2026 2027 2028 2029 Total
1a City Center Access Phase 1 - Environmental Update environmental documentation for modified access at S 320th St & S 324th St 4,422 300 4,722
1b City Center Access Phase 2 - SB Ramps Construct all SB I-5 ramps, extend S 324th Street from 23rd Ave S to I-5 6,000 24,000 10,490 20,000 22,560 22,560 105,610
2 SR 99 @ S 373rd St Install roundabout, median control 20 400 525 2,100 2,100 5,145
3 SW 320th St @ 47th Ave SW Install traffic signal 637 637
4 S 312th St @ 28th Ave S Add SB right-turn lane or construct roundabout 809 809
5 SW 340th St: 37th Ave SW - City Limits Widen to 5 lanes 310 420 525 2,308 3,563
6 21st Ave S @ S 320th St Install traffic signal 112 1,047 1,159
7 S 320th St & 1st Ave S Add EBL, WBL, WBR, NBT, SBR; widen to 5 lanes N to 316th St or Alternatlive Measure 569 10,376 10,945
8 S 348th St: 9th Ave S - SR 99 Overlay 15 95 1,076 1,186
9 16th Ave S: S 344th St - S 348th St Add SB auxiliary lane 420 1,678 4,306 6,404
10 Citywide Implement Adaptive Traffic Control System Phases I & II 2,693 300 2,993
11 Citywide Install variable lane use control signs 466 516 100 1,082
12 Military Rd S @ S Star Lake Rd Add EB right-turn lane, sidewalk 220 1,049 1,269
13 SR 509 @ SW 301st St Install compact roundabout 157 734 891
14 Citywide Implement Adaptive Traffic Control System Phase III 700 105 805
15 SR 509 @ 47th Ave SW Install compact roundabout 1,110 130 1,240
16 SW 340th St: 31st Ave SW - 37th Ave SW Widen to 5 lanes 525 1,570 4,200 6,295
17 Citywide Annual overlays 3,150 3,150 3,150 3,150 3,150 3,150 3,150 22,050
18 SR 509 @ 4th Ave S Install compact roundabout 210 840 1,050
19 City Center Adaptive Traffic Control System - City Center Stage 2 - Detection upgrades 875 875
20 Citywide Adaptive Traffic Control System Phase IV; 1st Ave S 787 787
21 Citywide Adaptive Traffic Control System Phase V; 21st Ave SW & SW Campus Dr 1259 1,259
22 Military Rd S: S 320th St - SR 18 Overlay 50 1260 1,310
23 S 356th St: 1st Ave S - SR 99 Widen to 5 lanes, bike lanes, sidewalks 315 315 3150 3150 14050 20,980
24 Citywide Street Vegetation Management 200 200 200 200 200 200 200 1,400
25 SW 344th St @ 27th Ave SW Construct compact roundabout 50 110 585 745
26 Citywide High Friction Surface Treatments 383 3640 4,023
27 S 320th St: 1st Ave S - SR 99 Overlay 50 3100 3,150
28 S 324th St: 11th Pl S - SR 99 Overlay 50 840 890
Subtotal Roadway Capital Projects 10,305 6,598 14,203 36,153 23,917 39,760 32,740 41,535 205,211
Map
ID Location Description Previous Years 2023 2024 2025 2026 2027 2028 2029 Total
29 SW King County Regional Trail Plan Plan to connect trails to adjacent cities 100 200 300
30 1st Ave S: S 292nd St - S 312th St Shoulder improvements 3,950 3,950
31 Citywide ADA Retrofits 420 420 420 420 420 420 420 2,940
32 Citywide Pedestrian Safety Install mid-block crossing treatments or other pedestrian improvements 1,231 168 168 168 168 335 335 335 2,908
33 Citywide Pedestrian Safety System Improvements Install mid-block crossing treatments 160 1,080 1,240
34 Citywide RRFB Upgrades Replace median-mounted RRFB's with mast arm mountings 140 690 830
35 SR 509: SW 312th St - 21st Ave SW Install sidewalk and streetlights on south side 200 1,300 1,500
36 Federal Way Transit Center Pedestrian Access Improvements 100 900 1,000
37 S 312th St: Steel Lake Park - 28th Ave S Install sidewalk and streetlights on south side 100 650 750
38 City Center Access - BPA Trail Extension Construct multi-use path between Celebration Park and Federal Way Transit Center 630 1,049 1,049 4,300 7,028
39a Pacific Hwy S Trail - 16th Ave S (S 288th St to S 308th St) Construct multi-use path 200 262 944 2188 7,350 10,944
39b Pacific Hwy S Trail - 16th Ave S (SR 509 to S 308th St) Construct multi-use path 300 1,993 2,293
40 S 314th St: PVR Wy S - 23rd Ave S Add sidewalks and street lights 175 131 131 1,678 1,365 3,480
41a S 288th St: Military Rd S - 34th Ave S Restripe to 3 lanes with bike lanes, improve pedestrian facilities 105 944 1,049
41b S 288th St: 16th Ave S - 34th Ave S Restripe to 3 lanes with bike lanes, improve pedestrian facilities 100 104 104 2,308 2,616
42 FWHS - City Center Greenway: S 308th St / 20th Ave S Greenway improvements 104 420 524
43 Citywide Local Improvement District Non-Motorized Improvement Program 315 315 315 315 315 315 315 2,205
44 S 320th St Grade Separation Conceptual design and feasibility analysis to lower S 320 St in City Center 200 100 300
45 28th Ave S: S 312th St - S 308th Ln Install sidewalk and streetlights on east side of 28th Ave S and south side of S 308th Ln 20 300 500 200 1,020
Subtotal Non-Motorized Capital Projects 2,306 5,478 4,706 7,953 9,083 3,797 7,534 6,020 46,877
TOTAL CAPITAL PROJECT COSTS 12,611 12,076 18,909 44,106 33,000 43,557 40,274 47,555 252,088
CITY OF FEDERAL WAY
NON-MOTORIZED CAPITAL PROJECTS Year 2023 Costs in $ thousands
TRANSPORTATION IMPROVEMENT PROGRAM (TIP) - 2024 TO 2029
Year 2023 Costs in $ thousandsROADWAY CAPITAL PROJECTS