23-104803City of Federal Way
FILF
Community Development Dept.
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: BROX
Project Address: 30859 22ND AVE S
Project Description: replace electrical water heater in same location
Plumbing
Permit #:23-104803-00-PL
Inspection Request Line: (253) 835-3050
Parcel Number: 053700 0569
Owner
Applicant
Contractor
MELANIE BROX
PERMIT DEPARTMENTDRF WATER
SMART WATER EXPERTS (PLUMBING)
30859 22ND AVE S
HEATING SOLUTIONS
SMARTWE782KP(8/2/24)
FEDERAL WAY WA 98003
10242 S BODE ST
10242 BODE ST
PLAINFIELD IL 60585
PLAINFIELD IL 60585
Water Heaters
Plumbing Fixtures
PERMIT EXPIRES Tuesday, 26 March, 2024
Permit Issued on Thursday, September 28, 2023
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Vu hl ton rid the City of Federal Way.
J K'
Owner or agent. F Date-
CITY o.
Federal Way
THIS CARD IS TO REII_-1I\ O\-SITE
Construction Inspection Record
INSPECTION REQITSTS: (253) 835-3050
Scheduled inspections aiv, be failed if this card is not on -site. DO NOT LOSE MS CARD. Inspections are listed as close to sequential order as possible
(read left to right. top to bottom). Please schedule inspections as appropriate. Work artist not be co-,: eyed until it is approved. Check ivith vowr inspector if
you are unsure abotit any of the inspections or the inspection sequence. inn-?oing inspections are logged on the back of th±s card.
ELECTRICAL
l
By
L�R Ground (4295)
Approved
Date
-
By
Ditch cover (4030)
Approved
Date
❑
By
SlablConcrete Floor (4255)
Approved to place concrete
Date
❑}
Pool Bonding (4195)
❑
Temporary Power (4275)
❑
Service (4235)
Approved
Approved
Approved
By
Date
By,
Date
By
Date
FeederslSub-panels (4045)
❑
Rough Electrical (4225)
❑
Ceiling Corer (4020)
Approved
Approved
Approved
By
Date
By
Date
By
Date
Final - Electrical (4055)
Approved
By
Date
MECHANICAL
❑
-Mechanical Rough -in (4165
Q
Gas Piping (4125)
Q
Final - \Mechanical (4065)
Approved
Approved to release test
Approved
By
Date
By
Date
By
Date
PLUMBING
❑ 0
0
Plumbing Groundwork (4190)
Rough Plumbing (4230)
Final - Plumbing (4075)
Approved to cover
Approved
Approved
By
Date
By
Date
By
y '
Date