Loading...
23-106056-SU-Lakehaven Water and Sewer-01-19-24CoA-2023.docx (Form Update 9/26/23) Page 1 of 4 WATER CERTIFICATE OF AVAILABILITY Lakehaven Water & Sewer District – Development Engineering Section 31623 – 1st Ave S  PO Box 4249  Federal Way, WA 98063-4249 Email: DE@Lakehaven.org  Telephone: 253-945-1581 or 253-945-1580 This certificate is intended to provide the applicant, land use agencies &/or public health departments with information necessary to evaluate development proposals. Lakehaven Water & Sewer Dist rict, at its sole discretion, reserves the right to delay, or deny, sewer service based upon capacity &/or supply limitations in Lakehaven’s or Other Purveyor’s system facilities. Proposed Land Use: Building Permit-SFR () Building Permit-MFR () Building Permit-Other Subdivision (26) Short Subdivision () Binding Site Plan Boundary Line Adjustment Other (specify/describe) Parcel Number(s): 192104-9018, -9019, -9024, -9026 Site Address: 1525 SW 341st Pl LWSD GIS Grid: G-11 Ex. Bldg. Area to Remain: UNKNOWN sf New Bldg. Area Proposed: UNKNOWN sf WATER SYSTEM INFORMATION 1. Water service can be provided by service connection to an existing ” diameter water main that is approximately feet from the site. 2. Water service for the site will require an improvement to LWSD’s water distribution system of: a. 5+/- feet of 8” diameter water main to reach the site; and/or b. The construction of a water distribution system on the site; and/or c. A major portion of LWSD’s comprehensive water system plan would need to be implemented and/or constructed; and/or d. Other (describe): LWSD Developer Extension (DE) Agreement required. Extend to far edge(s) per LWSD policy (if applicable). 3. a. The existing water system is in conformance with LWSD’s Comprehensive Water System Plan. b. The existing water system is not in conformance with LWSD’s Comprehensive Water System Plan and an Amendment to this Plan will be required. This may cause a delay in issuance of land use approvals or permits. 4. a. The subject property is within the corporate limits of Lakehaven Water & Sewer District, or has been granted Boundary Review Board approval for extension of water service outside of LWSD’s water service area. b. Annexation or Boundary Review Board approval will be necessary to provide service. 5. Water service is subject to: a. Payment of connection charges (to be determined by LWSD); b. Proof or reservation of easement(s) as required by LWSD; c. Other: All water service connection stubs (all components except the service meter) must be installed & approved by LWSD, prior to subdivision approval & recording. LWSD Service Connection applications required, subject to completion of associated LWSD DE Agreement project. Comments/special conditions: Care shall be taken to avoid encroachment upon existing LWSD water mains, and/or associated easement(s), on the site. The nearest fire hydrants will be on or adjacent to the Property (number & locations TBD by fire marshal). Fire Flow at no less than 20 psi available within the water distribution system is a minimum 1,000 GPM for two (2) hours or more. This flow figure depicts the theoretical performance of the water distribution system under high demand conditions. Fire flow rates greater than this may be accommodated through water distribution system improvements, contact LWSD for additional information. 538 Pressure Zone Est. Meter Elevation(s)-GIS: High 390+/-, Low 360+/- Est. Pressure Range at Meter(s) (psi): 55-77 I hereby certify that the above water system information is true. This certification shall be valid for one (1) year from the date of signature. Name: BRIAN ASBURY Title: DEVELOPMENT ENGINEERING SUPERVISOR Signature: Brian Asbury (e-signed) Date: 12/1/23 CoA-2023.docx (Form Update 9/26/23) Page 2 of 4 CoA-2023.docx (Form Update 9/26/23) Page 3 of 4 SEWER CERTIFICATE OF AVAILABILITY Lakehaven Water & Sewer District – Development Engineering Section 31623 – 1st Ave S  PO Box 4249  Federal Way, WA 98063-4249 Email: DE@Lakehaven.org  Telephone: 253-945-1581 or 253-945-1580 This certificate is intended to provide the applicant, land use agencies &/or public health departments with information necessary to evaluate development proposals. Lakehaven Water & Sewer District, at its sole discretion, reserves the right to delay, or deny, sewer service based upon capacity &/or supply limitations in Lakehaven’s or Other Purveyor’s system facilities. Proposed Land Use: Building Permit-SFR () Building Permit-MFR () Building Permit-Other Subdivision (26) Short Subdivision () Binding Site Plan Boundary Line Adjustment Other (specify/describe) Parcel Number(s): 192104-9018, -9019, -9024, -9026 Site Address: 1525 SW 341st Pl LWSD GIS Grid: G-11 Ex. Bldg. Area to Remain: UNKNOWN sf New Bldg. Area Proposed: UNKNOWN sf SEWER SYSTEM INFORMATION 1. Sewer service can be provided by service connection to an existing ” diameter sewer main that is approximately feet from the site and the sewer system has the capacity to serve the proposed land use. 2. Sewer service for the site will require an improvement to LWSD’s sanitary sewer system of: a. 5+/- or 275+/- feet of 8” diameter sewer main to reach the site; and/or b. The construction of a sanitary sewer collection system on the site; and/or c. A major portion of LWSD’s comprehensive wastewater system plan would need to be implemented and/or constructed; and/or d. Other (describe): LWSD Developer Extension (DE) Agreement required. Extend to far edge(s) per LWSD policy (if applicable).. 3. a. The existing sewer system is in conformance with LWSD’s Comprehensive Wastewater System Plan. b. The existing sewer system is not in conformance with LWSD’s Comprehensive Wastewater System Plan and an Amendment to this Plan will be required. This may cause a delay in issuance of land use approvals or permits. 4. a. The proposed site land use is within the corporate limits of Lakehaven Water & Sewer District, or has been granted Boundary Review Board approval for extension of sewer service outside of LWSD’s sewer service area. b. Annexation or Boundary Review Board approval will be necessary to provide service. 5. Sewer service is subject to: a. Payment of connection charges (to be determined by LWSD); b. Proof or reservation of easement(s) as required by LWSD; c. Other: All sewer service connection stubs (main-to-lot) must be installed & approved by LWSD, prior to subdivision approval & recording. LWSD Service Connection applications required, subject to completion of associated LWSD DE Agreement project. Comments/special conditions: Care shall be taken to avoid encroachment upon existing LWSD water mains, and/or associated easement(s), on the site. I hereby certify that the above sewer system information is true. This certification shall be valid for one (1) year from the date of signature. Name: BRIAN ASBURY Title: DEVELOPMENT ENGINEERING SUPERVISOR Signature: Brian Asbury (e-signed) Date: 12/1/23 CoA-2023.docx (Form Update 9/26/23) Page 4 of 4