01-100409CITY OFfG CITY HALL 33530 1 st Way South PO Box 9718 February 7, 2001 Mike Griffin 103 54th Avenue E Tacoma, WA 98424 RE: Permit #01-100409-000-00-SM; GRIFFIN PROJECT (PRE) 2245 S 333�d Street; Right of Way Modification Dear Mr. Griffin: (253) 661-4000 Federal Way, WA 98063-9718 This letter responds to your request to waive the required access improvements along S 333`d Street and 24th Avenue S associated with your proposed development. After evaluating the existing conditions along S 333`d Street and 24th Avenue S, review of Federal Way City Code (FWCC) provisions (Sections 22-1496, 22-1477 and 22-1524), and the direction provided by the City Council, the Public Works Department hereby modifies the requirements for street improvements applicable to your land use application, as discussed below. FWCC Section 22-1477 Modification of Improvements Along Property Frontage - This code section allows the Public Works Director to grant a request to modify, defer, or waive the required street improvements only after consideration of four specific reasons. The reason most applicable here is contained in FWCC 22-1477 (1) "Improvements as required would not be harmonious with existing street improvements." S 333`d Street is classified as a minor collector corresponding to Federal Way Roadway Section "R". This roadway section requires a 40-foot-wide paved street with curb, gutter, four -foot planter strip with street trees, six-foot sidewalk, three-foot utility strip, and streetlights all within a 66-foot right of way. 24th Avenue S is classified as a local access street corresponding to Roadway Section "W". This roadway section requires a 28-foot wide paved street with curb, gutter, four -foot planter strip with street trees, five-foot sidewalk, three-foot utility strip, and streetlights all within a 52-foot right of way. Application of the required street improvements would result in improved roadway sections that are not harmonious with existing street improvements. S 333`d Street consists of a 22-foot paved roadway and sidewalks to the west, within a 60-foot right of way. 24th Avenue S consists of a 20- foot paved road with no sidewalk within a 24-foot easement. As a result, the required street improvements are modified, to include constructing S 333`d Street along your frontage to a 20-foot paved road from centerline to curb, curb and gutter, four -foot planter strip with street trees, six-foot sidewalk, three-foot utility strip and streetlights. To accommodate these improvements a three-foot right of way dedication is required. 20 Avenue S will need to be constructed to include a 24-foot paved road, curb and five-foot sidewalk on the west side of the road. To accommodate these improvements five feet must be added to the access easement. A professional engineer registered in the State of Washington must design road improvements. The conditions of this right of way modification will be applicable for one year from the date of this letter. If a building permit is not issued within the one-year time limit, the right of way modification will be void and a new request for modification must be submitted. If you have any questions, call Jim Femling, Senior Engineering Plans Reviewer, at (253) 661-4196. Sincerely, Ken Miller, P.E. Deputy Public Works Director KM/JF:jlf enclosure "No Protest" LID Agreement cc Trent Ward, Development Services Manager Kathy Messinger, Streets Engineering Technician Response file #68 Project File Day File (JF) 1:\csdc\docs\save\54126291.doc Ito z Iq 0 m