Loading...
23-106041City of Feder.al Way Community Development Dept. 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: SILVER SHADOWS APARTMENTS BUILDING A Project Address: 27606 PACIFIC HWY S Project Description: Roof Mounted Solar Array Owner Applicant SILVER SHADOWS HOUSING PARTNERS REGAN MORRISELLENSBURG SOLAR LLLP LLC 2223 112TH A VE NE SUITE I 02 961 N STRANDE RD BELLEVUE WA 98004 ELLENSBURG WA 98926 Additional Permit Information Is this an Online or O.T.C. application? .................. Yes Alt Serv./Feeder: 0 to 200 am1 4 CONDITIONS: FmE APPROVAL CONDITIONS: Electrical Permit #:23-106041-00-EL Inspection Request Line: (253) 835-3050 Parcel Number: 7204800186 Contractor ELLENSBURG SOLAR ELLENSL864RR (12112/24) PO BOX 1681 ELLENSBURG WA 98926 Upon completion of installation, the following photographs shall be emailed to: planreview@southkingfire.org and alarms@southkiogfire.org -Finished installation showing 36" access from the ground and 18" clearance at roof peak. -Location of shutoff switch with signage. -Photo of the front of the hotise showing the address or street side view. Email the photographs at least two (2) business days before requesting electrical final. Due to size limitations, save photos on a single page and save as a .pdf before sending. You will receive a response back from SKF once the permit has been approved by SKF so you can schedule your electrical final inspection. If no response from SKF is within two (2) business days, call 253-946-7348 to check status. PERMIT EXPIRES Monday, 8 July, 2024 Permit Issued on Wednesday, January 10, 2024 Date : ________ _ CITYOF ~ Federal Way PERMIT#: 23 106041 00 THIS CARD IS TO REMAIN ON-SITE Construction Insoection Record INSPECTION REQUESTS: (253) 835-3050 Address: 27606 PACIFIC HWY S Bldg A • Project: SIL VER SHADOWS HOUSING PAR' FEDERAL WAY WA 98003 Scheduled inspections may be failed iflhis card is not on-site. DO NOT LOSE TH IS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or tht: inspection sequence. On-going inspections arc Jogged on the back of this card. II] By III By 0 By By D By UFER Ground (4295) Approved Date Pool Bonding (4195) Approved Date Feeders/Sub-panels (4045) Approved Date Ceiling Cover (4020) Approved Date Rough Electrical Approved Date [TI By m By [!] By By D By Ditch cover (4030) Approved Date Temporary Power (4275) Approved Date Rough Electrical (422S) Approved Date Final -Electrical (4055) Final Electrical Approved Date [I] By [!] By ~ By D By Slab/Concrete Floor (4255) Approved to place concrete Date Service (4235) Approved Date Final -S K F & R (4060) "\J Approved Date Right of Way Approved Date