23-106041City of Feder.al Way
Community Development Dept.
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: SILVER SHADOWS APARTMENTS BUILDING A
Project Address: 27606 PACIFIC HWY S
Project Description: Roof Mounted Solar Array
Owner Applicant
SILVER SHADOWS HOUSING PARTNERS REGAN MORRISELLENSBURG SOLAR
LLLP LLC
2223 112TH A VE NE SUITE I 02 961 N STRANDE RD
BELLEVUE WA 98004 ELLENSBURG WA 98926
Additional Permit Information
Is this an Online or O.T.C. application? .................. Yes
Alt Serv./Feeder: 0 to 200 am1 4
CONDITIONS:
FmE APPROVAL CONDITIONS:
Electrical
Permit #:23-106041-00-EL
Inspection Request Line: (253) 835-3050
Parcel Number: 7204800186
Contractor
ELLENSBURG SOLAR
ELLENSL864RR (12112/24)
PO BOX 1681
ELLENSBURG WA 98926
Upon completion of installation, the following photographs shall be emailed to:
planreview@southkingfire.org and alarms@southkiogfire.org
-Finished installation showing 36" access from the ground and 18" clearance at roof peak.
-Location of shutoff switch with signage.
-Photo of the front of the hotise showing the address or street side view.
Email the photographs at least two (2) business days before requesting electrical final.
Due to size limitations, save photos on a single page and save as a .pdf before sending.
You will receive a response back from SKF once the permit has been approved by SKF so you can
schedule your electrical final inspection.
If no response from SKF is within two (2) business days, call 253-946-7348 to check status.
PERMIT EXPIRES Monday, 8 July, 2024
Permit Issued on Wednesday, January 10, 2024
Date : ________ _
CITYOF ~
Federal Way
PERMIT#: 23 106041 00
THIS CARD IS TO REMAIN ON-SITE
Construction Insoection Record
INSPECTION REQUESTS: (253) 835-3050
Address: 27606 PACIFIC HWY S Bldg A
•
Project: SIL VER SHADOWS HOUSING PAR' FEDERAL WAY WA 98003
Scheduled inspections may be failed iflhis card is not on-site. DO NOT LOSE TH IS CARD. Inspections are listed as close to sequential order as possible
(read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or tht: inspection sequence. On-going inspections arc Jogged on the back of this card.
II]
By
III
By
0
By
By
D
By
UFER Ground (4295)
Approved
Date
Pool Bonding (4195)
Approved
Date
Feeders/Sub-panels (4045)
Approved
Date
Ceiling Cover (4020)
Approved
Date
Rough Electrical
Approved
Date
[TI
By
m
By
[!]
By
By
D
By
Ditch cover (4030)
Approved
Date
Temporary Power (4275)
Approved
Date
Rough Electrical (422S)
Approved
Date
Final -Electrical (4055)
Final Electrical
Approved
Date
[I]
By
[!]
By
~
By
D
By
Slab/Concrete Floor (4255)
Approved to place concrete
Date
Service (4235)
Approved
Date
Final -S K F & R (4060)
"\J Approved
Date
Right of Way
Approved
Date