Loading...
94-102019CITY OF gC�-- 33530 1ST WAY SOUTH November 17, 1994 Ms. Ly Ngov Mr. Lim Poan 929 South 312th Federal Way, WA 98003 (206) 661-4000 FEDERAL WAY, WA 98003-6210 RE: DYE/NGOV BUILDING CONVERSION PREAPPLICATION 28631 PACIFIC HIGHWAY SOUTH, FEDERAL WAY, WA Dear Ms. Ngov and Mr. Poan: Thank you for meeting with the city's Community Development Review Committee (CDRC) regarding your proposal at the above referenced site. This letter summarizes the November 3, 1994, pre -application conference, at which time committee members discussed development requirements applicable converting an existing building to a restaurant use. The various requirements are provided below or are enclosed. BACKGROUND: The existing site consists of two adjacent lots fronting both Pacific Highway South and 16th Avenue South. The lots drop in elevation from east to west. The northern lot is vacant. The southern lot contains a 2,800 square foot two-story building constructed in the late 1940's. It has housed numerous businesses, including a printing shop, karate school, massage parlor, etc. The building has not been in use for over a year according to Fire District records. LAND USE DIVISION (Deb Barker, 661-4103) Review Process - Restaurants in the Community Business (BC) zoning district are approved under Site Plan Review. A site plan information bulletin and master land use application form are enclosed, along with the Federal Way City Code (FWCC) sec. 22-756, Restaurant - Tavern land use chart. Processing time is approximately 60 to 75 days for completion of the review. Building permits are issued after the site plan review has concluded. 2. Non-conformance - Article IV of the FWCC establishes when and under what circumstances non -conforming aspects of a site must be brought into conformance. Pursuant to FWCC sec. 22-337, when the use on the subject property has changed, when any proposed work exceeds 50 percent of the assessed or appraised value of the existing building Ms. Ly Ngov Mr. Lim Poam November 17, 1994 Page 2 valuation, or if the use has ceased for over 180 days, then the following elements must be brought into conformance with current code regulations: o The required number of parking spaces must be provided. o All signs must conform. • All required landscaping and buffers must be provided. • Any facade of the structure that is over 50 feet in length must be modulated. • Structural setback requirements must be maintained. o Building height must not exceed the maximum allowed. 3. Change of Use - A change of use is determined to have occurred when it is found that the general character of the operation has been modified. The determination shall include review of, but not be limited to the following: FORMER USE PROPOSED USE (school, offices) (restaurant) Hours of operation: Required Parking: Traffic Generation: General appearance: If a documented change of use results in identified impacts, an environmental review may be required. 4. State Environmental Policy Act (SEPA) - The creation of 20 or more parking spaces, landfills, and excavation in excess of 500 cubic yards, or impacts identified with changes in use are subject to SEPA review. If SEPA is required, an environmental checklist must be submitted and reviewed prior to the city issuing an environmental threshold determination. All property owners and residents within 300 feet of the site are notified of the decision. Public notification includes a 15-day comment and 14-day appeal period. SEPA review must conclude before the site plan approval may be granted. 5. Fees - The proposal to develop the site requires the following fees (fees are indicated in parentheses): Site Plan review ($1,218.00 includes fire review fee) and SEPA environmental determination review as part of project ($472.00 includes fire review fee). If submitting for SEPA environmental determination review only ($945.00 includes fire review fee). Additional fees are associated with other city and district regulations and permits. Building permits must be obtained before any interior or exterior work commences. 6. Parking - One stall per each 100 square feet of gross floor area is required per the FWCC sec. 22-756. Compact parking space sizes are 8' x 15'. Up to 25 percent of the required Ms. Ly Ngov Mr. Lim Poam November 17, 1994 Page 3 parking stalls may be compact. Standard size stalls are 8.5' X 181. Vehicles shall not overhang more than two feet into any required landscape area. When abutting a landscape strip, parking overhang is allowed only when the landscape strip is widened to match the length of the overhang, e.g.: one foot overhang = one foot additional landscape width. 7. Required Landscaping - A preliminary landscape plan, prepared by a licensed landscape architect in accordance with FWCC Article XVII, Landscaping, is required as part of the site plan submittal. It should contain the following elements: a. Buffer Requirements - FWCC sec. 22-1566(f) requires Type III landscaping five feet in width along the perimeter of the subject site. Type III landscaping provides a partial visual separation of uses, so as to soften the appearance of parking areas and building elevations. b. Parking Lot Landscaping - Type IV landscaping must be provided in the interior of the parking lot in accordance with FWCC sec. 22-1567. Twenty square feet of interior lot landscaping must be provided for each parking stall. Twenty-eight parking spaces require 560 square feet of interior lot landscaping, which should be provided at the end of all parking rows and dispersed throughout the parking area in a manner to reduce visual impact of the parking lot. c. Plant Species - The landscape plan should state how it conforms to the drought tolerant plant species requirements of FWCC sec. 22-1564(f). d. S creen i n - Trash enclosures should be screened from abutting properties and rights of way by a 100 percent sight -obscuring fence or wall and appropriate landscape screen. Building walls which are uninterrupted by window, door, or other architectural feature and are 240 square feet in area or greater, must be screened by appropriate landscaping. Foundation landscaping is encouraged in order to reduce the scale, bulk, and height of structures. e. Modification - Opportunities to modify landscape requirements are available pursuant to Sec. 22-1570, Modification options. 8. Signs - Sign category E applies to restaurant uses in this zone. Wall mounted, marquee, pedestal, and monument signs are permitted. A sign permit must be obtained under separate permit; a sign permit application and code section are enclosed. Please contact Richard Cottage, Code Compliance Officer, at 661-4017, with signage questions. Ms. Ly Ngov Mr. Lim Poam November 17, 1994 Page 4 9. Setback Requirements - Buildings must be set back a minimum of 20 feet from the front property line in accordance with FWCC sec. 22-756. There are no side nor rear yard minimum setbacks. 10 Building Modulation - Building facades that exceed 50 feet in length must be modulated to a minimum depth of three feet, a minimum modulation width of four feet, and the maximum modulation width of 35 feet. 11. Building Height - The maximum height of the building is 35 feet above average building elevation. 11. Pedestrian Connection - Per FWCC sec. 22-1445, sidewalks along the perimeter of the building should be a minimum of five feet in width. Pedestrian access that connects these sidewalks to the right-of-way should be provided. 12. Recycling/Solid Waste Containers - Garbage and recycling receptacles must be installed in accordance with FWCC sec. 22-929. PUBLIC WORKS DEPARTMENT (Ron Garrow, 661-4137) There are numerous Public Works issues that apply to this site. Please refer to the enclosed Public Works Memorandum of October 20, 1994. BUILDING DIVISION (K.C. Ellis, 661-4123) Refer to the enclosed building department memorandum. LAKEHAVEN UTILITY DISTRICT, (Mary Cossette, 941-1516) The site is not connected to a public sewer system. Please refer to the enclosed Lakehaven Utility District memorandum of October 27, 1994. KING COUNTY FIRE DISTRICT #39 (Pat Kettenring, 946-7241) The Fire District requires additional information before they can comment on the pre - application. Please refer to the enclosed memorandum. Ms. Ly Ngov Mr. Lim Poam November 17, 1994 Page 5 The sign-up sheet from the meeting is enclosed. Thank you for participating in the pre - application process. As you know, this is a preliminary review only and it does not take the place of a full review of the formal application. If you have any questions, please contact me at 661-4103, or other staff persons as appropriate. I look forward to working with you. Sincerely, Deb Barker Associate Planner enc: Preapplication Sign -in Sheet Predevelopment Information from Building Division, 10/26/94 Comments from Fire Marshal's Office, November 10, 1994 Technical Review Comments from Lakehaven Utility District, October 27, 1994 Public Works Memorandum, October 20, 1994 FWCC Sec. 22-756 (Land Use Chart) SEPA Checklist Mailing Label Handout FWCC Article XVII, Landscaping FWCC Article XVIII, Signs FWCC Sec. 22-1441, Site Design FWCC Sec. 22-1445, Sidewalks Site Plan Review Handout FWCC Sec. 22-949 c: Ron Garrow, Public Works Dick Mumma, Building Division Mary Cossette, Lakehaven Utility District Pat Kettenring, Fire District p=pplibomen-a ['iyr bu ld ings«ary. dw CITY OF TO: Deb Barker FROM: Ronald Garrow Date: October 20, 1994 SUBJECT: John Dye Property, PRE94-0062 PUBLIC WORKS MEMORANDUM For Your Information The proposal to the City is to start up a restaurant in the existing building that formerly had a karate school in it. The site is located just north of S. 288th St. on the west side of Pacific Highway S. The site is accessed from Pacific Highway S. with the main entrance on the north side of the site and another access on the south. A "C" curb is located along the edge of the street preventing any intermediate access. The space between the "C" curb and the building is barely sufficient to provide parallel parking of two cars and one lane of travel. The north entrance accesses a parking lot along the north side of the building. The travel lane to the parking lot is only one lane wide and will not accommodate two way traffic. The parking lot apppears undersized to accommodate traffic from a restaurant. The amount of parking should be confirmed for the proposed use. The proposed parking lot configuration would relocate the drive aisle to the south allowing for cars to park against the north property line. No landscape buffer is shown. A parking stall is also depicted against the door to the lower floor. This could prevent emergency access to and from that floor. This stall should be eliminated. The conversion to a restaurant will require a Traffic Impact Analysis. Of concern is not only the trip generation but also the potential for left turn movements out of this area onto Pacific Highway S. During peak traffic hours in the p.m., this movement is next to impossible. Operations of this area may be restricted to right-in/right-out only movements. Because this is a change of use, appropriate non -conformances will need to be brought into conformance with the city codes. The following issues will need to be addressed as part of the permitting process: Site Plan Review 1. The site plan will need to provide the information indicated in the accompanying handouts. This information will need to be done at a scale of no smaller than 1" =20' and on 24"06" size sheets. 2. The site will need to be retrofitted with water treatment facilities for the runoff from the site per city code 22-330. The retrofit requires the installation of a biofiltration swale prior to discharge ofrunoff from the site. If this is not feasible, an alternative treatment method may be proposed for review and approval prior to site plan approval. 3. Access to the site does not conform with the code requirements of 1 access for every 150 feet of frontage. One of the access points will need to be eliminated. The other access will need to be developed to handle two directional traffic to and from the parking area. Parking may not occur in the right-of-way or along the front of the site such that maneuvering in and/or out of the stalls may potentially impede access to and from Pacific Highway S. The right-of-way may not be used for circulation to or from the stalls. 4. A Traffic Impact Analysis will need to be conducted by the applicant for the proposed use. If the proposal proceeds to land use review, the applicant should contact the Public Works Department at 661-4137 to obtain a scoping sheet for the proposed project. From this scoping sheet, the applicant's engineer can prepare the analysis. The results of this analysis will be a basis for determining any pro-rata share contributions to any identified Transprotation Improvement Program project. The results of the analysis will also assist indetermining any circulation constraints for this site to provide some level of safety for the applicant and customers. 5. In the event that improvements to the site exceed 25 % of the assessed value of the existing buildings on the site, off -site roadway improvements will be required per code. The modified requirements will consist of widening of Pacific Highway S. on the west side only including but not limited to pavement widening to 42.5 feet from the centerline of the right-of-way, vertical curb and gutter, 6-foot landscape strip with. street trees planted 30 feet on centers, 8-foot wide sidewalk, illumination, and associated storm drainage improvements. Right-of-way dedication to accommodate these improvements will be required along the street frontage. 6. If a secondary access and parking facility are constructed off of 16th Ave. S. to the west and downhill of Pacific Highway S., the applicant will be required to construct frontage improvements along 16th Ave. S. as similarly conditioned for other proposals along this street. The improvements shall include but not be limited to pavement widening to 24 feet total, vertical curbs and gutters on both sides of the street, 4-foot landscape strip and 5-foot sidewalk on the east side, and associated storm drainage facilities. -No landscape strip or sidewalk are required for the west side. Dedication of right-of-way will be required to accommodate these improvements as necessary. 7. The site consists of two lots. A lot line elimination will be required for this process to consolidate the two lots into one. COMMUNITY DEVELOPMENT TECHNICAL REVIEW COMMITTEE AGENDA OF: October 27, 1994 ATTN: Deb Barker Associate Planner FROM: Lakehaven Utility District SUBJECT: Agenda Item No. 6 - Dye Building Preapplication Meeting PRE94-0062 COMMENTS: Water: Existing building is currently connected via a 5/8" x 3/4" water meter. If a larger meter is required, owner shall apply to upgrade same and pay required charges. Applicability of increased facilities charges due to change of use could be determined at that time. Sewer: Sewer service would require extension of main line facilities under developer extension agreement with the District. Topographic survey will determine direction of service. Owner shall complete an Industrial User Survey (I.U.S.) with pretreatment requirements to be determined upon review of said I.U.S. By; Date: �O -Z%— 5; KING COUNTY FIRE PROTECTION DISTRICT NO. 39 FEDERAL WAY FIRE DEPARTMENT 31617 • 1ST AVENUE SO. FEDERAL WAY, WASHINGTON 98003 November 10, 1994 Deb Barker City of Federal Way Re: Dye / Ngov Building Dear Deb, The Fire Marshal's Office has the following comments regarding the proposal; The plans submitted showed no clear plan for future use. To properly review, we need to see what is proposed, not what exists. Respectfully submitted, Patrick D. Kettenring Assistant Fire Marshal Business Phones: Seattle 206-839-6234 Tacoma 206-927-3118 FAX: 206-946-2086 Ok JECT NAME PR, ~DEVELOPMENT INFORMAT IN rEDERAL WAY BUILDING SECTION 661-4118 CCUP CY TYPE CONSTRUCTION A-1. Submit with completed application for permit, -seen complete sets of plans of 241lx36" maximum dimension (include architectural, structural, electrical, drainage, utilities, and landscaping). Provide three each 8'/s"xll" and three full size site plans for addressing multiple building sites. 2. At submittal provide two sets of structural calculat' ns prepared by a professional engineer, registered in the State of Washington. kT- RQ L✓ W( U)5; 3. At submittal provide two copies of soil investigations and reports, as specified in Chapter 29 of the Uniform Building Code. 4. At submittal provide two sets of energy code calculations, including lighting budget. Washington State Energy Code (1991). Non -Residential Energy Code (NREC) effective April 1, 1994. X5. Provide two copies of King County Health Department approved drawings. �Yf der �v� fug rss�o�c 71-c 46. At the time of submittal, those regulations which are currently in effect shall be applicable to all project plans and specifications. The City of Federal Way has currently adopted all Uniform Codes, 1991 editions. 7. Washington State Disability Standards apply (WAC 51-20). 8. Special inspection by an approved testing laboratory is required for site welding, high -strength bolting, piling operations, sprayed -on fireproofing, structural masonry, and cast -in -place concrete. Include testing lab selection and personnel credentials with building permit submittal for Building Section approval prior to construction (must be WABO certified agency and inspectors on January 1, 1994). 9. Separate permits are required for demolition, signs, rack storage, rockeries, etc., refer to Washington State Department of L & I for electrical permits. Plumbing and mechanical should be included on the main application for permits, described in #1 above. 10. Revisions to submitted drawings will be subject to additional plane review fees, if on arger sheets than /z " 8'xll". � fi'0[ 11. Minimum estimated fireflow (gpm) '12. Provide TWO FULL SIZE SITE PLANS APPROVED BY THE FEDERAL WAY POSTMASTER, showing approved locations, when installing gang -type mail boxes. �13. No building or portion of a building shall be occupied or used for storage prior to the issuance of the CERTIFICATE OF OCCUPANCY. 14. No work shall start prior to the issuance of the permit. 15. Other: PREPARED BY �10_ U-V DATE rnEn"v.FRM Ji fc�o all, nawme"l-- )t4,49Y 55ETT� wo CFRCe K�if�i vE�l UTILITY 6-5-TV6T '0/�-� 134 6 3�� COMMUNITY DEVELOPMENT TECHNICAL REVIEW COMMITTEE AGENDA OF: November 3, 1994 ATTN: Ms. Deb Barker Associate Planner FROM: Lakehaven Utility District SUBJECT: Agenda Item No. 2 - Dye/Ngov Building Preapplication w/Applicant PRE94-0062 COMMENTS: General: Our comments of October 27, 1994, are still applicable (copy attached). By: Date: 11- 3- 7 COMMUNITY DEVELOPMENT TECHNICAL REVIEW COMMITTEE AGENDA OF: October 27, 1994 ATTN: Deb Barker Associate Planner FROM: Lakehaven Utility District SUBJECT: Agenda Item No. 6 - Dye Building Preapplication Meeting PRE94-0062 COMMENTS: Water: Existing building is currently connected via a 5/8" x 3/4" water meter. If a larger meter is required, owner shall apply to upgrade same and pay required charges. Applicability of increased facilities charges due to change of use could be determined at that time. Sewer: Sewer service would require extension of main line facilities under developer extension agreement with the District. Topographic survey will determine direction of service. Owner shall complete an Industrial User Survey (I-U.S.) with pretreatment requirements to be determined upon review of said I.U.S. By: —P�C15-" Date: I b - 2-? - S 0 I-) C-0 UL w D \_1 F7. - - ALL olmEt./S i^!ti•S lly Ic E T. I 2 E- . oV 3 � 0 4 ) PROP. 4 CORNEA; 1 - SIDE WALK y�D 20 TO Tax 15 r_ I2J� 30 o 1 o �-►— i Q —ems PROP. CoRNcR�r O Ati H•_ \n 1 ^N `r •r� t� Y e • to ;: lofa °I,0�= .Ir jl,.' A FRCI'Fit' y FURVR'.i e( FR401 RICIATTrR " 2;1619 Pacific- tligtma7 tooth f,ent, Imem.ngt-in 98031 %1-05'28 r IN- Lir1 AT, DF.;(:RTPTInNt The Ws ft. of t he N. 1914 ft„ (,f• 7. 5n3 rt. ae mmeoured along thn m nt-rl y line of Primary S tato Iliphwaq t'o. 1, raid that portion of thd S8w Of- t.hc VO, of Section 33, Totmehip North, I pngo A B.N.M., lying of ;;ta"O fltc-'-:nay ro 1.1 by r,r^er) r1U11TTr Ft IV Il.l TMP y R(.+Ki.etercd Prof eaaional LwA Survc7r)rn 304a Highwey Scut >~edoral Vej, Waa ,, 98002 VT. 9-3 799 • Job # 71083 RES TROOM A R �� E I V E D MkSM. `` 'SAND USE APPLICATION OCT 18 1994 DEPARTMENT OF COMMUNITY DEVELOPMENT 335301at Way Sauk Federal Way, WA 99003 CITY OF FEDERAL WAY BUILDING DEOT, APPLICATION NO. PM C�A — 0() Date f U L Agent Name of Applicant V ❑ wrier JOH/V DY Address TIf Signature v - Owner Name/Address V6- Phone (4f different than appacany p I S . r ,,/ Property Location o � 3 �� ' L/M � �� e_7S_66_!5 Kroll Legal Description I ine ' C y Project Description Parcel Number(s) Type of Permit Required: SEPA Notice Sign Checklist Mailed Board Site Plan Review R R Land Surface Modification R R Boundary Line Adjustment Binding Site Plan R R R Short Subdivision Subdivision R R R Shoreline R R Variance R R R Conditional Use R R R Use - Process I R R Use - Process H R R R Use - Process III R R R Quasi -Judicial Rezone R R R Variance R* R R Comp. Plan/Rezone R R Annexation R R Lot Line Elimination ' *Pre -Application Meeting R = Required # = Optional by City J N 6 FI w Nu Fl✓t CITY OF f� 33530 1ST WAY SOUTH October 21, 1994 Mr. Ly Ngov 929 South 312th Street Federal Way, WA 98003 (206) 661-4000 FEDERAL WAY, WA 98003- i210 RE: PRE 94-0062 ION PREAPPLICATION DYE/NGOV BUILDING CONVERS 28631 PACIFIC HIGHWAY SOUTH FEDERAL WAY, WA Dear Mr. Ngov: The above referenced proposal has been assigned to me as project Planner. At this time, the submittal packet has been routed to members of the Developmentfollows: Review Committee. A meeting with project proponents has been scheduled as November 3, 1994 - 10:00 AM Community Development Conference Room, City Hall, rust floor 33530 1st Way South Federal Way, WA 98003 We look forward to meeting with you at that time. Please call me at 661-4103 if you have any questions. Sincerely, 104 Deb Barker Associate Planner c: FILE Kathy McClung. Land Me Administrator MEMO TO: DRC Committee Members FROM: Kathy McClung for Deb Barker PROJECT PLANNER: Deb Barker Please Respond By: October 27, 1994 (Internal meeting) File Number: PRE94-0062 Project name: Dye building Project Address: 28631 Pacific Highway Prject Description: conversion of multi -tenant building to restaurant . Prject Contact: Lee Ngov 946-3626 SEPA may be required for change of use