Loading...
23-105169City of Federal Way FILE Community Development Dept. 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: ROSAS-LEON Project Address: 419 S 305TH ST Project Description: HVAC-Install Furnace Swap Mechanical Permit #:23-105169-00-ME Inspection Request Line: (253) 835-3050 Parcel Number: 104250 0013 Owner Applicant Contractor GERARDO ROSAS-LEON CRYSTAL WALTZALLRED HEATING ALLRED HEATING COOLING ELECTRIC 419 S 305TH ST COOLING ELECTRIC LLC LLC (GENERAL) FEDERAL WAY WA 98003 505 "F" ST SE ALLREHC899N3 (8/23/25) AUBURN WA 98002 505 "F" ST SE AUBURN WA 98002 Additional Permit Information Mechanical Work Valuation? .................................. 2772 Is this an Online or O.T.C. application?.................. Yes Mechanical Fixtures Furnaces ] PERMIT EXPIRES Monday, 15 April, 2024 Permit Issued on Wednesday, October 18, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: Date: f:164 44ro. arr or Federal Way THIS Ck1CD IS TO REALAI1 ON -SITE Construction Inspection Record INSPECTION REQUESTS: (253) 835-3050 Scheduled inspections =ry be failed if this card is not on -site. DO NOT LOSE TBIS C_-iFD. Inspections are listed as close to sequential order as possible ('read left to right. top to bottom). Please schedule inspections as appropriate. Work unit not be covered until it is approved. Check with your inspector if ou are unsure about any, of the inspections or the inspection sequence- On -going inspections are logged on the back of this card - ELECTRICAL El LTFER Ground (429-5) El Ditch corer (4030) Q Slab!Concrete Floor (4255) Approved Approved Approved to place concrete By Date By Date By Date El Service (4235) ❑ Temporary- Power (4275) 0 Pool Bonding (4195) - Approved Approved Approved By- Date By Date By Date El Feeders/Sub-panels (404) 0 Rough Electrical (4225) Q Ceiling Corer (4020) Approved Approved Approved By Date By Date By Date 0 Final - Electrical (4055) Approved By Date MECHANICAL Q Mechanical Rough -in (416) Gas Piping (4125) ❑ Final - Mechanical (4065) Approved Approved to release test Approved By Date By Date By V-VA Date 3 �; A yy r Yr A . Il1 PLUMBING 0 Plumbing Groundwork (4190) 0 Rough Plumbing (4230) Final - Plumbing (4075) Approved to cover Approved Approved By Date By Date By Date