23-105167City of Federal Way
Community Development Dept.
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: ROSAS-LEON
Project Address: 419 S 305TH ST
Project Description: HVAC-Install Furnace Swap
FILE
Electrical
Permit #:23-105167-00-EL
Inspection Request Line: (253) 835-3050
Parcel Number: 104250 0013
Owner
Applicant
Contractor
GERARDO ROSAS-LEON
CRYSTAL WALTZALLRED HEATING
ALLRED HEATING COOLING ELECTRIC
419 S 305TH ST
COOLING ELECTRIC LLC
LLC (ELECTRICAL)
FEDERAL WAY WA 98003
505 "F" ST SE
ALLREHC775LO (7/6/25)
AUBURN WA 98002
505 "F" ST SE
AUBURN WA 98002
Additional Permit Information
Is this an Online or O.T.C. application? .................. Yes
Electrical Factures _
Alt. Serv./Feeder: 0 to 200 aml 1 Circuits - Residential 1 Thermostat ]
PERMIT EXPIRES Monday, 15 April, 2024
Permit Issued on Wednesday, October 18, 2023
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
�;, as in t n and the it of Federal Way.
Owner or agent: Date
_4k
CITY Of
Federal Way
THIS CARD IS TO REALM\ ON -SITE
Construction Inspection Record
INSPECTION REQUESTS: (253) 335-3050
Scheduled inspections tna: be failed if this card is not on -site. DO NOT LOSE THIS CARD. nspections are listed as close to sequential order as possible
( read left to right. top to bottom). Please schedule inspections as appropriate. Jt ork mast not be co,: eyed until it is approved- Check -xith your inspector if
oll are Unsure about an:- of the inspections or the inspection witlence. Ongoing inspect oils are logged on the back of this Card
ELECTRICAL
Q L-FER Ground (429-5) ❑' Ditch cover (4030) ❑ SlabiConcrete Floor (4255)
Approved Approved Approved to place concrete
By Date By Date By Date
El Pool Bonding (4195) ❑ Temporary Power (4275) ElService (4235)
Approved Approved Approved
By Date B`- Date By Date
❑ Feeders/Sub-panels (4045) ❑ Rough Electrical (4225) ❑ Ceiling Comer (4020)
Approved Approved Approved
By Date Bi Date Bc Date
❑ Final - Electrical (4055)
Approved
By MV Date 3
MECHANICAL
❑ Mechanical Rough -in (4165) ElGas Piping (4125) ❑ Final - Mechanical (4065)
Approved Approved to release test Approved
By Date By Date B's• Date
0 Plumbing Groundwork (4190) ❑ Rough Plumbing (4230) 0 Final - Plumbing (4075)
Approved to cover Approved Approved
By Date By Date B, Date