Loading...
23-105167City of Federal Way Community Development Dept. 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: ROSAS-LEON Project Address: 419 S 305TH ST Project Description: HVAC-Install Furnace Swap FILE Electrical Permit #:23-105167-00-EL Inspection Request Line: (253) 835-3050 Parcel Number: 104250 0013 Owner Applicant Contractor GERARDO ROSAS-LEON CRYSTAL WALTZALLRED HEATING ALLRED HEATING COOLING ELECTRIC 419 S 305TH ST COOLING ELECTRIC LLC LLC (ELECTRICAL) FEDERAL WAY WA 98003 505 "F" ST SE ALLREHC775LO (7/6/25) AUBURN WA 98002 505 "F" ST SE AUBURN WA 98002 Additional Permit Information Is this an Online or O.T.C. application? .................. Yes Electrical Factures _ Alt. Serv./Feeder: 0 to 200 aml 1 Circuits - Residential 1 Thermostat ] PERMIT EXPIRES Monday, 15 April, 2024 Permit Issued on Wednesday, October 18, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of �;, as in t n and the it of Federal Way. Owner or agent: Date _4k CITY Of Federal Way THIS CARD IS TO REALM\ ON -SITE Construction Inspection Record INSPECTION REQUESTS: (253) 335-3050 Scheduled inspections tna: be failed if this card is not on -site. DO NOT LOSE THIS CARD. nspections are listed as close to sequential order as possible ( read left to right. top to bottom). Please schedule inspections as appropriate. Jt ork mast not be co,: eyed until it is approved- Check -xith your inspector if oll are Unsure about an:- of the inspections or the inspection witlence. Ongoing inspect oils are logged on the back of this Card ELECTRICAL Q L-FER Ground (429-5) ❑' Ditch cover (4030) ❑ SlabiConcrete Floor (4255) Approved Approved Approved to place concrete By Date By Date By Date El Pool Bonding (4195) ❑ Temporary Power (4275) ElService (4235) Approved Approved Approved By Date B`- Date By Date ❑ Feeders/Sub-panels (4045) ❑ Rough Electrical (4225) ❑ Ceiling Comer (4020) Approved Approved Approved By Date Bi Date Bc Date ❑ Final - Electrical (4055) Approved By MV Date 3 MECHANICAL ❑ Mechanical Rough -in (4165) ElGas Piping (4125) ❑ Final - Mechanical (4065) Approved Approved to release test Approved By Date By Date B's• Date 0 Plumbing Groundwork (4190) ❑ Rough Plumbing (4230) 0 Final - Plumbing (4075) Approved to cover Approved Approved By Date By Date B, Date