23-105433City of Federal Way
Community Development Dept.
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: HOLMAN LOGISTICS
Project Address: 32001 32ND AVE S
Building - Commercial
Permit #:23-105433-00-CO
Inspection Request Line: (253) 835-3050
Parcel Number: 2154650010
Project Description: BLUEBEAM - Tenant improvements in existing office suite including demolition of partitions,
doors and ceiling grid; construction of new wall and light fixtures in existing ceiling grid and
tile. No plumbing or mechanical.
Owner
Applicant
Contractor
Lender
STERLING REALTY
KELLY FREI BORGFREI BORG
D P INC GENERAL
TENANT FINANCED
ORGANIZATION
DESIGN + PLANNING
CONTRACTORS
777 108TH AVE NE
2019 FAIRHAVEN AVE E SUITE P
19936 BALLINGER WAY NE
BELLEVUE WA 98052
SEATTLE WA 98102
SEATTLE WA 98155
Census Category: 437 - Commercial alt / add / conversion
Includes:
#1
#2
#3
#4
Occupancy Class:
Construction Type:
Occupancy Load:
Floor Area (sq. ft.)
0.00
Additional Permit Information
Mechanical to be Included?_...... ..........................:.. No Plumbing Work Valuation? ..................................... 0
Mechanical Work Valuation? .................................. 0 Number of Stories................................................... 2
Is this an Online or O.T.C. application? .................. No Permit for Building Shell Only? ........................... .., No
Plumbing to be Included? ........................................ No
Total Valuation: 35,000.00
No Fixtures Associated With This Permit !!
PERMIT EXPIRES Tuesday, 20 August, 2024
Permit Issued on Thursday, February 22, 2024
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washin ton and the City of Federal Way.
Owner or agent: Date.
�i\
THIS CARD IS TO REMAIN ON -SITE
CITY OF -ram"_ Construction Inspection Record
Federal Way INSPECTION REQUESTS: (253)'835-3050
PERMIT #: 23 105433 00 Address: 32001 32ND AVE S Unit 100
Project: STERLING REALTY ORGANIZATII FEDERAL WAY WA 98001
Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
❑ Footings/Setback (4110) ❑ Re -steel (4215) ❑ Slab/Concrete Floor (4255)
Approved to place concrete Approved to place concrete or grout Approved to place concrete
By Date By Date By Date
❑
By
Underfloor Framing (4285)
Approved to sheath floor
Date
By
Floor Sheathing (4105)
Approved to install flooring
Date
❑
By
Fire/Draft Stops (4095)
Approved
Date
Prior to scheduling a Framing inspection;
❑ Framing (4120)
❑ Insulation (4150)
Electrical, Plumbing & Mechanical Rough -in
and Fire/Draft Stop inspections must be signed-
approved. IBC 109.3.4
t
Approved to insul�)Wl
7offand
By Date 7
Approved to install wallboard
By Date
9❑ Gypsum Wallboard Nailing (4130)
Approved to install mud & tape
By Date
❑ Suspended Ceiling Grid (4265)
Approved to drop tile
By -G Date r
l Final - S K F & R (4060)
Approved
By Date
Approved
�'- Final - Planning JrBy
By Date
Final - Building (4050)
Approved
__� C) Date
Rough Electrical
❑
Final Electrical
❑
Right of Way
Approved
Approved
Approved
By
Date
By
Date
By
Date
CITY OF n Building Division
33325 Eighth Avenue South
Federal Wa Federal Way, Fax
98003-4A'�I.L6325
y Phone 253-835-2607 Fax 253-35-609
CORRECTION NOTICE
ADDRESS: I � �� l - PERMIT#:
IF YOU HAVE QUESTIONS CALL `' (253) 835- Wa 7
WHEN CORRECTIONS HAVE BEEN MADE, CALL (253) 835-3050 FOR RE -INSPECTION. SEE BACK OF CARD
FOR DETAILS. NOTE: ELECTRICAL CORRECTIONS ARE REQUIRED TO BE MADE WITHIN 15 DAYS.
DATE INSPECTOR
DO NOT REMOVE THIS NOTICE
Page of