23-101970Electrical
City of Federal Way L}
..F Permit #.23 101970 00 EL
Community rlc,�•c.lop�nc.ni Dept
33325 8th Ave 5
Federal Way, WA 98003 Inspection Request Line: (253) 835-3050
Ph: (253) 635-2607 Fax: [253] 835-2509
Project Name: BOO HAN PLAZA, Unit H
Project Address: 30919 PACIFIC HWY S Parcel Number: 082104 9063
Project Description: LED RETROFIT
Owner
Applicant
Contractor
HAN CHONOG CORP
YDLIYA GOLUBOVICHR. V ➢ ELECTRIC &
R V B F.I.FCTRIC & CONST INC
30919 PACIFIC. HWY S
CONST INC
RVBELV➢84IM8 (7/30/24)
FEDERAL WAY WA 98003
2803 N GRAND AVE ➢LDC
1523 132ND 5T 5E SUITE 112
EVERETT WA 98201
F.VF.RE.TT WA 99208
Additional Permit Information
Is this an Online or O.T.C. application? .................. Yes
Electrical Fixtures
Circuits - Commercial 3
PERMIT EXPIRES Saturday, 14 October, 2023
Permit Issued on Monday, April 17, 2023
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
sh' gt n ndflCityrderal Way.
g
Owner or agent: UNDate:
-
�;n�l
.A�6
Federal Way
THIS CARD IS TO REMAL OZ-SITE
Construction Inspection Record
L\SPECTIOti REQ ESTti: (253) S35-3044
Scheduled inspections may be failed if this card is not on -site. DONOT LOSE THIS C =LRD- Inspections are listed as close to sequential order as possible
(read left to right, top to bottom). Please schedule inspections as appropriate- LVork must nor be covered until it is approved. Check ;sAth your innertor if
you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
ELECTRICAL
❑
By
LTFTR Ground (4295)
Approved
Date
❑
By
Ditch cover (4030)
Approved
Date
❑
By
Slab/Concrete Floor (4255)
Approved to place concrete
Date
❑
Pool Bonding (419a)
❑
Temporary Power (4275)
Q
Senice (4235)
Approved
Approved
Approved
By
Date
By
Date
By
Date
❑
Feeders/Sub-panels (404)
Rough Electrical (4225)
❑
Ceiling Cover (4020)
ov
Approved
LBy
Approved
Approved
ByDate
Date
By
Date
1D
Final - Electrical (4055)
Approved
B�
Date
MECHANICAL
0
liechankal Rough -in (4165)
❑
Gas Piping (4125)
Q
Final - Alechanicai (4065)
Apprmed
approved to release test
Approved
By
Date
By
Date
$}
Date
PLUMBING
❑
Plumbing Groundwork (4190)
0
Roughs Plumbing (4230)
Q
Final - Plumbing (4075)
Approved to emer
Approved
Approved
By
Date
13V
Date
By
Date