Loading...
22-103482'k- � - City of Federal Way Community Development Dept. 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Building - Multi Family Permit #:22-103482-00-MF Inspection Request Line: (253) 835-3050 Project Name: FEDERAL WAY MIXED USE @ 348TH - BUILDING A Project Address: 1ST AVE S Parcel Number: 912940 0010 3 47,(� Project Description: BLUEBEAM - Construction of FOUNDATION ONLY for 137-unit 4-story apartment building with 3 stories of structured parking below. Includes under slab plumbing work. Owner Applicant Contractor Lender X MARKS THE SPOT LLC BRETT JACOBSENX MARKS THE F N W INC KATHLEEN BROWN 'I I WEST VALLEY HWY SUITE 21 SPOT LLC 711 WEST VALLEY HWY SUITE 20 SANDERSUMPQUA BANK AUBURN WA 98001 711 WEST VALLEY HWY SUITE 2( AUBURN WA 98001 1111 3RD AVE SUITE 2900 AUBURN WA 98001 SEATTLE WA 98101 Census Category: 105 - New 5- or More Family Building Includes: #1 #2 #3 #4 Occupancy Class: Construction Type: Occupancy Load: Floor Area (sq. ft.) Additional Permit Information Mechanical to be Included? ..................................... No Plumbing Work Valuation?..................................... 125000 Mechanical Work Valuation? .............. .................... 0 Number of Stories................................................... 7 Is this an Online or O.T.C. application? .................. No Permit for Building Shell Only?.............................. No Plumbing to be Included? ........................................ Yes Comprehensive Plan Designation........................... Community Business Zoning Designation ................................................. BC Total Valuation: 3,800,000.00 f'lunlbiug Fixtures Bathtubs 155 Dishwashers 137 Drains 72 Drinking Fountains 1 Laundry Washer Outlets 137 Lavatories 165 Sinks 139 Sumps 2 Urinals 1 Water Closets 166 Hose Bibbs 23 PERMIT EXPIRES Monday, 30 January, 2023 Permit Issued on Wednesday, August 3, 2022 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: Date: r i THIS CARD IS TO REMAIN ON -SITE CITY OF Construction Inspection Record Federal Way INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 22 103482 00 Address: 34815 1ST AVE S Bldg A Project: X MARKS THE SPOT LLC FEDERAL WAY WA. 98003 I Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. ® Footings/Setback (4110) 0 Foundation Wall (4115) 0 Drainage/Downspout (4040) Approved to place concrete Approved to place concrete - Approved to backfill By DateL� By Date By Date ® Re -steel (4215) ® Plumbing Groundwork (4190) ® Slab/Concrete Floor (4255) Approved to place concrete or grout Approved to cover Approved to place concrete By Date By I\j Date 9 ZZ By Date ] Underfloor Framing (4285) Floor Sheathing (4105) ® Shear Walls (4245) Approved to sheath floor Approved to install flooring Approved to install siding By Date By Date By Date 1D Roof Sheathing (4220) 1l Rough Plumbing (4230) tz Fire/Draft Stops (4095) Approved to install roofing Approved Approved By Date By Date By Date Prior to scheduling a Framing inspection; 1 "� Framing (4120) 14 Insulation (4150) Electrical, Plumbing & Mechanical Rough -in Approved to insulate Approved to install wallboard and Fire/Draft Stop inspections must be signed - off and approved. IBC 109.3.4 By Date By Date 1B Gypsum Wallboard Nailing (4130) Suspended Ceiling Grid (4265) t7 Final - S K F & R (4060) Approved to instal I mud & tape Approved to drop tile Approved By Date By Date By Date 7e Final - Planning Final - Public Works (4080) Final - Plumbing (4075) Approved Approved Approved By Date By Date By Date El Final - Building (4050) Approved By Date Rough Electrical El Final Electrical ❑ Right of Way Approved Approved Approved By Date By Date By Date CITY OF `Building'oivision 33325'EghtA Avenue South Fed "` ra l Way Federal Way, 98-b325 Phone 253-835-2607 Faxx 253-835835-2609 CORRECTION NOTICE ADDRESS: � a 1 T - 5 --1 -. �- PERMIT#: IF YOU HAVE QUESTIONS CALL�t_a (253) 835- % WHEN CORRECTIONS HAVE BEEN MADE, CALL (253) 835-3050 FOR RE -INSPECTION. SEE BACK OF CARD FOR DETAILS. NOTE: ELECTRICAL CORRECTIONS ARE REQUIRED TO BE MADE WITHIN 15 DAYS. DATE INSPECTOR DO NOT REMOVE THIS NOTICE Page----. of