Loading...
23-103099City of Federal Way Community Development Dept 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 FILE Project Name: HILDEN Project Address: 33808 33RD PL SW Project Description: Replacing 50 gallon gas hot water heater Plumbing Permit #:23-103099-00-PL Inspection Request Line: (253) 835-3050 Parcel Number: 954280 0520 Owner Applicant Contractor GUY & KRISTINA HILDEN SENECCA ROBBENThe Plumbing & Drain THE PLUMBING & DRAIN CO INC 33808 33RD PL SW Co (PLUMBING) FEDERAL WAY WA 98023 926 96TH ST E PLUMBDC790MG (12/9/23) TACOMA WA 98445 926 96TH ST E TACOMA WA 98445 Plumbing Fixtures Water Heaters 1 PERMIT EXPIRES Monday, 11 December, 2023 Permit Issued on Wednesday, June 14, 2023 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of s n tan th-t Orty of Federal Way. IN Owner or agent: Date: F:INALED _1§�' CITY or Federal Way THIS CARD IS TO REILAI\ O\-SITE Construction Inspection Record INSPECTION REQiT-STS: (2-53) 33:5-30_50 Scheduled inspections may be failed if this card is not on -site. DO -NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right. top to bottom). Please schedule inspections as appropriate. Fork nnrst not be covered until it is approved. Check with your inspector if you are unsure re about any. of the inspections or the inspection sequence. On -going inspections are logged on the back of this card_ ELECTRICAL LIFER Ground (4295) ❑ Ditch cover (4030) ❑ Slab/Concrete Floor (4255) Approved Approved Approved to place concrete By Date By Date By Date ❑ Pool Bonding (4195) ❑ Temporary Power (4275) ❑ Service (4235) Approved Approved Approved BV Date By Date By Date ❑ Feeders/Sub-panels (4045) ❑ Rough Electrical (4225) Q Ceiling Cover (4020) Approved Approved Approved By Date Bj• Date By Date t" Final - Electrical (4055) Approved By Date MECHANICAL l Mechanical Rough -in (4165) Gas Piping (4125) E Final - \Iechanica.l (4065) Approved Approved to release test Approved By Date Bv Date By Date PLUMBING E) Plumbing Groundwork (4190) 0 Rough Plumbing (4230) Q Final - Plumbing (4075) Approved to cover Approved Approved By Date ByDate By , Date 4