23-104974City of Federal Way
Community Development Dept.
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: SODERQUIST
Project Address: 2017 S 282ND ST
Project Description: Gas line upgrade for dryers from 3/4" to 199
.
Mechanical
Permit #:23-104974-00-ME
Inspection Request Line: (253) 835-3050
Parcel Number: 422231 0200
Owner
Applicant
Contractor
THOMAS SODERQUIST
THOMAS SODERQUIST
OWNER IS CONTRACTOR
2017 S 282ND ST AVE
2017 S 282ND ST AVE
FEDERAL WAY WA 98003
FEDERAL WAY WA 98003
Additional Permit Information
Mechanical Work Valuation?.. 1000 Is this an Online or O.T.C. application? .................. Yes
Mechanical Fixtures
Gas Piping 1 Gas Pipe Outlets
PERMIT EXPIRES Tuesday, 2 April, 2024
Permit Issued on Thursday, October 5, 2023
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washingt nd the City of Federal Way.
Owner or agent:. Date:
FINALED
-.N.,I
cnr Of
Federal Way
THIS CARD IS TO REAL-U-N O\-SITE
Construction Inspection Record
INSPECTION REQUESTS: (253) 835-3050
Scheduled inspections m u, be failed if dhis crud is not on -site. DQ NOT LOSE THIS CARD. hicpectiom are Listed as close to sequent_al order as possible
(read le8 to right. top to bottom; . Please schedule il'spectiovs as appropriate. Work nmt not be covered llntLl IL i_ aptb'o1 ell. Check with your inspecror ii
you are unsure about an': of the inspections or the inspection sequence. On -going inspections are logged on the back oI this card.
ELECTRICAL
0
BV
LTFER Ground (4295)
Approved
Date
❑
By
Ditch cover (4030)
Approved
Date
❑
By
SIWConcrete Floor (4255)
Approved to place concrete
Date
By
Pool Bouding (4195)
Approved
Date
❑
By
Temporary Power (4275)
Approved
Date
❑
By
Serv-ice (4235)
Approved
Date
❑
By
❑
By
Feeders/Sub-panels (4045)
Approved
Date
Final - Electrical (4055)
Approved
Date
0
By
Rough Electrical (4225)
approved
Date
❑
By
Ceiling Cover (4020)
Approved
Date
MECHANICAL
❑ Mechanical Rough -in (4165) El Gas Piping (4125) ❑ Final -'Mechanical (4065)
Approved Approved to release test Approved
B} Date BV U Date 1 � � B% \ Date
PLUMBING
❑ Plumbing Groundwork (4190) ❑ Rough Plumbing (4230) ❑ Final - Plumbing (4075)
Approved to cover approved Approved
By Date By Date By Date